HomeMy WebLinkAboutApplication
Page 1 of 1
Holmes, Christine B
From: Holmes, Christine B
Sent: Wednesday, June 28,20062:59 PM
To: Mast, Darren (dmast@carmel.in.gov); Brennan, Kevin S (kbrennan@carmel.in.gov); Weddington, Trudy A.;
Blanchard, Jim E; Brewer, Scott I; Conn, Angelina V; DeVore, Laura B; Dolan, Veronica A; Griffin, Matt L; Hancock,
Ramona B; Hohlt, William G; Hollibaugh, Mike P; Holmes, Christine B; Keeling, Adrienne M; Lillard, Sarah N;
Littlejohn, David W; Mindham, Daren; Ochs, James A; Ryg, Karyn; Schriner, Adam J; Stewart, Lisa M; Tingley,
Connie S
Cc: 'fredavide@castaliahomes.com'
Subject: Docket No. Assignment: (SDR RES) Watkins House (#06060021 SDR RES)
I have contacted the petitioner and updated the file. I have issued the necessary Docket Number for (SDR) Watkins House. It is
the following:
Docket No. 06060021 SDR RES: Watkins House
DR Application Fee:
otal Fee:
$133.50
$133.50
Docket No. 06060021 SDR RES: Watkins House
The applicant seeks approval for the construction of a 1,91 0.89-square foot, two-story single-family dwelling.
The site is located at 131 3rd Street NW. It is zoned R4/Residential and is within the Old Town Overlay.
Filed by Frank Redavide of Castalia Homes for Jeff Watkins.
Petitioner, please note the following:
1. This item does not require review by the Technical Advisory Committee.
2. Mailed and Published Public Notice does not need to occur.
3. Proof of Notice is not needed.
4. The Filing Fee must be paid before issuance of the letter of decision.
5. This Item will be reviewed administratively.
PETITIONER: refer to your instruction sheet for more detail.
Mr. Redavide can be contacted at 317.76.6770 or fax 317.706.6771.
Thank you.
,
Christine Barton-Holmes
Planning Administrator
Carmel City Hall
One Civic Square
Carmel, IN 46032
(317) 571-2425
~C~JtaliaHomes
Where We Build Your Dreams
Frank Redavide
11805 North Pennsylvonio St.
Cormel, Indiono 46032
www.costoliohomes.com
Phone: (317) 706-6770
Fox: (317) 706-6771
Mobile: (317) 496-6026
Emoil: lredovide@costoliohomes.com
6/28/2006
~
w
o
DOCKET NO.
SDR
DATE RECEIVED:
(Information above to be completed by Department of Community Services)
CITY OF CARMEL AND CLAY TOWNSHIP
Department of Community Services
Division of Planning & Zoning
SITE PLAN & DE~IGN REVIEW
APPLICATION & PROCEDURES
Residential: $133.50 Commercial: $374.00
PREPARATION AND APPROVAL PROCEDURE FOR
THE CITY OF CARMEL & CLAY TOWNSHIP
HAMILTON COUNTY, INDIANA
Applicant Name: C{Ut", l( (J .z OlttJ ; () e
.
Applicant Address: JJcg 0 ~ .AJ~ P.€1I1\ S,:, ill""':" .r+
Applicant Phone Day: ~ I") - 7 () to, b ') J 0
Applicant Fax Number: ) 17 - 7 Db ~ bT17 I
Applicant Email Address: Fr,j4-\llJ..e p c~ oS h. \,~ Ac;V\o's-
Property Owner Name: :r " ~,: r~ /.J", + j.(. ,'/\ )
Property Owner Address: }q'i A-""o S /).111/\ r f.
Property Owner Phone Day: ') n - .f'.r 7" CJS' 'f g
Signature of filer: ~ __~
FMAlk A~/JA'I/:/)t?
(Printed Name)
Cc-IJ~ I ~A./ '-1b{)j~
Evening: J /), 'If? b .. (00:;) b
(' 0 ""
c&vJ~1
Evening:
;:,J L/hlJi)
{o- S'j-?- C;s'i'f
THIS PROCESS MUST BE COMPLETE BEFORE AN IMPROVEMENT LOCATION PERMIT WILL BE ISSUED.
This checklist is to be followed in filing a petition. The Department will review each item to ensure it is complete. The
application will not be considered filed with the Department until all items are complete.
Completed
~ No Petitioners shall contact the Planning & Zoning Division of the Department of Community Services (Planning
V Department) to schedule a pre-application conference, during which the petitioners will be advised of the details of the
review procedures. It shall be the responsibility of the petitioner to become familiar with the regulations,
policies and procedures of the City. If desired, a copy of the Carmel/Clay Zoning Ordinance may be purchased
from the Planning Department. Review the document carefully. At the pre-application conference, the petitioner
shall designate one contact person to work with the Planning Department for the duration of the project.
Contact:
Department of Community Services
City Hall, Third Floor
One Civic Square
Carmel, IN 46032
Telephone: 317/571-2417
1 of 3
u
u
e No Basic Proiect Information.
Address of Property: J 3) .
Tax ID Number:
~-y
3,J
St~
))0.
C'j./) ..oj
.J,..v
"16 P3a.
- 0 \ d -\n 0Yl - c...)~(l!fCLC-.(.ey s.~ "0 a.K'-e€l
Zoning:
Current Use:
v",,-J
Lo-1
Proposed Use: S ;'^.J ~ ~, ~
Please check appropriate box:
_ New Construction
o Renovation/Addition
Yes @ Recorded deed or recorded land contract. Must be the most recent recorded deed.
Yes ~ Letter of consent. If you are leasing, buying on contract, or petitioning for property that is not legally in your name, the
owner of the property must sign a letter giving his or her consent for the petition.
~
No Existing Features & Site Analvsis Plan. Please provide us with: two (2) print copies of your property surveyor site
plan, accurately drawn to scale, and one legible reduction at either 8.5" x 11" or 11" x 17" suitable for photocopying.
The site plan must illustrate:
1. The subject property;
2. The location of all existing and proposed buildings, structures and improvements to be made to the subject
property, including drainage and erosion control facilities and features;
3. Accurate dimensions of the parcel, buildings, parking areas and ingress/egress driveways;
4. Location, owner of record, zoning and use of adjacent properties, including the location, size and use of all
structures within fifty (50) feet of the subject property;
5. Location, right-of-way and pavement width of all streets adjacent to the subject property; and
6. Proposed connections to public utilities.
7. Location, size and type of all existing landscaping on the property.
CVY
2. Two (2) copies of the landscaping plan indicating the location of plantings, types and sizes of plantings,
planting details, and mounding locations and details.
3. Two (2) copies of the signage plan indicating the location, size, materials and colors of any proposed signs.
2 of 3
U
EVALUATING YOUR
U
PETITION
Section 23D.4 (B-C) of the Carmel/Clay Zoning Ordinance states:
Review.
Review of the Application and Supporting Documents and Materials by the Director; following the receipt of the written
application and required supporting information by the Director, the Director shall review the materials for the sole purpose of
determining whether the application is complete and in technical compliance with all applicable ordinances, laws and
regulations.
If the materials submitted by the applicant are not complete or do not comply with the necessary legal requirements, the
Director shall inform the applicant of the deficiencies in said materials.
,
1. Unless and until the Director formally accepts the application as complete and in legal compliance, it shall not be
considered as formally filed for the purpose of proceeding to succeeding steps toward approval as hereinafter set forth.
2. Within ten (10) days of the formal acceptance of the application by the Director, he shall formally approve, deny, or
request additional information about the petition.
Approval or Denial of the Application bv the "Commission".
1. An approved Site Plan & Design Review petition shall be valid for two (2) years from the date of approval. If
construction of the building(s) has (have) not started at the end of the two (2) year period, the Site Plan & Design
Review request must be re-submitted to the Director.
2. If an approved Site Plan & Design Review petition is (are) substantially altered, re-submittal to the Director for approval
is required.
3. If the petition is denied by the Director, the Director shall provide the applicant with a copy of said reasons, if
requested.
4. The applicant may appeal the decision of the Director, as specified in Chapter 30.
Z:\docs\shared\FORMS\PC Applications - current\Site Plan Design Review 2004.rtf
01/03/2006
3 of 3
Page 1 of 1
DeVore, Laura B
From: Conn, Angelina V
Sent: Monday, June 26, 2006 4:56 PM
To: DeVore, Laura B
Cc: Holmes, Christine B
Subject: FW: 131 Third Street NW Carmel
Laura: please include this consent "letter" with the SDR that was submitted today.
Thank you,
Angie
From: Jeff Watkins [mailto:jwatkins@esallc.com]
Sent: Monday, June 26, 2006 4:02 PM
To: Conn, Angelina V
Cc: fredavide@castaliahomes.com
Subject: 131 Third Street NW Carmel
Angie,
Frank Redavide of Castalia Homes is our builder; we give Frank permission to act on our behalf to
submit our home plans for approval.
Please do not hesitate to contact me wi any questions.
Thank you
Jeff
Jeff Watkins
Environmental Services Associates, LLC
P.O. Box 333
Carmel, Indiana 46082
Phone 317 544-2133
Fax 317544-2135
Mobile 317 557-9588
Office Location: 4201 Millersville Road, Indpls., IN
6/26/2006
1-
, Foster Land SurvQ'jng, Inc.
MAPPING - SUBDIVISIONS - SITE DESIGN
BOUNDARY - TOPOGRAPHIC - LAYOUT
8801 SPINNAKER CT. INDIANAPOLIS, IN 46256 (317) 594-9933
SITE DEVELOPMENT PLAN
131 3rd StreetNW, Carmel, IN 46032
(INSTRUMENT NO. 200400033262)
Last Date of Field work: 6-9-2006
MQIE:
This Plot Plan was derived using construction plans and record drawings. This
information was not necessarily confirmed by a field survey. Therefore, Foster Land
Surveying, Inc. does not warrant the accuracy of the information contained hereon.
All existing conditions should be verified by the Builder and Contractor prior to
construction. Please report any discrepancies to Foster Land Surveying, Inc.
immediately. Failure to do so will imply that the Contractor assumes all liability.
FLOOD HAZARD STATEMENT: The accuracy of
all flood hazard data shown on this plan is
subject to uncertainties in location and/or
elevation due to deviation in map scale and
reproduction of the referenced flood insurance
rate map. It has been determined that ALJ. the
land of 131 3rd Street NW, Carmel, Indiana
DOES NOT LIE within Zone A as designated on
Panel 207 of 290, Map No. 18057C0207F. Dated
February 19, 2003 of the FIRM map by the
Federal Emergency Management Agency.
TYPICAL WATERSHED
PATTERN FOR LOT.
\ , I
~n'
,U-l
I I \
NOTE: BUILDER TO ENSURE
ADEQUATE DRAINAGE AWAY FROM
STRUCTURE.
tmIE: Per Carmel Sewer Collection, the lowest elevation to have gravity sanitary
sewer service must be more than one (1) foot above the lowest top of casting
elevation of either the first upstream or downstream manhole on the main line sewer
to which the connection is to be made.
't5 O-.~*=-
AMES A. FO , II
LS NO. 20500003
-
-
...
Property Address: 131 3rd NW, Carmel, IN 46032
County: Hamilton Project: 06-034 Owner: Castalia Homes
Revisions:
Drawn By: R. Thomas Date: 6/14/2006
Page 1 of 2
LEGEND
@ SEEDING REQUIRED
@ EX. SANITARyl MH.
~ STABILIZED
W/; ENTRANCE
SL - SANITARY LATERAL
- S - SANITARY S~WER
-W-WATER LINE,
.. Silt Fence
· Water Meter
(R) Record
(M) Measured
e Cleanout
VI
::
rrI
-~-
35 Min. F. Y.
DATI
-'
VI
e>-
(0 It)
(0 IX)
,...... 0)
~ IX)
'-" 0
,.....
0 ...;
c u..
Q)
- C'"
Q) (/)
L.
.-1
~;
1
-T"""'":""7-~
20 Min. R. Y.SB
Deed Overlap.
No improvements
within hatched area
I
\1
RjW
SicfewaTk
3:
z
Q)
::l
C
Q)
~I
_ TC 823.92
Jrd Street NorthwesL Inv. 815.12
S S s F'ow~
(Asphalt)
..,
en
Inlet protection
Required on
Any
Downstream
Inlet
(T)'I).)
[.Y.S.B.
[12ll
32.0'
~
L.
01 L. 0
I"') .!: 0).2 ~
.=IX) c
"It~d"Oo
N ..- - C'" (/)
IX)QO)Q)
II "0 ~o::: ~
.Q). Q)E
wen..,Q.
u..:ou..EQ)
....., Q. en
~ u..: 0 C'" ti 0
~ ct(/),-"Q)
9.0'
~
0
Q) Q)
Q Q.
0
0 01
en C
"0 :;;
C en
0 Q) 'x
....J >
'C W
(/) Q
~ -'
VI
~ -...J
0
q
~
t.I
~
o
-.i
Q)N
01 IX)
~ II
o
"LJ
U; 4.0
u..(1l
18.9' 0
9.7'
~~~~~~._I
T' I ..
Chainlink fence
oJY
C
I&J
~
~
~
o 10 20
SCALE: 1 "=20'
EROSION CONTROL NOTES:
1.) LAND ALTERATION WHICH STRIPS THE LAND OF VEGETATION, INCLUDING
REGRADING, SHALL BE DONE IN A MANNER THAT WILL MINIMIZE EROSION.
2.) CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL ORDINANCES
THAT APPLY.
3.) THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE
CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL
SEDIMENT FROM LEAVING THE SITE.
4.) ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE
INSTALLED IF DEEMED NECESSARY BY ON SITE INSPECTION.
5.) SEDIMENT LADEN WATER SHALL BE DETAINED BY EROSION CONTROL
PRACTICES AS NEEDED TO MINIMIZE SEDIMENTATION IN THE RECEIVING
STREAM. NO STORM WATER SHALL BE DISCHARGED FROM THE SITE IN A
MANNER THAT CAUSES EROSION AT THE POINT OF DISCHARGE.
6.) WASTES AND UNUSED BUILDING MATERIALS SHALL NOT BE ALLOWED
TO BE CARRIED FROM THE SITE STORM WATER RUNOFF. PROPER DISPOSAL
OF ALL WASTES AND UNUSED BUILDING MATERIALS IS REQUIRED.
7.) SEDIMENT BEING TRACKED ONTO PUBLIC OR PRIVATE ROADWAYS
SHALL BE MINIMIZED. CLEARING OF ACCUMULATED SEDIMENT SHALL NOT
INCLUDE FLUSHING WITH WATER. CLEARED SEDIMENT SHALL BE RETURNED
TO THE SITE FOR DISPOSAL
8.) SOIL WHICH HAS ACCUMULATED NEXT TO EROSION CONTROL DEVICES
SHALL BE COLLECTED AND REDISTRIBUTED ON SITE AFTER EACH RAINFALL
EVENT, AND AT LEAST ONCE PER WEEK.
9.) IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE
INTERRUPTED BY WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL BE
COVERED WITH FILTER FABRIC.
10.) BURNING OF WASTE AND DEBRIS IS mrr ALLOWED ON SITE. ALL
WASTE, DEBRIS, DEMOLISHED STRUCTURES, OLD FENCING, CUT TREES, ETC.
WITHIN CONSTRUCTION AREA SHALL BE REMOVED AND DISPOSED OF OFF
SITE. (HOMEOWNER SHALL CLEARLY MARK ANY EXISTING TREES THAT THEY
INTEND TO KEEP.)
1.) SCHEDULE OF EARTHWORK ACTIVITIES:
a.) THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED
SHALL BE KEPT TO A PRACTICAL MINIMUM. THE AREA SHALL BE
STABILIZED AS SOON AS POSSIBLE. TEMPORARY VEGETATION OR MULCHING
SHALL BE USED TO PROTECT EXPOSED AREAS IF PERMANENT VEGETATION
CANNOT BE SEEDED WITHIN 15 DAYS OR ACTIVITY CEASES FOR MORE THAN
15 DAYS OR AS DIRECTED BY THE ENGINEER.
b.) TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM MARCH 1 TO
OCTOBER 31. STOCKPILE TOPSOIL AT ALL OTHER TIMES OF THE YEAR.
PERMANENT AND FINAL VEGETATION AND STRUCTURAL EROSION CONTROL
DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER FINAL
GRADING OR AS SOON AS POSSIBLE.
Property Address: 131 3rd StreetNW, Carmel, IN 46032
County: HAMILTON Project: 06-034 Owner(s): CastaliaHomes
Revisions:
Date: 6-14-2006
Page 2 of2
SITE DEVELOPMENT PLAN
I
131 3rd Street NW
Carmel, IN, 46032
(INSTRUMENT NO. 1995-11830)
SEASONAL SOIL PROTECTION 'CHART
JAN. FEB. MAR APR MAY JUN. JUL AUGSE~. OCT. NOV DEC.
A II II III j. P.
= SILT FENCE CONSTRUCTION =
N.T.S.
t;dSPAClNG~
PER MfG.
RECOMMENDA liON
NOTE:
POSTS SHAU: LENGTH Of'
36 INCHES PLUS BU IAL DEPTH. POST MATERIAL
SHALL BE WOOD. STEEl. OR SYNTHEllC AND SHALL
BE OF" SUFFICIENT STRENGTH TO RESIST DAMAGE FILTER FABRIC
DURING INSTALLAllON AND TO SUPPORT APPUED
LOADS.
fABRIC SHALL BE A WOVEN GEOTEXllLE fABRtC
CONSlSllNG Of STRONG. ROT RESISTANT MATERIALS FLOW
RESISTANT TO DETERIORAllON fROM ULTRAVIOlET
AND HEAT EXPOSURE.
B
WIRE
WOOD POST
A = KENTUCKY BLUEGRASS 100 LBS/ ACRE; GREEPING RED
FESCUE 100 LBS/ACRE; PLUS 2 TONS STRAW MULCH/ACRE,
OR ADD ANNUAL RYEGRASS 20 LBS/ACRE i.
B = KENTUCKY BLUEGRASS 120 LBS/ACRE; CREEPING RED
FESCUE 120 LBS/ACRE; PLUS 2 TONS STRAW MULCH/ACRE,
OR ADD ANNUAL RYEGRASS 30 LBS/ACRE
C = SPRING OATS 3 BUSHELS/ACRE
D = WHEAT OR RYE 2 BUSHELS/ACRE
E = ANNUAL RYEGRASS 40 LBS/ACRE (1 LBJl1000 SQ. FT.)
F = SOD
/ / / / / = IRRIGATION REQUIRED
** = IRRIGATION REQUIRED FOR 2-3 WEEKS ~FTER SODDING.
SEEDBED PREPARATION FOR PERMANENT SEEDING:
1.) TEST SOIL TO DETERMINE pH AND NUTRIENT LEVELS.
I
2.) IF SOIL pH IS UNSUITABLE FOR THE SPECI~S TO BE SEEDED,
APPLY LIME ACCORDING TO TEST RECOMMENDATIONS.
3.) FERTILIZE AS RECOMMENDED BY THE SOIL lTEST. IF TESTING
WAS NOT DONE, CONSIDER APPLYING 400-609 LBS/ACRE OF
12-12-12 ANALYSIS, OR EQUIVALENT, FERTILIZER.
4.) TILL TOP SOIL TO OBTAIN A UNIFORM SEEDBED, WORKING
THE FERTILIZER AND LIME INTO THE SOIL 2-4 INCHES DEEP
WITH A DISK OR RAKE ACROSS THE SLOPE.
RULE 5 REQUIRES ALL DISTURBED AREAS LIKELY TO BE IDLE
FOR 15 DAYS, OR MORE, SHALL HAVE SURFACE STABILIZATION
APPLIED. WHEN WEATHER CONDITIONS PREVENT RAPID
GERMINATION OF GRASS, 2 TON/ACRE MULCHI.NG SHOULD BE
USED TO ENSURE GROUND STABILIZATION REQUIREMENTS ARE
MET. '
MAINTENANCE:
INSPECT THE SILT fENCE PERIODICALLY AND AfTER
EACH STORM EVENT. If fENCE fABRIC TEARS,
STARTS TO DECOMPOSE. OR IN ANY WAY BECOMES
INEf'FECllVE. REPLACE THE AFFECTED PORllON
IMMEDIATELY. REMOVE DEPOSITED SEDIMENT WHEN
IT REACHES HALF" THE HEIGHT Of' THE fENCE AT
ITS LOWEST POINT OR IS CAUSING THE fABRIC TO
BULGE. TAKE CARE TO AVOID UNDERMINING THE
fENCE DURING CLEANOUT. AfTER THE CONTRIBUllNG
DRAINAGE AREA HAS BEEN STABIUZED. REMOVE THE
fENCE AND SEDIMENT DEPOSITs. BRING THE
DISTURBED AREA TO GRADE AND STABIUZE.
~
EXTEND FABRIC &
WIRE TO 4" BELOW
SURFACE
= STABILIZED CONSTRUCTION ENTRANCE =
N.T.S.
PROVIDE APPROPRlA TE TRANSlllON
BETWEEN STABIUZED CONSTRUCllON
ENTRANCE AND EXISllNG PAVEMENT.
~~~~J~.
= PROFILE =
GROUNo-........
MAINTENANCE:
INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA
WEEKLY AND AfTER EACH STORM EVENT OR HEAVY
USE. RESHAPE PAD AS NEEDED fOR DRAINAGE AND
RUNOFF CONTROL TOP DRESS WITH CLEAN STONE AS
NEEDED. IMMEDIATELY REMOVE MUD AND SEDIMENT
TRACKED OR WASHED ONTO PUBUC!l>RIVATE ROADS BY
BRUSHING OR SWEEPING. fLUSHING SHOULD ONLY BE
USED If WATER IS CONVEYED INTO A SEDIMENT TRAP
OR BASIN. REPAIR ANY BROKEN ROAD PAVEMENT
IMMEDIATELY.
= PLAN =
I HEREBY CERTIFY THAT THE
SECTION 102.07 NOTES: .,
I) BUILDER TO INSTALL TEMPORARY CONSTRUCTION ENTRANCE PRIOR TO ANY EARTH DISTURBING
ACTIVITY. I
II) BUILDER TO INSTALL SILT FEN,CE OR APPROVED EQUAL BUILDER TO INSTALL AND/OR
MAINTAIN INLET SEDIMENT PROTECl)ON.
III) BUILDER TO CLEAN MUD FROM! STREETS AND ALLEYS DAILY. CLEARED SEDIMENT MUST BE
REDISTRIBUTED OR DISPOSED OF IN A MANNER COMPLIANT WITH ALL STATUTES AND
REGULATIONS. !
IV) BUILDER MUST COMPLY WITH t-LL ORDINANCES GOVERNING SITE EROSION AND SEDIMENT
SEDIMENT CONTROL AND THE APPROVED EROSION CONTROL PLAN FOR THE DEVELOPMENT.
V) BUILDER SHALL NOT ALTER ELEVATIONS OF ADJOINERS LOT. BUILDER TO ENSURE
SEDIMENT/EROSION DOES NOT LEAVE THE LOT.
VI) THE OVERALL SELF MONITORING PLAN AND PROCEDURES AS APPROVED FOR THE
DEVELOPMENT SHALL BE USED IN CONJUNCTION WITH THIS PROPOSED SITE PLAN.
VII) BUILDER TO OBTAIN A REFERRAL FROM THE DEVELOPER FOR THE "QUALlFIED INDIVIDUAL" IN
CHARGE OF THE MANDA TORY STORM WATER POLLUTION PREVENTION SELF MONITORING PROGRAM
FOR THIS PROJECT SITE. BUILDER TO ENSURE THE NECESSARY DOCUMENTS, PLANS, AND
PROCEDURES ARE IN PLACE PRIOR TO THE COMMENCEMENT OF CONSTRUCTION.
VIII) BUILDER IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF ALL EROSION AND
SEDIMENT CONTROL MEASURES UNTIL SITE IS STABILIZED.
AND EROSION & SEDIMENT
CONTROL MEASURES ARE
CONSISTENT WITH THE OVERALL
DEVELOPMENT PLANS.
C-.
~
Foster Land SUTVQ'jng, Inc.
MAPPING - SUBDIVISIONS - SITE DESIGN
BOUNDARY - TOPOGRAPHIC - LAYOUT
8801 SPINNAKER cr. INDIANAPOLIS, IN 46256 (317) 594-9933