GENERAL CONSTRUCTION SPECIFICATIONS:
1. POOL LOCATION: Per drawings
2. POOL STRUCTURE DESIGN SHAPE Rectangle
POOL FINISH: Gunite Shell
PIPING MATERIAL: Sch 40 pvc
3. TILE:~6 x 6 TYPE Frostproof
COLOR: Owners Choice
4. SURFACE SKIMMER:_~ LOCATION: As determined
5. COPING TYPE: Poured in Place
6. INTERIOR FINISH: Diamond Brite
7. STEPS: Standard WALKS:
8. OTHER:_Undertrack auto-cover w/ore-cast lid, 8' Spa per drawing, approximately
1.500 sq. ft. decking @ $11.00/sq. ft.
PLUMBING AND FILTERING SPECIFICATIONS:
9. PUMP AND MOTOR: MAKE:_Sta-Rite_ MODEL:_TBD_
SIZE: I Yz HP TYPE: Medium Head
MAIN SUCTION LINE SIZE:]'
RETURN TO POOL LINE SIZE:]'
FILTER SYSTEM: MAKE: Sta-Rite MODEL: 450 sq. ft. Modular Media
10. HEATER: MAKE: Raypak MODEL: RP2100
BTU: 265,000 TYPE: Natural Gas
POOL CLEANER: MAKE:
CHLORINATOR: MAKE: Rainbow Erosion TYPE:
OTHER EQUIPMENT:
LlGHTS:_l
LADDER: MAKE:
WATTS: 500 VOLTAGE:~I20
TYPE: SIZE:
II.
2
"
HANDRAIL: I set Stainlees Steel with recessed plastic steps
CLEANNING EQUIPMENT: 35' vac hose. 12" flex vacuum head. 16'
telescoping pole
WALL & FLOOR BRUSH: 18" Gunite
LEAF SKIMMER: Deluxe
WATER TEST KIT: DPD type
OTHER ACCESSORIES: I - 12" x 12" main drain sumps. I - Hydrostatic valve
FOR ANY DESIGNATED MATERIAL, EQUIPMENT, PRODUCT, METHOD OF
CONSTRUCTION, INSTALLATION OR SERVICE IDENTIFIED BY SPECIFIC BRAND OR
TRADE NAME, CONTRACTOR HAS THE RIGHT TO SUBSTITUTE AND FURNISH
ANOTHER MATERIAL, EQUIPMENT PRODUCT, METHOD OF CONSTRUCTION,
INSTALLATION OR SERVICE OF COMPARABLE QUALITY OR UTILITY.
ADDITIONAL WORK
If Purchaser requests Contractor to perform additional work and if the Contractor is willing
to perform such additional work, Purchaser agrees to pay Contractor for each item of extra work at
the actual cost of subcontracts, labor, materials and equipment plus Fifteen Percent (15%) for
Contractor's overhead and fee. Request for extra work or modifications shall be in writing, signed
by both parties and shall become part of this contract. All sums for extras or modifications shall
be due and payable when completed, concurrent with the other progress payments, and the
Contractor shall have the right to stop work and keep the job idle if payments are not made when
due.
Extra work shall include, but is not limited to the following:
Any changes requested by the Purchaser not included in the scope of work.
Expense incurred because unsuitable or hard soil, filled ground, rocks, ground water or any
other material not removable by ordinary hand tools is encountered.
The removal or rerouting of pipes, sprinkler systems, electrical wires, water or sewage
disposal or conduits in areas of excavation.
Any change or alteration from the drawings or specifications.
3
-,,-
if.
... ii
l_s
-,
f
-J'.
,..
~
~
/ .. l.J ~
, ........ -:-
.- '-I ~.
<I;..y "'
vJ
....c" t"
,
" "
~ ~
r '0
~f f t ~\ ~
~ .
~ -
, r '""
,- ~~
,.
~ r~ (
'^
I - .. S "
i r \'
i ( '~.
';'. \ )
lJ'. f i jf '~
! ~ '1
~
i
r
~ F c..
~f [
1~
/
'-.,
~ ,
& ~
jd
~
'---'