Loading...
HomeMy WebLinkAboutCorrespondence u Q City of Carmel VIA FAX: 580-2666 Original by Mail July 5,2001 L1 COpy Brian Pahud Landmark Properties 9333 North Meridian Street, Suite 350 Indianapolis,~ 46240 RE: Old Meridian Professional Center (phase Two) - ADLS Amendment for Landscaping Dear Mr. Pahud: This letter is in response to your ADLS amendment petition for the above referenced property. The following comments need to be addressed and/or plans updated accordingly: 1. Please refer to landscaping in terms of shrubs and trees. The notion that the proposed plan represents a 59 percent increase in plantings from the original plan is misleading at least. In addition most of the plant material you propose is smaller than that approved for use in the original plan (shrub height and tree caliper). As you indicate in your letter the objective is to correct not delete. 2. Identify the area at the rear of the buildings that is outside the utility easement and legal drain easement. This area would be suitable for relocating the plantings that may not be placed in the legal drain easement. In addition, please provide our Department with a copy of any agreements or approvals you have with the County Surveyor and/or the property owner to the south regarding the maintenance of all living trees and shrubs along the fencerow. 3. The landscaping proposed around the dumpster is not adequate nor does it come close to the level of landscaping proposed on the plan approved for construction by the Plan Commission. 4. Our Department relies on the plans submitted with applications to make a recommendation to the Plan Commission. Our department would not have recommended approval of this revised plan if it ad been submitted at the time of the original application. This is regardless of the issue of plantings identified in the legal drain easement. 5. Trees identified for the parking lot area have been replaced with shrubs in some locations and smaller trees in others. This is not an acceptable alternative. 6. Respond to Mr. Brewer's letter dated May 22,2001. I will rely on his assistance in reviewing the proposed changes. To date If you have any questions or if I may be of further assistance please do not hesitate to call. Sincerely, t, {~, . ~ ~on C. Dobosiewicz Planning Administrator cc: Scott Brewer Carmel/Clay Plan Commission Special Studies Committee OldMeridianPCl.rtf Page 1 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 u o City of Carmel Department of Community Services One Civic Square Carmel, IN 46032 317-571-2417 Fax: 317-471-2426 FACSIMILE TELECOPY COVER LETTER DATE: July 5, 2001 TO: Brian Pahud FAX: 580-2666 FROM: Jon Dobosiewicz Attached hereto are 2 pages, including this cover letter, for facsimile transmission. Should you experience any problem in the receipt of these pages, please call 317/571/2419 and ask for Connie. NOTES: Please call if you have any questions. CONFIDENTIALITY NOTICE: The materials enclosed with this facsimile transmission are private and confidential and are the property of the sender. The information contained in the material is privileged and is intended only for the use of the individual(s) or entity(ies) named above. If you are not the intended recipient, be advised that any unauthorized disclosure, copying, distribution or the taking of any action in reliance on the contents of this telecopied information is strictly prohibited. If you have received this facsimile transmission in error, please immediately notify us by telephone to arrange for return of the forwarded documents to us. l \ \u: (J City of Carmel c, I z'6 ~() ;0 r I " H-QQQ, i <:; 0.-. \ e./tt:eIl :r ~ '" T ~. '~VH...._<3l I V\ Vv.Ay. fu CJ:\ t \sLl M \ \~ A /1d S A I d ~, tAM..~ l'S koclc...e.~ck 'I -ttvrP :t lAJ..J\A.(d As(ce-J h t'~ ,-{o dO..fh \$. t-t.rL ~.AS No-? Ili2p I w.:,J -tt) /'l'\.fi.._, Y Gt,~' As JA4t k; I AQ] t:. ~ pP.k~s' r:::B~~) t1 0"'- -.J...:- l' I <C t..I{.... .J.' IA ~. - ~ I J ~ f i ~~ pv\UtlL~ J -;;p.u- / Itf'+,CI2-.VVA-5" doV\.GL. '+0 P~~6c.? (/~I O-~ pf'lD+e~f-"'t~s "l " . , i.Q"iClJ'lo'1. c<..)I\S"'If.?lA,cho/'I dArhA,9€..- .T~5 ni f,!' 0...- IJ/" /7 ..?:,. /) ~ae.. i\.JO:'I -\-ellc...tZ.c o~ I /,",';) t.o (,If"'tk-. '[(1ftq :+-- J i IJ ' . S I ~. wAs uvs4t..v',l"::J-~\o O"j 1("J;;?''7e. L-OI\$~Ut.+?'c)/\ e'Ot-l 'Pf\;'I.QfV"T""/ (\1.,,1 d (2.0 ~~ ~ - B I! (~ d" ~N1 e;{,fV?; v()'O~. r~\ p pe.d c::;vv,;,'t 0.(\ 1 fl.O(.)"t\d (0 r~ l p€l(::ser~ve_,(t ~ $). 7k {A~e... -t'~s ~ ~_~ tt'w_d A.r~ CDf\ s-rf<:uCftoA ( 'I uJOQ.k:J2J .!~">Q 'f"f,...fL +12.4? (.of"(,PAv')Y -t-hA+ d,J ~. WeJ~< ). 5e~1 LAJ::.Cfe. ~f f\ fl..l2..... c" l R..l2th d Y d eO. dA y') J ~ s 11 ~ l."" decJ the..-. -:r h", v..e_ '1! II e /l ..;JJ..e..... O"~_I\J\ P I A 1\ ~ ~ . SA VI "'7 It ~ +ei\.Cl2: ~a.-J -+~s 0 1"\ t-C\.tL :"':D1,A:+-fA.. .T ~v.e.- "0 \.( d '1"~\Q._ -('I'~ I "S i ~ P t;4{) 0 '"1 Ph 4s::.a.:t. 4 '-,d ~IC'~"-t~~ \.lv, "th, c~7es ,-/rs1tei -Lbn it> fY-y ~ AfJS-f2"2/o1 p~~" \A>OlA l~ ~ ~,~~~tC~ . .-:~. 1-. -rh is Pfl(;) ~vT hAs h.ee" IAck'I~ o.'r ecu:,.( /0 . k~_ - ONECIV!tSQVXRE' CARMEL,IND!ANA46032 317/5714400 ~ 1Y'1t;;ec-hW\ of (-1J1c!sC-1fhL_ V1Jfle'( rrO/'1 t >?OllJ ,,>~ rl- J I I. ~Q.., :1 '-"~'AN PtJorlli'SJ~ ~ 7 /10 J 0 I S$1JE5 ! - P\ ~ I'. b.E.~~ ~ "t- , , w . W\ ,Oto.) .s - ~-n~ ,.. HI. co~~ l-rt' ~ ! i 3 w t'OI , $~.s I' :1' - E - ~ - !""'- V\ " CARMEL/CLAY PLAN COMMISSION SPECIAL STUDIES COMMITTEE DEPARTMENT REPORT July 10, 2001 6. Docket No. 75-01 ADLS Amend; Old Meridian Professional Center Petitioner seeks Architectural Design, Lighting, Landscaping & Signage Amendment approval for changes to an approved Landscaping Plan. The site is located at 1185 West Carmel Drive. Filed by Brian Pahud for Landmark Properties. Please see the attached letter dated May 22,2001 from Scott Brewer (Urban Forester) to the applicant. In addition a review letter regarding this petition has been attached along with a leter received form the applicant dated June 27,2001. The Department as several concerns outlined in these letters and would like the applicant to address those concerns. The Department recommends that the Committee continue this request and direct the applicant to address the comments made in the review letters generated based on the information submitted by the applicant on June 27, 2001. Based on the plan as presented to date, the Department would recommend that the committee deny this request. Committee Report 2001-07-10.rtf City of Carmel DEPT. OF COMMUNITY SERVICES May 22, 2001 Brian Pahud Landmark Properties 9333 North Meridian St Suite 350 Inmanapolis,~ 46240 RE: Phase 2, Old Meridian Professional Center Dear Brian: After meeting with you on site and reviewing the proposed changes in your landscaping plans for the Old Meriman Professional Center, my comments are as follows: 1. The plans are not complete. Air conditioning units and other utility structures need to be shown on the plan where they exist. Some planting may be done it the available space that remains between the buildings and the rear sidewalk. Right of Way lines also need to be on the plans. Some of the problems we are dealing with now, could have been avoided if the original plans had been properly labeled. 2. The existing trees need to be labeled properly. For example, at least two existing trees are labeled "Oak", but they are obviously not Oak trees. 3. The increase in the number of plants between the two plans is due mainly due to the increase of perennial plants (over 170 perennials added). The number of shrubs and the number of species have been reduced. Two admtional species of shrubs need to be added, and the numbers of Junipers and Hatfield yews need to be reduced to provide better species mversity. 4. Three (3) more shade trees need to be added to the parking lot area. Three (3) more shade trees need to be added as street trees on the Carmel Drive side. Three (3) admtional shade trees need to be installed on the Hancock Street side, and five (5) more ornamental trees need to be added (Total: 9 shade trees, 5 ornamental trees) . 5. Planting areas like the open space around the patio, and along Hancock Street should be utilized to plant trees first, then filled in along Carmel Drive. ONE CIVIC SQUARE CARMEL. INDIANA 46032 317/571-2417 _~~___~~~_______~_~n___~_~_~_____ _ _J____ 6. The plantings around the transformer and dumpster pads on the southeast comer of the lot are reduced in size and number from the original plan. These plantings should be the same size, number, and relative position as the original plan. If you have any questions or comments, please contact me by phone at 571-2417. ~d~ Scott Brewer Urban Forester, The City of Carmel CC: Jeff Kendall, Building Commissioner Sarah Lillard, Permits Mike Hollibaugh, Director of DOCS File City of Carmel VIA FAX: 580-2666 Original by Mail July 5,2001 Brian Pahud Landmark Properties 9333 North Meridian Street, Suite 350 Indianapolis,~ 46240 RE: Old Meridian Professional Center (phase Two) - ADLS Amendment for Landscaping Dear Mr. Pahud: 1bis letter is in response to your ADLS amendment petition for the above referenced property. The following comments need to be addressed and/or plans updated accordingly: 1. Please refer to landscaping in tenns of shrubs and trees. The notion that the proposed plan represents a S9 percent increase in plantings from the original plan is misleading at least. In addition most of the plant material you propose is smaller than that approved for use in the original plan (shrub height and tree caliper). As you indicate in your letter the objective is to correct not delete. 2. Identify the area at the rear of the buildings that is outside the utility easement and legal drain easement. This area would be suitable for relocating the plantings that may not be placed in the legal drain easement. In addition, please provide our Department with a copy of any agreements or approvals you have with the COlmty Surveyor and/or the property owner to the south regarding the maintenance of all living trees and shrubs along the fencerow. 3. The landscaping proposed around the dumpster is not adequate nor does it come close to the level of landscaping proposed on the plan approved for construction by the Plan Commission. 4. Our Department relies on the plans submitted with applications to make a recommendation to the Plan Commission. Our department would not have recommended approval of this revised plan if it ad been submitted at the time of the original application. This is regardless of the issue ofplantings identified in the legal drain easement. S. Trees identified for the parking lot area have been replaced with shrubs in some locations and smaller trees in others. This is not an acceptable alternative. 6. Respond to Mr. Brewer's letter dated May 22,2001. I will rely on his assistance in reviewing the proposed changes. To date If you have any questions or if I may be of further assistance please do not hesitate to call. Sincerely, ~ t~, . ~ /ron C. Dobosiewicz Planning Administrator cc: Scott Brewer CarmeVClay Plan Commission Special Studies Committee OldMeridianPCl.rtf Page 1 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 . Development . Brokerage . Management ANDMARK OPE R TIE S, INC. June 27, 2001 VIA Hand Deliverv Jon C. Dobosiewicz Planning Administrator Department of Community Services City of Carmel One Civic Square Carmel, IN 46032 RE: DOCKET No. 75.01 ADLS AMENDMENT - LANDSCAPE PLAN OLD MERIDIAN PROFESSIONAL CENTER 1185 W. CARMEL DRIVE CARMEL, INDIANA Dear Jon: .. ... Per our conversation and your request, please accept this letter as a supplemental submittal to our Application for approval of an ADLS Amendment in the above- referenced matter wherein we seek approval of a modified Landscape Plan for "Phase Two" of the above-referenced project. The Old Meridian Professional Center was developed in two "Phases". Phase Two of this project was approved as Docket No. 83-99 DP/ADLS while Phase One of this project was approved as Docket No. 98-98 DP/ADLS. Phase Two has been under construction since July 2000 and we are currently 50% occupied with three (3) medical tenants. Phase One was constructed during the period June 1999 through December 2000 and is 100% occupied by four (4) medical practices. The modified Landscape Plan seeks to maintain consistency between the two "Phases" of this project as well as address certain issues relative to plantings that were incorrectly placed in Easements for a Legal Drain as well as for Utilities serving the property. Prior to approval of Phase Two, a Special Study meeting was held where there was discussion regarding the mature trees on site wherein we (the petitioner/developer) 9333 North Meridian St. Suite 350 Indianapolis, IN 46260 317/580-2650 Fax 317/580-2666 uL Jon C. Dobosiewicz Planning Administrator Department of Community Services City of Carmel ADLS Amendment #75.01 June 26, 2001 Page 2. agreed to "... preserve the Ash and Elm along Carmel Drive, and the huge Oak tree on site." Not only have these trees been preserved, we took steps necessary to preserve two (2) additional mature trees along the private drive which serves as the eastern boundary of the subject parcel. In addition to this commitment, it was noted at the Special Study meeting that "The legal drain on the southern part of the property will remain a non-disturbance area." During a pre-construction meeting with the Hamilton County Surveyor's office they confirmed that no plantings could take place within the easement for the legal drain (see letter attached to our Application for ADLS Amendment). Furthermore, the County requested that we clear all trees and shrubs located within the area. We successfully pleaded with their representative to maintain all living trees and shrubs located along the fence row, separating our property from the adjacent boat storage area located to the rear of John Kirk's buildings. The original Landscape Plan for Phase Two specified that we plant various species of trees, shrubs, and perennials totaling 417. This breakdown and allocation is contained within our application. The modified Landscape Plan seeks to accomplish two (2) issues; first, we want to match the species and quantities planted in the completed, approved Phase One of this development. Specifically, all plantings and species along the wrought-iron fencing which has been continued into Phase Two along Carmel Drive and the private drive to the East. We also want to match the plantings in the islands located within the parking lot as well as the areas designated for plantings in front of the Buildings. Secondly, since we cannot plant in the legal drain, nor can we plant in the utility easements running behind the Buildings, the modified plan specifies "Hydro seed" for those respective areas. Please note that even with the removal of these plantings in the easement areas, we have scheduled a total of 665 plantings for Phase Two, representing a 59% increase in the plantings set forth in the original Landscape Plan. In summary, we believe that the modified Landscape Plan presents a better alternative to the original Landscape Plan in that the modified plan presents a consistent, quality landscaping to a comprehensive "phased" development, correcting (not deleting) certain areas to be landscaped while increasing the total number of plantings. -- -- -- - -- -- --- -----~ - - ______ _____1_______ Jon C. Dobosiewicz Planning Administrator Department of Community Services City of Carmel ADLS Amendment #75.01 June 26, 2001 Page 3. I appreciate your time in this matter and in the event you have any questions or need any additional information, please contact me at your convenience. ~-- Brian C. Pahud Landmark Properties, Inc. BCP/caw ~ ___ _ _n~__u____ __I ..cur.....,,""""".... ....OC....ClCllU.lVe, ...........Wll!I:.....,. ..- r...... ... tuat ... --- ::,:,r--==-~ 1IUIl:1D"~"" .........,.....t6lGiD... alIUIfm..._uu::::pf -- .....- CllrItiO_......_ .....1'IlC* 1aI'......,........ 1I'....MORL __ _ ....., crND'" OIL_ r........... ~ -.-a. ~CDNCr. _-.&1'1.......'"- SHADE TREE PlANTING DETAIL -- ......- r"'~""'. ...... MCIIftJ.,~"". ...... ORNAMENTAL TREE PI.ANTING DETAIL SCHEIlIJI..E .... -- -- ... - -- ,..... ............,.. ,..,... .. ,... ,.".,. ,.. .. -- ........ LL""" ,.. , - -- -- r .. - ..... ...... - ..-- II' .. ..-- ........... a-t II' .. --.. ......."'--' ... " -.. .,.....,..... .. .. --- --- ...... ........ 'BIIIt .,. " ......- ~J.''''''fNlr ... .. -- _.- II' " ---~....,..... ........~ .. .. --- -- .,. II ---- - -- ""-' .,. " - -.... - --- .. " ........ ..... M1. JIlMIr a&\1'bVl8 IWU. CXIrARI ta NiIEIlDN A!lSIOClGDII t:S II..A!IiEJMIIW IDMWlDI. II&.IM1I1WJ IHtU. . R.U. .. ... '10 o.uuw. FClfM. otU.NNIID_8MIl&LMflMlA~mca . II&. PUHIID .. ...., 11& ... ItWJ. Me A CXMR ... 1MU to RUli ItCM!I ~ t11 IMBIIID tWINOOD MIl. I&AJ:lII. 1& PUMNI IlIIMI RR DQliIftONL .LCIGUDII CII' ~ ...,.. MiIOIftlU Wlt I8!D to Ie #IWIII!D .. NID 10 IlDCI:IiM'OIft IllISnG ClR ~ uramn. CUliNIRI!INIIJ &.OeA'!DCICIf' ftlI.IICWI:lN 1'l.AHfMJI.1III.V/'GD 10. ucaAEDAS ~ ---- CDmlllCraR IHIU. WIFt ALL CUNnID ON ....... MIISI7..c. .... _ .. - r __ .-1Uat ... (lCMiIIIQDII .... IJU& '10 ... l!DIIE U&BI ....... ..... .....CMfIIfMlMIIIClFBlftr.. -- r....~.....~ ... ............ . r~ . ...~.... -.... ........ ..... WORI..en-. .......ClQlIIw:I..-c:l........""" SHRUB PlANTING DETAIL OIl \",\ " .......... ........... ", ", "- -........... '-, "- ................. , '" APPROVED PLAN PHASE TWO i ~. ~i en !i o ow ~~ !l1~ lIE i a: w I- Z W o ...J <C Z o (/) (/) W lL o a: 0.. It) zeo <c;: C a: W ~ C ...J o w > a: c -I W ~ a: <C o :z <( -I a.. W a... <( u en o :z <( -I : I i ;Ih ti ~ & Ii ::l~g II"" ~Q~ ~~" 1iIa::" II u.S ~~~ !I/i ~~~ ~ s m ~ ~~, .., ~. Ol')~ 6l . ~I')o ~ :5! ftl .J~~ r :!E if 'i, DATE: AUGUST 19. 1999 SCALE: I" a 20' PROJECT NO. m-1194 SHEET NO. CI07 n94Ip3.DGN --........ -- -- -, -- -- '- -- -- -- -- '" -', -- ......-......- , '''... 24" See (bon Jlrjper (l3) -. 6~.ir-z,!s..'__ R . 545.00' --. r . 83. 88 I L . 166.44' Ch' 165.80' Bro' S 72"37'33'( ... 5gn ......-- ------~~-..- -..._-- 2" PtaIrIIinl CnIbepple (1) I o . 20' 40' ---- ----- '..., -- .................. .......-............... ----- ----.. ---.. 30" ~_ Cl8nboll)bush l22l CARMEL DR~ ----.. ----- --..._-- ---- ...--- ----- 2" Pra!lIIr8 CnIbBlJpI8 --."J!~_~~, ---..... " -"''''- "'.. -.. "1 SleIa D'Qro DayIlIy (4) ............... 24" Flemer~Yew (to) 2" _ CmbappIo 24" JelTIIIIIClRe (B) #1 _ D'Oro Day\1IJ l12l ~ 2"PnIIrifinl~t2l ..... 24' Sea Gnlon .Anpor (14) BIll; N..-.c ..... ..",---...... -..- 18" 1rrplMcI. Dr"'" Rod Spna (11) .. ~..... .Nt;M..... 18" IrrplMcI Dwarf Rod Spna (11) .-- 24" Sea Gnlon JunIper (17) 24" JelTIIIII 0uR:e (B) 2" ProIri1k8 Crllbepple , , . , I , I I ! , , , . . , , I , I 2 W' ~ AppI8use WhIle Ash (9) (SlroelT'l"'"l I I I I I I 'C'-~"y '*:.'1 a: w Stella D'Oro D8)1Ily (50) I- " MlV>D Pine (1) Z W 2" Sargent QabappIe (I) 0 -J :z <( Z au <C 0 > -I - a:: c.. 24' Campoct PIIIzar JunIper (I2,l ClJ 0 ClJ ... W W au c.. u. :E <C 0 a:: a: <C (,) a.. 0 en It) c z IX) <( .... :z .... <C 2" Sargent C18bapp1e (I) 0 -I 24" Compocl PlIlzIlr.ll61lper (17) a: w :E 0 -J 0 ....MCWU. ___ 10 ...... ......CQMICf,.. --....""" 2' Sargent QabappIe (I) " " "Il1Jl'T DIG BL IND' 4 1-800-382-5544 CAll BEfORE YlIJ DIG "'CIII',,__~.. .......4*lCll'AD*&...... "-IIQ-- .. - ", '" 2" Sargent Crabapple (1) AMENDED PLAN PHASE TWO "...-aD MltIU.llt IAIIl ...-.... ..... - .... ......-DO.. N&.101I&1IIIIDUlIQ.1i&&OtAIII ...10 1't!........1DII: ... ........ team .... -.QI1O K* CII'''' ---...... '. 18.~ European Cronbort)tlush (13) '. '. 24" ~ PlIlzer Juriper (l2) ". ........ " " ", " ". -- -..- ...-.......... ~ .::0:..-:=-'::... ---- -..... .. 18" Dwarf ELnlpoan Crllnben)t>ush (13) . 40' "--- " . o ......IlCML....,. ..... ....... OiIl-DiB~"" ar--...a M:Ift.L~IIlICIftLCDlI'M:I. ...... ...... --..... , .24" Corr1J8Cl PliIzer .kIriper (l3) " ---.... 20' SHADE TREE Pl.ANT1NG DErAIL ---...... '. ..-..... ---- -"'-.. --.... " CAR~ DRIVE ", I....,. ", ". ". '" ". ""'-.. ..-.....- ". . _ _ ~4' Compact PlIlzor Juniper (13) ---... --"'-.. 24" Comi>ad Pfilmt ~ (7) ORNAMENTAl. TREE PlANTING DETAIL PlANT SCHEDULE .... -- -- ... -.. ""'" -- - .... -- .... ..,.......~~......~ -- -- .... ......,. .......... _DC. -- -- -- " IIIItN~"""'rII~___""'" --- -- " -- --- ....... ......... ~ ... IU;,.........~.... .... -.... --- ... -- --- ... .. -- -- ... . ....... - .... o-tAMI ..... --.,.IL'ClcIOc:hI' yo .. ~NlIrIII:tilCI:~___ -- ,..- .. .. -- .. -- - .. . - --- --..... .. .. -- .. ... .....a.o.n.dtlrOrilnr..... ........ ... ..... -- .. CIIMlWIO..~Dng........ -- -- .. o..cItlD"~IMitw....... - -- .. a-..bI~CIutIlI........ . SpecIes 10 be Delenrinod by __ Pdar III k1slaIIaUan #2 Stella d'Om D8)'IIIy (IS) #2 Faxlail C15J <12' PynvrOdaIJapano8e YrNI 18' ImprCMd Dwarf Rod SpIrea 111) EXlST1NG TREE SCREIiN INII9ITCRY -- ........ r_' 0 w_, _ . ... , -- IlL I'UNI' IMo1BIU: aWL a::lfIIDMI 10 MIBIQtN IISIClCIIAJ'Df OF ~ IWI:I<<IIS. ,Iti........ atU.. RJ.l. MrG 1IlUI! 1D QI2UW.. FGU. _fUIGID .. 8Wl.~ It. ~ IDCIE. MLIUIGIGi lIDS NG ~ .... ItW.L H4II! A CiCllIlIm f!I'DWE 10 feU IDIB P-4,CIl ..-aIlED t..xJD INllIUOl. _ I'UNIIlII DIPU FaR IllCIPIDO. LCQ1IQIrII OF PACll'OllID IIINI!' ~ Wit MID '10 . AUJI1II) It fBJ) 10 ~ II!llIIIItII ClIIIVOSED ~ auwmse IMIJ &a:AJ08. 01 RUCM1IDN I'UJCtIGS W!:I MID 1D . WIllN!D ,. aa.&*I. --...... CXIMDIlQ'QlI ............ iIIIL Cll.WGDa GIrt JlN& 24' HaIlIeId YfIIN (l2) 4'r 1'ylam/daI~ YJNI 24" _ YJNI (8) 24" CanlJOCI PlIlzIlr JunIp8r (8) 4'r F'yramidaI Japanese YJNI 24' Compect Pfitzor Juniper (8) 18' GoIc!lnw1d SpIrea (8) 4'r ~Japanese YrNI (2) 18" GoIdmcund SpIrea (8) 24' HeIlIeId Y8VI (11) . 1r dwart EumpOIIIl CrBllIlerlybuBh (&) , 24" HaIfieId YJNI (11) 5 ...;M'3.... 11.12' " " .....--...- . - r NIIDlIm ....1aDI ,.. CIl:lY'IrallItt fIllOU -"":10". _&Nell .,.... ~ .-.aot ....... elF 18) iii r~ ExisIIng Oak I . , . , , , , I , . , . , I . , . . I . -..- r....~...chRM----. .....................c roc. III lI!DI.oc.- DB-. _ Me .....~tf'ECII8I..cIftLMIlZLIa IlMW&I.ClCUIlfCf,.MIO__ II..... SHRUB PlANTING DETAIL ... ~ i II i lith !~n ~Iu III/e S ~. ~~ I~ ;-c. ! ~!i lE .. ... ... 0: .. Ul ~l: j:-tol 0:9a ...o:~ ~~~ fx:ui ~~::i 11:00 <Z~ ~fIIi ZfII- <fIIO .J1Il~ DAlE: AUGUST 19,1999 SCAl..E:1'.2IJ' PROJEcr NO. 111-1194 SHEET NO. CI07 1194lp-c8v2.llG j j E ~I a: a: I ~ ~ lL ::> '" ~ , d 0 SO' 60' Ci ofS ~... ..~ Z 0% U a:Q " " " " '" " ..../ --- / / / / / / '" I I I I I I I I I I I I I \ \ \ , ~~t=,,~-robU '" J(j'~C...~h(ln '" '" 1/2' 5or~~boppIe (I) 24' ~ f'hl2er Juroper (15) "- 21/2'f'.~rI) ..... ..... (j' o-~opun C""""'rryI>us!I (17) ""ilOlllo~(I) ~~ Oloo fluctqe (I) "I' ~ f'nl:zcrJ...p'" (15) ..... '" " I HZ,500'"'3ent Cr.w""le (I) 3' IR/:l~ N:NClNG WlTI1 R1CKCOIL'I..1!:!:5 .42' ~.,..nc:se Yew (I) 24' ~ I'fotm:..!...."'" (0) 5Leilll dOro D..~1y (20)- ..... 2 1/2' Clt:.velond 5eIt:.<;t P';;;'l"Il..... 24' C~.et I'fotzerJ...pcr (10)............_ '_dYcw(5) _.... Ste~ ~ ~(20) - oxbol Gra9.>-t!.:>' t!IeId 'Yew.(5l... . ' Clevelatld 5i!Io4 P.,.,- I I) , Compact PnI:2t:.r Juno""Per-( \.01- .... " APPROVED/AS-BUILT PLAN PHASE ONE -A I ". , / " / . --- NOll5, I .AS-6UILT I'IANT1NG INfORMATION 5t1OWN ON TIllS I'l.AN WI'5 TMDl fROM AN ON-5ITf I'lANT INVENTOR.Y f'tllfORMfD OY 1.ANOtIM~ ~PE~:nes. -- -- 24'I\lltlit:.ld Yew (b) 42' Pyr.OTlld>I J.paneoe Yew (I) "12" f'ynmuda: J;opaneoe Yew (I) 24' Hathc:ld Yew (I B 5te11a d'Oro o.)'ldy (15) f'''"bOlI~(15) 24' Compact Pnl2er JU01lf't:.I" (14 24' H.thcId Yew (5 I (j' GoIdmound 51""'" 15 42' f'yr.oflllllal J.p.neoe 'Yew (I) J 42' f'yrarmdal J~Y_(I) I B' GoIdmound 5po't:.o (5 2"1' I\llllw:ld y"", (G) "12" f'yron1ldal Jop_ Yew (I) A5-6UILT PLANT SCHEDULE TtI'C COUMON NAMe wr""'CAl~ 5~ QUANT IlOTtS 24' Compoet Phb<:r Junoper (5) Sbactt=Tr=c::s 24' H.t:IleId Yew (5) ~....... Auz_ 2" 2 -: p""s,....en; ~ 42' f'yrorllldal J.~ y"... I I) Hoooy IDcwl ~_.... 21/2" II 2" Pp""""'J.pa= Yew (I) P-..... -~,......... 21J2" 2 24' eompoct Piltzer JUI1Il""r (4) 24' Hati",1o:l Yew (Gl """"'""'"' T.... f'o.cbol Gross ( I 3) c MHos ~ I 1/2" 4 """ M ~ hAootd>n9 SteM> dOro DoyI:!y (I Il) CIevdaftd Sdcc:t. reM' gllcryolna"C:lcw-:brld 2 1/2" 2 24' Comp.a l'f1l2er Juno"", ("l) I 0' GoIdmound 5plf'Cll (5) ~"""'"".,.... ~~~ PiAlJ:M Iloonchng ~....,.......v... T_.......,.u 'Capotato' 42' 11 .........v... T__ ~ tbt.lldM 24' 7' C""'l""'""""Joonop<r ~~- 24' 131 ..".....- ............". 24' 2 0ec<Iu0u0 _ DMrf e....,.... Co>oloeny""'" '^""'-.,..... - Ill' 70 (Ccnlaonco- ~ , ~Ic:b 'Gold Mouncf ''''- 20 r........- -- _1>On>~ _'5tcil>D'Ood '2 ConI. 172 fOllbllGri156 -,........... 12 Cent. 47. _Clot_ t1dIc.tDtnchon ~c:ro '2 Coot. -- r""""""""~ '2 Cent. _10...._ ~ ~ ---1 rn..__. Ii I' II i Z !Z<( ~ ; c{ ...J ~ I~~ 0.. <( I CJ 0.. W ~ IZ<( o '-0 !_O!I-en iLL Z 'z :LL 1<(0 o ..j I...J ~ ...J, ~ I i 0... ...J ~ ~ iSo u ,- w o I=>O w II~Z ~ ,en W ! <( ::2: , <( I i I i I Ii I \, I L_ Jl__ ~ . i;l ;jll~ ... i~!~ ~ l "!" ~S ~Igi ~;<';~ ~~/i~ ~~~ s m g:~'" ~&I ~~~iS~ g. fil ~~~ ~:S ~ ~:i?;~ ~:E ~ l:l9 L o..;:~ DAn:: NOV. 27 . 2000 SCAU:: l' D SO' PROJECT NO. 111-1292 'sm-NO. 1 'n._ _.___~_ Landmark Properties, Inc. 0410912001 Old Meridian professional center 1185 W. Carmel Drive Carmel, Indiana . Plan Commission Docket # 83-99 DP/ADLS original Modified Plant Schedule Plan Plant Schedule Plan Shade Trees Shade Trees white Ash Various Mature, Preserved Trees. street 5 Honey locust various Mature, Preserved Trees. Buffer 38 sugar Maple, Street 4 Ornamental Trees Honey Locust, parking Lot 4 Prairie Fire Crab Ornamental Trees Evergreen Shrubs sargent Crabapple, street 7 Chamzin Holly White Flowering Dogwood 1 Sea Green Juniper Evergreen Shrubs Flemer Compa~t Yew pfitzer Juniper 126 Hick's Yew Japanese Yew 14 Deciduous Shrubs Hatfield Yew 74 Glossy Black Chokeberry Mugho Pine 2 Jet Trail Quince Deciduous Shrubs Pink summersweet Red Spirea 22 Dwarfed Red spirea Goldmound Spirea 32 Korean Spice Viburnum cranberry Bush 46 cranberrybush Perennials I Grasses Perennials Stella D'Oro Daylily 115 Stella DtOro DaylilY 21 Perennial Beds (2) 150 Blue Oat Grass 5 Fountain Grass 10 Foxta II 10 "ToC::Ill''''r.A.L 41' TOTAL 665 Phase ~ Plant Schedule. xis u u Johnson, Sue E From: Sent: To: Cc: Subject: Dobosiewicz, Jon C Thursday, June 14,2001 10:27 AM Johnson, Sue E Lillig, Laurence M; Hahn, Kelli A; Hollibaugh, Mike P Docket Number Assignment - Old Meridian Professional Center- ADLS Amendment Sue Ellen, Please issue the necessary Docket Number for Old Meridian Professional Center- ADLS Amendment. It will be the following: '15 ##-01 ADLS Amend $350 Total Fee: $350 ~ O,^\ Docket No. ??-01 ADLS Amend; Old Meridian Professional Center Petitioner seeks Architectural Design, Lighting, Landscaping & Signage Amendment approval for changes to an approved Landscaping Plan. The site is located at 1185 West Carmel Drive. Filed by Brian Pahud for Landmark Properties. The petition be placed on the July 3,2001, Special Studies Committee agenda. Please contact Mr. Pahud with this information. Once the docket is assigned please return the file to my office. Thanks, \ ~ ~<2-'- ___ ~ GP'- \~ ~e \ L.m. Jon ~ '2:> s-e:, 6oL-~ ~ ...., -0 I (~'J~L...- ~ IS ~'M~D ~ jJ\ 16 lo~ ~~ vb 1 Landmark Properties, Inc. Old Meridian Professional Center 1185 W. Carmel Drive Carmel, Indiana Plan Commission Docket # 83-99 DP/ADLS €' Plant Schedule Shade Trees White Ash Honey Locust 620 Cl Ornamental Trees Prairie Fire Crab Evergreen Shrubs Chamzin Holly Sea Green Juniper Flemer Compact Yew Hick's Yew Deciduous Shrubs Glossy Black Chokeberry Jet Trail Quince Pink Summersweet Dwarfed Red Spirea Korean Spice Viburnum Cranberrybush Perennials Stella D'Oro Daylily TOTAL Phase 2 Plant Schedule Shade Trees Various Mature, Preserved Trees - Street 5 Various Mature, Preserved Trees - Buffer -A \ I 01\ ~~" 38 sugar Maple, Street .;,k- ~~j\Lt-.-~ 4 Honey Locust, parking Lot 4 Ornamental Trees sargent Crabapple, Street White Flowering Dogwood Evergreen Shrubs pfitzer Juniper Japanese Yew Hatfield Yew Mugho Pine Deciduous Shrubs Red Spirea GOldmound Spirea Cranberry Bush perennials / Grasses Stella D'Oro Daylily Perennial Beds (2) Blue Oat Grass Fountain Grass Foxtail Original Plan TOTAL (J_.9 -ciJ.t,~-tL._j~ 04/09/2001 Modified Plan 7 1 (2PJtA.-c.-,<-_, , G 14, ~ 2 J--( G I 22 32 .AfL ! CJ 0 ,A .G;) ,(1SCtJ ~~5 10 10 665 Plant Schedule.xls Q.) Q Development . Brokerage · Managem .l /~ 1fIt r -A~ (~p ~ ~ o (It~ ~ ~ ^ (!Ji / YN'j' J-vt1 V' - Od~O ~ #4iP Vg!4~vj^v~.J~u~1 { a~4171 fr~, f.rv v,, vCs ,f ~.A ~~~4 .... AND MARK OPER TIES, INC. March 29, 2001 Scott Brewer Department of Community Services City of Cannel One Civic Square Cannel, IN 46032 RE: PHASE #2, OLD MERIDIAN PROFESSIONAL CENTER Dear Mr. Brewer: Brian Pahud is out of town and asked me to forward to you the landscape plan for 1185 Cannel Drive for your review. He would like to meet with you at your office after he returns. Please give me a call to set up an appointment time during the week of April 10th. daal- d:- ~#-- Carol Ann Webb, Office Manager Landmark Properties, Inc. ~. ] ,,' J ".,I lil:1i I I /". I', ..IV' " ."J (do" ...."... " I (~:fV' ,:;1 (t.- ' \ ~1\(,1Jl" (: \(\1'. ! , ..,- I look forward to your call. Sincerely, n \: ~ i\ ,.. (,,:'-.... \ ~'i j iJ (\ \. ., ! Q.. '" \ ('f" [\9!\/)\/ , v OfIP\ <c ,i \ '\ ,1 J +:--" . [.' /' ,\'" Ii" \.../' ~.-\ Enc. '" t"-)) ),-",Y t', /"1jv.P-' ~' / tN' . ~/ f)( ('i'-" (r- ~ n)-" (I',)J S t . NJjV.,.4'f .1 \'!i' / '/'I ,~I " ; '\ , f:" 9333 North Meridian St. Suite 350 Indianapolis, IN 46260 317/580-2650 Fax 317/580-2666 \0\1 nff'- ' ,}...r- ,)1 r( Vi -0 ~."i QJ; j" ""; ".. . v'lr ,'_ /1)'/''; \Y. ,.Iv , -j....' \ "-( ~. NOV 03 '00 04:03PM P.1/2 .. Qj SLL~I''-Y()'l &iu 1'16 (jrre ,g(aYtlilto." COWlt!l Squate :-rloblcwille. /J"Jian.a '1606a-~a!l(; November 3, 2000 Landmark Properties Attn: Brian Pauhud 9333 North Meridian Street Indianapolis, IN 46269 RE: W.R. Fertig Regulated Drain Old Meridian Professional Center (Block 17; Lot- 3) Dear Brian: The Hamilton County Surveyor's Office does not allow trees or landscaping to be placed within Regulated Drainage Easements. No enchroacements are allowed to be placed within a Regulated Drainage Easement without approval of the Hamihon County Surveyor's Office or the Hamilton County Drainage Board. This Office also recommends that trees and landscaping not be placed within any Easement that contains utilities. Landscaping should be placed in a designated Landscaping or Buffer Easement placed outside of easements containing utilities. If you have any further questions please contact me at 776-8495_ Thank you. w u CITY OF CARMEL Department of Community Services One CMc square Carmel, IN 4ED32 (317) 571-2417 Fax: (317) 571-2426 Fax Tol~~\ ~ Y",~ €: ef:J~ ;.J(rJ ~Q From~ da~~ r Fax: Pages: Ph~XO ~/" ~ ~ ,Re5 ~ . FPo..P, , Date: CC, o Urgent Cl For Review 0 P.lease Comn1ent D Please Reply o Please Recycle ~ ~ . ~