Loading...
HomeMy WebLinkAbout06050191 State Release Would you like to reduce your turnaround time? ELECTRONICALLY FILE YOUR PROJECT WITH STATE OF INDIANA AT efile24-7@dhs.state.in.us, Or VISIT OUR WEB SITE AT www.in.gov/dhs/osbc Project number INDIANA 02 ! I ~OOOO 318006 C.onstruction type V-B 5 cope of release ARCH ELEC FDN PLUM STR E-Filed, No hard copy will be mailed 05/08/06 . Occupancy classification Release date CONSTRUCTION DESIGN RELEASE State Form 41191 (R9/5-98) Report Printed on: May 8, 2006 M, ADD, REM Indiana Department of Homeland Security DIVISION OF FIRE SAFETY I PLAN REVIEW 402 W. Washington St., Room E245 Indianapolis, IN 46204 MECH To: Owner I Architect I Engineer Harold Sark & Associates Inc Harold J Sark 8600296 2520 Durbin Dr Carmel IN 46032 SUPPORT HOOSIER SAFETY Type-of release ---- Standard Project name Great Frame Up Available At Your Local Licence Branch Street address First 8t SW City . County Fax & e-mail: ,hsark@sarkassociates.com The plans,- specificafions- anda-pplication submitted for the above referenced project have been reviewed for compliance with the applicable rules of the Fire Prevention and Building Safely Commission. The project is released for construction subject to, but not necessarily limited to, the conditions listed below. THIS ISNOT'A BUILDING PERMIT. All required local permits'and licenses must be obtained prior to beginning construction work. All construction work must be in full compliance with all applicable State rules. Any changes in the released plans and/or specifications, must be filed with and released by this Office before any work is altered..This " release may be,suspended.or revoked if it is determirledto be:issued in: error, in violation of any rules of the Commission or if it is based.dn incOrrect or insuffiCient information."This release shall expire by"limitation, and become null and void, if the work authorized is not commenced within one (1)year from the above date. CONDITIONS: Carmel HAMILTON Note :(A 1A & A 1 B): In accordance with the affidavit sworn under penalties of perjury in the application for construction design release the plans and speCifications filed in conjunction with this project shall comply with all of the applicable rules and laws of Fire Prevention and Building Safety Commission. Providing false information constitutes an act of perjury, which is a Class 0 felony punishable by a prison term and a fine up to $10,000. In accordance with Section 19 of the General Administrative Rules (675 lAC 12-6-19) a complete set of plans and specifications that conform exactly to the design that was released by the office of the state building commissioner shall be maintained on the construction jobsite as well as a copy of the design release. 4G0412AC No addition or alteration shall cause an existing building, structure, or any part of the .permanent heating, ventilating, air conditioning, electrical, plumbing, sanitary, emergency detection, emergency communication, or fire or explosion suppression systems to become unsafe or overloaded under the provisions of the rules of the Commission for new construction in accordance with 675 lAC 12-4- 12(c). No addition, alteration, or repair shall reduce existing exit capacities to less than that required under the provisions of the rules of the Indiana Fire and Building Safety Commission for new construction in accordance with 675 lAC 12-4-12(d). 3B1606A Buildings shall be designed and constructed to sustain all dead load, live load and environmental loads in accordance with Sections 1606.1 and 1607.1, IBC (675 lAC 13-2.4). Please be advised that if an administrative review of this action is desired, a written petition for review must be filed at the above address with the Fire Prevention and Building Safety Commission identifying the matter for which a review is sought no later than eighteen (18) days from the above- stated date, unless the eighteenth day falls on a Saturday, a Sunday, a legal holiday under State statute, or a day in which the Department of Fire and Building Services is closed during normal business hours. In the latter case, the filing deadline will be the first working day thereafter. If you choose to petition, and the before-mentioned procedures are followed, your petition for review will be granted, and an administrative proceeding will be conducted by an administrative law judge of the Fire Prevention and Building Safety Commission. If a petition for review is not filed, this Order will be final, and you must comply with its requirements. 4G0412AF Page 1/2 Would you like to reduce your turnaround time? ELECTRONICALLY FILE YOUR PROJECT WITH STATE OF INDIANA AT efile24-7@dhs.state.in.us, Or VISIT OUR WEB SITE AT www.in.gov/dhs/osbc Code Enforcement & Plan Review Branch Director Filed By Code review official PATRICIA CRAYTON Address (name,title of local official,street,city,state and ZIP code DEPT DF COMMUNITY SERVICE JIM BLANCHARD DNE CIVIC SQUARE CARMEL, IN 46032 Fax & e-mail: 317571~~~,jt;l.l~nchard@carmel.in.gov State Fire Marshal u~~//S~ V?~o~ Page 2/2