Loading...
HomeMy WebLinkAboutD101 - GarveyBEDROOM MASTER 8'-0" 201 BATHROOM MASTER VARIES 202 CLOSET 8'-0" 202 KITCHEN 101 GREAT ROOM 100 RESTROOM 103 Pantry 100 CORRIDOR 103 A100DEMOLITION PLANSSecond Level Demolition Floor Plan Scale: 1/4" = 1'-0" 02 A100 SHEET NO.DRAWN BY.CHECKED BY. TGJ COPYRIGHT: Architects Forum, LLC expressly reserves the common law copyright and other property rights in these plans. These plans are not to be reproduced in any form or manner, nor assigned to any third party, without first obtaining the expressed permission and consent of Architects Forum, LLC.PROJECT NO.220510HA8555 North River Road .Suite 220 . Indianapolis . Indiana . 46240[p] 317. 842.8500 [f] 317.842.8877MICHAEL & CAROLINE'SRESIDENCE1193 HELFORD LANECARMEL, INDIANA 46032CERTIFIED BY.DATE:REVISIONS:SEPTEMBER 22, 2022PERMIT SETSEPTEMBER 22, 2022First Level Demolition Plan Scale: 1/4" = 1'-0" 01 A100 A. COORDINATE EXTENT OF DEMOLITION WORK WITH ALL NEW CONSTRUCTION, AS INDICATED IN CONTRACT DOCUMENTS. B. THESE DEMOLITION NOTES REPRESENT SURVEYED SPACES BEFORE DEMOLITION WORK. LOCATION OF CASEWORK, COUNTERS, ETC. WITHIN THESE DOCUMENTS MAY NOT BE COMPLETELY ACCURATE. C. FIELD VERIFY EXACT SIZES AND LOCATION OF ALL EXISTING WORK PRIOR TO CONSTRUCTION. CONTACT THE ARCHITECT IN THE EVENT OF CONFLICTS. D. ALL DEMOLITION ITEMS SHALL BE CONSIDERED PROPERTY OF THE OWNER UNTIL VERIFICATION HAS BEEN MADE AS TO ITEMS TO BE RETAINED, PRIOR TO REMOVAL FROM THE SITE. ALL ITEMS NOT TO BE RETAINED SHALL BE REMOVED FROM THE SITE BY THE CONTRACTOR. E. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO INSURE THAT THE BUILDING REMAINS WATERTIGHT AND SECURE AT ALL TIMES. F. CONTRACTOR SHALL PROVIDE ALL TEMPORARY PARTITIONS AND DOORS AS DEEMED NECESSARY BY ARCHITECT AND OWNER TO AVOID MIGRATION OF DUST INTO ADJOINING AND OCCUPIED AREAS. G. PROTECT ALL EXISTING STRUCTURAL SUPPORTS. H. MAKE ALL DEMOLITION CLEAN AND COMPLETE AND IN A MANNER SUITABLE TO ACCEPT NEW FINISHES AND/OR SURFACES. I. WHEN DEMOLITION CAUSES OR EXPOSES DAMAGE TO EXISTING SLAB, FLOOR, WALL OR CEILING SURFACES WHICH WILL REMAIN EXPOSED IN THE FINISHED WORK, THE CONTRACTOR SHALL REPAIR AND LEVEL SUCH CONDITIONS AS REQUIRED. J. REMOVE EXISTING FLOOR, WALL AND CEILING FINISHES WITHIN BOUNDARY OF PROJECT SUITE. PROTECT ALL EXISTING CORRIDOR INTERIOR FINISHES TO REMAIN. K. WHERE ANY EXISTING PIPING OR DUCTWORK IN FLOORS, WALLS OR CEILINGS IS TO BE REMOVED OR RELOCATED, FILL IN PENETRATION OPENINGS FLUSH WITH AND OF THE SAME MATERIALS. L. REFERENCE STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. M. REMOVAL OF ANY ASBESTOS IS THE RESPONSIBILITY OF THE OWNER. NOTIFY THE ARCHITECT IF SUCH MATERIAL IS DISCOVERED DURING DEMOLITION OPERATIONS. N. DASHED LINES INDICATE TO REMOVE WALLS, DOORS, FRAMES AND ASSOCIATED ITEMS COMPLETE. DEMOLISH PORTION OF EXISTING WALL AS REQUIRED TO ACCOMMODATE NEW CONSTRUCTION. PATCH AND REPAIR ALL EXISTING ADJACENT SURFACES TO REMAIN. REMOVE EXISTING FRAME, DOOR, AND / OR WINDOW COMPLETE. REMOVE EXISTING CASEWORK AND / OR COUNTERTOP COMPLETE. VERIFY OWNER'S INTENT OF ITEMS TO BE RETAINED, PRIOR TO REMOVAL FROM THE SITE. EXISTING COUNTERTOP AND SINK TO REMAIN. PROTECT DURING ALL PHASES OF CONSTRUCTION. GENERAL DEMOLITION NOTES CONTAMINATION PREVENTION DEMOLITION LEGEND DEMOLITION PLAN NOTES 1 2 · THE PROJECT CONSTRUCTION AREA SHALL BE ISOLATED WITH RIGID, DUST-PROOF, FIRE RATED BARRIER WALLS AND A GASKETED DOOR AT ENTRY LOCATIONS AND WALL PENETRATIONS. · THE TEMPORARY WALLS SHALL BE SOUND REDUCING WHERE POSSIBLE. · DESIGNATED ENTRY AND EXIST PROCEDURES SHALL BE DEFINED WITH EGRESS PATHS KEPT FREE AND DEBRIS. TEMPORARY SIGNAGE SHALL BE INSTALLED TO DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA. · AIR SYSTEM FLOW SHALL BE NEGATIVE TO THE SURROUNDING AREAS AND VENTILATED AS REQUIRED TO PREVENT ENVIRONMENTAL CONTAMINATION. EXISTING VENTS TO REMAIN OPERATIONAL DURING CONSTRUCTION SHALL BE COVERED WITH HEPA FILTER MATERIAL. DASHED LINE INDICATES TO REMOVE EXISTING WALL CONSTRUCTION, DOOR OR WINDOW ASSEMBLY, CASEWORK, FIXTURES, ETC. COMPLETE. 3 4 1 1 2 PROJECT KEY MAP PROJECT LOCATION 3 1 1 1 2 2 2 4 10/28/22