Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
C102 EXISTING CONDITIONS AND DEMO PLAN
PART OF LOT 2 LOT 3First Financial Bank NALAKEFRONT COURT LAKEFRONT COURTCARM E L D R I V E FE R T I G R E G U L A T E D D R A I N ( C L O S E D D R A I N ) LOT 5 Carmel Drive Professional Partners LLC LOT 4 Carmel Practice LLC REI Real Estate Services LLCLOT 1 Midwest Independent Trans System Operator Inc A C C A1 C1 A C C 48'± A C B D D D D D D D D B B B B B B B B 16'±16'±16'±60'± SEWER TABLE STORM TABLE Carmel Drive Professional Partners LLC PROJECT NO. CHECK:DRAWN: PLAN DATE: DESIGN: STATE OF No. PE10707583 OO14020 Mississinewa Drive Carmel, Indiana 46033 P: 317.324.8695 F: 317.324.8717 www.Fritz-Eng.com Fritz Engineering Services, LLC REVISIONS AND ISSUES BYDATE CLIENT: PROJECT: PROJECT LOCATION: GENERAL NOTES / LEGEND: SECTION, TOWNSHIP, RANGE: LAKEFRONT COURT 2 CARMEL SCIENCE & TECHNOLOGY PARK DAVID RAUSCH STUDIO 170 S. MAIN STREET ZIONSVILLE, IN 46077 5/18/2022 2204001 LAKEFRONT COURT CARMEL, INDIANA 46032 HAMILTON COUNTY NW 1 4, S36 , T18N, R3E SHEET NAME SHEET NO. PRELI MI N A R Y NOT F O R CONS T R U C TI O N ©2022 FRITZ ENGINEERING SERVICES, LLCC102 EXISTING CONDITIONS AND DEMO PLAN 1.REV PER TAC COMMENTS 7/7/2022 AF NMS NMS KG 00 20'40' SCALE: 1" = 20' N "IT'S THE LAW" R Know what's below. Call before you dig. 2 WORKING DAYS BEFORE YOU DIG.PRINTED BY: Ashton FritzDATE: 7/8/2022 3:06 PMSHEET SIZE, SCALE: ANSI FULL BLEED D (34.00 X 22.00 INCHES), 1:1FILE NAME: F:\2022\2204001 - LAKEFRONT COURT 2\02 CIVIL\PLANS\C102.DWG, LAYOUT: C102KEY NOTES: A A1 REMOVE EXISTING PAVEMENT/SIDEWALK REMOVE EXISTING PAVEMENT (STREET) B EXISTING PAVEMENT TO REMAIN IN PLACE C C1 SAW CUT CURB/PAVEMENT/SIDEWALK SAW CUT CURB/PAVEMENT (STREET) D PROTECT EX. UTILITY THROUGHOUT CONSTRUCTION E EX. UTILITY POLE & OVERHEAD LINES TO REMAIN. XX FLOOD ZONE: THE PROJECT SITE IS LOCATED WITHIN THE FEMA COMMUNITY PANEL MAP #18057C0209G DATED NOVEMBER 19, 2014. REVIEW OF THE MAP INDICATES THE SITE IS LOCATED WITHIN THE FLOOD DESIGNATIONS 'ZONE X' (UNSHADED). THE PROPOSED BUILDINGS AND IMPROVEMENTS ARE LOCATED IN ZONE X UNSHADED AND ARE THEREFORE NOT SUBJECT TO FLOOD CONTROL ORDINANCE REQUIREMENTS.