HomeMy WebLinkAboutSumpSUMP PUMP WATER DISCHARGE OUTLETS
It shall be the responsibility of the builder to provide for an a
discharge outlet for a sump pump. dequate
• If a subsurface storm water drainage system is available (adjacent)
the building site, the
systemsump pump shall discharge via a pipe to this to
. This must be shown on the submitted site plans in detail, a
the connections must be inspected by the Carmel City Engineer. nd
If a flowing stream is available (adjacent) to the buildingsite
sump pump shall discharge directly to this stream. This mst be�sthe
hown
on the site plan in detail.
If no other way exists for discharge, the sump Pum
be located in an area between the back wall of the house and th
Pump pipe outlet shall
Of the rear yard. In no circumstance shall the sum a middle
Closer than twenty-five feet, zero inches (25'0") to theeasement
be
the storm water Swale. This location shall be shown on the s —te of
n detai to p an
GEOTHERMAL HEAT PUMP
WATER DISCHARGE OUTLET
In shall be the responsibility of the builder or propertyowner
for an adequate discharge outlet for Geothermal heat pumps.
to provide
• It is highly recommended that a closed loo p
heat pump be used in Carmel and Clay TownshipYstem for a Geothermal
Injection wells are not recommended for use in Carmel and Cl
Special permission from the City of Carmel must be obtained if Township.
the only system that can be used. Contact the Water Department this is
for additional information. t (846-7315)
If a water discharge outlet is proposed for the Geothermal h
system it must outlet directlyb eat pump
Storm water System or a subsuface pStormndrainage eithertile lswste stream,
connection must be inspected by the Carmel City Engineerand must be
shown in detail on the site or plot plan. If the sum be
Geothermal heat pump is to discharge into a County regulatedor
it will need to tie directly into a subsurface the and be dr vee bway,
the County Surveyor. approved by