Loading...
HomeMy WebLinkAboutCS103 TRAIL PLAN & PROFILESTATION EX DRIVEWAY EXISTING WETLAND 4+00904.65904.514+50903.47903.125+00903.43902.915+50903.39903.006+00902.99902.786+50902.26902.077+00901.89900.937+50901.62899.988+00901.62899.562.41% -1.51%-0.73% -4.76% -0.08%-4.28% 0.00%GRADE BREAK STA = 3+77.56ELEV = 904.440GRADE BREAK STA = 3+95.43ELEV = 904.871GRADE BREAK STA = 4+07.98ELEV = 904.274GRADE BREAK STA = 4+26.42ELEV = 903.484GRADE BREAK STA = 5+74.79ELEV = 903.370GRADE BREAK STA = 6+47.40ELEV = 902.277GRADE BREAK STA = 7+37.00ELEV = 901.625START OF PRECAST BOARDWALK FACE OF ABUTMENT STA: 7+37.00 ELEV: 901.62 PROPOSED GRADE AT CENTERLINE OF TRAIL EXISTING GRADE AT CENTERLINE OF TRAIL BOTTOM ELEVATION OF PRECAST CONCRETE BEAM TO SUPPORT BOARDWALK 9 0 0 900 900 900 900 901 901 901902 902 902 903 903 903 903 903 9031.7%1.5%1.5%903903 902 901 900901.59 901.67 MATCHLINE: SEE SHEET CS102MATCHLINE: SEE SHEET CS104A R455'10'R405'R505'B C 4+505+00 5+50 6+006+507+007+508+00 8+50 PC: 4+39.10 PC: 5+87.96 PC: 7+63.88 PT: 5+58.39 PT: 7+36.93 PT: 8+83.371.TREE SURVEY SHOWN ON THIS SHEET PERFORMED 12/10/2021 BY V3. 2.ALL PAVING WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY. 3.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 4.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPER TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 5.ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURES AND BRIDGES ACROSS THE FRONTAGE OF THIS DEVELOPMENT ARE INDICATED ON THE PLANS. PROVISIONS HAVE BEEN MADE TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES AND BRIDGES AS NECESSARY OR AS REQUESTED BY THE CITY TO ACCOMMODATE THE PAVEMENT WIDENING, AUXILIARY LANES, MULTI-USE PATH, AND ANY OTHER REQUIRED IMPROVEMENTS TO THE PROPERTY OR THE ROADWAY. THE COST TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES AND BRIDGES WILL BE DONE BY THE DEVELOPER. PRECAST CONCRETE BOARDWALK EXISTING WETLAND DELINEATED 12/08/2021 PROPOSED DRAINAGE SWALE A B 1 CS501 C ASPHALT PAVEMENT CONCRETE PAVEMENT CONTROL JOINT ISOLATION (EXPANSION) JOINT DETECTABLE WARNING PLATES CONCRETE BOARDWALK EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED DRAINAGE SWALE PROJECT LIMITS 865 864 865 864 SHEET NOTES LEGEND KEYED NOTES TRAIL PLAN & PROFILE PROJECT NORTH 0'40'20'10' SCALE: 1" = 20' 13202 CS103 SEALS AND SIGNATURES KEY PLAN DRAWING TITLE PROJECT NUMBER SCALE DRAWING NUMBER WEST PARK: PERIMETER TRAIL EXTENSION DATEREVISSUED FOR 44 EAST MIFFLIN STREET SUITE 500 MADISON, WI 53703 608.251.1177 www.smithgroup.com 2700 W. 116TH STREET CARMEL, IN 46032 Owner: CITY PERMIT REVIEW 08/23/2022 CITY PERMIT RESUBMITTAL 10/12/2022 N HORIZ SCALE: 1" = 20'2 TRAIL PROFILE: STA. 4+25 TO 8+75 VERT SCALE: 1" = 10' SCALE: 1" = 20' TRAIL PLAN: STA. 4+25 TO 8+751 1 CS500 2 CS500 3 CS500 4 CS500 6 CS500 1 CS502