Loading...
HomeMy WebLinkAboutM20027 College Park Rev. Utility Plan_20221209UTILITY PLAN10 TELEPHONE LINEELECTRIC LINEGAS LINESANITARY LINEWATER LINESANITARY MANHOLEFIRE HYDRANTBUFFALO BOXGAS VALVECLEAN OUTLEGENDVALVE VAULTNORTH1" = 30'GRAPHIC SCALESTORM SEWERSTORM FLAREDEND SECTIONCOPYRIGHT C 2022DATE: DESCRIPTION: eritCorpM G R O U P , L L C09-23-2022 ISSUED FOR REVIEW COPYRIGHT C 2022COLLEGE PARK CHURCH OUTDOOR VENUE 2606 WEST 96TH STREET CARMEL, INDIANA FINAL ENGINEERING PLANSPROJECT NO. M20027 eritCorpM G R O U P , L L CDRAWN BY:JDSCHECKED BY:CLSSHEET NO. /13 eritCorp Engineering - Planning - Surveying - Environmental M G R O U P , L L C Other Office Locations: Gurnee, IL 4222 Meridian Parkway, Suite 112 Aurora, IL 60504 Office 630.554.6655 Lic. No. 184-005860 www.meritcorp.com 11-09-2022 REVISED PER CITY COMMENTSNOTES1. THE STORM SEWER SYSTEM SHALL BE CONSTRUCTED PER DESIGN SPECIFIED ANDAS APPROVED BY THE CITY OF CARMEL ON THE FINAL APPROVED CONSTRUCTIONPLANS. DEVIATIONS FROM THE APPROVED DESIGN SHALL ONLY BE PERMITTED DUETO SPECIAL CIRCUMSTANCES OR DIFFICULTY DURING CONSTRUCTION AND WILLREQUIRE PRIOR FIELD APPROVAL FROM A DESIGNATED REPRESENTATIVE OF THECITY OF CARMEL IN ADDITION TO SUPPLEMENTAL APPROVAL BY THE DESIGNENGINEER. AN EXPLANATION OF ANY SUCH DEVIATION SHALL BE INCLUDED AS AREQUIREMENT ON AS-BUILT/RECORD DRAWINGS SUBMITTED FOR RELEASE PFPERFORMANCE GUARANTEES. APPROVED DESIGN SLOPES IDENTIFIED ASGENERATING VELOCITIES OF 2.5 FPS OR LESS OR 10 FPS OR GREATER (AT FULL FLOWCAPACITY) SHALL REQUIRE AS-BUILT CERTIFICATION AT THE TIME OF CONSTRUCTION,PRIOR TO BACKFILLING THE PIPE. THE CONTRACTOR IS INSTRUCTED TO AS-BUILTEACH SECTION OF STORM PIPE AS IT IS BEING INSTALLED TO ENSURE COMPLIANCEWITH THE DESIGN PLANS AND AS APPROVED BY THE CITY OF CARMEL.2. CONTRACTOR SHALL COORDINATE WITH THE CITY OF CARMEL FOR POSTINDICATOR VALVE AND FIRE DEPARTMENT CONNECTION REQUIREMENTS.