HomeMy WebLinkAboutS-100 - FOUNDATION PLAN1 1 2 2 2.9 4 4 5 5 6 6 8 8 AA B C D E F G B.8B.8 A.2 A.1 1.2 155'-3" 3'-4 5/8" 26'-0" 26'-3" 28'-6" 26'-4" 26'-4" 21'-10" 3'-4 1/8"160'-0"3'-4 5/8" 3'-7" 21'-7" 21'-4" 5'-0" 26'-4" 26'-4" 26'-4" 29'-6"ELEV. 4" CONCRETE SLAB ON GRADE w/ 6x6-W1.4xW1.4 WWF OVER 6" CRUSHED STONE FIN. FLR. EL. 100'-0" EXISTING BUILDING (V.I.F.) 50'-10" 3'-4 5/8" 1'-3" 24'-9" 24'-10" V.I.F. 3'-11"46'-6" 2'-7 5/16"3'-4 5/8"20'-4" 24'-7" 1'-7" 3'-4 5/8" 7 7 F.1 B.1 3 B.9 9 HSS8x4x1/4 1.1 INFILL EXISTING POOL/SPA WITH SOIL AND INSTALL 4" CONC SLAB WITH 6x6-W1.4xW1.4 WWF OVER 6" CRUSHED STONE. TOP OF SLAB ELEVATION TO MATCH EXISTING. DOWEL INTO EXISTING CONCRETE PER TYPICAL DETAIL ON S-300 4'-9"9'-9 1/8"1'-9 1/4"F156 98'-0" C7 F30.20 98'-0"F30.20 98'-0"C3 C7 C4 C8 C4 C8 C8 C8 C8 C8 C8 C1 C1 C1 C1 C2 C4 C4 C4 C1 C1 C8C8C8 C8 C1 C1 C8 C1 C4 C1 C1C1 C8 F70 98'-0" F100180 98'-0" (*) F156 98'-0" F130 98'-0" F120 98'-0" F146 98'-0" F100180 98'-0" (*) F120 98'-0" F156 98'-0" F120 98'-0" F120 98'-0" F146 98'-0" F120 98'-0" F146 98'-0" F96 98'-0" F130 98'-0"F120 98'-0"F120 98'-0"F120 98'-0"F120 98'-0" F120 98'-0" F96 98'-0" F110 98'-0" F156 98'-0"F146 98'-0"F146 98'-0" F110 98'-0" F110 98'-0" F110 98'-0" F96 98'-0" F50 98'-0" C7F30.20 98'-0" F30.20 98'-0" F30.20 98'-0" 6'-4" 6'-4" F30.20 98'-0"F30.20 98'-0"38" FOUNDATION MAT w/ #9 @ 12" o/c T&B 95.00' F70 98'-0" F100180 98'-0" (*) F120 98'-0" ABOVE 3" EXP. JT. C5 3 S-301 17'-0"30'-0" 10'-8"10'-8"4'-9" C7 4'-1 1/4" B.2 B.3 8.6 7.2 PU3 PU3 C9 C8 S.F. 3'-1"6'-6" 6'-6"LIMITS OF UNDERPINNING SEE NOTES F30.20 98'-0"3'-6 3/8" 1'-2" 15'-7 5/8"12'-2" 10'-8 1/8" 1'-8 1/4" 7'-11 3/4" 1'-0 1/8" 8" STEP FOOTING, MATCH BOTTOM OF NEW FOOTING WITH EXISTING * 1'-6" E.2 E.9 3'-9 1/4" 19'-10 5/8" 2'-8 1/8"2.6 13'-7 5/8" 11'-2 3/8" PU2 PU2 SEE "4" ON SHEET S-301 S.F.CONTROL JOINTS (TYPICAL) S.F. 2 S-301 1 S-301 1 S-301 1 S-301 2 S-301 1 S-301 1 S-301 1 S-301 1 S-301 1 S-301 NOTES 1) SEE PLAN FOR FINISHED FLOOR ELEVATION RELATIVE TO DATUM ELEVATION 100.00' (ACTUAL ELEVATION 862.39'). SEE ARCHITECTURAL DOCUMENTS FOR ALL SLOPES AND VARIANCES. 2) TOP OF SLAB ELEVATION 100'-0", RELATIVE TO DATUM ELEVATION 100'-0", UNLESS NOTED OTHERWISE. 3) TOP OF FOOTING ELEVATION 98'-0", RELATIVE TO DATUM ELEVATION 100'-0", UNLESS NOTED OTHERWISE. 4) (+/-___) INDICATES TOP OF FOOTING ELEVATION RELATIVE TO TOP OF SLAB ELEVATION, UNLESS NOTED OTHERWISE. 5) TOP OF FOOTING ELEVATION (-2'-0"), RELATIVE TO TOP OF SLAB ELEVATION, UNLESS NOTED OTHERWISE. 6) SEE S-201 FOR COLUMN, PIER, FOOTING AND GRADE BEAM SCHEDULES AND PILE CAP INFORMATION. 7) FOUNDATIONS, COLUMNS AND PIERS ARE CENTERED ON THE GRID LINE, UNLESS NOTED OTHERWISE. 8) SEE ARCHITECTURAL DRAWINGS FOR DIMENSIONS NOT INDICATED. 9) ALL STRUCTURAL STEEL, INCLUDING BASE PLATES, BASE PLATE EXTENSIONS, GUSSET PLATES AND TOPS OF ANCHOR RODS, EXPOSED TO SOIL, ARE TO BE COATED WITH APPROVED COAL TAR EPOXY, 16 MILS MINIMUM THICKNESS, AND ENCASED IN CONCRETE WITH MINIMUM 3" COVER. 10) (*) INDICATES BOTTOM OF FOOTING ELEVATION TO MATCH BOTTOM OF EXISTING FOOTING ELEVATION. 11) INDICATES APPROXIMATE EXTENT OF UNDERPINNING. EXACT EXTENTS TO BE DETERMINED BY UNDERPINNING ENGINEER. 12) ALL WOOD/LIGHTGAGE STEEL COLUMNS/POSTS/JAMBS ARE NOTED THUS ' ', UNLESS NOTED OTHERWISE AND ARE CALLED OUT AT THE FRAMING LEVEL THEY SUPPORT. SEE SPECIFIC FRAMING PLANS. SS ROC PROFE.AI GNNIOLAE RER SASTATE OF 860325 NNID No. A ENI R M I ED EG N TSE Y MOC DE c SHEET TITLE SHEET NUMBER RATIO 101 South Pennsylvania Street Indianapolis, Indiana 46204 317-633-4040 Architect McComas/O'Donnell & Naccarato Structural Engineer 1717 E. 116th Street, Suite 200 Carmel, Indiana 46032 317-580-0402 KEY PLAN B A HOTEL PROJECT NO. SHEET ISSUE SEAL | DATE COPYRIGHT NOTICE: THIS ARCHITECTURAL AND ENGINEERING DRAWING IS GIVEN IN CONFIDENCE AND SHALL BE USED ONLY PURSUANT TO THE AGREEMENT WITH RATIO. NO OTHER USE, DISSEMINATION OR DUPLICATION MAY BE MADE WITHOUT PRIOR WRITTEN CONSENT OF RATIO. ALL COMMON LAW RIGHTS OF COPYRIGHT AND OTHERWISE ARE HEREBY SPECIFICALLY RESERVED. TRAINING CENTER THESE ARE PROGRESS DRAWINGS, THEREFORE THEY ARE ISSUED PRIOR TO COMPLETION OF THE STRUCTURAL DESIGN AND OTHER DESIGN DISCIPLINES INCLUDING BUT NOT LIMITED TO ARCHITECTURAL OR MECHANICAL DESIGNS; AND AS SUCH, ARE INCOMPLETE BY NATURE FOR THE COMPREHENSIVE SCOPE OF THE PROJECT. ALLOWANCES FOR STRUCTURAL ELEMENTS REQUIRED DUE TO THE COMPLETION AND CROSS-COORDINATION OF ALL OTHER DISCIPLINES SHOULD BE MADE. 1717 EAST 116TH STREET | SUITE 200 | CARMEL, IN. 46032 (317) 580-0402 | WWW.O-N.com | Project No. 7167.0014.00 SHELL & CORE PERMIT SET 10/15/2021 Mechanical / Plumbing Design/Builder Civil Engineer DEEM LLC 6831 E 32nd Street Indianapolis, Indiana 46226 Kimley Horn 250 East 96th Street, Suite 580 Indianapolis, Indiana 46240 Electrical Design/Builder Barth Electric Co., Inc. 1934 N. Illinois Street Indianapolis, Indiana 46202 Kite Realty Group 30 S. Meridian Street, #1100 Indianapolis, Indiana 46204 Owner Republic Airways Holdings 8909 Purdue Road, Suite 300 Indianapolis, Indiana 46268 10/15/2021 2:14:27 PMS-100 FOUNDATION PLAN 0-N 7167.0014.00 Republic Airways Hotel 12197 N Meridian St. Carmel, IN 46032 SCALE: 1/8" = 1'-0" FOUNDATION PLAN FOUNDATION DESIGN BASED ON GEOTECHNICAL ENGINEERING RECOMMENDATION OF RAMMED AGGREGATE PIERS (RAP). SIZE, DEPTH, AND SPACING OF RAP'S ARE TO BE DESIGNED BY SPECIALTY CONTRACTORS. ASSUMPTIONS AT A MINIMUM INCLUED: 1) A RAMMED AGGREGATE PIER WILL BE LOCATED TO ACHIEVE UNIFORM SOIL BEARING CAPACITY OF 5000 PSF UNDER FOUNDATIONS. 1 DESIGN DEVELOPMENT 10/01/21 10/01/21 10/19/22