HomeMy WebLinkAboutS-101A-FOUNDATION PLAN -AREA A1 2 3 5 6 7 8 A B C D 7.7 D.3 MATCHLINE S-101B 14'-11 11/16" 3'-11 9/16" 26'-7 3/4" 45'-8" 26'-6 11/16" 4'-0 1/2" 5'-11 9/16" 9'-11 7/8" 6'-5 3/8"196'-6" ELEV. 1 S-301 F70A (+98.00') F110 (+98.00')F110 (+98.00') F110 (+98.00') F110 (+98.00') F110 (+98.00') F110 (+98.00') F110 (+98.00') F110 (+98.00')F90A (+98.00') F90A (+98.00') F70A (+98.00') F70A (+98.00') 2 S-301TYP.4 S-301 1 S-301 4 S-301 1 S-301 F50.32 (+95.50') F50.32 (+98.00')S.F.5 S-301 6 S-301 1 S-301 1 S-301 7 S-301 F40.26 (+98.00')F50.32 (+98.00')S.F. C3 F50A (+98.00') ELEV.HSS10x4x1/412" PRECAST WALL (TYP.) 16" CONCRETE SLAB ON GRADE w/ #8 @ 12" E.W.T. & B. OVER 6" CRUSHED STONE PER GEOTECH. REPORT FIN. FLR. EL. +100'-0" 16" CONCRETE SLAB ON GRADE w/ #8 @ 12" E.W.T. & B. OVER 6" CRUSHED STONE PER GEOTECH. REPORT FIN. FLR. EL. +100'-0" 18" CONCRETE SLAB ON GRADE w/ #8 @ 12" E.W.T. & B. OVER 6" CRUSHED STONE PER GEOTECH. REPORT FIN. FLR. EL. +100'-0" 16" CONCRETE SLAB ON GRADE w/ #8 @ 12" E.W.T. & B. OVER 6" CRUSHED STONE PER GEOTECH. REPORT FIN. FLR. EL. +100'-0" 12" CONCRETE SLAB ON GRADE w/ #5 @ 12" E.W.T. & B. OVER 6" CRUSHED STONE PER GEOTECH. REPORT FIN. FLR. EL. +100'-0" 12" CONCRETE SLAB ON GRADE w/ #5 @ 12" E.W.T. & B. OVER 6" CRUSHED STONE PER GEOTECH. REPORT FIN. FLR. EL. +100'-0" 12" CONCRETE SLAB ON GRADE w/ #5 @ 12" E.W.T. & B. OVER 6" CRUSHED STONE PER GEOTECH. REPORT FIN. FLR. EL. +100'-0" NOTE: CONTROL JOINTS BETWEEN GRIDS A AND D 21'-7 3/4"12'-4 1/4" 21'-7 3/4" 12'-4 1/4" PRECAST STRUCTURE (BY OTHERS) 2'-9" 2'-9"34'-0"34'-0" 3'-7 5/8"10" PRECAST WALL ALONG GRID 'D'5'-10"F90A (+95.50') F90A (+95.00') 34'-0" ISOLATION JOINT AROUND PRECAST COLUMN - TYP ( +95.00' ) VERIFY w/ ELEV. MFR. 12" CONC. PIT WALLS (TYP. @ ELEV.) 8" CMU SHAFT WALLS (TYP. @ ELEV.) 12" CONC. MAT C.7 C.6 A.3 A.3 A.4 A.4 1.8 2.2 2.3 2.4 3.8 4.13.9 5.4 5.5 5.6 6.4 6.5 6.6 7.4 7.5 7.6 7.8 C.8 8'-0" 1'-9" 6'-7 11/16" 2'-10" 2'-9 15/16" 4'-2 7/8" 12'-7 1/2" 17'-0 3/16" 2'-4 13/16" 3'-3 1/8" 16'-9 7/8" 4'-0" 13'-0 3/16" 2'-10" 2'-9 15/16" 16'-9 7/8" 4'-0" 13'-0 3/16" 2'-10" 2'-9 15/16" 16'-9 7/8" 16'-10 5/8" 2'-10" 2'-9 15/16" 6'-3 5/16" 1'-2 3/4" 9'-0 3/8" C2 C1 C1 C1 C1 C2 C2 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C2 C2 C1 C2 C1 C1C1 C1 C2 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C2 C1 C1 C1 C1 C1 5.2 6.2 2.6 C1 NOTES 1) SEE PLAN FOR FINISHED FLOOR ELEVATION RELATIVE TO DATUM ELEVATION 100.00' (ACTUAL ELEVATION 862.00'). SEE ARCHITECTURAL DOCUMENTS FOR ALL SLOPES AND VARIANCES FROM 0.00'. 2) +/- ___' INDICATES TOP OF SLAB ELEVATION RELATIVE TO DATUM ELEVATION 0.00'. 3) ( ) INDICATES TOP OF FOOTING ELEVATION RELATIVE TO DATUM ELEVATION 0.00'. 4) TOP OF PIER ELEVATION [-0.67'] RELATIVE TO DATUM ELEVATION 0.00', UNLESS NOTED THUS [ ]. 5) SEE S-201 FOR COLUMN, PIER, FOOTING AND GRADE BEAM SCHEDULES AND PILE CAP INFORMATION. 6) FOUNDATIONS, COLUMNS AND PIERS ARE CENTERED ON THE GRID LINE, UNLESS NOTED OTHERWISE. 7) SEE ARCHITECTURAL DRAWINGS FOR DIMENSIONS NOT INDICATED. 8) ALL STRUCTURAL STEEL, INCLUDING BASE PLATES, BASE PLATE EXTENSIONS, GUSSET PLATES AND TOPS OF ANCHOR RODS, EXPOSED TO SOIL, ARE TO BE COATED WITH APPROVED COAL TAR EPOXY, 16 MILS MINIMUM THICKNESS, AND ENCASED IN CONCRETE WITH MINIMUM 3" COVER. 9) FOUNDATION DESIGN BASED ON GRAVITY REACTIONS (DATED 9/15/2021) AND LATERAL REACTIONS (DATED 9/27/2021) PROVIDED BY PRECAST MANUFACTURER (KERKSTRA). 10) ATTACHMENT OF EQUIPMENT, INCLUDING SIMULATORS, TO THE FLOOR SLAB, BY OTHERS. SS ROC PROFE.AI GNNIOLAE RER SASTATE OF 860325 NNID No. A ENI R M IED EG N TSE Y MOC DE c SHEET TITLE SHEET NUMBER RATIO 101 South Pennsylvania Street Indianapolis, Indiana 46204 317-633-4040 Architect McComas/O'Donnell & Naccarato Structural Engineer Civil Engineer Mechanical / Plumbing Design/Builder 1717 E. 116th Street, Suite 200 Carmel, Indiana 46032 317-580-0402 Kimley Horn 250 East 96th Street, Suite 580 Indianapolis, Indiana 46240 DEEM LLC 6831 E 32nd Street Indianapolis, Indiana 46226 KEY PLAN B A HOTEL PROJECT NO. SHEET ISSUE SEAL | DATE COPYRIGHT NOTICE: THIS ARCHITECTURAL AND ENGINEERING DRAWING IS GIVEN IN CONFIDENCE AND SHALL BE USED ONLY PURSUANT TO THE AGREEMENT WITH RATIO. NO OTHER USE, DISSEMINATION OR DUPLICATION MAY BE MADE WITHOUT PRIOR WRITTEN CONSENT OF RATIO. ALL COMMON LAW RIGHTS OF COPYRIGHT AND OTHERWISE ARE HEREBY SPECIFICALLY RESERVED. TRAINING CENTER **-ALL DRAWINGS MARKED AS PART OF AN "EARLY" SUBMISSION PACKAGE ARE ISSUED PRIOR TO COMPLETION OF OTHER DESIGN DISCIPLINES INCLUDING BUT NOT LIMITED TO ARCHITECTURAL OR MECHANICAL DESIGNS; AND AS SUCH, ARE INCOMPLETE BY NATURE FOR THE COMPREHENSIVE SCOPE OF THE PROJECT. ALLOWANCES FOR STRUCTURAL ELEMENTS REQUIRED DUE TO THE COMPLETION AND CROSS-COORDINATION OF ALL OTHER DISCIPLINES SHOULD BE MADE. 1717 EAST 116TH STREET | SUITE 200 | CARMEL, IN. 46032 (317) 580-0402 | WWW.O-N.com | Project No. 7167.0013.00 SHELL & CORE PERMIT SET 10/15/21 Electrical Design/Builder Barth Electric Co., Inc. 1934 N. Illinois Street Indianapolis, Indiana 46202 10/15/2021 2:23:01 PMS-101A FOUNDATION PLAN - AREA A 21040.000 Republic Airways Training Center 12195 N. Meridian St. Carmel, Indiana 46032 SCALE: 1/8" = 1'-0" FOUNDATION PLAN - AREA AFOUNDATION DESIGN BASED ON GEOTECHNICAL ENGINEERING RECOMMENDATION OF RAMMED AGGREGATE PIERS (RAP). SIZE, DEPTH, AND SPACING OF RAP'S ARE TO BE DESIGNED BY SPECIALTY CONTRACTORS. ASSUMPTIONS AT A MINIMUM INCLUDE: 1) A RAMMED AGGREGATE PIER WILL BE LOCATED TO ACHIEVE UNIFORM SOIL BEARING CAPACITY OF 5000 PSF UNDER FOUNDATIONS. 2) RAMMED AGGREGATE PIERS TO SUPPORT SLAB ON GRADE BETWEEN GRIDS A AND D. 1 DESIGN DEVELOPMENT 10/01/21 2 CONSTRUCTION DOCUMENTS 10/15/21 10/15/21 10/19/22