HomeMy WebLinkAboutMinutes PC 09-20-22 • Sidewalks and connections around the building will be provided
• The proposed signage meets the requirements of the PUD
• Staff recommends this is continued to the Oct. 6 Commercial Committee for further review
ICommittee Comments:
Jeff: Is there a plan on the timing of the relocation of the dog park and greenspace?Provide us sight views from the east.
Will the existing walking path be reconstructed?Are there any ways to spruce up the NW facing side of the building?
Brad: Is there a possibility of valet parking for the rooftop restaurant?It would be great if we design and plan ahead for
this. Steve Hardin: Yes,valet parking will be provided.
Brad: The City's lighting standards are pretty current,but lighting designs,product,and technique are still more up to
date than our lighting standards.Any unique lighting features that wouldn't over commercialized this project would have
my support.
Dubbie: Can the entrance design be relooked at?Is there a possibility to add another access point? Josh: The State is not
interested in adding more access points along US 31.Alan: Are you referring to the entrance to this hotel project or the
entire Clay Terrace development?Dubbie: An entrance to the US 31 and entrance to this hotel. Josh: I'm concerned we
are overstepping our reach. This is up to the Engineering and Fire Department. Kevin: When this was originally built, it
was the main drag to carry traffic north and south.Now with the upgrades to US 31, it doesn't have to be that.
A Motion made by Hill and seconded by Westermeier to continue PZ-2022-00149 DP/ADLS to the Oct.6
Commercial Committee,with the full Plan Commission having the final voting authority.
Approved 8-0,absent Rider.
4. Docket No.PZ-2022-00167 Z: 1st Avenue SE C2 Rezone.
The applicant seeks to rezone 4 parcels from the B5 Business,R2 Residential and R3 Residential Districts within
the Old Town Overlay Character Subarea to the C-2 Mixed Use District. The site is generally located on the west
side of 181 Avenue SE,between 1st Street SE and Supply Street. Filed by the Department of Community Services
on behalf of the Cannel Plan Commission.
Petitioner: Adrienne Keeling:
• Presented site location map and zoning map, we are proposing the 4 parcels outline in yellow to rezone to C-2.
The western half of this block is already zoned C-2.
• The purpose of this rezone request is to extend this C-2 zoning district across the entire block to allow for a
redevelopment proposal to be reviewed
• The proposed redevelopment project is for a 1933 Lounge Restaurant concept,with upper floors as office space,
and townhomes along the eastern half of the block.
• This concept plan was presented at a City Council meeting,but nothing has been approved by the CRC
• We have received some comments from the public and will be taken in consideration by the CRC
• C-2 project includes several steps for approval by the CRC architectural review board and public hearing by the
Plan Commission Hearing Officer
• Staff recommends that you suspend the Rules of Procedure and send this item to the City Council with a favorable
recommended
Public Comments:
Bob Campbell, 1st Street SE: I'm not opposed to it,but I have a couple requests.The townhouses will be looking into my
house,I ask if they are setback 15-ft from the curb.They are proposing 3-stories high with a balcony,and I ask if they are
set 4-ft down and have the balconies face west towards Rangeline. I ask for a tree line along the townhomes.I ask this
type of development is not allowed to go south of Supply Street.With valet parking,we ask they don't use the parking lot
at the Lions Club and to have this area designated as permit parking only for the residents.
IJanet Raymond, S. Rangeline Road: We are not opposed to this development,but we ask for them to be mindful to the
long-term residents in this area. We would like to avoid in having the valet parking traffic backed up.Loading docks and
dumpsters should be located closer to the commercial node and buffered from the adjacent residential neighbors.
7
Plan Commission Meeting Minutes 9-20-22
Jeff Watkins, I' Street SE: Bob Campbell is my neighbor. We ask for consideration of the height and appearance of
townhomes. What are the unattended consequences?Parking and lighting. We do not want strong street lighting.I would
ask for no parking on the stub-street or the Lions Club parking lot.
Zachary Jedamzik, Supply Street: I love what we are doing in Cannel. Tonight,we are asking about a rezoning.If we
rezone this for C-2,then it will go only to the CRC. We won't have a say in this redevelopment. The residents want a
partnership and have a say what is going in this area. What is the plan?What are we voting on?The Old Town Overlay
Zoning District is completely changing. What are the unattended consequences?
Rebuttal to Public Comments: Adrienne Keeling:
• We do not have a site plan. We are not to that level of design,but it is good to bring things up early in the process
• Parking restrictions will be under the City Council review
• DOCS works very closely with the CRC in project reviews and continue to relay those comments to work on the
design of this project
• We know this block would be developed simultaneously since the western part of this block is already zoned C-2
Committee Comments:
Sue: I want to thank everyone who came out to speak about this proposal. We are only asked to rezone this to C-2. I
would like to hear from the Redevelopment Commission in how people can participate in this rezone.Henry Mestetsky,
CRC Director: This is a holistic project that we asking to rezone. We can't pick and choose which part we want to
redevelop. Once this is rezoned,there's a CRC Architectural Review Board meeting and we ask for the highest level of
architecture.We have a TAC committee that involves all the City Agencies and Departments. Then we file for DP/ADLS
process,and we have a public hearing for this.I believe there's a lot of opportunity for people to be involved.This project
follows what we are trying to do for the core of our City.Rachel Keesling: There's not a set schedule for a C-2 public
hearings, it is scheduled on a by a project-by-project basis. We do work through all the details, so it meets the
requirements of the UDO prior to the Plan Commission Hearing Officer public hearing.Anyone can attend and has a right
to speak at the C-2 public hearings.
Christine: Are the 4-story townhomes going to meet the required height limits adjacent to residential per the C-2 zoning?
Adrienne Keeling: If the standards of the C-2 zoning are not met,then they would seek a variance. Brad: Can the PC
members add our input?Adrienne Keeling:Yes.
Josh: I don't understand why we can't develop this second block through a full Plan Commission public hearing.
Mike Hollibaugh,Director of DOCS: With the feedback we heard tonight, is very useful for us prior to any site plan. The
process is virtually same,and with each C-2 redevelopment project, it gets better.The CRC Architectural Review
Committee is more publicly orientated now than it previously has been. Consideration of the public input we heard tonight
will be put towards the design.All these C-2 projects get the same attention from Staff. I would like to point out the
streets are public,and if no parking is imposed on 1st Street SE,that is not up to us,but by the Police and Engineering
Departments.Brad: Can you speak to us at all how the parking would be provided by this project and how would the off-
site parking work for this project? Mike Hollibaugh: The concept plan we saw provides enough parking.The Lion's
Club parking lot is sometimes full,and we can't rely on them for parking. We have street parking all through downtown
and free parking garages. Christine: Are there any of the concerns you heard tonight that you and Staff can enforce on
this project, such as the parking and landscape?Mike Hollibaugh: Staff pushes the CRC on the sensitivity issues. We can
respect the Old Town Overlay Zone in how it applies to townhome designs.
Alan: During the rezone proposal process for a C-2 rezone, a development plan(DP)is not required,but we want to know
what is coming through.Mike Hollibaugh: We've done a number of rezones where nothing was being proposed and we
didn't have a developer,but we were trying to position the land.Alan: I get feel that the PC wants to get more involved.
Brad: The C-2 district was endorsed by the Plan Commission at that time and agreed to delegate C-2 DP/ADLS proposals
to the PC Hearing Officer. If we are uncomfortable with this process,then we need to amend the Ordinance.Mike
Hollibaugh: A public hearing is still required by law,and nothing gets approved until all issues are addressed and
resolved.
8
Plan Commission Meeting Minutes 9-20-22
A Motion made by Buckler and seconded by Hill to suspend the Rules of Procedure in order to send PZ-2022-
00167 Z to the City Council.
5-3,Holle,Potasnik,Kirsh,absent Rider. Motion Fails since suspension of rules requires 2/3 majority vote.
IA Motion made Potasnik and seconded by Holle to send this to the Oct. 6 Commercial Committee with final
approval authority. Approved 6-2,Hill,Kirsh,absent Rider.
Old Business:
4. Docket No.PZ-2022-00118 DP/ADLS: The GOAT.
The applicant seeks site plan and design approval for a building addition/remodel on 0.2 acres. The site is located at 220 2nd
St. SW in Frank Hawkins Addition Lot 1.The site is zoned B-2 and is within the Old Town Overlay, Character Sub
Area. Filed by Ben Bemis of CEC Inc.on behalf of Kevin Paul,owner.
Petitioner: Dan Coots,Coots, Henke& Wheeler, PC.:
• With me tonight are the owner of The GOAT, Kevin Paul and the architect of this project, Dan Moriarity
• We request the PC approved the unanimously favorable recommendation by the Commercial Committee to
approve this DP/ADLS
Department Report: Rachel Keesling
• Adjustments have been made to the plans in regarding the size and placement of the building in order to meet the
setback requirements and to avoid the stormwater and utility easement along the Monon Blvd.
• 120 new seats and 6 new restroom facilities. There are two existing restrooms on the other side of building
• They are seeking a variance for 80% lot coverage and will be heard at Sept. 26 BZA
• Staff recommends approval at tonight's meeting
Commercial Committee Recap,Alan Potasnik,Chair:
• I'll defer to Staffs report. There's nothing anything else to add unless other members of the Committee want to
add any comments
Committee Comments: None
A Motion made by Buckler and seconded by Westermeier to approve PZ-2022-00118 DP/ADLS.
Approved 8-0,absent Rider.
New Business
5. Docket No. PZ-2022-00143 ADLS: North End Pool
The applicant seeks site plan and design approval for a new pool and pool house at the North End
Development. The site is located north of Mariposa Trail and Freeland Way and is zoned UR/Urban
Residential. Filed by Rebecca McGuckin with Old Town Companies.
Petitioner: Rebecca McGuckin:
• Presented site location plan, overall site plan,pool site plan, color pallet, seating and grill images,floor plan for
equipment room, elevations, lighting plan and fixtures, and landscaping plan
• We made a commitment to DOCS for additional tree plantings around the perimeter of the pool site
Department Report: Alexia Lopez
• This will be located between Apartment building C and the Maples Restaurant
• Bike parking is required per UDO and the Petitioner will add additional spots within 50-ft of entrance
• Architecture is similar to the other buildings within this development
• Landscaping beds will be provided
• Downlighting and bollards lights will be provided
• Staff recommends approval at tonight's meeting. We will continue to finalize the outstanding items in ProjectDox
Committee Comments:
9
Plan Commission Meeting Minutes 9-20-22