HomeMy WebLinkAboutApplication
JUL-21-03 MON 11:15 AM
THE SCHNEIDER CORP
W
FAX NO. 317 82Q 6410
U
P,02
MPLlCA TION fOR SECONDARY ~LA TOR REPLA T
Date: June 30, 2003
Docket #:
The undersigned agrees that any construction, reconstruction, enlargement, relocation of alteration of structure, or any
change in the use of land or structures requested by this application will comply with, and conform to, all applicable laws
of the State of Indiana, and the Zoning Ordinance of Carmel, Indiana - 1880. adopted under the authority of Acts of 1979,
Public Law 17'8, Sec. " et.seq, General Assembly 01 the State of Indiana, and all Acts amendatory thereto.
Name of Applicant:
Brenwlck TNO Communities, L.L.C.
Phone # .@17) 574-3400
Address of Applicant 12821 E. New Market Street, Suite 200
Name of Subdlvlsion: Village of West Clay. Section 9006-A
Legal DescI'iptiol'1 (To be typewritten on separate $heet and attached).
Area (in Clcres) 2.42
Number of Lots: 4
Length of miles of new streets to be dedicated to public use: 0.06
Surveyor certifying plat:
James M. Mulryan
Surveyor's address and phone#: The Schneider Corp. 12821 e. New Market St, Suite 100, (317) 569-8112
xonnet, IN ~ .
Sig_ra of Applicant ~\~ .~ (Plintad) DO'le Sexton, P.E.
TITLE: Director - Re~dential Developmern - The Schneider Corp. (Agent)
~."""**"."**.""~""'*..********""."'''''..A...''.*..~''''~~w...***.*.*'...........,........................*.*...-..*
STATE OF INDIANA
58
County of Hamil~n
Before me, the undersigned. a Notary Public for Hamilton County, State of Indiana, personally appeared Oave Sexton
and acknowledge the execution of the foregoing instrument this 30th Day of June 2003.
~~ tJ. JJ..JJu'~
N tary Public -~;.;.,'tfj'. ~/'6on
My Commission Expires: April 22, 2008
5.1.10..&m!Lcatlon for Secon.!i~.fIi! Two (2) copies, or more if necessary, of the secondary plat and the construction
plans, together with supporting documents, shall be submitted to the Building commissioner with this application and the
application fee as indicated in Section 29.6 01 the Zoning Ordinance.
Additional plans to be distl'ibuted to necessary authorltJes by applicant.
Fee: $
Received by:
N:\1238\9006ldocsI9OOfiA\SECONDARY.APPL-l A.doc
JUL-21-03 MON 11:15 AM THE~HNEIDER CORP
FAX NO. 317 826 6410
U
P, 01
FAX TRANSMITTAL
Schneider
12821 E. New M~et St., SuIte 100. Carmel, IN 48032 . Telephone: 317.569~112. Fax: 317-826-S410. ww..w.schneldercoro.com
NAME:
FIRM:
ADDRESS:
f..M
FROM:
FAA#:
DIRECT DIAL:
2~&. ~~~~
~
DATE:
JOB#:
PROJECT:
RE:
PAGES:
FAX.:
CC:
1/" c 1$
\1. (. ~,,~ 6' l).l. C'-"Y
..,. (including cover sheet)
~OMMENTS:
ARfc.. ( <: At 'a~ ~-& R-.
<\ Q 0'-",.
o.
Offices In Indian8po1i$, AIIOfI, Carmel, and Lafayette. /nditma
N:\OOCb'\CMLIFORM5IF~I8IlS.doc
u
u
~ ~
~
RECENtD
~U~ ~ 200\
noes
APPLICA nON FOR SECONDARY PLAT OR REPLA T
Fee: $500.00
Date: June 5, 2001
Docket #:
The undersigned agrees that any construction, reconstruction, enlargement, relocation of alteration of structure, or any
change in the use of land or structures requested by this application will comply with, and conform to, all applicable laws
of the State of Indiana, and the Zoning Ordinance of Carmel, Indiana - 1980, adopted under the authority of Acts of 1979,
Public law 178, Sec. 1, et.seq, General Assembly of the State of Indiana, and all Acts amendatory thereto.
Name of Applicant:
Brenwick TND Communities, L.L.C.
Phone # (317) 574-3400
length of miles of new streets to be dedicated to public use: 0.436
Address of Applicant: 12821 E. New Market Street, Suite 200
Name of Subdivision: Village of WestClay, Section 9006
legal Description (To be typewritten on separate sheet and attached).
Area (in acres) 18.016
Number of lots: 29
Surveyor certifying plat:
Richard H. Miller, L.S.
Surveyor's address and phone#: The Schneider Corp. 12821 E. New Market St., Suite 100,
~IN ~032
TITLE: Project Manager - The Schneider Corp. (agent)
(317) 569-8112
Signature of Applicant:
(Printed) Keith lash, P.E.
******************************************************************************************************************************************
STATE OF INDIANA
SS
County of Hamilton
Before me, the undersigned, a Notary Public for Hamilton County, State of Indiana, personally appeared Keith Lash
and acknowledge the execution of the foregoing instrument this 5th Day of June 2001.
~~u).-H~
Notary Public ~'Ulnn:.. aJ. 1-\4)'Y'I.!aOn
My Commission Expires: April 22, 2008
5.1.10 Application for Secondary Plat Two (2) copies, or more if necessary, of the secondary plat and the construction- .
plans, together with supporting documents, shall be submitted to the Building commissioner with this application and th~
application fee as indicated in Section 29.6 of the Zoning Ordinance.
;-::
~"
Additional plans to be distributed to necessary authorities by applicant.
Fee: $
Received by:
\\CARMEL_NT1 \JOBS\1238\9006\docs\SECONDARY PLAT OR REPLA T APPL.doc
, ~j.L
r -
u
a
~ fI
~
~tct\'Jtn .
~~\\ \ 1~~\
-' fJO~
LAND DESCRIPTION:
Village of West Clay Section 9006
A part of the West Half of the Northeast Quarter of Section 28, Township 18 North, Range 3 East,
Second Principal Meridian, Clay Township, Hamilton County, Indiana, more particularly described as
follows:
Commencing at Southeast Comer of said Half-Quarter, thence South 89 degrees 15 minutes 12 seconds
West along the south line thereof 130.00 feet to the southwest comer of a tract of land described in a deed
to Lasher, recorded as Instrument Number 199209213826 in the Office of the Recorder of said county, and
the Point of Beginning; thence continuing South 89 degrees 15 minutes 12 seconds West along the south
line of said Half-Quarter 365.00 feet to the southeast comer of a tract of land described in a deed to Frank,
recorded in Deed Book 163 Page 280, in the Office of said Recorder; thence North 00 degrees 07 minutes
32 seconds East 390.43 feet; thence North 16 degrees 30 minutes 47 seconds East 38.08 feet; thence North
11 degrees 21 minutes 50 seconds East 331.31 feet; thence North 10 degrees 14 minutes 39 seconds West
170.00 feet; thence South 79 degrees 45 minutes 21 seconds West 17.71 feet; thence North 10 degrees 14
minutes 39 seconds West 50.00 feet; thence North 09 degrees 38 minutes 41 seconds West 167.66 feet;
thence North 90 degrees 00 minutes 00 seconds East 57.79 feet; thence North 03 degrees 55 minutes 18
seconds East 341.15 feet; thence North 00 degrees 00 minutes 00 seconds East 50.00 feet; thence North 90
degrees 00 minutes 00 seconds East 8.44 feet; thence North 03 degrees 55 minutes 18 seconds East 177.04
feet; thence North 86 degrees 04 minutes 42 seconds West 26.61 feet; thence North 03 degrees 55 minutes
18 seconds East 90.00 feet; thence South 86 degrees 04 minutes 42 seconds East 181.61 feet; thence North
03 degrees 55 minutes 18 seconds East 27.47 feet to a curve to the left having a radius of245.00 feet, the
radius point of which bears North 86 degrees 04 minutes 42 seconds West; thence northerly along said
curve an arc distance of 40.11 feet to a point which bears North 84 degrees 32 minutes 27 seconds East
from said radius point; thence North 84 degrees 32 minutes 27 seconds East 50.00 feet; thence South 86
degrees 49 minutes 34 seconds East 187.32 feet to the East line of said Half-Quarter; thence South 00
degrees 03 minutes 50 seconds East along said East line 1560.95 feet to the northeast comer of the
aforesaid Lasher tract; thence South 89 degrees 15 minutes 12 seconds West along the north line thereof
130.00 feet to the northwest comer thereof; thence South 00 degrees 03 minutes 50 seconds East along the
west line thereof 271.00 feet to the Point of Beginning. Containing 18.016 acres, more or less.
\\CARMEL NTl\JOBS\1238\9006\docs\9006 desc.doc
- -
06/04/0 I kdk
VILLAGE OF WEST CLAY
"'
o (j
Report on Water Distribution, Sanitary Sewer and Storm Sewer
1. Water Distribution
The potable water to the site will be provided by the Indianapolis Water Company (IWC).
Connections onto the existing mains will be made at the following location:
. A 16" main will be extended from it's current location at the intersection of Ditch Road
and 13 pI Street. The new 16" main will run along our site's frontage on 13 pI Street, and
will be stubbed at our Westernmost boundary for future extension by others.
. A second 16" main will be tapped and extended from the West, from it's terminus within
the Laurel Lakes Subdivision on 126th Street.
. A 12" main will be tapped and extended the Irsay Horse Arena on 136th Street.
. Another 12" main will be tapped within the existing Claridge Farm Subdivision, and a
12" main will be extended through our site.
. An 8" main will be tapped at the Laurel Lakes Subdivision entrance on Towne Road.
Preliminary hydraulic computations have been completed by IWC, and working in conjunction
with our estimated development of each section within the Village of W estClay, we have
developed a plan that ensures adequate pressure for fire fighting capabilities at all times during
the build out and beyond.
Approval for the extension of every water main will be required from the Indiana Department of
Environmental Management, and all mains will be designed and installed in accordance with
IWC rules and regulation.
2. Sanitary Sewer
Sanitary sewer effluent for the site will be accepted by the Clay Township Regional Waste
District (CTRWD). A lift sation is proposed along the Eastern boundary of the site which will
pump effluent via a force main into the existing 18" interceptor located in Springmill Road.
Two additional lift stations are proposed within the Village of West Clay to serve areas which
cannot be served by gravity sewers. One will be placed within the common area located along
Hoover Road, South of the Claridge Farm entrance. It will serve the Southern third of the
project, and will pump North into the gravity system described above. The station is temporary
in nature, and will be taken off line upon extension of the interceptor proposed to the South and
East shown in the CTRWD's master plan.
i.,
.j
o
(j
The second station is also temporary, and is located along the project's Westernmost boundary
near 126th Street. The station will also pump to the gravity sewers to the East, and it serves the
portion of the project located West of Towne Road.
Approvals for the design and construction of the sanitary sewers must also be obtained, in
addition to the CTRWD and it's consultant, from the Indiana Department of Environmental
Management.
3. Storm Sewer
The surface runoff on the site will be conveyed by a system of swales and pipes to a network of
retention lakes within the Village of West Clay. In accordance with the requirements of the
Hamilton County Surveyor's requirements, the retention lakes will provide storm water
management control in order to restrict the discharge rates onto the site's various outfall points.
The discharge points for the site are as follows:
. Elliot Creek; which traverses the site along the Northern third, then crosses 131 sl Street
and leaves the site just East of the existing 8.5 acre lake on the Perez parcel.
. Claridge Farms Legal Drain; which was sized per the County Surveyor's calculations, to
accept a 146 acre drainage area that lies within the boundary of the Village of West Clay.
Connection onto the Claridge Farm drain will be made at an existing 36" concrete pipe
just South of the existing mound bordering the Perez property, and will address drainage
problems evident at that location.
. Clay Creek; Which traverses the site along the Southern third, then crosses Hoover Road
near the proposed common area South of Claridge Farm entrance.
. Brendle Legal Drain; which flows along the site' s Western boundary, then crossed 1261h
Street West of Towne Road.
It is the intent that all main storm sewer lines and all lines interconnecting lakes and serving as
outlet points be petitioned to be accepted by the County Surveyor as regulated drains. A limited
portion of the storm sewers that serve to drain rear and side yards may remain within the
maintenance jurisdiction of the project's homeowner's association; however, most storm sewers
and all retention lakes will be maintained by the County Surveyor. Subsurface drains, or
pavement base drains, are proposed to be installed under the street curbs, in order to provide an
outlet point to home sump pumps, and in order to intercept groundwater seepage before reaching
and compromising the pavement stability.
4. Erosion Control
During all phases of the construction the Site General Contractor and all Subcontractors shall
exercise measures to prevent the erosion of soils due to the action of water and wind. All erosion
and sediment control measures shall be implemented prior to earth moving activities.
The proposed detention area along with any swales shall be constructed first. The detention area
~~ ....
~
u
o
and outfall structure must be complete and operational prior to the placement of any impervious
surface.
Sediment in run-off water shall be trapped by the use of such methods as debris basins, siltation
sumps and silt fences until the disturbed area is stabilized. These shall be in place before any
land alterations/grading.
Trapping devices shall be periodically inspected during dry periods and after each rainfall event
by the Site Contractor. Trapping devices shall be replaced if determined to be incapable of
performing intended function of sediment trapping.
The Contractor shall have available on the construction site a water source capable of applying
water to dry exposed soil in order to prevent wind erosion. The application rate and manner shall
be such that soil moisture is attained and no surface run-off is created.
J:\ 123 8\agO 1 \docs\sewreprt.doc