Loading...
HomeMy WebLinkAboutCoffin Project DescriptionCoffin Project Description Remove existing deck and haul away. Install a new Azek Vintage English Walnut Collection deck with 6x6 posts set in concrete footings, 2x12 beams, 2x10 joists at 12” on center with tape tape on top and decking hidden fastened. Replace existing ledger board on house and attach framing to new ledger using joist hangers. Install 11 steps at 5’ wide to grade. Install 12” Azek Vintage English Walnut Fascia to cover outer band boards of deck and sides of stair stringers. Install 36” Westbury Tuscany handrail on both sides of landing and down stairs. Install 36” Skyline Cable rail along front edge of deck. Install 6’ tall Outdeco privacy screen panels on left and right sides of deck using 4x4 cedar posts, 2x4 stringers and 2x6 top cap. All materials to be stained to match finish on Panels. Use (3) 4’ wide by 6’ tall panels. Outdeco pattern to be chosen by homeowner. Install (13) post cap lights on handrail posts. Lights will be halo and down combo lights with transformer. Install flush mount black riser lights on steps. 24 lights total.