HomeMy WebLinkAbout06050174 Sq. Ft.
I
k. All sidewalks and driveways I
I. Sewer and water lines, septic system, (tanks & filed system) and/or well locations
m. Drainage flow arrows I
n. All drainage swales and subsDrface facilities (retention / detention areas, etc...)
o. Sump pump -- Show sump pDmp pit(s) and discharge line locations
p. Geothermal heat pump disch~rge locations
*NOTE: If land is not within a pl~tted subdivision, a legal description is required.
. I
FURTHER NOTES / NOTICES:
} CARMEL ZONING ORDINANCE Z-289, SEmON 29.04.02 (3): "The Director shall approve or deny the Improvement
Location Permit within five (5) working days of the receipt of the written application form and accompanying
materials. The Improvement Location Pefmit shall be issued when the proposed structure, improvement, or use and
its location conform in all respects to this:ordinance." .
I
} IN ADDITION TO THE ABOVE-LISTED SUBMITTAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED
WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY
INVOLVED. THIS WOULD INCLUDE ANY IPLAN COMMISION, 80ARD OF ZONING APPEALS, AND/OR DEPT. OF
COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED.
,
'-
} ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF
THE sUBMffiED PLANS ARE NOT OF SUFFICiENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT
OF niE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALCAPPLICABLE CODES AND ORDINANCES.
SUBMffiAL OF ADDITIONALLY REQUEsTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBMffiAL, WILL
EXTEND THE TIME IT TAKES COMPLETE ~HE PERMIT REVIEW.
} THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON
CONSTRUCTION PLANS AS A "BONUS ROOM" TO 8E UNOCCUPIABLE. UNFINISHED SPACE. IF AN AREA SO
LABELED IS TO 8E A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS
DETERMINED THAT AN UNFINISHED, "BONUS ROOM" AREA IS TO BECOME A FINISHED AREA AFTER THE
ISSUANCE OF THE PERMIT. THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING &
CODE ENFORCEMENT. I .
} ALL CONSTRUCTION IS SUBJECT Tol FIELD INSPECTION, AND SHOULD NOT BEGIN PRIOR TO THE
'ISSUANCE OF THE BUILDING PERMIT. ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED,
I' INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION. Beginning prior to obtaining
a building 'permit and/or proceeding with :construction beyond the stage of a required inspection without approval i
constitutes Late Fee penalties, per Z-289of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29.06.08.
I
BVILDING & CODE ENFORCEMENT; CITY 9F CARMEL. One Civic 5'1.; (qrmel. IN 46032. ph. (317) 571-2444-:
- -- ..- --
I, the undersigned, certify that all of the aboJe listed information is shown completely and accurately on the
attached plot or site plan(s), construction plahs, and any other submitted documentation, submitted with the
building permit application to the City of Carmel/Clay Township Department of Community Services. I further
certify that the joining of water supply pipinglshall be made with lead-free solders and fluxes. Failure to comply
will result in a replacement of the system. (Plumbing Code P-S09-S) Under the penalties of Perjury (Indiana I
Code 35-44-2-1), I also hereby affirm, under bath, that all of the information I have provided in the table beloW is
true and accurate, to the best of my knowledge and belief, and that I have not knowingly or intentionally
provided or omitted any information that would tend to hide, obscure, or otherwise mislead the Dept. of
Community Services regarding the truth of the matters addressed therein.
~
BASEMENT 1 st Floor 2nd Floor ! 3rd Front Rear Total Sq. TOTAL
(Finished and Floor Porch Porch or Ft. of
Unfinished) Sunroom Garages
3 /IL( 5;()/'( /; )J2- I fz :JDO 73'1 73G6
)
\1
/\~~""
i / . .r: .::>
APl'CICANT'S SIGNATURE
:s c.aff Sat1+lcLq I(A
NAME PRINTED ,/ .
s- /.2 y / L?0
DATE
S:Permits/FORMS/RESIDENTIAL PROCEDURES
20f2