THIS IS A TRUSS PLACEMENT DIAGRAM ONLY.These trusses are
designed as individual components to be incorporated into the building design
at the specification of the building designer. See Individual design sheets for
each truss design identified on the placement drawing. The building designer
is responsible for temporary and permanent bracing of the roof and floor
systems and for the overall structure. The design of the truss support
structure including headers, beams, walls, and columns is the responsibility of
the building designer. For general guidance regarding the bracing, consult
"Bracing of Wood Truss" available from the Truss Plate Institute, 583 D'Onifrio
Drive: Madison, WI 53179
Davis Homes
Perry OYL 144-Roof Trusses
COMPONENT
PLACEMENT PLAN
**GIRDERS MUST BE FULLY CONNECTED TOGETHER PRIOR TO ADDING ANY LOADS.**DIMENSIONS ARE READ AS: FOOT-INCH-SIXTEENTH.**TRUSS TO TRUSS CONNECTIONS ARE TOE-NAILED, UNLESS NOTED OTHERWISE.
General Notes:
**DAMAGED COMPONENTS SHOULD NOT BE INSTALLED UNLESS TOLD TO BY THE COMPONENT PLANT.**FRAMER MUST REFER TO PLANS WHILE SETTING COMPONENTS.