HomeMy WebLinkAbout06050191 State Release
Would you like to reduce your turnaround time?
ELECTRONICALLY FILE YOUR PROJECT WITH STATE OF INDIANA AT
efile24-7@dhs.state.in.us, Or VISIT OUR WEB SITE AT www.in.gov/dhs/osbc
Project number
INDIANA 02 !
I
~OOOO
318006
C.onstruction type
V-B
5 cope of release
ARCH ELEC FDN
PLUM STR
E-Filed, No hard
copy will be mailed 05/08/06
. Occupancy classification
Release date
CONSTRUCTION DESIGN RELEASE
State Form 41191 (R9/5-98)
Report Printed on: May 8, 2006
M, ADD, REM
Indiana Department of Homeland Security
DIVISION OF FIRE SAFETY I PLAN REVIEW
402 W. Washington St., Room E245
Indianapolis, IN 46204
MECH
To: Owner I Architect I Engineer
Harold Sark & Associates Inc
Harold J Sark 8600296
2520 Durbin Dr
Carmel IN 46032
SUPPORT HOOSIER SAFETY
Type-of release ----
Standard
Project name
Great Frame Up
Available At Your Local Licence Branch
Street address
First 8t SW
City
. County
Fax & e-mail: ,hsark@sarkassociates.com
The plans,- specificafions- anda-pplication submitted for the above referenced project have been reviewed for compliance with the applicable rules of
the Fire Prevention and Building Safely Commission. The project is released for construction subject to, but not necessarily limited to, the conditions
listed below. THIS ISNOT'A BUILDING PERMIT. All required local permits'and licenses must be obtained prior to beginning construction work. All
construction work must be in full compliance with all applicable State rules. Any changes in the released plans and/or specifications, must be filed with
and released by this Office before any work is altered..This " release may be,suspended.or revoked if it is determirledto be:issued in: error, in violation
of any rules of the Commission or if it is based.dn incOrrect or insuffiCient information."This release shall expire by"limitation, and become null and
void, if the work authorized is not commenced within one (1)year from the above date.
CONDITIONS:
Carmel
HAMILTON
Note :(A 1A & A 1 B): In accordance with the affidavit sworn under penalties of perjury in the application for construction design release the plans
and speCifications filed in conjunction with this project shall comply with all of the applicable rules and laws of Fire Prevention and Building Safety
Commission. Providing false information constitutes an act of perjury, which is a Class 0 felony punishable by a prison term and a fine up to $10,000.
In accordance with Section 19 of the General Administrative Rules (675 lAC 12-6-19) a complete set of plans and specifications that conform
exactly to the design that was released by the office of the state building commissioner shall be maintained on the construction jobsite as well as a
copy of the design release.
4G0412AC
No addition or alteration shall cause an existing building, structure, or any part of the .permanent
heating, ventilating, air conditioning, electrical, plumbing, sanitary, emergency detection, emergency
communication, or fire or explosion suppression systems to become unsafe or overloaded under
the provisions of the rules of the Commission for new construction in accordance with 675 lAC 12-4-
12(c).
No addition, alteration, or repair shall reduce existing exit capacities to less than that required under
the provisions of the rules of the Indiana Fire and Building Safety Commission for new construction
in accordance with 675 lAC 12-4-12(d).
3B1606A Buildings shall be designed and constructed to sustain all dead load, live load and environmental
loads in accordance with Sections 1606.1 and 1607.1, IBC (675 lAC 13-2.4).
Please be advised that if an administrative review of this action is desired, a written petition for review must be filed at the above address with the
Fire Prevention and Building Safety Commission identifying the matter for which a review is sought no later than eighteen (18) days from the above-
stated date, unless the eighteenth day falls on a Saturday, a Sunday, a legal holiday under State statute, or a day in which the Department of Fire
and Building Services is closed during normal business hours. In the latter case, the filing deadline will be the first working day thereafter. If you
choose to petition, and the before-mentioned procedures are followed, your petition for review will be granted, and an administrative proceeding will
be conducted by an administrative law judge of the Fire Prevention and Building Safety Commission. If a petition for review is not filed, this Order will
be final, and you must comply with its requirements.
4G0412AF
Page 1/2
Would you like to reduce your turnaround time?
ELECTRONICALLY FILE YOUR PROJECT WITH STATE OF INDIANA AT
efile24-7@dhs.state.in.us, Or VISIT OUR WEB SITE AT www.in.gov/dhs/osbc
Code Enforcement & Plan Review Branch Director
Filed By
Code review official
PATRICIA CRAYTON
Address (name,title of local official,street,city,state and ZIP code
DEPT DF COMMUNITY SERVICE
JIM BLANCHARD
DNE CIVIC SQUARE
CARMEL, IN 46032
Fax & e-mail: 317571~~~,jt;l.l~nchard@carmel.in.gov
State Fire Marshal
u~~//S~
V?~o~
Page 2/2