HomeMy WebLinkAboutS-400-TYPICAL FRAMING DETAILS#3
#4
#5
#6
#7
#8
#9
#10
#11 BAR SIZENOTES:
1) THE SCHEDULE INCLUDES SPLICE AND DEVELOPMENT LENGTHS WHICH SATISFY THE PROJECT
REQUIREMENTS AND THE FOLLOWING CRITERIA:
fy = 60,000 psi (75,000 psi FOR #14 AND #18 BARS).
CONCRETE WEIGHT = 150 lb/cu.ft.
TENSION DEVELOPMENT AND LAP SPLICE LENGTHS ARE DIVIDED INTO TWO CATEGORIES WHICH
SHALL BE APPLIED AS FOLLOWS:
CATEGORY I CLEAR SPACING OF BARS BEING DEVELOPED OR SPLICED NOT LESS THAN db,
CLEAR COVER NOT LESS THAT db, AND BEAM STIRRUPS OR COLUMN TIES
THROUGHOUT Ld NOT LESS THAN THE CODE MINIMUM
OR
CLEAR SPACING OF BARS BEING DEVELOPED OR SPLICED NOT LESS THAN 2db &
CLEAR COVER NOT LESS THAN db.
CATEGORY II BARS NOT COVERED BY CATEGORY I
2) USE COMPRESSION LAP SPLICE LENGTH (LCS) AT ALL COLUMN SPLICE LOCATIONS NOT SPECIFICALLY
DETAILED AND UNLESS INDICATED OTHERWISE ON PLANS OR DETAILS. USE TENSION LAP SPLICE LENGTH
(LTS) FOR ALL OTHER SPLICES (UNLESS OTHERWISE SHOWN ON DRAWINGS).
3) THE STANDARD LAP SPLICE (0.0005 X fy X D) IS USED FOR COMPRESSION SPLICES AND THE CLASS "B"
SPLICE IS USED FOR TENSION SPLICES. THE CONTRACTOR MAY SUBMIT LESSER SPLICE LENGTHS
FOR REVIEW AND APPROVAL AT THE SAME TIME PROVIDING THE FOLLOWING INFORMATION.
A. DETAILS PREPARED AND SUBMITTED BY THE CONTRACTOR INDICATING
LOCATION AND PROPOSED LAYOUT OF REBARS AND LENGTHS OF SPLICES.
B. WHERE THE SIZE AND NUMBER OF TIES OR SPIRALS PERMIT THE REDUCTION
OF LAP LENGTH, THOSE BARS SHALL BE INDICATED ON THE DETAILS.
C. WHERE COMPUTED STRESS VALUES PERMIT THE REDUCTION OF LAP
LENGTH, COMPUTATIONS SHALL BE SUBMITTED FOR REVIEW.
D. THE APPLICABLE SECTION OF THE ACI CODE PERMITTING THE LESSER
SPLICE LENGTH SHALL BE INDICATED ON THE SUBMITTED MATERIAL.
4) TOP BARS ARE HORIZONTAL BARS PLACED SO THAT MORE THAN 12 INCHES OF CONCRETE IS CAST
IN THE MEMBER BELOW THE BAR.
5) WHERE BARS OF DIFFERENT SIZE ARE TO BE SPLICED, THE SPLICE LENGTH FOR ALL BARS SHALL
BE THAT REQUIRED FOR THE LARGEST.
6) WHEN LIGHTWEIGHT CONCRETE IS USED, THE VALUES LISTED IN THE TABLE FOR TENSION
DEVELOPMENT + LAP SPLICE LENGTHS SHALL BE INCREASED BY 30%.
7) WHEN REINFORCING BARS ARE EPOXY-COATED, ALL VALUES IN THE TABLE SHALL BE
INCREASED BY 50%.
8) COMBINATIONS OF EFFECTS DUE TO CONCRETE WEIGHT AND EPOXY BARS ARE CUMULATIVE. LD SHALL BE
MULTIPLIED BY EACH FACTOR TO FIND THE CORRECT VALUE.
9) ACI DOES NOT PERMIT LAP SPLICES OF #14 OR #18 BARS. BARS OF THIS SIZE SHALL BE COUPLED BY
ACCEPTABLE MECHANICAL MEANS, WHICH ARE RATED TO DEVELOP 125 PERCENT OF Fy OF THE BAR.
COMPRESSION DEVELOPMENT LENGTHSTANDARD LAP SPLICE LENGTH12
15
19
23
27
30
34
39
43
8
11
14
17
19
22
25
28
31
TABLE OF DEVELOPMENT AND LAP SPLICE LENGTH (IN INCHES)
#18
#14 38
50
NOTATIONUSED ONDWG.LCD LCS LD LTS
101 78152 117
22 17 29 22
36 28
43 33
63 48
72 55
81 62
91 70
101 78CATEGORYSEE NOTE 133 43
54
64
94
107
121
136
151
25 43 33 56
41 70
50 84
72 122
82 139
93 157
105 177
116 196
29 37
47
56
81
93
105
118
131
19 14
31 24
37 28
54 42
62 48 70 54
78 60
87 67
28
46
55
81
93 104
117
130
25 19 37
21 36
28 48
36 60
43 72
62 105
72 121 80 136
90 153
100 170
24
36
40
48
70
81 90
102
113
25
17
37 33
54 48
62
55
70
78
87
37
55
81
93104
117
130
19 28
31 2846
25 19
41 32
50 38
72 56
83 64
13
21
25
37
42
22 17
43 33
63 48
72 55
78 60
32
65
94
108
117
36 2854
25
41
50
72
83
90
33
54
64
94
107
121
136
151
43 22
36
43
63
72
81
91
101
29
I II I II I II I II I II I II I II I II I II I II I II I IICATEGORYSEE NOTE 1CATEGORYSEE NOTE 1CATEGORYSEE NOTE 1TOP BARSOTHER BARSTOP BARSOTHER BARSTENSION (f'c = 3,000 psi)CATEGORYSEE NOTE 1CATEGORYSEE NOTE 1CATEGORYSEE NOTE 1CATEGORYSEE NOTE 1TOP BARSOTHER BARSTOP BARSOTHER BARSTENSION (f'c = 4,000 psi)CATEGORYSEE NOTE 1CATEGORYSEE NOTE 1CATEGORYSEE NOTE 1CATEGORYSEE NOTE 1TOP BARSOTHER BARSTOP BARSOTHER BARSTENSION (f'c = 5,000 psi)
62 47 92 71 120 80 62 92
70 54 105 81 137 91 70 105
LD LTS LD LTS
22 17 32 25 42 28 3222
DEVELOPMENT LENGTH LAP SPLICE LENGTHDEVELOPMENT LENGTH LAP SPLICE LENGTHDEVELOPMENT LENGTH LAP SPLICE LENGTH
(IN INCHES)
TABLE OF HOOKED BAR DEVELOPMENT LENGTHS
BAR #3,000 psi
f'c
4,000 psi 5,000 psi
3 6 6 6
4 8 7 6
5 10 9 8
6 12 10 9
7 14 12 11
8 16 14 12
9 18 15 14
10 20 17 16
11 22 19 17
NOTES:
1) CONCRETE SIDE COVER ON BARS ¢ 2.5".
2) FOR EPOXY-COATED BARS, MULTIPLY TABULATED VALUES BY 1.3.
4d #3 - #812 dbdbb
5d #9, #10, #11
6d #14
b
b
2'-2 1 /2"dhd b 4d ¢ 2 1/2"b
START OF
DEVELOPMENT
l dh
l
14 33 29 26
TYPICAL VERTICAL CONSTRUCTION
JOINT IN CONCRETE WALL
TYPICAL VERTICAL CONTROL
JOINT IN CONCRETE WALL
3"
TYP. EQ.EQ. EQ. 1 1/2"
KEY
3"
TYP.
CUT ALTERNATING HORIZONTAL
BARS AT JOINTS ON EACH FACE
WHERE BARS ARE #5 OR SMALLER
PROVIDE KEY WHERE
CONST. JOINT OCCURS
AT CONTROL JOINT
INTERIOR FACE
EXTERIOR FACE
VERT.
REINF. 3/4"x3/4" V-JOINT
(SEE ARCH. DWGS.
FOR SEALANT
REQUIREMENTS) (TYP.)
INTERIOR FACEHORIZ. REINF.
VERT.
REINF.
(PROVIDE @ 30'-0" o/c MAXIMUM FOR EXPOSED WALLS)
HORIZ. REINF.
(CONT. THROUGH
JOINTS)
.
4"
4"
4"
3 1 /4"
.EQ. EQ. EQ. 4"
4"
4"
EXTERIOR FACE
3/4"x3/4" V-JOINT
(SEE ARCH. DWGS.
FOR SEALANT
REQUIREMENTS) (TYP.)
TYPICAL ELEVATOR GUIDE RAIL SUPPORT
BETWEEN SEPARATOR BEAMS & FOR COUNTERWEIGHTS
NOTES:
1) THIS DETAIL TO BE USED AS REQUIRED. G.C. TO COORD. w/ ELEVATOR MFR.
THE MAX. ALLOWABLE VERT. SPANS OF SPECIFIC RAIL TYPE.
2) G.C. TO COORDINATE w/ ELEV. MFR. QUANTITY AND LOCATION OF HSS.
BEAM (TYP.)
ž3x3x5/16x0'-3" (TYP.)
HSS 12x4x1/4 RAIL SUPPORT.
RAIL TO BE ATTACHED TO HSS
PER ELEV. MFR.G.C. TO COORDINATE SPACING6"12"
3/16 TYP.3/16 TYP.
TYPICAL ELEVATOR SEPARATOR BEAM
CONNECTION TO CONCRETE WALL
™ 1/2x8x1'-4" w/
ž4x4x3/8x0'-6"
BOTH SIDES
CONCRETE WALL
(4) 3/4"Øx5" HEADED
STUDS @ 4" o/c E.W.
SEPARATOR BEAM
TYPICAL DETAIL FOR OPENINGS IN WEB OF STEEL BEAMS
3xd
4d
H L
® OPENING® OPENING
1/2 OF OPENING
HEIGHT, TOP & BOTT.,
2" MIN. (TYP.)
2'-0 3/8"D= MINIMUM CLEAR
@ CONNECTION OR
POINT LOAD, TYP.
EDGE OF CONNECTION
MATERIAL
TYP. 1/ 2" MAX.
1/2" MAX.
TYP. 3xL SEE PLAN FOR
BEAM SIZE
NOTE:
ALL HOLES IF POSSIBLE SHALL BE LOCATED IN THE MIDDLE THIRD OF SPAN.
1) IF THE OPENING IS IN THE MIDDLE THIRD OF THE SPAN AND:
a) "d" OR "L" OR "H" IS 1/4 D OR SMALLER - NO REINFORCEMENT IS REQUIRED.
b) "d" OR "L" OR "H" IS LARGER THAN 1/4 D BUT SMALLER THAN OR EQUAL TO 1/3 D -
ADD WEB REINFORCING PLATE SAME THICKNESS ON ONE SIDE ONLY (3/8" MIN.).
c) "d" OR "L" OR "H" IS LARGER THAN 1/3 D - SEE STIFFENER REINFORCEMENT DETAIL.
2) IF THE OPENING IS LOCATED OUT OF THE MIDDLE THIRD OF THE SPAN AND:
a) "d" OR "L" OR "H" IS 1/6 D OR SMALLER - NO REINFORCEMENT IS REQUIRED.
b) "d" OR "L" OR "H" IS LARGER THAN 1/6 D BUT SMALLER THAN OR EQUAL TO 1/4 D -
ADD WEB REINFORCING PLATE SAME THICKNESS ON ONE SIDE ONLY (3/8" MIN.)
c) "d" OR "L" OR "H" IS LARGER THAN 1/4 D - SEE STIFFENER REINFORCEMENT DETAIL.
(UNREINFORCED OR DOUBLER PLATE REINFORCING)dD3 1
3
/
1
6
"
1/4 TYP.
TYPICAL MINIMUM SEISMIC REINFORCEMENT FOR
ALL MASONRY WALLS OTHER THAN SHEAR WALLS
NOTES:
1) FILL ALL CORES WITH REINFORCING BARS WITH 3000 PSI GROUT.
2) THIS IS MININIMUM REINFORCEMENT REQUIRED. SEE WALL SECTIONS AND
SCHEDULES FOR ADDITIONAL REINFORCING.16" MAX.(TYP.)6"2'-0@ 48"
#4 DOWELS
SLAB
OR THICKENED
FOUNDATION
@ 16" o/c TYP.
JOINT REINF. MIN. 9 GA.
GALV. TRUSS TYPE HORIZ.
PROVIDE HOT-DIPPED
1 5/1 6" 16" MAX.(TYP.)HORIZ. JT.
REINF.
(TYP.)
1
5
/
1
6
"
CONTROL JOINT
STOP HORIZONTAL JOINT
REINFORCEMENT AT VERTICAL
CONTINUOUS BOND BREAKER PREFORMED GASKET
SEE ARCH. FOR
SEALANT/JOINT FILLER
PROVIDE MIN. ONE REINFORCING BAR ON
EACH SIDE OF VERTICAL CONTROL JOINT.
REINFORCING BAR SIZE TO MATCH TYP.
WALL REINFORCEMENT SIZE
TYPICAL VERTICAL CONTROL JOINT IN CMU WALLS
.TYPICAL WELDED WIRE SUPPORT DETAIL
OVER INFILL BEAMS
SEE PLAN FOR
SLAB DEPTH
3/4" COVER
WELDED WIRE FABRIC DRAPED OVER
BEAM BOLSTERS (TYPICAL)
METAL DECK.SEE PLAN FOR
SLAB DEPTH
3/4" COVER
ADDITIONAL WELDED WIRE
FABRIC OVER GIRDER
WELDED WIRE FABRIC
OVER BEAMS AT
SLAB MID-DEPTH
METAL DECK
2'-0" 2'-0" ....
TYPICAL SLAB REINFORCING AT GIRDERS AND AT
BEAMS/GIRDERS ALONG COLUMN LINES
(FOR CONCRETE THICKNESS OVER COMPOSITE DECK NOT EXCEEDING 3 1/2")
TYPICAL ROOF OPENING & RTU
CURB SUPPORT DETAIL - BEAM
SPACING GREATER THAN 6'-0"
MC6x15.1
(TYP. 4 SIDES)
FOR OPENING SIZES
METAL DECK
(TYP.) AND ARCH. ROOF PLAN
SEE MECH. DWGS.
AND LOCATIONS
1) PROVIDE AT PERIMETER OF ALL ROOFTOP MECHANICAL UNITS
2) FOR OPENINGS LARGER THAN 6" UP TO 12",
AND ROOF OPENINGS LARGER THAN 12" SQ. AS REQUIRED.
(PROVIDE ž3x3x5/16 AT ROOF SUMPS)
OR SCREWED w/ SHEET METAL SCREWS @ 6" o/c.
PROVIDE 2'-0"x2'-0"x0.071" STEEL ™ WELDED TO DECK,
NOTE:
2'-1 1 /8"
SS
ROC
PROFE.AI GNNIOLAE RER
SASTATE OF
860325
NNID
No.
A ENI
R
M
IED
EG
N
TSE
Y MOC
DE
c
SHEET TITLE
SHEET NUMBER
RATIO
101 South Pennsylvania Street
Indianapolis, Indiana 46204
317-633-4040
Architect
McComas/O'Donnell & Naccarato
Structural Engineer
Civil Engineer
Mechanical / Plumbing Design/Builder
1717 E. 116th Street, Suite 200
Carmel, Indiana 46032
317-580-0402
Kimley Horn
250 East 96th Street, Suite 580
Indianapolis, Indiana 46240
DEEM LLC
6831 E 32nd Street
Indianapolis, Indiana 46226
KEY PLAN
B
A
HOTEL
PROJECT NO.
SHEET ISSUE
SEAL | DATE
COPYRIGHT NOTICE: THIS ARCHITECTURAL
AND ENGINEERING DRAWING IS GIVEN IN
CONFIDENCE AND SHALL BE USED ONLY
PURSUANT TO THE AGREEMENT WITH RATIO.
NO OTHER USE, DISSEMINATION OR
DUPLICATION MAY BE MADE WITHOUT PRIOR
WRITTEN CONSENT OF RATIO. ALL COMMON
LAW RIGHTS OF COPYRIGHT AND OTHERWISE
ARE HEREBY SPECIFICALLY RESERVED.
TRAINING
CENTER
**-ALL DRAWINGS MARKED AS PART OF AN "EARLY"
SUBMISSION PACKAGE ARE ISSUED PRIOR TO COMPLETION OF
OTHER DESIGN DISCIPLINES INCLUDING BUT NOT LIMITED TO
ARCHITECTURAL OR MECHANICAL DESIGNS; AND AS SUCH,
ARE INCOMPLETE BY NATURE FOR THE COMPREHENSIVE
SCOPE OF THE PROJECT. ALLOWANCES FOR STRUCTURAL
ELEMENTS REQUIRED DUE TO THE COMPLETION AND
CROSS-COORDINATION OF ALL OTHER DISCIPLINES SHOULD
BE MADE.
1717 EAST 116TH STREET | SUITE 200 | CARMEL, IN. 46032
(317) 580-0402 | WWW.O-N.com | Project No. 7167.0013.00
SHELL & CORE PERMIT SET
10/15/21
Electrical Design/Builder
Barth Electric Co., Inc.
1934 N. Illinois Street
Indianapolis, Indiana 46202
10/15/2021 2:23:27 PMS-400
TYPICAL FRAMING
DETAILS
21040.000
Republic Airways
Training Center
12195 N. Meridian St.
Carmel, Indiana
46032
1 DESIGN DEVELOPMENT 10/01/21
2 CONSTRUCTION DOCUMENTS 10/15/21
10/15/21
10/19/22