Loading...
HomeMy WebLinkAboutApplication Page 1 of 1 Holmes, Christine B From: Holmes, Christine B Sent: Wednesday, June 28,20062:59 PM To: Mast, Darren (dmast@carmel.in.gov); Brennan, Kevin S (kbrennan@carmel.in.gov); Weddington, Trudy A.; Blanchard, Jim E; Brewer, Scott I; Conn, Angelina V; DeVore, Laura B; Dolan, Veronica A; Griffin, Matt L; Hancock, Ramona B; Hohlt, William G; Hollibaugh, Mike P; Holmes, Christine B; Keeling, Adrienne M; Lillard, Sarah N; Littlejohn, David W; Mindham, Daren; Ochs, James A; Ryg, Karyn; Schriner, Adam J; Stewart, Lisa M; Tingley, Connie S Cc: 'fredavide@castaliahomes.com' Subject: Docket No. Assignment: (SDR RES) Watkins House (#06060021 SDR RES) I have contacted the petitioner and updated the file. I have issued the necessary Docket Number for (SDR) Watkins House. It is the following: Docket No. 06060021 SDR RES: Watkins House DR Application Fee: otal Fee: $133.50 $133.50 Docket No. 06060021 SDR RES: Watkins House The applicant seeks approval for the construction of a 1,91 0.89-square foot, two-story single-family dwelling. The site is located at 131 3rd Street NW. It is zoned R4/Residential and is within the Old Town Overlay. Filed by Frank Redavide of Castalia Homes for Jeff Watkins. Petitioner, please note the following: 1. This item does not require review by the Technical Advisory Committee. 2. Mailed and Published Public Notice does not need to occur. 3. Proof of Notice is not needed. 4. The Filing Fee must be paid before issuance of the letter of decision. 5. This Item will be reviewed administratively. PETITIONER: refer to your instruction sheet for more detail. Mr. Redavide can be contacted at 317.76.6770 or fax 317.706.6771. Thank you. , Christine Barton-Holmes Planning Administrator Carmel City Hall One Civic Square Carmel, IN 46032 (317) 571-2425 ~C~JtaliaHomes Where We Build Your Dreams Frank Redavide 11805 North Pennsylvonio St. Cormel, Indiono 46032 www.costoliohomes.com Phone: (317) 706-6770 Fox: (317) 706-6771 Mobile: (317) 496-6026 Emoil: lredovide@costoliohomes.com 6/28/2006 ~ w o DOCKET NO. SDR DATE RECEIVED: (Information above to be completed by Department of Community Services) CITY OF CARMEL AND CLAY TOWNSHIP Department of Community Services Division of Planning & Zoning SITE PLAN & DE~IGN REVIEW APPLICATION & PROCEDURES Residential: $133.50 Commercial: $374.00 PREPARATION AND APPROVAL PROCEDURE FOR THE CITY OF CARMEL & CLAY TOWNSHIP HAMILTON COUNTY, INDIANA Applicant Name: C{Ut", l( (J .z OlttJ ; () e . Applicant Address: JJcg 0 ~ .AJ~ P.€1I1\ S,:, ill""':" .r+ Applicant Phone Day: ~ I") - 7 () to, b ') J 0 Applicant Fax Number: ) 17 - 7 Db ~ bT17 I Applicant Email Address: Fr,j4-\llJ..e p c~ oS h. \,~ Ac;V\o's- Property Owner Name: :r " ~,: r~ /.J", + j.(. ,'/\ ) Property Owner Address: }q'i A-""o S /).111/\ r f. Property Owner Phone Day: ') n - .f'.r 7" CJS' 'f g Signature of filer: ~ __~ FMAlk A~/JA'I/:/)t? (Printed Name) Cc-IJ~ I ~A./ '-1b{)j~ Evening: J /), 'If? b .. (00:;) b (' 0 "" c&vJ~1 Evening: ;:,J L/hlJi) {o- S'j-?- C;s'i'f THIS PROCESS MUST BE COMPLETE BEFORE AN IMPROVEMENT LOCATION PERMIT WILL BE ISSUED. This checklist is to be followed in filing a petition. The Department will review each item to ensure it is complete. The application will not be considered filed with the Department until all items are complete. Completed ~ No Petitioners shall contact the Planning & Zoning Division of the Department of Community Services (Planning V Department) to schedule a pre-application conference, during which the petitioners will be advised of the details of the review procedures. It shall be the responsibility of the petitioner to become familiar with the regulations, policies and procedures of the City. If desired, a copy of the Carmel/Clay Zoning Ordinance may be purchased from the Planning Department. Review the document carefully. At the pre-application conference, the petitioner shall designate one contact person to work with the Planning Department for the duration of the project. Contact: Department of Community Services City Hall, Third Floor One Civic Square Carmel, IN 46032 Telephone: 317/571-2417 1 of 3 u u e No Basic Proiect Information. Address of Property: J 3) . Tax ID Number: ~-y 3,J St~ ))0. C'j./) ..oj .J,..v "16 P3a. - 0 \ d -\n 0Yl - c...)~(l!fCLC-.(.ey s.~ "0 a.K'-e€l Zoning: Current Use: v",,-J Lo-1 Proposed Use: S ;'^.J ~ ~, ~ Please check appropriate box: _ New Construction o Renovation/Addition Yes @ Recorded deed or recorded land contract. Must be the most recent recorded deed. Yes ~ Letter of consent. If you are leasing, buying on contract, or petitioning for property that is not legally in your name, the owner of the property must sign a letter giving his or her consent for the petition. ~ No Existing Features & Site Analvsis Plan. Please provide us with: two (2) print copies of your property surveyor site plan, accurately drawn to scale, and one legible reduction at either 8.5" x 11" or 11" x 17" suitable for photocopying. The site plan must illustrate: 1. The subject property; 2. The location of all existing and proposed buildings, structures and improvements to be made to the subject property, including drainage and erosion control facilities and features; 3. Accurate dimensions of the parcel, buildings, parking areas and ingress/egress driveways; 4. Location, owner of record, zoning and use of adjacent properties, including the location, size and use of all structures within fifty (50) feet of the subject property; 5. Location, right-of-way and pavement width of all streets adjacent to the subject property; and 6. Proposed connections to public utilities. 7. Location, size and type of all existing landscaping on the property. CVY 2. Two (2) copies of the landscaping plan indicating the location of plantings, types and sizes of plantings, planting details, and mounding locations and details. 3. Two (2) copies of the signage plan indicating the location, size, materials and colors of any proposed signs. 2 of 3 U EVALUATING YOUR U PETITION Section 23D.4 (B-C) of the Carmel/Clay Zoning Ordinance states: Review. Review of the Application and Supporting Documents and Materials by the Director; following the receipt of the written application and required supporting information by the Director, the Director shall review the materials for the sole purpose of determining whether the application is complete and in technical compliance with all applicable ordinances, laws and regulations. If the materials submitted by the applicant are not complete or do not comply with the necessary legal requirements, the Director shall inform the applicant of the deficiencies in said materials. , 1. Unless and until the Director formally accepts the application as complete and in legal compliance, it shall not be considered as formally filed for the purpose of proceeding to succeeding steps toward approval as hereinafter set forth. 2. Within ten (10) days of the formal acceptance of the application by the Director, he shall formally approve, deny, or request additional information about the petition. Approval or Denial of the Application bv the "Commission". 1. An approved Site Plan & Design Review petition shall be valid for two (2) years from the date of approval. If construction of the building(s) has (have) not started at the end of the two (2) year period, the Site Plan & Design Review request must be re-submitted to the Director. 2. If an approved Site Plan & Design Review petition is (are) substantially altered, re-submittal to the Director for approval is required. 3. If the petition is denied by the Director, the Director shall provide the applicant with a copy of said reasons, if requested. 4. The applicant may appeal the decision of the Director, as specified in Chapter 30. Z:\docs\shared\FORMS\PC Applications - current\Site Plan Design Review 2004.rtf 01/03/2006 3 of 3 Page 1 of 1 DeVore, Laura B From: Conn, Angelina V Sent: Monday, June 26, 2006 4:56 PM To: DeVore, Laura B Cc: Holmes, Christine B Subject: FW: 131 Third Street NW Carmel Laura: please include this consent "letter" with the SDR that was submitted today. Thank you, Angie From: Jeff Watkins [mailto:jwatkins@esallc.com] Sent: Monday, June 26, 2006 4:02 PM To: Conn, Angelina V Cc: fredavide@castaliahomes.com Subject: 131 Third Street NW Carmel Angie, Frank Redavide of Castalia Homes is our builder; we give Frank permission to act on our behalf to submit our home plans for approval. Please do not hesitate to contact me wi any questions. Thank you Jeff Jeff Watkins Environmental Services Associates, LLC P.O. Box 333 Carmel, Indiana 46082 Phone 317 544-2133 Fax 317544-2135 Mobile 317 557-9588 Office Location: 4201 Millersville Road, Indpls., IN 6/26/2006 1- , Foster Land SurvQ'jng, Inc. MAPPING - SUBDIVISIONS - SITE DESIGN BOUNDARY - TOPOGRAPHIC - LAYOUT 8801 SPINNAKER CT. INDIANAPOLIS, IN 46256 (317) 594-9933 SITE DEVELOPMENT PLAN 131 3rd StreetNW, Carmel, IN 46032 (INSTRUMENT NO. 200400033262) Last Date of Field work: 6-9-2006 MQIE: This Plot Plan was derived using construction plans and record drawings. This information was not necessarily confirmed by a field survey. Therefore, Foster Land Surveying, Inc. does not warrant the accuracy of the information contained hereon. All existing conditions should be verified by the Builder and Contractor prior to construction. Please report any discrepancies to Foster Land Surveying, Inc. immediately. Failure to do so will imply that the Contractor assumes all liability. FLOOD HAZARD STATEMENT: The accuracy of all flood hazard data shown on this plan is subject to uncertainties in location and/or elevation due to deviation in map scale and reproduction of the referenced flood insurance rate map. It has been determined that ALJ. the land of 131 3rd Street NW, Carmel, Indiana DOES NOT LIE within Zone A as designated on Panel 207 of 290, Map No. 18057C0207F. Dated February 19, 2003 of the FIRM map by the Federal Emergency Management Agency. TYPICAL WATERSHED PATTERN FOR LOT. \ , I ~n' ,U-l I I \ NOTE: BUILDER TO ENSURE ADEQUATE DRAINAGE AWAY FROM STRUCTURE. tmIE: Per Carmel Sewer Collection, the lowest elevation to have gravity sanitary sewer service must be more than one (1) foot above the lowest top of casting elevation of either the first upstream or downstream manhole on the main line sewer to which the connection is to be made. 't5 O-.~*=- AMES A. FO , II LS NO. 20500003 - - ... Property Address: 131 3rd NW, Carmel, IN 46032 County: Hamilton Project: 06-034 Owner: Castalia Homes Revisions: Drawn By: R. Thomas Date: 6/14/2006 Page 1 of 2 LEGEND @ SEEDING REQUIRED @ EX. SANITARyl MH. ~ STABILIZED W/; ENTRANCE SL - SANITARY LATERAL - S - SANITARY S~WER -W-WATER LINE, .. Silt Fence · Water Meter (R) Record (M) Measured e Cleanout VI :: rrI -~- 35 Min. F. Y. DATI -' VI e>- (0 It) (0 IX) ,...... 0) ~ IX) '-" 0 ,..... 0 ...; c u.. Q) - C'" Q) (/) L. .-1 ~; 1 -T"""'":""7-~ 20 Min. R. Y.SB Deed Overlap. No improvements within hatched area I \1 RjW SicfewaTk 3: z Q) ::l C Q) ~I _ TC 823.92 Jrd Street NorthwesL Inv. 815.12 S S s F'ow~ (Asphalt) .., en Inlet protection Required on Any Downstream Inlet (T)'I).) [.Y.S.B. [12ll 32.0' ~ L. 01 L. 0 I"') .!: 0).2 ~ .=IX) c "It~d"Oo N ..- - C'" (/) IX)QO)Q) II "0 ~o::: ~ .Q). Q)E wen..,Q. u..:ou..EQ) ....., Q. en ~ u..: 0 C'" ti 0 ~ ct(/),-"Q) 9.0' ~ 0 Q) Q) Q Q. 0 0 01 en C "0 :;; C en 0 Q) 'x ....J > 'C W (/) Q ~ -' VI ~ -...J 0 q ~ t.I ~ o -.i Q)N 01 IX) ~ II o "LJ U; 4.0 u..(1l 18.9' 0 9.7' ~~~~~~._I T' I .. Chainlink fence oJY C I&J ~ ~ ~ o 10 20 SCALE: 1 "=20' EROSION CONTROL NOTES: 1.) LAND ALTERATION WHICH STRIPS THE LAND OF VEGETATION, INCLUDING REGRADING, SHALL BE DONE IN A MANNER THAT WILL MINIMIZE EROSION. 2.) CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL ORDINANCES THAT APPLY. 3.) THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING THE SITE. 4.) ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON SITE INSPECTION. 5.) SEDIMENT LADEN WATER SHALL BE DETAINED BY EROSION CONTROL PRACTICES AS NEEDED TO MINIMIZE SEDIMENTATION IN THE RECEIVING STREAM. NO STORM WATER SHALL BE DISCHARGED FROM THE SITE IN A MANNER THAT CAUSES EROSION AT THE POINT OF DISCHARGE. 6.) WASTES AND UNUSED BUILDING MATERIALS SHALL NOT BE ALLOWED TO BE CARRIED FROM THE SITE STORM WATER RUNOFF. PROPER DISPOSAL OF ALL WASTES AND UNUSED BUILDING MATERIALS IS REQUIRED. 7.) SEDIMENT BEING TRACKED ONTO PUBLIC OR PRIVATE ROADWAYS SHALL BE MINIMIZED. CLEARING OF ACCUMULATED SEDIMENT SHALL NOT INCLUDE FLUSHING WITH WATER. CLEARED SEDIMENT SHALL BE RETURNED TO THE SITE FOR DISPOSAL 8.) SOIL WHICH HAS ACCUMULATED NEXT TO EROSION CONTROL DEVICES SHALL BE COLLECTED AND REDISTRIBUTED ON SITE AFTER EACH RAINFALL EVENT, AND AT LEAST ONCE PER WEEK. 9.) IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FILTER FABRIC. 10.) BURNING OF WASTE AND DEBRIS IS mrr ALLOWED ON SITE. ALL WASTE, DEBRIS, DEMOLISHED STRUCTURES, OLD FENCING, CUT TREES, ETC. WITHIN CONSTRUCTION AREA SHALL BE REMOVED AND DISPOSED OF OFF SITE. (HOMEOWNER SHALL CLEARLY MARK ANY EXISTING TREES THAT THEY INTEND TO KEEP.) 1.) SCHEDULE OF EARTHWORK ACTIVITIES: a.) THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM. THE AREA SHALL BE STABILIZED AS SOON AS POSSIBLE. TEMPORARY VEGETATION OR MULCHING SHALL BE USED TO PROTECT EXPOSED AREAS IF PERMANENT VEGETATION CANNOT BE SEEDED WITHIN 15 DAYS OR ACTIVITY CEASES FOR MORE THAN 15 DAYS OR AS DIRECTED BY THE ENGINEER. b.) TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM MARCH 1 TO OCTOBER 31. STOCKPILE TOPSOIL AT ALL OTHER TIMES OF THE YEAR. PERMANENT AND FINAL VEGETATION AND STRUCTURAL EROSION CONTROL DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER FINAL GRADING OR AS SOON AS POSSIBLE. Property Address: 131 3rd StreetNW, Carmel, IN 46032 County: HAMILTON Project: 06-034 Owner(s): CastaliaHomes Revisions: Date: 6-14-2006 Page 2 of2 SITE DEVELOPMENT PLAN I 131 3rd Street NW Carmel, IN, 46032 (INSTRUMENT NO. 1995-11830) SEASONAL SOIL PROTECTION 'CHART JAN. FEB. MAR APR MAY JUN. JUL AUGSE~. OCT. NOV DEC. A II II III j. P. = SILT FENCE CONSTRUCTION = N.T.S. t;dSPAClNG~ PER MfG. RECOMMENDA liON NOTE: POSTS SHAU: LENGTH Of' 36 INCHES PLUS BU IAL DEPTH. POST MATERIAL SHALL BE WOOD. STEEl. OR SYNTHEllC AND SHALL BE OF" SUFFICIENT STRENGTH TO RESIST DAMAGE FILTER FABRIC DURING INSTALLAllON AND TO SUPPORT APPUED LOADS. fABRIC SHALL BE A WOVEN GEOTEXllLE fABRtC CONSlSllNG Of STRONG. ROT RESISTANT MATERIALS FLOW RESISTANT TO DETERIORAllON fROM ULTRAVIOlET AND HEAT EXPOSURE. B WIRE WOOD POST A = KENTUCKY BLUEGRASS 100 LBS/ ACRE; GREEPING RED FESCUE 100 LBS/ACRE; PLUS 2 TONS STRAW MULCH/ACRE, OR ADD ANNUAL RYEGRASS 20 LBS/ACRE i. B = KENTUCKY BLUEGRASS 120 LBS/ACRE; CREEPING RED FESCUE 120 LBS/ACRE; PLUS 2 TONS STRAW MULCH/ACRE, OR ADD ANNUAL RYEGRASS 30 LBS/ACRE C = SPRING OATS 3 BUSHELS/ACRE D = WHEAT OR RYE 2 BUSHELS/ACRE E = ANNUAL RYEGRASS 40 LBS/ACRE (1 LBJl1000 SQ. FT.) F = SOD / / / / / = IRRIGATION REQUIRED ** = IRRIGATION REQUIRED FOR 2-3 WEEKS ~FTER SODDING. SEEDBED PREPARATION FOR PERMANENT SEEDING: 1.) TEST SOIL TO DETERMINE pH AND NUTRIENT LEVELS. I 2.) IF SOIL pH IS UNSUITABLE FOR THE SPECI~S TO BE SEEDED, APPLY LIME ACCORDING TO TEST RECOMMENDATIONS. 3.) FERTILIZE AS RECOMMENDED BY THE SOIL lTEST. IF TESTING WAS NOT DONE, CONSIDER APPLYING 400-609 LBS/ACRE OF 12-12-12 ANALYSIS, OR EQUIVALENT, FERTILIZER. 4.) TILL TOP SOIL TO OBTAIN A UNIFORM SEEDBED, WORKING THE FERTILIZER AND LIME INTO THE SOIL 2-4 INCHES DEEP WITH A DISK OR RAKE ACROSS THE SLOPE. RULE 5 REQUIRES ALL DISTURBED AREAS LIKELY TO BE IDLE FOR 15 DAYS, OR MORE, SHALL HAVE SURFACE STABILIZATION APPLIED. WHEN WEATHER CONDITIONS PREVENT RAPID GERMINATION OF GRASS, 2 TON/ACRE MULCHI.NG SHOULD BE USED TO ENSURE GROUND STABILIZATION REQUIREMENTS ARE MET. ' MAINTENANCE: INSPECT THE SILT fENCE PERIODICALLY AND AfTER EACH STORM EVENT. If fENCE fABRIC TEARS, STARTS TO DECOMPOSE. OR IN ANY WAY BECOMES INEf'FECllVE. REPLACE THE AFFECTED PORllON IMMEDIATELY. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF" THE HEIGHT Of' THE fENCE AT ITS LOWEST POINT OR IS CAUSING THE fABRIC TO BULGE. TAKE CARE TO AVOID UNDERMINING THE fENCE DURING CLEANOUT. AfTER THE CONTRIBUllNG DRAINAGE AREA HAS BEEN STABIUZED. REMOVE THE fENCE AND SEDIMENT DEPOSITs. BRING THE DISTURBED AREA TO GRADE AND STABIUZE. ~ EXTEND FABRIC & WIRE TO 4" BELOW SURFACE = STABILIZED CONSTRUCTION ENTRANCE = N.T.S. PROVIDE APPROPRlA TE TRANSlllON BETWEEN STABIUZED CONSTRUCllON ENTRANCE AND EXISllNG PAVEMENT. ~~~~J~. = PROFILE = GROUNo-........ MAINTENANCE: INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AfTER EACH STORM EVENT OR HEAVY USE. RESHAPE PAD AS NEEDED fOR DRAINAGE AND RUNOFF CONTROL TOP DRESS WITH CLEAN STONE AS NEEDED. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBUC!l>RIVATE ROADS BY BRUSHING OR SWEEPING. fLUSHING SHOULD ONLY BE USED If WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY. = PLAN = I HEREBY CERTIFY THAT THE SECTION 102.07 NOTES: ., I) BUILDER TO INSTALL TEMPORARY CONSTRUCTION ENTRANCE PRIOR TO ANY EARTH DISTURBING ACTIVITY. I II) BUILDER TO INSTALL SILT FEN,CE OR APPROVED EQUAL BUILDER TO INSTALL AND/OR MAINTAIN INLET SEDIMENT PROTECl)ON. III) BUILDER TO CLEAN MUD FROM! STREETS AND ALLEYS DAILY. CLEARED SEDIMENT MUST BE REDISTRIBUTED OR DISPOSED OF IN A MANNER COMPLIANT WITH ALL STATUTES AND REGULATIONS. ! IV) BUILDER MUST COMPLY WITH t-LL ORDINANCES GOVERNING SITE EROSION AND SEDIMENT SEDIMENT CONTROL AND THE APPROVED EROSION CONTROL PLAN FOR THE DEVELOPMENT. V) BUILDER SHALL NOT ALTER ELEVATIONS OF ADJOINERS LOT. BUILDER TO ENSURE SEDIMENT/EROSION DOES NOT LEAVE THE LOT. VI) THE OVERALL SELF MONITORING PLAN AND PROCEDURES AS APPROVED FOR THE DEVELOPMENT SHALL BE USED IN CONJUNCTION WITH THIS PROPOSED SITE PLAN. VII) BUILDER TO OBTAIN A REFERRAL FROM THE DEVELOPER FOR THE "QUALlFIED INDIVIDUAL" IN CHARGE OF THE MANDA TORY STORM WATER POLLUTION PREVENTION SELF MONITORING PROGRAM FOR THIS PROJECT SITE. BUILDER TO ENSURE THE NECESSARY DOCUMENTS, PLANS, AND PROCEDURES ARE IN PLACE PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. VIII) BUILDER IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES UNTIL SITE IS STABILIZED. AND EROSION & SEDIMENT CONTROL MEASURES ARE CONSISTENT WITH THE OVERALL DEVELOPMENT PLANS. C-. ~ Foster Land SUTVQ'jng, Inc. MAPPING - SUBDIVISIONS - SITE DESIGN BOUNDARY - TOPOGRAPHIC - LAYOUT 8801 SPINNAKER cr. INDIANAPOLIS, IN 46256 (317) 594-9933