HomeMy WebLinkAbout2022.01.24 The Bridges Site Retaining Wall Structural Progress SetSPECIAL INSPECTIONS BASIC SERVICES -CONCRETE CONSTRUCTION
REFER TO IBC 2012 CHAPTER 17 TABLE 1705.3 AND ACI 318-11
ITEM TASK APPLICABLE TO
PROJECT (Y/N)FREQUENCY
INSPECT REINFORCEMENT, INCLUDING PRESTRESSING TENDONS (WHERE
APPLICABLE) AND VERIFY CORRECT PLACEMENT
PERIODIC
PERIODIC
PERIODIC
VERIFY WELDABILITY OF BARS OTHER THAN ASTM A706
VERIFY ALL WATER STOPS ARE PROPERLY INSTALLED AND ANCHORED INTO
POSITION PRIOR TO PLACEMENT OF CONCRETE
Y
N
Y
REFERENCE
ACI 318 SECTIONS 3.5
AND 7.1 THROUGH
7.7; IBC 1910.4
REINFORCEMENT
REINFORCING BAR WELDING
WATER STOPS
PERIODICINSPECT ANCHORS POST-INSTALLED IN HARDENED CONCRETE MEMBERS YANCHORS POST-INSTALLED IN
HARDENED CONCRETE
PERIODICVERIFY USE OF REQUIRED CONCRETE MIX AT EACH APPLICATION YCONCRETE MIX
CONTINUOUSVERIFY THAT CONCRETE SAMPLING AND TESTING IS PERFORMED IN
ACCORDANCE WITH CONSTRUCTION DOCUMENTS
YCONCRETE TESTING ASTM C172, ASTM
C31, ACI 318 5.6, 5.8;
IBC 1910.10
CONTINUOUSINSPECT FOR PROPER PLACEMENT TECHNIQUES YCONCRETE PLACEMENT ACI 318 SECTIONS
5.9, 5.10; IBC 1910.6,
1910.7, 1910.8
CONTINUOUSINSPECT FOR PROPER APPLICATION TECHNIQUES NSHOTCRETE PLACEMENT ACI 318 SECTIONS
5.9, 5.10; IBC 1910.6,
1910.7, 1910.8
PERIODICVERIFY MAINTENANCE OF PROPER CONCRETE TEMPERATURE AND CURING
TECHNIQUES
YCONCRETE CURING ACI 318 SECTIONS
5.11 THROUGH 5.13;
IBC 1910.9
CONTINUOUSINSPECT FOR PROPER APPLICATION OF PRESTRESSING FORCES NPRESTRESSED CONCRETE ACI 318 SECTION 18.20
CONTINUOUSINSPECT FOR PROPER GROUTING OF BONDED PRESTRESSING TENDONS NPRESTRESSED CONCRETE ACI 318 SECTION
18.18.4
PERIODICVERIFY WELDING PROCEDURE SPECIFICATIONS ARE FOLLOWED NERECTION OF PRECAST
CONCRETE MEMBERS
ACI CHAPTER 16
PERIODICINSPECT ALL CONNECTIONS OF THE PRECAST ELEMENTS TO THE
FOUNDATIONS FOR CONFORMANCE TO THE CONTRACT DOCUMENTS
NERECTION OF PRECAST
CONCRETE MEMBERS
ACI CHAPTER 16
PERIODICINSPECT ALL CONNECTIONS OF THE PRECAST ELEMENTS TO THE
STRUCTURAL FRAMING FOR CONFORMANCE TO THE CONTRACT
DOCUMENTS
NERECTION OF PRECAST
CONCRETE MEMBERS
ACI CHAPTER 16
PERIODICVERIFY IN-PLACE CONCRETE STRENGTH PRIOR TO STRESSING TENDONS IN
POST-TENSIONED CONCRETE
NIN-SITU CONCRETE STRENGTH -
PRE-STRESSING
ACI 318 SECTION 6.2
PERIODICVERIFY IN-PLACE CONCRETE STRENGTH PRIOR TO REMOVAL OF FORMS
AND SHORES FROM BEAMS AND STRUCTURAL SLABS
NIN-SITU CONCRETE STRENGTH -
FORMS AND SHORES
ACI 318 SECTION 6.2
PERIODICINSPECT FORMWORK FOR SHAPE, LOCATION AND DIMENSIONS OF THE
CONCRETE MEMBER BEING FORMED
YFORMWORK ACI 318 SECTION 6.1.1
INSPECT ALL ANCHORS AND EMBEDDED ITEMS FOR PROPER SIZE, TYPE,
QUANTITY, LOCATION, POSITION, PROJECTION AND EMBEDMENT
PERIODICY ACI 318 SECTIONS
3.8.6, 8.1.3, 21.2.8; IBC
1908.5, 1909.1
ANCHORS AND EMBEDDED
ITEMS CAST IN CONCRETE
AWS D1.4, ACI 318
SECTION 3.5.2
ACI 318 SECTIONS
3.8.6, 8.1.3, 21.2.8;
IBC \1909.1
ACI 318 CHAPTER 4,
SECTIONS 5.2
THROUGH 5.4; IBC
1904.2, 1910.2, 1910.3
SPECIAL INSPECTIONS BASIC SERVICES -SOILS AND EARTHWORK
REFER TO IBC 2012 CHAPTER 17 TABLE 1705.6
ITEM TASK APPLICABLE TO
PROJECT (Y/N)FREQUENCY
VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE TO
ACHIEVE THE DESIGN BEARING CAPACITY
PERIODIC
PERIODICVERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE
REACHED PROPER MATERIAL
Y
Y
REFERENCE
BEARING SOILS FOR SHALLOW
FOUNDATIONS
EXCAVATIONS
CONTINUOUSVERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT THICKNESSES
DURING PLACEMENT AND COMPACTION OF COMPACTED FILL
YFILL MATERIAL PLACEMENT
PERIODICPRIOR TO PLACEMENT OF COMPACTED FILL, INSPECT SUBGRADE AND
VERIFY THAT SITE HAS BEEN PREPARED PROPERLY
YSUBGRADE PREPARATION
PERIODICVERIFY THAT BELOW-GRADE WALLS WITH UNEVEN BACKFILL CONDITIONS
ARE NOT BACKFILLED UNTIL FLOOR CONSTRUCTION AT TOPS OF WALLS
(OR OTHER PERMANENT BRACING WHERE APPLICABLE) IS COMPLETE OR
TEMPORARY BRACING IS PROVIDED
YBACKFILL AT BELOW-GRADE
WALLS
VERIFY CLASSIFICATION AND TESTING OF COMPACTED FILL MATERIALS IS
PERFORMED
PERIODICYFILL MATERIALS
JST JOIST
JT JOINT
KB KNEE BRACE
KIP, K 1,000 POUNDS
KO KNOCK-OUT
KSI KIPS PER SQUARE INCH
L ANGLE OR LENGTH
LAB LABORATORY
LB POUND
LF LINEAL FOOT
LIN LINEAL, LINEAR
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONGIT LONGITUDINAL
LP LOW POINT
LSL LAMINATED STRAND LUMBER
LSLT LONG SLOTTED HOLE
LTWT LIGHT WEIGHT
LVL LAMINATED VENEER LUMBER
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MC MISCELLANEOUS CHANNEL
MECH MECHANICAL
MEMB MEMBRANE
MEP MECHANICAL/ ELECTRICAL/ PLUMBING
MF MOMENT FRAME
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MULT MULTIPLE
N/A NOT APPLICABLE
NO NUMBER
NOM NOMINAL
NS NEAR SIDE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OFD OVERFLOW DRAIN
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
OPPHD OPPOSITE HAND
ORIG ORIGINAL
OVS OVERSIZED HOLE
OWJ PRE-MANUFACTURED OPEN WEB JOIST
PAF POWDER ACTUATED FASTENER
PC PRECAST CONCRETE
PEMB PRE-ENGINEERED METAL BUILDING
PERIM PERIMETER
PERM PERMANENT
PERP PERPENDICULAR
PJP PARTIAL JOINT PENETRATION
PL PLATE
PLF POUNDS PER LINEAL FOOT
PLYWD PLYWOOD
PREFAB PREFABRICATED
PRELIM PRELIMINARY
PREP PREPARATION, PREPARE
PROJ PROJECTION
PS PRESTRESSED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSL PARALLEL STRAND LUMBER
PT POST-TENSIONED
R RADIUS
RD ROOF DRAIN
REF REFERENCE
REINF REINFORCEMENT, REINFORCE
REQD REQUIRED
RO ROUGH OPENING
RTU ROOFTOP MECHANICAL UNIT
S SLOPE
SCHED SCHEDULE
SECT SECTION
SF SQUARE FEET
SHT SHEET
SIM SIMILAR
SIP STRUCTURAL INSULATED PANEL
SOG SLAB-ON-GRADE
SOMD SLAB ON METAL DECK
SPA SPACES, SPACE
SPECS SPECIFICATIONS
SQ SQUARE
SS STAINLESS STEEL
SSLT SHORT SLOTTED HOLE
STD STANDARD
STIFF STIFFENER
STL STEEL
STRUC STRUCTURAL
SYM SYMMETRICAL
T & B TOP AND BOTTOM
T/ TOP OF
T/GB TOP OF GRADE BEAM
TBS MECHANICAL TENSION BUTT SPLICE
TC TOP CHORD
TEMP TEMPERATURE
THRU THROUGH
TJI PREFABRICATED WOOD I-JOIST
TRANS TRANSVERSE
TYP TYPICAL
UL UNDERWRITERS' LABORATORY INC.
UNO UNLESS NOTED OTHERWISE
UT ULTRA-SONIC TEST
VERT VERTICAL
W WIDE FLANGE
W/ WITH
W/O WITHOUT
WD WOOD
WH WEEP HOLE
WP WORK POINT
WT WEIGHT, STRUCTURAL T
WWF, WWR WELDED WIRE REINFORCEMENT
XS EXTRA STRONG (PIPE)
XXS DOUBLE EXTRA STRONG (PIPE)
& AND
A/E ARCHITECT/ENGINEER
ACI AMERICAN CONCRETE INSTITUTE
ADDL ADDITIONAL
ADJ ADJACENT
AGGR AGGREGATE
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
ALT ALTERNATE
ANSI AMERICAN NATIONAL STANDARDS
INSTITUTE
APA AMERICAN PLYWOOD ASSOCIATION
APPROX APPROXIMATE
AR ANCHOR ROD
ARCH ARCHITECTURAL
ASTM AMERICAN SOCIETY FOR TESTING AND
MATERIALS
AWS AMERICAN WELDING SOCIETY
B/ BOTTOM OF
BAL BALANCE
BC BOTTOM CHORD
BD BOARD
BF BRACED FRAME
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BEAM
BOT BOTTOM
BRG BEARING
BRKT BRACKET
BTWN BETWEEN
BU BUILT UP
C STANDARD CHANNEL
CANT CANTILEVER
CC CENTER TO CENTER
CF COLD FORMED
CG CENTER OF GRAVITY
CIP CAST-IN-PLACE
CJ CONTROL, CONTRACTION OR
CONSTRUCTION JOINT
CJP COMPLETE JOINT PENETRATION
CL CENTERLINE
CLR CLEARANCE, CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CTR CENTER
CTRD CENTERED
CU FT CUBIC FEET
CU IN CUBIC INCH
CYD CUBIC YARD
DBA DEFORMED BAR ANCHOR
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION, DEMOLISH
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIAG DIAGONAL
DIAPH DIAPHRAGM
DIM DIMENSION
DN DOWN
DO DITTO
DP DEEP
DWG DRAWING
DWL DOWELS
EA EACH
EF EACH FACE
EJ EXPANSION JOINT
EL, ELEV ELEVATION
ELEC ELECTRICAL
ENCL ENCLOSURE
ENGR ENGINEER
EOD EDGE OF DECK
EOJ EDGE OF JOIST
EOS EDGE OF SLAB
EQ EQUAL
EQPT EQUIPMENT
ES EACH SIDE
EW EACH WAY
EX EXISTING
EXP EXPANSION
EXT EXTERIOR
FD FLOOR DRAIN
FDN FOUNDATION
FIN FINISH
FLG FLANGE
FLR FLOOR
FS FAR SIDE
FT FEET
FTG FOOTING
FTGD FOOTING DRAIN
FV FIELD VERIFY
GA GAUGE
GALV GALVANIZED
GB GRADE BEAM
GL GLUED LAMINATED TIMBER (GLULAM)
GRND GROUND
GT GIRDER TRUSS
HAS HEADED ANCHOR STUD
HORIZ HORIZONTAL
HP HIGH POINT
HSS HOLLOW STRUCTURAL SECTION
HT HIP TRUSS
HVAC HEATING, VENTILATION, AIR
CONDITIONING
ID INSIDE DIAMETER
IF INSIDE FACE
IN INCH
INCL INCLUDE
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
J/BRG JOIST BEARING
STRUCTURAL DRAWINGS ABBREVIATIONS
SHEET #SHEET NAME
S001 GENERAL NOTES AND SPECIAL INSPECTION REQUIREMENTS
S002 FOUNDATION PLAN, SCHEDULES, SECTIONS, AND DETAILS
S003 FOUNDATION SECTIONS AND DETAILS
STRUCTURAL INDEX
Project Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:NOT FOR CONSTRUCTIONPROGRESS SET
1/24/2022 3:46:38 PMS001
GENERAL NOTES
AND SPECIAL
INSPECTION
REQUIREMENTS
2021.00998
01/24/2022
THE BRIDGES
MULTI-FAMILY SITE
RETAINING WALL
CARMEL, INDIANA
GENERAL
STRUCTURES INDICATED ON THESE DRAWINGS HAVE BEEN DESIGNED FOR THE IN-
SERVICE LOADS ONLY. THE METHODS, MEANS, PROCEDURES, AND SEQUENCES OF
CONSTRUCTION ARE THE RESPONSIBILITY OF THE CONTRACTOR. THE STRUCTURES
ARE DESIGNED TO BE SELF-SUPPORTING AND STABLE AFTER CONSTRUCTION IS
COMPLETE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE
CONSTRUCTION PROCEDURES AND SEQUENCE TO ENSURE SAFETY OF THE
STRUCTURES AND RELATED COMPONENTS DURING CONSTRUCTION. THIS INCLUDES
THE ADDITION OF NECESSARY SHORING, SHEETING, TEMPORARY BRACING, GUYS,
TIEDOWNS, ETC.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THAT CONSTRUCTION LOADS
DO NOT EXCEED THE CAPACITY OF ANY STRUCTURAL ELEMENT AT THE TIME THE
LOADS ARE APPLIED, INCLUDING BUT NOT LIMITED TO: WEIGHTS OF MATERIALS,
WEIGHTS OF EQUIPMENT AND WORKERS, AND ALL LOADS APPLIED FROM
TEMPORARY LIFTS, HOISTS AND CRANES, ETC.
THE STRUCTURAL DRAWINGS AND SPECIFICATIONS SHALL BE USED IN CONJUNCTION
WITH THE DRAWINGS AND SPECIFICATIONS OF ALL OTHER DISCIPLINES, TRADES, AND
DELEGATED DESIGN ELEMENTS. THE CONTRACTOR IS RESPONSIBLE FOR
COORDINATION OF THE STRUCTURAL WORK WITH ALL OTHER APPLICABLE TRADES.
THE GENERAL NOTES ON THE DRAWINGS ARE TO BE USED IN CONJUNCTION WITH
THE FULL WRITTEN MATERIAL SPECIFICATIONS (IF ANY) FOR THE PROJECT.
DO NOT SCALE THE DRAWINGS. REFER TO THE WRITTEN DIMENSIONS AND
INFORMATION.
IF A DISCREPANCY IS NOTED ON THE DRAWINGS, GENERAL NOTES, OR
SPECIFICATIONS, THE CONTRACTOR SHALL SUBMIT TO THE STRUCTURAL ENGINEER
A WRITTEN REQUEST FOR CLARIFICATION AND SHALL NOT PROCEED WITH THE
AFFECTED WORK WITHOUT DOCUMENTED RESOLUTION OF THE DISCREPANCY. ALL
COSTS RESULTING FROM THE CONTRACTOR IMPROPERLY PROCEEDING WITH THE
AFFECTED WORK PRIOR TO DOCUMENTED RESOLUTION OF THE DISCREPANCY,
INCLUDING COST OF REMOVAL AND REPLACEMENT OF NON-CONFORMING WORK,
SHALL BE BORNE BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
CONCRETE MIX DESIGN SUBMITTAL
THE CONTRACTOR SHALL SUBMIT FOR THE REVIEW OF THE STRUCTURAL ENGINEER
A MIX DESIGN FOR EACH PROPOSED CLASS OF CONCRETE. EACH MIX DESIGN SHALL
BE IDENTIFIED BY A MIX NUMBER OR OTHER UNIQUE IDENTIFICATION. THE
CONTRACTOR SHALL NOT VARY FROM THE MIX DESIGNS NOR USE ANY CONCRETE
OTHER THAN THE APPROVED MIX DESIGNS WITHOUT THE APPROVAL OF THE
STRUCTURAL ENGINEER. MIX DESIGN SUBMITTALS SHALL INCLUDE THE FOLLOWING
INFORMATION:
1. MIX DESIGN NUMBER OR UNIQUE IDENTIFICATION AND INTENDED LOCATION
OF PLACEMENT.
2. CEMENT TYPE, PROPORTION AND NAME OF MANUFACTURER.
3. FLY ASH PROPORTION (WHEN USED), LABORATORY ANALYSIS CERTIFICATION,
AND NAME AND LOCATION OF SUPPLIER.
4. COURSE AGGREGATE PROPORTION, GRADATION REPORT, NAME AND
LOCATION OF SUPPLIER.
5. FINE AGGREGATE PROPORTION, GRADATION REPORT, NAME AND LOCATION
OF SUPPLIER.
6. MIXING WATER PROPORTION AND SOURCE.
7. ADMIXTURE DOSAGES, PRODUCT NAME(S) AND MANUFACTURER NAME(S).
8. FIBER REINFORCEMENT DOSAGE (WHEN USED), PRODUCT NAME AND
MANUFACTURER NAME.
9. DESIGN 28-DAY COMPRESSIVE STRENGTH (F'C).
10. DESIGN SLUMP RANGE.
11. DESIGN AIR-ENTRAINMENT (FOR CONCRETE REQUIRING ENTRAINED AIR).
12. STATISTICAL ANALYSIS OF LABORATORY STRENGTH TEST DATA IN
ACCORDANCE WITH "STANDARD DEVIATION" DETERMINATION OUTLINED IN
ACI 318.
PRODUCT DATA SUBMITTALS
THE CONTRACTOR SHALL SUBMIT FOR APPROVAL PRODUCT DATA FOR THE SPECIFIC
ITEMS LISTED BELOW. CONTRACTOR SHALL NOT USE PRODUCTS OTHER THAN
THOSE SUBMITTED WITHOUT THE APPROVAL OF THE STRUCTURAL ENGINEER.
SUBMIT HARD COPIES OR ELECTRONIC VERSIONS OF PRODUCT DATA. FOR HARD
COPY OPTION, SUBMIT A MINIMUM OF TWO COPIES OF PRODUCT DATA TO THE
STRUCTURAL ENGINEER FOR REVIEW (ONE COPY SHALL BE RETAINED BY THE
STRUCTURAL ENGINEER). FOR ELECTRONIC OPTION, SUBMIT PRODUCT DATA IN
ADOBE PDF FORMAT.
1. CONCRETE CURING COMPOUND
2. CONCRETE JOINT SEALANT
3. WATER STOPS
4. FORM-LINER
FOUNDATIONS
SEE GEOTECHNICAL REPORT NUMBER 21-1056-01G PREPARED BY PATRIOT
ENGINEERING AND ENVIRONMENTAL, INC. DATED DECEMBER 7, 2021 AND ALL
APPLICABLE ADDENDA AND AMENDMENTS FOR INFORMATION RELATED TO
FOUNDATION EXCAVATIONS AND SOIL-RELATED WORK.
DESIGN NET SOIL PRESSURE:
CONTINUOUS WALL FOOTINGS: 1,500 PSF
FOUNDATIONS AND SOILS RELATED WORK SHALL BE INSPECTED BY A LICENSED
GEOTECHNICAL ENGINEER. WRITTEN FIELD REPORTS SHALL BE FORWARDED TO THE
STRUCTURAL ENGINEER AS SOON AS THEY BECOME AVAILABLE.
FOUNDATION CONDITIONS NOTED DURING CONSTRUCTION, WHICH DIFFER FROM
THOSE DESCRIBED IN THE GEOTECHNICAL REPORT, SHALL BE REPORTED TO THE
STRUCTURAL ENGINEER AND GEOTECHNICAL ENGINEER BEFORE FURTHER
CONSTRUCTION IS ATTEMPTED.
THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE AND MAINTAIN APPROPRIATE
EXCAVATION PROTECTION, INCLUDING ALL NECESSARY LAYBACKS, SHORING,
SHEETING, TIE-BACKS AND OTHER MEASURES AS DETERMINED BY THE
CONTRACTOR'S ENGINEER.
EXCAVATIONS FOR SPREAD FOOTINGS, COMBINED FOOTINGS, CONTINUOUS
FOOTINGS AND MAT FOUNDATIONS SHALL BE CLEANED AND HAND TAMPED TO
UNIFORM SURFACE AND SHALL BE PROTECTED AND MAINTAINED UNIFORM UNTIL
CONCRETE IS PLACED.
LATERAL SOIL PRESSURE CRITERIA (DRAINED):
ACTIVE COEFFICIENT, Ka = 0.30
AT-REST COEFFICIENT, Ko = 0.45
PASSIVE COEFFICIENT, Kp = 3.4
PASSIVE IGNORE DEPTH = 3 FT
UNIT WT OF BACKFILL = 125 PCF
SLIDING FRICTION COEFFICIENT = 0.3
BELOW-GRADE WALLS
DO NOT BACKFILL AGAINST BELOW-GRADE CONCRETE (OR MASONRY) WALLS UNTIL
THE CONCRETE (OR MASONRY ASSEMBLAGE) HAS REACHED ITS 28-DAY
COMPRESSIVE STRENGTH.
WHERE BACKFILL IS REQUIRED ON BOTH SIDES OF BELOW-GRADE WALLS, BACKFILL
EVENLY ON EACH SIDE OF EACH WALL TO PREVENT UNBALANCED SOIL LOADS
AGAINST THE WALL.
CONCRETE
REINFORCED CONCRETE HAS BEEN DESIGNED IN ACCORDANCE WITH THE BUILDING
CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318) AND COMMENTARY
(ACI 318R).
MIXING, TRANSPORTING, AND PLACING OF CONCRETE SHALL CONFORM TO THE
LATEST EDITION OF THE SPECIFICATIONS FOR STRUCTURAL CONCRETE (ACI 301).
READY-MIXED CONCRETE SHALL CONFORM TO THE REQUIREMENTS OF ASTM C94. IN
CASE OF A DISCREPANCY, THE PLANS AND SPECIFICATIONS SHALL GOVERN.
CEMENT SHALL CONFORM TO ASTM C150, TYPE I, UNO.
FLY ASH SHALL CONFORM TO ASTM C618, CLASS C OR F.
NORMAL WEIGHT AGGREGATES SHALL CONFORM TO ASTM C33.
WATER-REDUCING ADMIXTURES SHALL CONFORM TO ASTM C494.
AIR-ENTRAINING ADMIXTURES SHALL CONFORM TO ASTM C260 AND SHALL BE
CERTIFIED BY THE MANUFACTURER TO BE COMPATIBLE WITH OTHER ADMIXTURES.
CALCIUM CHLORIDE ADMIXTURES OR ADMIXTURES CONTAINING MORE THAN 0.1
PERCENT CHLORIDE IONS SHALL NOT BE USED.
IN COLD WEATHER CONDITIONS, MIXING, PLACING, FINISHING, CURING AND
PROTECTION OF CONCRETE SHALL BE PERFORMED IN ACCORDANCE WITH THE
LATEST EDITION OF ACI 306R, COLD WEATHER CONCRETING.
IN HOT WEATHER CONDITIONS, MIXING, PLACING, FINISHING, CURING AND
PROTECTION OF CONCRETE SHALL BE PERFORMED IN ACCORDANCE WITH THE
LATEST EDITION OF ACI 305R, HOT WEATHER CONCRETING.
USE OF JOINTS IN CONCRETE ELEMENTS AT LOCATIONS OTHER THAN THOSE
INDICATED ON THE DRAWINGS SHALL BE SUBMITTED TO THE STRUCTURAL ENGINEER
FOR REVIEW.
SLUMP FOR PUMPED CONCRETE SHALL BE MEASURED AT POINT OF DISCHARGE.
NORMAL WEIGHT CONCRETE SHALL HAVE THE PROPERTIES AS INDICATED IN THE
CONCRETE MIX SCHEDULE AND SPECIFICATIONS.
DO NOT INSTALL OR EMBED ALUMINUM ITEMS, INCLUDING BUT NOT LIMITED TO
ALUMINUM CONDUIT, INTO OR IN CONTACT WITH CONCRETE.
CONCRETE TESTING
MAKE ONE SET OF TEST CYLINDERS IN ACCORDANCE WITH ASTM C31 FOR EACH DAY'S
POUR AND FOR EACH 100 CUBIC YARDS FOR EACH TYPE OF CONCRETE PLACED. EACH
SET SHALL INCLUDE ONE SPECIMEN TESTED AT 7 DAYS, 2 SPECIMENS TESTED AT 28
DAYS (3 SPECIMENS TESTED AT 28 DAYS IF USING 4x8 CYLINDERS) AND ONE SPECIMEN
RETAINED IN RESERVE TO BE TESTED AT THE DIRECTION OF THE STRUCTURAL
ENGINEER. SPARE CYLINDER MAY BE DISCARDED 90 DAYS AFTER CASTING UNLESS
DIRECTED OTHERWISE BY THE STRUCTURAL ENGINEER. THIS SET OF TEST CYLINDERS
SHALL BE PROTECTED AGAINST FREEZING.
WHEN THE AMBIENT TEMPERATURE IS EXPECTED TO FALL BELOW 40 DEGREES
DURING THE COURSE OF A CONCRETE POUR OR SUBSEQUENT CURING PROCESS, AN
ADDITIONAL SET OF CONCRETE TEST CYLINDERS SHALL BE MADE AND TESTED. THESE
CYLINDERS SHALL BE STORED IMMEDIATELY ADJACENT TO, AND CURED UNDER THE
SAME CONDITIONS AS THE BUILDING CONCRETE. SPECIAL CURING BOXES ARE NOT
PERMITTED FOR THESE TEST CYLINDERS.
FORWARD COPIES OF TEST RESULTS TO THE ARCHITECT, STRUCTURAL ENGINEER,
READY-MIX SUPPLIER AND CONTRACTOR WITHIN 24 HOURS AFTER TESTING.
POTENTIALLY LOW-STRENGTH CONCRETE: WHEN 7-DAY TESTS RESULT IN CONCRETE
STRENGTHS LESS THAN 70% OF THE SPECIFIED 28-DAY STRENGTH, THE CONCRETE
CONTRACTOR SHALL INVESTIGATE TO DETERMINE THE VALIDITY AND LIKELY CAUSE(S)
OF THE LOW STRENGTH TEST RESULTS AND SUBMIT TO THE STRUCTURAL ENGINEER
FOR REVIEW. CONCRETE WHICH EXHIBITS STRENGTH BASED ON 7-DAY TESTS BELOW
70% OF THE SPECIFIED 28-DAY COMPRESSIVE STRENGTH MAY BE CONSIDERED
DEFECTIVE WORK AND SHALL BE SUBJECT TO REPAIR OR REPLACEMENT BY THE
CONTRACTOR AT THE DISCRETION OF THE OWNER AND STRUCTURAL ENGINEER AT
NO ADDITIONAL COST TO THE OWNER.
REINFORCING STEEL
REINFORCING STEEL SHALL BE DEFORMED BARS CONFORMING TO ASTM A615 AND
SHALL HAVE A MINIMUM YIELD STRENGTH OF 60,000 PSI, UNO.
REINFORCING BAR DETAILING, FABRICATING, AND PLACING SHALL CONFORM TO THE
LATEST EDITION OF THE FOLLOWING STANDARDS: ACI 301, ACI 315, ACI 318, ACI
DETAILING MANUAL (SP66), AND CRSI MANUAL OF STANDARD PRACTICE.
THE CONTRACTOR SHALL PROVIDE BAR SUPPORTS AND SPACERS AS REQUIRED TO
MAINTAIN PROPER SUPPORT AND POSITIONING OF THE REINFORCING STEEL
THROUGHOUT CONCRETE PLACEMENT OPERATIONS. DESIGN OF THE SUPPORT
SYSTEM SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
UNLESS A GREATER AMOUNT OF COVER IS INDICATED ON THE DRAWINGS, PROVIDE
THE FOLLOWING MINIMUM CONCRETE COVER OVER REINFORCEMENT AS FOLLOWS:
CONCRETE CAST AGAINST EARTH: 3 INCHES
FOUNDATION TOP REINFORCEMENT: 2 INCHES
FOUNDATION BOTTOM AND SIDE REINFORCEMENT: 3 INCHES
WALL REINFORCEMENT - #5 AND SMALLER: 1-1/2 INCHES
WALL REINFORCEMENT - #6 AND LARGER: 2 INCHES
REINFORCING STEEL SHALL NOT BE TACK WELDED, WELDED, HEATED OR CUT
UNLESS INDICATED ON THE CONTRACT DOCUMENTS OR APPROVED BY THE
STRUCTURAL ENGINEER.
LAP SPLICES SHALL BE TENSION LAPS IN ACCORDANCE WITH SPLICE/EMBEDMENT
TABLES, UNO.
ALL 90 DEGREE AND 180 DEGREE BENDS SHOWN ON THE DRAWINGS SHALL BE
STANDARD HOOKS, UNLESS NOTED OTHERWISE.
PROVIDE CORNER BARS OF SAME SIZE AND SPACING AS HORIZONTAL BARS AT
CORNERS OF ALL WALLS AND GRADE BEAMS. LAP SPLICE CORNERS BARS WITH
STRAIGHT BARS.
UNLESS OTHERWISE SHOWN OR NOTED, PROVIDE 2-#5 BARS (ONE EACH FACE)
AROUND UNFRAMED OPENINGS IN CONCRETE WALLS AND GRADE BEAMS. PLACE
BARS PARALLEL TO THE SIDES OF THE OPENING AND EXTEND 24" BEYOND CORNERS.
DESIGN DATA
NEW STRUCTURES ON THESE DRAWINGS HAVE BEEN DESIGNED IN ACCORDANCE
WITH THE 2014 INDIANA BUILDING CODE.
WIND LOAD DESIGN DATA (2012 IBC)
BASIC WIND SPEED (3-SECOND GUST) = 115 MPH
WIND EXPOSURE = C
WIND DESIGN PRESSURE (P) = VARIES WITH HEIGHT AND LOCATION
PVC WATERSTOPS
PROVIDE FACTORY MADE WATERSTOP FABRICATIONS FOR ALL CHANGES OF
DIRECTION, INTERSECTIONS, AND TRANSITIONS LEAVING ONLY STRAIGHT BUTT JOINT
SPLICES FOR THE FIELD.
SECURE WATERSTOP IN CORRECT POSITION USING HOG RINGS OR GROMMETS
SPACED AT 12 INCHES ON CENTER ALONG THE LENGTH OF THE WATERSTOP AND WIRE
TIE TO ADJACENT REINFORCING STEEL.
PROVIDE TEFLON COATED THERMOSTATICALLY CONTROLLED W ATERSTOP SPLICING
IRONS FOR FIELD BUTT SPLICES.
FIELD BUTT SPLICES SHALL BE HEAT FUSED WELDED. FOLLOW APPROVED
MANUFACTURER RECOMMENDATIONS.
LAPPING OF WATERSTOP, USE OF ADHESIVES, OR SOLVENTS SHALL NOT BE ALLOWED.
PENETRATIONS AND EMBEDDED ITEMS
CONTRACTOR SHALL COORDINATE WITH ALL AFFECTED TRADES THE REQUIRED
SIZES, TYPES, AND LOCATIONS OF ALL EMBEDDED ITEMS IN, AND ALL PENETRATIONS
THROUGH, STRUCTURAL ELEMENTS PRIOR TO CONSTRUCTION.
NO PENETRATIONS THROUGH STRUCTURAL ELEMENTS, OTHER THAN THOSE SHOWN
ON THE STRUCTURAL DRAWINGS, SHALL BE MADE WITHOUT THE APPROVAL OF THE
STRUCTURAL ENGINEER.
NO ITEMS (INCLUDING, BUT NOT LIMITED TO, CONDUIT, PIPING, ETC.), OTHER THAN
THOSE SHOWN ON THE STRUCTURAL DRAWINGS, SHALL BE EMBEDDED IN
STRUCTURAL ELEMENTS WITHOUT THE APPROVAL OF THE STRUCTURAL ENGINEER.
ALL EMBEDDED ITEMS IN EXPOSED EXTERIOR CONCRETE SHALL BE GALVANIZED,
PLASTIC, OR EPOXY-COATED.
SHOP DRAWING SUBMITTALS
THE CONTRACTOR SHALL PREPARE DETAILED SHOP DRAWINGS TO ENABLE ALL PARTS
OF THE WORK TO BE FABRICATED AND CONSTRUCTED IN ACCORDANCE WITH THE
DRAWINGS AND SPECIFICATIONS. THESE SHOP DRAWINGS WILL BE REVIEWED FOR
GENERAL COMPLIANCE WITH THE DESIGN INTENT ONLY. THE CONTRACTOR IS
RESPONSIBLE FOR ALL DIMENSIONS, ACCURACY AND FIT OF WORK.
ALL SHOP DRAWINGS SHALL BE REVIEWED BY THE CONTRACTOR PRIOR TO SUBMITTAL
TO THE STRUCTURAL ENGINEER. DRAWINGS SUBMITTED WITHOUT CONTRACTOR'S
REVIEW WILL BE RETURNED UNCHECKED.
PROVIDE ALL SUBMITTALS IN ELECTRONIC PDF FORMAT.
WORK REQUIRING SUBMITTALS FOR STRUCTURAL ENGINEER REVIEW SHALL NOT BE
STARTED BY THE CONTRACTOR WITHOUT APPROPRIATE REVIEWED SUBMITTALS.
WORK PERFORMED BY THE CONTRACTOR PRIOR TO RECEIVING APPROPRIATE
REVIEWED SUBMITTALS SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AS
DEEMED NECESSARY BY THE STRUCTURAL ENGINEER, AT THE CONTRACTOR'S
EXPENSE, AND WITH NO COST TO THE OWNER.
SUBMIT SHOP DRAWINGS FOR EACH OF THE FOLLOWING ITEMS:
1. CONCRETE REINFORCEMENT
2. PROPOSED RETAINING WALL JOINT PLAN (EXPANSION JOINTS, CONSTRUCTION
JOINTS, CONTROL JOINTS)
OMISSION OF ANY MATERIALS REQUIRED BY THE CONTRACT DOCUMENTS FROM SHOP
DRAWINGS SHALL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY FOR
FURNISHING THESE MATERIALS REGARDLESS OF WHETHER THE SUBMITTALS HAVE
BEEN REVIEWED.
THE USE OF ELECTRONIC FILES OR REPRODUCTIONS OF THE CONTRACT DOCUMENTS
BY THE CONTRACTOR SIGNIFIES CONTRACTOR’S ACCEPTANCE OF ALL THE
INFORMATION SHOWN “AS IS”. CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING
THE ACCURACY AND COMPLETENESS OF THE INFORMATION PROVIDED. ISSUED
DRAWINGS AND SPECIFICATIONS TAKE PRECEDENCE OVER ANY ELECTRONIC
INFORMATION PROVIDED. ADDENDA, CHANGE ORDERS, SUPPLEMENTAL
INSTRUCTIONS ARE NOT NECESSARILY INCLUDED IN THE ELECTRONIC FILES.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN ALL CONTRACT
DOCUMENTS, INCLUDING LATEST ADDENDA, AND TO DISTRIBUTE TO ALL
SUBCONTRACTORS PRIOR TO THE SUBMITTAL OF SHOP DRAWINGS.
SPECIAL INSPECTION
THE OWNER OR OWNER’S AGENT SHALL EMPLOY INDEPENDENT AGENCY(IES) OR
INDIVIDUAL(S) TO PROVIDE SPECIAL INSPECTION FOR ITEMS AS INDICATED ON THE
DRAWINGS.
SPECIAL INSPECTION IS A MANDATORY REQUIREMENT FOR VERIFYING
CONFORMANCE OF THE INDICATED CONSTRUCTION. SPECIAL INSPECTION IS
REQUIRED IN ADDITION TO ALL MATERIAL TESTS AND INSPECTIONS IDENTIFIED
ELSEWHERE IN THE CONSTRUCTION DOCUMENTS.
THE SPECIAL INSPECTOR SHALL BE A QUALIFIED PERSON, WHO SHALL
DEMONSTRATE COMPETENCE, TO THE SATISFACTION OF THE BUILDING OFFICIAL
AND THE STRUCTURAL ENGINEER, FOR INSPECTION OF EACH PARTICULAR TYPE OF
CONSTRUCTION OR OPERATION REQUIRING SPECIAL INSPECTION.
“PERIODIC” SPECIAL INSPECTION IS DEFINED AS “THE PART-TIME OR INTERMITTENT
OBSERVATION OF WORK REQUIRING SPECIAL INSPECTION BY AN APPROVED
SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE WORK HAS BEEN
OR IS BEING PERFORMED AND AT THE COMPLETION OF THE WORK.”
“CONTINUOUS” SPECIAL INSPECTION IS DEFINED AS “THE FULL-TIME OBSERVATION
OF WORK REQUIRING SPECIAL INSPECTION BY AN APPROVED SPECIAL INSPECTOR
WHO IS PRESENT IN THE AREA WHERE THE WORK IS BEING PERFORMED.”
SUBMIT TO THE STRUCTURAL ENGINEER FOR REVIEW A MINIMUM OF 14 DAYS PRIOR
TO COMMENCEMENT OF CONSTRUCTION OF ELEMENTS REQUIRING SPECIAL
INSPECTION THE FOLLOWING:
1. NAME(S), ADDRESS(ES), TELEPHONE NUMBER(S), EMAIL ADDRESS(ES), AND
STATEMENT(S) OF QUALIFICATIONS OF ALL SPECIAL INSPECTOR(S) TO BE
ENGAGED ON THE PROJECT.
2. A LISTING OF ALL ITEMS TO RECEIVE SPECIAL INSPECTION, DESIGNATION
WHETHER INSPECTIONS WILL BE CONTINUOUS OR PERIODIC AND THE NAME
OF THE INDIVIDUAL THAT WILL BE PERFORMING INSPECTION FOR EACH ITEM.
THE CONTRACTOR SHALL COORDINATE WITH THE SPECIAL INSPECTOR
SUFFICIENTLY IN ADVANCE OF WORK REQUIRING SPECIAL INSPECTION AND SHALL
PROVIDE ACCESS TO THE SITE AND TO THE CONSTRUCTION DOCUMENTS (CURRENT
DRAWINGS AND SPECIFICATIONS) FOR THE SPECIAL INSPECTOR TO CARRY OUT THE
REQUIRED OPERATIONS.
THE SPECIAL INSPECTOR SHALL OBSERVE THE WORK REQUIRING SPECIAL
INSPECTION FOR CONFORMANCE TO THE CONSTRUCTION DOCUMENTS. ALL NON-
CONFORMING WORK SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
CONTRACTOR FOR CORRECTION, THEN, IF UNCORRECTED, TO THE IMMEDIATE
ATTENTION OF THE OWNER OR OWNER’S AGENT AND STRUCTURAL ENGINEER.
THE SPECIAL INSPECTOR SHALL SUBMIT PERIODIC PROGRESS REPORTS TO THE
OWNER OR OWNER’S AGENT, CONTRACTOR AND STRUCTURAL ENGINEER
IDENTIFYING ALL SPECIAL INSPECTION OPERATIONS PERFORMED. REPORTS SHALL
BE SUBMITTED NO MORE THAN 7 DAYS FOLLOWING EACH SPECIAL INSPECTION
OPERATION. REPORTS SHALL IDENTIFY THE ITEM(S) INSPECTED AND AN INDICATION
OF WHETHER THE INSPECTED ITEMS WERE IN CONFORMANCE WITH THE
CONSTRUCTION DOCUMENTS.
AT THE COMPLETION OF ALL WORK REQUIRING SPECIAL INSPECTION, THE SPECIAL
INSPECTOR SHALL SUBMIT A FINAL SIGNED REPORT TO THE OWNER OR OWNER’S
AGENT, CONTRACTOR AND STRUCTURAL ENGINEER STATING W HETHER THE WORK
REQUIRING SPECIAL INSPECTION WAS, TO THE BEST OF THE SPECIAL INSPECTOR'S
KNOWLEDGE, IN CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS.
FAILURE TO PERFORM SPECIAL INSPECTION FOR THE INDICATED CONSTRUCTION OR
FAILURE TO CORRECT NON-CONFORMING WORK SHALL CONSTITUTE A BASIS FOR
REJECTION OF THE WORK AND REMOVAL AND REPLACEMENT BY THE GENERAL
CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER, INCLUDING, BUT NOT
LIMITED TO:
1. THE COST OF REMOVAL AND REPLACEMENT OF ALL WORK FOR WHICH
SPECIAL INSPECTION WAS REQUIRED BUT NOT PERFORMED, INCLUDING THE
COST OF TESTING AND SPECIAL INSPECTION FOR THE REPLACEMENT WORK.
2. THE COST OF ALL RELATED WORK MADE NECESSARY BY THE REMOVAL AND
REPLACEMENT OF THE UNINSPECTED WORK PER ITEM 1 ABOVE.
3. THE COST FOR DESIGN PROFESSIONAL’S SERVICES RELATED TO ALL WORK
FOR WHICH SPECIAL INSPECTION WAS REQUIRED BUT NOT PERFORMED AND
SERVICES RELATED TO THE REPLACEMENT WORK.
PROVIDE SPECIAL INSPECTION FOR THE FOLLOWING CONSTRUCTION:
SOILS AND EARTHWORK
CONCRETE CONSTRUCTION
SEE TABLES ON THE DRAWINGS FOR SPECIAL INSPECTION PROGRAM
REQUIREMENTS.
REVISION SCHEDULE
NO. DESCRIPTION DATE
TRANS TRANS
4
S002
4
S002
4
S002
SEE CIVIL DWGS FOR
WALL LOCATION
COORDINATES
SEE CIVIL DWGS FOR
WALL LOCATION
COORDINATES
SEE CIVIL DWGS FOR
WALL LOCATION
COORDINATES
SEE CIVIL DWGS FOR
WALL LOCATION
COORDINATES
(2) PIPE PENETRATIONS.
COORDINATE SIZES AND
LOCATIONS WITH CIVIL. SEE
"TYPICAL CONCRETE WALL
OPENING DETAIL" FOR
ADDITIONAL INFORMATION.FROM GRADE3' - 6"COORDINATE WITH LANDSCAPE
ARCHITECT FOR WALL FINISHES, COLORS,
REVEALS, AND SELECTED FORM-LINER
DESIGN.
PROVIDE FINISH MATERIAL SUPPORT AS
REQUIRED. GROUT ALL VOIDS SOLID
BELOW GRADE.
GRADE PER
CIVIL
SMOOTH FORM
FINISH ABOVE
GRADE ON THIS
FACE
GRADE PER
CIVIL
BELOW GRADE3' - 0" , MIN3" CLR 3" CLR
2X6 SHEAR KEY AND ROUGHEN
JOINT 1/4" AMPLITUDE
2" CLR1' - 6"4' - 3"1' - 0"7' - 6"
12' - 9"
#5 @ 9" OC HORIZONTAL
#8 @ 9" OC INSIDE
VERT DOWELS
#6 @ 9" OC OUTSIDE
VERT DOWELS
#5 DIAGONAL @ 9" OC
12"
12"#5 LONGITUDINAL
@ 12" OC, CONT
#8 TRANSVERSE
@ 9" OC TOP
NOTES:
1. ASSUMED NET ALLOWABLE SOIL BEARING PRESSURE = 1,500 PSF PER GEOTECH REPORT. SEE GEOTECHNICAL REPORT FOR
ADDITIONAL INFORMATION.
2. SEE CIVIL DRAWINGS FOR WALL EXTENTS, PAVEMENT, GRADING, AND ADDITIONAL INFORMATION.
3. BACKFILL EVENLY ON BOTH SIDES OF WALL UNTIL PAVEMENT SUBGRADE ELEVATION AT LOWER SIDE IS ACHIEVED BEFORE
PLACING UNBALANCED FILL AT HIGH SIDE.
4. SEE "TYPICAL RETAINING WALL BACKFILL DETAIL" FOR BACKFILL AND DRAINAGE REQUIREMENTS.
5. CAST KEY INTEGRAL WITH FOOTING (NO CONSTRUCTION JOINT).
6. THIS WALL IS NOT DESIGNED FOR VEHICLE IMPACT LOADING.
7. PEDESTRIAN SAFETY RAILING POSTS ARE NOT PERMITTED TO BE ATTACHED TO WALL. A SEPARATE FALL PROTECTION SYSTEM
WILL BE REQUIRED IF WALL DOES NOT EXTEND A MINIMUM OF 3'-6" ABOVE GRADE.
MIN 6" DIA FULLY PERFORATED
CONTECH A-2000 DRAINPIPE @ 0.5%
GRADE. CONNECT DOWNSTREAM END
OF DRAINPIPE TO STORM SEWER.
COORD W/ PLUMBING AND CIVIL.
LOCATE BOTTOM OF DRAIN AT NORMAL
POOL ELEVATION AT LOWEST POINT. 3" CLRNORMAL POOL
ELEVATION PER
CIVIL
100-YEAR STORM
ELEVATION PER
CIVIL
WATERPROOFING
PER ARCH, TYP
1' - 0"
FULL STRUCTURAL
DEPTH REQUIREDVARIES
ADDITIONAL FORMED CONCRETE
AS REQUIRED FOR SELECTED
FORM-LINER DESIGN
2' - 2"#6 KEY VERT
@ 12" OC
(4) #5 KEY
LONGITUDINAL,
CONT
T/WALL
PER CIVIL
EXTEND WALL UP FOR
FALL PROTECTION
#4 U-BAR @ 12" OC
12"12"3" CLR2" CLR2" CLR
OUTSIDE VERT DOWELS
TO EXTEND TO BACK OF
HEEL
INSIDE VERT DOWELS
TO EXTEND TO FRONT
OF TOE
REINFORCING BAR LAP LENGTHS: Lt, Lc
AND DEVELOPMENT LENGTHS: Ld, Ldh,
Ldt, Ldc (INCHES)
BAR SIZE
#3
#4
#5
#6
#7
#8
#9
#10
#11
NOTES:
1.db =DIAMETER OF BAR BEING DEVELOPED
Lt ="CLASS B" TENSION LAP SPLICE LENGTH
Lc =COMPRESSION LAP SPLICE LENGTH
Ld =TENSION DEVELOPMENT LENGTH OF STRAIGHT BARS
Ldh =TENSION DEVELOPMENT LENGTH OF HOOKED BARS
Ldt =TENSION DEVELOPMENT LENGTH OF HEADED BARS
Ldc =COMPRESSION DEVELOPMENT LENGTH OF STRAIGHT BARS
2.TABULATED VALUES ARE CALCULATED PER THE PROVISIONS OF ACI 318
3.TABULATED VALUES ARE FOR NON-EPOXY-COATED GRADE 60 REINFORCEMENT IN
NORMAL WEIGHT CONCRETE.
4.WHERE BARS OF DIFFERENT SIZES ARE LAPPED IN TENSION, THE LAP LENGTH SHALL
BE THE LARGER OF Ld OF THE LARGER BAR AND Lt OF THE SMALLER BAR.
5.WHERE BARS OF DIFFERENT SIZES ARE LAPPED IN COMPRESSION, THE LAP LENGTH
SHALL BE THE LARGER OF Ldc OF THE LARGER BAR AND Lc OF THE SMALLER BAR.
6.TABULATED VALUES FOR Lt ASSUME THE FOLLOWING:
A)MINIMUM CLEAR SPACING BETWEEN REBAR IS THE GREATER OF THE BAR
DIAMETER AND 1 INCH.
B)MINIMUM CLEAR COVER IS 3/4 INCHES OR GREATER.
C)BARS BEING SPLICED ARE NOT REQUIRED TO BE ENCLOSED WITHIN
REINFOREMENT ACTING AS CONFINEMENT TIES
7.TABULATED VALUES FOR Ld ASSUME ONE OF THE FOLLOWING CONDITIONS IS
PROVIDED; WHERE THESE CONDITIONS AREN'T ABLE TO BE MET, CONTACT
ENGINEER OF RECORD FOR CONDITION SPECIFIC VALUES:
A)BARS BEING DEVELOPED ARE ENLCOSED WITHIN REINFORCEMENT ACTING
AS CONFINEMENT TIES, AND CLEAR SPACING OF BARS BEING DEVELOPED IS
GREATER THAN OR EQUAL TO db, AND CLEAR COVER TO BAR BEING
DEVELOPED IS GREATER THAN OR EQUAL TO db
B) CLEAR SPACING OF BARS BEING DEVELOPED IS GREATER THAN OR EQUAL
TO 2 TIMES db, AND CLEAR COVER TO BAR BEING DEVELOPED IS GREATER
THAN OR EQUAL TO db
8.TABULATED VALUES FOR Ldt ARE ONLY VALID FOR NORMAL WEIGHT CONCRETE
WITH CLEAR COVER NOT LESS THAN 2 TIMES db AND CLEAR SPACING NOT LESS
THAN 4 TIMES db (CLEAR COVER AND SPACING REQUIREMENTS LISTED IN THE
GENERAL NOTES APPLY TO THE HEAD/ANCHOR, CLEAR COVER AND SPACING IN
THIS PROVISION ARE WITH RESPECT TO THE REINFORCING ONLY)
f 'c = 4000 PSI
Ld Ldh Ldt Ldc
15 8 6
19 10 8
24 12 10
29 15 12
42 17 14
48 19 16
54 22 18
61 25 20
67 27 22
f 'c = 5000 PSI
Ld Ldh Ldt Ldc
13 7 6 8
17 9 7 9
22 11 9 12
26 13 11 14
38 15 12 16
43 17 14 18
48 20 16 21
54 22 18 23
60 24 20 26
8
10
12
15
17
19
22
25
27
16
25
36
48
76
93
95
109
127
14
23
32
43
68
83
85
98
114
LcLt
12
15
19
23
27
30
34
39
43
LcLt
12
15
19
23
27
30
34
39
43
1. SEE GENERAL NOTES AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2. ALL CONCRETE IS NORMAL WEIGHT AND CEMENT IS ASTM C150 TYPE 1, UNO. DO NOT USE LIGHTWEIGHT CONCRETE
UNLESS SPECIFICALLY INDICATED.
3. ACCEPTABLE CEMENT REPLACEMENT MATERIAL, WHERE PERMITTED, SHALL BE FLY ASH, ASTM C618 TYPE C OR F, UNO.
4. TARGET SLUMP SHALL BE DETERMINED BY THE CONTRACTOR AS NEEDED FOR PROPER PLACEMENT.
CONCRETE MIX SCHEDULE
CONCRETE USAGE
28-DAY
COMPRESSIVE
STRENGTH
(PSI)
FOOTINGS
EXTERIOR RETG WALLS
NOTES:
MAX CEMENT
REPLACEMENT
(NOTE 3)
MAXIMUM
W/CM RATIO
AIR CONTENT
(PERCENT)
MAXIMUM
AGGREGATE
SIZE (INCHES)
4,000
5,000
20%0.50 0-3 1.5
20%0.42 6 +/-1.5 1
Project Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:NOT FOR CONSTRUCTIONPROGRESS SET
1/24/2022 3:46:38 PMS002
FOUNDATION PLAN,
SCHEDULES,
SECTIONS, AND
DETAILS
2021.00998
01/24/2022
THE BRIDGES
MULTI-FAMILY SITE
RETAINING WALL
CARMEL, INDIANA
GENERAL PLAN NOTES:
1. TOP OF FOOTING ELEVATION = AS REQUIRED PER TYPICAL RETAINING WALL DETAIL.
2. REFER TO STRUCTURAL GENERAL NOTES, LEGEND, SCHEDULES, TYPICAL DETAILS, AND SPECIAL
INSPECTION REQUIREMENTS FOR ADDITIONAL INFORMATION.
3. SEE CIVIL AND ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION AND DIMENSIONS.
4. COORDINATE LOCATIONS OF ALL EMBEDS / OPENINGS / SLEEVES WITH MEP, WALL SYSTEMS,
EQUIPMENT SUPPLIERS, AND ALL OTHER AFFECTED TRADES PRIOR TO PLACING CONCRETE.
1/32" = 1'-0"S002
1 FOUNDATION PLAN
N.T.S.S002
4 TYPICAL RETAINING WALL DETAIL
N
N.T.S.S002
2 CONCRETE REINFORCEMENT DEVELOPMENT LENGTH AND LAP SPLICE TABLE
N.T.S.S002
3 CONCRETE MIX SCHEDULE
NO. DESCRIPTION DATE
OPEN
2'-0" TYP2" CLR, TYP
BARS TO
MATCH WALL
REINF AT
EACH FACE,
TYP EACH
LAYER
NOTE 1
OPEN
2" CLR, TYP
GREATER OF 1/2 INTERRUPTED BARS
EA FACE OR (2) #5 MIN @ 3" OC AT EA
LAYER, TYP UNO. EXTEND BEYOND
FACE OF OPENING EACH SIDE AS
INDICATED, UNO.
NOTE 1
SMALL OPENING LARGE OPENING
NOTES:
1. PROVIDE STANDARD HOOK WHEN EDGE OF WALL IS TOO CLOSE TO OPENING TO ALLOW
STRAIGHT BAR EMBEDMENT INDICATED.
2. VERIFY ALL OPENINGS (INCLUDING PIPING/ CONDUIT PENETRATIONS) NOT SHOWN ON
STRUCTURAL DRAWINGS WITH THE STRUCTURAL ENGINEER PRIOR TO CONSTRUCTION.
3. SEE PLANS AND DETAILS FOR REQUIRED WALL REINFORCEMENT.
4. UNINTERRUPTED WALL REINFORCMENT NOT SHOWN IN DETAIL FOR CLARITY. ADJUST WALL
REINFORCEMENT TO MINIMIZE NUMBER OF INTERRUPTED BARS.
5. COORDINATE OPENING SIZE AND ELEVATION WITH PIPE PLACEMENT PRIOR TO FABRICATION
OF REINFORCEMENT.
ADDL (2) #5 X 9'-0" DIAGONAL
BARS @ 3" OC EA LAYER OF
REINF, TYP 4 SIDES OF
OPENING
NOTE 3, TYP
(1'-0" x 1'-0" MAX)(3'-8" x 3'-8" MAX)
NOTE 3,
TYP
#5 X 2'-6"
TYP EACH
LAYER OF
REINF
UP TO ONE
HORIZ BAR EACH
FACE MAY BE
INTERRUPTED
WH
Lt + H, TYP AT
HORIZ BARS
Lt + W, TYP AT
VERT BARS
GENERAL NOTE:
PRIOR TO FABRICATION OF REINFORCEMENT, CONTRACTOR SHALL REVIEW
REQUIRED OPENINGS WITH ALL TRADES REQUIRING PENETRATIONS. FOR
OPENINGS THAT EXCEED THE LIMITATIONS OF THIS DETAIL, COORDINATE
REQUIREMENTS WITH THE STRUCTURAL ENGINEER PRIOR TO FABRICATION OF
REINFORCEMENT.
#4 WITH Lts LAP WITH INTERRUPTED
BARS, TYP. USE U-BARS AT WALLS WITH
REINF BOTH FACES. USE 180 DEGREE
HOOKS AT WALLS WITH 1 REINF LAYER.
WALL CORNER / ANGLED WALLS WALL ENDS DOUBLE LAYER
A
MATCH SIZE AND
SPACING OF WALL
BARS X
(2) VERT
BARS, MIN
HOR BARS WITH
STANDARD HOOK
(2 LAYERS REINF)(2 LAYERS REINF)AA
MATCH HORIZ REINF
NOTES:
1. "A" INDICATES Lt LAP SPLICE, SEE TYPICAL LAP SPLICE TABLES.2' -0"2' -0"
65
7
1
9
3
4
2
FINISH
GRADE
8
FINISH
GRADE
2' - 10 3/ 4"MAX--1'-0" MINRETAINING WALL BACKFILL DETAIL
GENERAL NOTES:
A. SEE RETAINING WALL STRUCTURAL DETAILS FOR REINFORCEMENT, DIMENSIONS, AND ADDITIONAL INFORMATION.
B. SEE CIVIL DRAWINGS FOR WALL LOCATIONS, LENGTHS, ELEVATIONS, GRADING AND ADDITIONAL INFORMATION.
C. ALL SOILS AND BACKFILL OPERATIONS SHALL BE INSPECTED AND APPROVED BY THE PROJECT GEOTECHNICAL TESTING AGENCY.
D. BACKFILL EQUALLY ON BOTH SIDES OF WALL UNTIL LOWER SIDE GRADE IS WITHIN 8 INCHES (MAX) OF FINAL GRADE BEFORE PLACING REMAINDER OF HIGH SIDE GRADE. USE HAND-OPERATED
COMPACTION EQUIPMENT WITHIN 6 FEET OF WALL.
E. PLACE BACKFILL IN LIFTS AND COMPACT IN ACCORDANCE W ITH THE PROJECT SPECIFICATIONS.
F. COMPACTED GRANULAR FILL SHALL CONSIST OF NATURALLY OR ARTIFICIALLY GRADED MIXTURE OF NATURAL OR CRUSHED GRAVEL, CRUSHED STONE, AND NATURAL OR CRUSHED SAND; ASTM
D-2940; WITH AT LEAST 90 PERCENT PASSING A 1-1/2-INCH (37.5-MM) SIEVE AND NOT MORE THAN 12 PERCENT PASSING A NO. 200 (0.075-MM) SIEVE OR OTHER SUITABLE GRANULAR FILL
APPROVED BY THE PROJECT GEOTECHNICAL ENGINEER.
G. COMPACTED FILL SHALL BE SUITABLE CLEAN COMPACTABLE SOIL MATERIAL APPROVED BY THE PROJECT GEOTECHNICAL TESTING AGENCY.
H. FILTER FABRIC SHALL BE A LIGHTWEIGHT, NONWOVEN, 100% POLYPROPYLENE GEOTEXTILE WEIGHING NOT LESS THAN 3.5 OUNCES PER SQUARE YARD, MEETING ASTM D-4632 50% ELONGATION
AT BREAK, WITH APPARENT OPENING SIZE EQUAL TO A #50 SIEVE AND FLOW RATE PER ASTM D-4491 OF NOT LESS THAN 150 GAL/MIN PER SFT.
DETAIL NOTES:
1. ZONE OF COMPACTED GRANULAR FILL.
2. ZONE OF COMPACTED FILL AND FINISH GRADE MATERIALS. SEE CIVIL DRAWINGS.
3. LINE OF EXCAVATION AND/OR BENCHING AS DETERMINED BY THE CONTRACTOR FOR THE SITE SOIL CONDITIONS IN ACCORDANCE WITH RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL
REPORT AND THE PROJECT GEOTECHNICAL TESTING AGENCY. CONTRACTOR IS SOLELY RESPONSIBLE FOR MAINTAINING SAFETY DURING ALL EARTHWORK OPERATIONS.
4. EXISTING SOIL OR COMPACTED FILL.
5. KEY (WHERE REQUIRED). INSTALL IN SUITABLE EXISTING FIRM UNDISTURBED SOIL OR COMPACTED FILL.
6. INSTALL FOOTING ON AND WITHIN SUITABLE FIRM UNDISTURBED SOIL OR COMPACTED FILL.
7. ZONE OF COMPACTED FILL AND FINISH GRADE MATERIALS PER CIVIL DRAWINGS.
8. INSTALL FOOTINGS TO ELEVATIONS INDICATED ON THE DRAWINGS. IN NO CASE SHALL BOTTOMS OF FOOTINGS BE LESS THAN THE GREATER OF LOCAL FROST DEPTH OR 3'-0" BELOW LOWER
FINISH GRADE ELEVATION. IF A DIMENSIONAL DISCREPANCY OCCURS THAT WOULD IMPLY PLACEMENT WITH LESS THAN REQUIRED SOIL COVER, NOTIFY THE STRUCTURAL ENGINEER IMMEDIATELY
AND DO NOT INSTALL THE FOOTING WITHOUT PRIOR REVIEW BY THE STRUCTURAL ENGINEER.
9. WHERE FOOTING DRAINS ARE INDICATED ON STRUCTURAL DETAILS, INSTALL 2'-0" WIDE BED OF COMPACTED GRANULAR FILL WRAPPED IN FILTER FABRIC, FULL-HEIGHT FROM TOP OF FOOTING TO
TOP OF GRANULAR FILL LAYER. WHERE FOOTING DRAINS ARE INDICATED BUT NOT OTHERWISE SIZED, USE MINIMUM OF 6-INCH DIAMETER PERFORATED PVC PIPE, EXTENDED TO DRAINAGE
OUTLET AS INDICATED ON THE CIVIL DRAWINGS. FULLY WRAP DRAINS WITH FILTER FABRIC PRIOR TO SETTING IN PLACE.
#
CONTRACTION JOINT
CONSTRUCTION JOINTEXPANSION JOINT
FORMED RECESS,
TYP. RECESSES AT
FRONT AND BACK
MUST ALIGN.
FORMED RECESS,
TYP
3/4" CHAMFERED EDGES
AND 3/4" DEEP EXTERIOR
SEALANT (AT ALL EXPOSED-
TO-VIEW WALL AREAS).
SIKAFLEX 15LM (OR
ENGINEER APPROVED
SUBSTITUTE). COORDINATE
COLOR WITH OWNER AND
ARCHITECT.
1" PRE-FORMED EXPANSION JOINT FILLER
9" PVC RIBBED CENTER BULB WATERSTOP,
(GREENSTREAK MODEL #735 OR ENGINEER
APPROVED SUBSTITUTE -SEE SPECIFICATIONS).
INSTALL WATERSTOP CONTINUOUS FROM TOP OF
FOOTING UP TO 3 INCHES BELOW TOP OF WALL.TERMINATE REINF 2"
CLEAR BACK FROM FACE
OF CONCRETE, TYP EACH
SIDE.
CHAMFER OPTIONAL AT
BACKFILL SIDE BELOW GRADE
WHERE NOT EXPOSED TO VIEW
1" DIA x 1" LONG COMPRESSIBLE
MATERIAL TAPED TO END OF
DOWEL
1" DIA x 1'-6" SMOOTH DOWELS
SAME SPACING AS HORIZ BARS
(TIE TO HORIZ BARS OF FIRST
POUR)
WRAP SMOOTH DOWEL TO PREVENT BOND AT
SECOND POUR
SECOND POURFIRST POUR
BACKFILL SIDE
3/4"3/4"3/4"3/4"3/4"3/4"EXPANDABLE BENTONITE WATERSTOP
(VOLCLAY RX101 OR ENGINEER
APPROVED SUBSTITUTE). INSTALL
WATERSTOP CONTINUOUS FROM TOP
OF FOOTING UP TO 3 INCHES BELOW
TOP OF WALL.
SPLICE CHART
LAP PER
TERMINATE 50% OF HORIZONTAL
REINFORCEMENT (EVERY OTHER BAR)
2" BACK FROM CENTER OF
CONTRACTION JOINT, TYPICAL EACH
CONTRACTION JOINT.
TERMINATE 50% OF HORIZONTAL
REINFORCEMENT (EVERY OTHER BAR) 2"
BACK FROM CENTER OF CONSTRUCTION
JOINT. EXTEND 50% OF HORIZONTAL
BARS THROUGH THE JOINT.
NOTES:
1. INSTALL CONSTRUCTION JOINTS AT 50'-0" OC MAXIMUM AT STRAIGHT RUNS OF WALL.
2. INSTALL CONSTRUCTION JOINTS WITHIN 15'-0" OF WALL CORNERS AND INTERSECTIONS.
3. INSTALL CONTRACTION JOINTS AT 25'-0" OC MAXIMUM BETWEEN CONSTRUCTION JOINTS.
4. INSTALL EXPANSION JOINTS IN STRAIGHT RUNS OF WALL EXCEEDING 200"-0" IN LENGTH. SPACING OF EXPANSION JOINTS SHALL NOT EXCEED 150'-0" OC.
5. INSTALL AND ANCHOR WATER STOPS INTO POSITION IN STRICT CONFORMANCE WITH MANUFACTURER'S WRITTEN REQUIREMENTS TO ENSURE PROPER ALIGNMENT
THROUGHOUT PLACEMENT OF CONCRETE.
6. SUBMIT PROPOSED JOINT LAYOUT TO ENGINEER WITH RETAINING WALL REINFORCEMENT SUBMITTAL.
Project Number
CERTIFIED BY
ISSUANCE INDEX
DATE:
PROJECT PHASE:NOT FOR CONSTRUCTIONPROGRESS SET
1/24/2022 3:46:38 PMS003
FOUNDATION
SECTIONS AND
DETAILS
2021.00998
01/24/2022
THE BRIDGES
MULTI-FAMILY SITE
RETAINING WALL
CARMEL, INDIANA
N.T.S.S003
2 TYPICAL CONCRETE WALL OPENING DETAIL
N.T.S.S003
3
TYPICAL CONCRETE WALL
REINFORCEMENT DETAILS
N.T.S.S003
1 TYPICAL RETAINING WALL BACKFILL DETAIL
N.T.S.S003
4 TYPICAL RETAINING WALL JOINTS
NO. DESCRIPTION DATE