HomeMy WebLinkAbout06060052 Sewer
CLAY TOWNSHIP REGIONAL WASTE DISTRICT
SANITARY SEWER PERMIT
[ ] Conditional Permit [x ] Final Permit
"
INDIVIDUAL LOTS/EXISTING BUILDINGS
Project Title:
Location:
Primary
Village of WestClay sec 10002
Owner/Builder:
Woodall construction
Lol# 835
Street address: 12085 Leighton Ct
City: CArmel Zip: 46032
.L _
Interceptor Charges Paid: PRI:
County: Hamilton
EDU Fee:1650.00
Application fee: 100.00'~
PLEASE NOTE: .. Installation ot building sewer shall be per the specifications of the Clay Township
Regional Waste District (see reverse) and any conditions noted below. All installations shall be inspected by District
personnel during "open trench" phase and before backfilling with sand or stone to six inches above the pipe. NO
footing or foundation drains, or other sources of.ground or stormwater, shall be permitted to enter the District's
sanitary sewer system. The District will assume no liability for drains which are below the arade level of the
nearest downstream manhole nor for laterals which are extended beneath drivewavs or sidewalks. The
permit holder (property owner, developer or builder) will be responsible for damages to the District's sewer system.
This includes damages to manholes, castings, manhole lids and the like; caused by construction activity on the
building site which is the subject of this permit.
Inspections by the District are MANDATORY and shall be arranged by contacting the District's office at 844-9200
24 hours in advance. All new construction will be placed on billing six months after connection has been made or
when water is connected, whichever comes first.
!IJJ ~he District reserves the right to inspect all sump pump connections to ensure no illegal
connections have been made. .
~ have received a copy of Ordinance No. 9-13-99 and agree to follow all District standards. Building
/ . has a [ ] crawl space [ ] slab or [ x] basement that [ x ]will be finished with grinder pump installed to
comply with elevation requirements [ ]rough-in plumbing with arinder pump installed during construction,
[ ] rough-in plumbing only and arinder pump will not be installed during construction, [ ] no plumbing in
the basement. (Please check appropriate box.)
/ V~anholes shall remain accessible at all times. If a manhole is buried, it shall be the
builder/homeowner responsibility to correCt per District standards.
_Conditional Permit Terms: .
[ ] NO CONNECTION to the sewer until further notification.
[ I Certificate of Insurance must be on file with CTRWD listed as certificate holder.
[ ] 48 hours notice before work starts on manhole core drilling or cuts of active lines
and District inspector must inspect all work before covered:
[ ] All District fees will be paid in full.
[ ] Approval pending Districts review of plans.
[ I Copies of approved permits from appropriate county or city agencies for work in
the right-of-way road cuts or are required.
[ ] No occupancy until further notification
[ ]
All Conditions have been met and final permit issued
2006.
By signing below, I attest that I am familiar with the District's specifications and agree to accept responsibility for all
work done under this permit.
~/~~ <-0~'--
Builder/Owner Signaturen
1)<Q\.<<- WD9~ \~
Printed Name
574-1944
Phone
Permit issued this 7th day of June, 2006.
ves 2 site plans submitted
~
- -------
Director of Administration & Customer Service
sv
Please note chan es on lateral s ecification as of Janua
Permit is valid for ONE- YEAR from the date issued.
Permit valid only with CTRWD seal in red ink.
Permit-rev.05-05-06cf
r
CLAY TOWNSHIP REGIONAL WASTE DISTRICT
SUMMARY OF LATERAL INSTALLATION REQUIREMENTS
1. All houses, buildings, etc., shall connect to the District's sanitary sewer system within 90 days of notice providing a sewer is within 300 feet
for Hamilton County or 100 feet for Boone County of the property line. Only one building may connect to the sewer main per lateral unless
otherwise approved by the District.
2. No foundation or other stonn water drains shall be interconnected to the sewer lateral installed and connected to the District's sanitary
sewer.
3. The existing sewer line from the building to the septic tank may only be used if it is located under a building addition, patio, porch or paved
driveway. Air test is required to show if acceptable for fe-use. The property owner shall bear the cost of all testing. The District inspector
must be onsite for the duration of the air test.
I
4. The owner or contractor shall notify the District prior to covering the Installed lateral so that the District can make an inspection to detennine
compliance with the District's sewer use ordinance. Such notification shall be made 24 hours prior to the need tor the inspection. If the
inspection fails and a second inspection is required, or contractor is not on site tor scheduled inspection, or fails to cancel inspection, an
additional fee of $100.00 will be due. This must be paid prior to the time of the follow up inspection.
5. Property owners are hereby advised that the County Board of Health regulates the operation and maintenance of private sewage disposal
(septic) systems. The County Ordinance provides in part that, upon connection to a public sewer, a septic tank ~...shall be abandoned and
filled with earthen material in a safe and sanitary manner: Please contact the appropriate County Board of Health for further infonnation.
6. Acceptable Pipe Materials:
PVC PIPE: SDR 35, ASTM 0-3034, SIX INCH PIPE
PVC PIPE: SDR 21, ASTM 0-241, SIX INCH PIPE
GASKETS JOINTS ASTM 0 3212
GASKETS ASTM F-477
FITTINGS - SDR-26
DUCTILE IRON MECHANICAL COUPLING WITH PROPER FITTINGS.
CLEAN OUTS TO BE LOCATED THREE FEET WITHIN THE FOUNDATION AND NO MORE THAN
100 FEET APART.
7. Bedding:
Use Number 8 crushed stone or Number 8 fractured face aggregate
Fill material Is to be placed from 6 inches below to 6 inches above the pipe
The trench should be a minimum of 18 inches wide
8. laterals shall be installed no closer than 20 feet from water wells unless PVC pressure grade pipe is used meeting SDR 21 and ASTM D-
2241. Any proposed installation requiring pressure pipe shall be reviewed and accepted by the District and the District's engineer Drior to
installation. ..
9. Where a transition is made between SDR 35 pipe and pressure grade SQR 21 pipe, a ductil~ iron gasketed mechanical coupling shall be
used.
10. laterals shalt terminate within 3 feet of the building unless the conditions in item #3 above are met. No olued oioe shall be installed outside
of buildino foundation walls.
11. Additional infonnation on District standards and specifications may be obtained from the District's office during business hours of 8:00a.m.
to 4:30 p.m. Monday through Friday: All District standards can be located on our web site at htto:/l\w"w.ctrwd.ora/. .
Clay Township Regional Waste District
1 0701 North College Suite A.
Indianapolis, Indiana 46280
Phone: 844-9200 Fax: 844-9203
12. Septic effluent shall not be pumped out into the sanitary sewer system.
13. The District shall insoect ALL laterals. Please call the District office at 644.9200 24 hours prior to time of inspection
14. Contractors shall lav 14 cauae-solid wire the entire lenath of the lateral. Wire is to be placed on top of the lateral. The District
inspector will verify placement of the wire. After inspection, bedding is to be placed on top.
15. Call before you dig. IUPPS 1-80G-382-5544, 48 hours prior to digging~
Lateral-rev.01-13-Q6cf