Change_Order_3;_White_Construction, LLC; (-$16,294.38);_16-ENG-22_Monon_Boulevard_Phase_2;_CO__3_-_FINAL.
DocuSign Envelope ID:90B4CA35-810E-4B4C-8A71-145F6440AD8E APPROVED By Jon Oberlander at 2:34 pm,Dec 13,2022 City of Carmel Project 16-ENG-22 Monon Boulevard- Phase 2 CHANGE ORDER #3, FINAL Change order represents additional work completed outside of the contract. Contract Price prior to this Change Order $15,187,192.65 Contract Price will be decreased by this Change Order - $ 16,294.38 New Contract Price including this Change Order $15,170,898.27 Cumulative% PO-101689 Change from Original Contract Original Contract $13,998,000.00 N/A Change Order 1 $999,192.65 7% Change Order 2 $190,000.00 8% Change Order 3 -($16,294.38) 7.7% Adjusted Amount $15,170,898.27 DocuSign Envelope ID:90B4CA35-810E-4B4C-8A71-145F6440AD8E CITY OF CARMEL TO:White Construction CONTRACT CHANGE ORDER NO.:FINAL 43 3900 E.White Avenue DATE:3/07/2022 PO BOX 249 PROJECT NAME: 16-ENG-22 Monon Boulevard Phase 2 Clinton.IN 47842 CITY REQ.NO.: CITY PO NO.: 101689 CITY PO DATE:06/07/2018 I. You are directed to make the following changes in this Contract: Add additional items due to modifications in the field and requests from Cannel Engineering Department. SCHEDULED ADJUSTMENT ITEM AMOUNT t+I OR t- I DAYS *See detail of items and summary of changed costs in attached Table TOTAL OF CHANGE ORDER ITEMS -$16,294.38 0 Days II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order:R.F.P.: _n/a W.D.C.NO.: n/a Other;_B'Request from the Cii of Cannel t'er proposals_included herein The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order S15.187 192.65 Contract Price will be increased by this Change Order New Contract Price including this Change Order S15.170,898.27 Contract Time prior to this Change Order 781 Days 7/31/2020 Completion Date Net increased resulting from this Change Order 0 Days Current Contract Time including this Change Order 7/31/2020 Completion Date This Change Order is for full and final settlement of all direct,indirect,impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended The Above Changes Are Accepted Approved Not Present CROSSROAD ENGINEER S White Construction James Brainard.Mayor ENGINEER CONTRACTOR 115 N 17th Avenue 3900 E.White Avenue Je y �hn1n,Cit ngineer Address Address M.a bun,bn.Vict- Beech Grove.IN 46107 Clinton.IN 47842 Mary esnn a.urKce Member o se ny: City/State/Zip City/State/Zip I�I��t1�" EAVI watSAlA, l cf i7q EW a „dblember By, La 1St� By;. 7-• / F—4 A a tender„ Phone: 317-780-1555 Pi ne: 574_875-.? 83 St Wol`rro Date: Date: !I--S-zz Date: 12/21/2022 DocuSign Envelope ID:90B4CA35-810E-4B4C-8A71-145F6440AD8E 16-ENG-22 Marron Boulevard Phase 2 FINAL CHANGE ORDER#3 TABLE Itent Description Unit Unit Price Original Original Final Final Amount Over/Under ,No. Quantity Amount Quantity I Construction Engineering LS S950,000.00 I $ 950,000.00 1.00 $ 950,000.00 S - 2 Mobilization and Demobilization LS $950,000.00 1 $ 950,000.00 _ _ 100 $ __ 950,000.00 S _ - _ 3 Clearing of Right of Way LS $734,730.88 1 $ 734,730.88 I.00 $ 734,730.88 Ir.S - 4 Excavation,Common CYD $50.00 6,764 $ 338,200.00 7,111.11 $ 355,555.50 $ 17,355.50 5 Borrow CYD $0.01 6,550 $ 65.50 4,500.00 S 45.00 S (20.50) 6 SWQCP Preparation and Implementation,Level 1 LS $5,000.00 I $ 5,000.00 I.00 S 5,000.00 $ - 7 Storm Water Quality Management Budget DOL $1.00 27,417 $ 27,417.00 14,634.08 S 14,634.08 $ (12,782.92) 8 Subgrade Treatment,Type II I Undistributed) SYS $12.50 900 $ 11,250.00 260.72 S 3,259.00 $ (7,991.00) 9 Structural Backfill,Type I CYD $75.00 625 $ 46,875.06 339.94 $ 25,495.50 S (21,379 50) 10 Non-Woven Geotextile SYS S2.50 1,142 $ 2,855.00 1,442.35 $ 3,605.88 $ 750.88 I I Compacted Aggregate,No.53 TON $50.00 2,465 $ 123,250.00 4,591 17 $ 229,558.50 $ 106,308 50 12 Geogrid,Non-Permeable SYS $3.00 900 $ 2,700.00 2,963.52 $ 8,890.56 $ 6,19056 13 Curb Ramp,Concrete _ _ SYS $275.00 10 $ 2,750.00 25.88 $ 7,1 17.00 $ 4,367 00 14 Curb,Concrete LFT $55.00 216 $ 11,880.00 137.60 $ 7,568.00 $ (4,312.00) 15 PCCP,6 in. SYS $98.00 1,655 S 162,1.90.00 1,861.82 $ 182,458.36 $ 20,268 36 16 PCCP,9 in. _ SYS $120.00 1,050 $ 126,000.00 1,168.06 $ 140,167 20 $ 14,167 20 17 PCCP,12 in.,Band SYS $750.00 6 $ 4,500 00 5 78 S 4,335.00 $ {165.00) 18 Sidewalk,Concrete SYS $88 00 6,500 $ 572,040.00 7,926 43 $ 697,525.84 $ 125,525.84 19 Sidewalk,Concrete,6 M. SYS $107.00 775 S 82,925.00 492,51 $ 52,698.57 $ (30,226 43) 20 Pavers,Type l SFT $17.00 24,000 S 408,000.00 _ 23,845A3 $ 405,372.31 $ _ (2,627.69) 21 Pavers,Type 2 SFT $22.00 9,850 $ 216,700.00 9,788.94 $ 215,356.68 $ (1,343 32) 22 Pacers,Type 3 _ SET $32.00 10,028 $ 320,896.00 10,028.00 $ 320,896.00 $ - 23 Pavers,Type4 SFT $31.00 451 S 13,981.00 451,00 $ 13,981.00 $ - 24 Pavers,Type S SIT $64.00 409 $ 26,176.00 409.00 $ 26,176.00 $ - 25 Pavers,Type 6 _ SET $34.00 1,436 $ 48,824.00 1539.21 $ 52,333.14 $ 3,509.14 26 Pavers,Type 7 SET $23.00 305 $ 7,015.00 178 56 $ 4,106.88_$ (2,908 12) 27 Pavers,Type 8 SFT $24.00 75 S 1,800.00 116 71 $ 2,801 04 $ 1,001.04 28 Pavers,Type 8,Ante Stock EA $40.00 16 $ 640.00 - $ - $ (640.00) 29 Pavers,Type 9 SET $21 00 43,400 $ 911,400.00 43,246.40 $ 90.8,174.40 $ (3,225.60) 30 Pavers,Type 10 SET $21 00 185 $ 3,885.00 - $ - $ (3,885.00) 31 Pavers,Bike Symbol_ EA S1,750.00 25 $ 43,750 00 25.00 $ 43,750.00 $ - 32 Pavement,Stabilized Decomposed Granite SET $15.00 6,900 $ 103,500.00 3,505.21 $ 52,578.15 $ (50,921.85) 33 Paver,Edge Restraint,Type I LET $8.00 7,810 $ 62,480.00 5,442 90 $ 43,543 20 $ (18,936.80) 34 Paver,Edge Restraint,Type 2 LFT $9,50 1,400 $ 13,300.00 20996 $ 1,994.62 $ (11,305 38) 35 'Trench Drain,Type I LFT $50000 17 $ 8,500.00 17.90 $ 8,950.00 $ _ 450.00 36 Curb,Granite,12"Wide,Type I LFT $125 00 1,621 $ 202,625.00 825.05 $ 103,131 25 $ (99,493 75) 37 Curb,Granite,12"Wide,Type 2 LFT $250.00 6 $ 1,500,00 6.00 $ 1,500.00 S - 38 Curb,Granite,6"Wide,Type 1 LFT $115.00 2,164 $ 248,860.00 1,664.12 $ 191,373.80 $ (57,486.20) 39 Curb,Granite,6"Wide,Type 2 LFT $250.00 5 $ 1,250.00 5.00 $ 1,250,00 $ - 40 Curb,Granite,6"Wide,Type 3 LET $190.00 21 $ 3,990.00 16,00 $ 3,040.00 $ (950.00) 41 Architectural Concrete Wall CYD S950.00 93 $ 88,35000 90..00 $ 85,500.00 $ (2,850.00) 42 Screen Fence LFT $1,125.00 110 $ 123,750,00 145.00 $ 163,125:00 $ 39,375.00 43 Seatwall LET $980.00, 60 $ 58,800.00 60.00 $ 58,800.00 $ - 44 Art Piece 51,Foundation EA _ $12,500_00 I $ 12,500.00 0.63 $ 7,875.00 $ (4,625.00) 45 Art Piece#2,Foundation EA $10,000.00' 1 $ 10,00000 I 00 $ 10,000,00 $ - 46 Art Piece 63,Foundation EA $5,00000 1 $ 5,000.00 1.00 $ 5,000.00 $ 47 Tree Grate,Type 1 EA $2,500.00 34 $ 85 00000 34.00 $ 85,000.00 $ - 48 Tree Grate,Type 2 EA $3,000.001 1 $ 3,000.00 1.00 $ 3,000.00 $ - 49 Tree Grate,Type 3 EA $6,000.00.. 4 $ 24,000.00 4.00 $ 24,0(10.00 $ - 50 Water Bollard EA $7,500.00' 2 $ 1500000 2..00 $ 15,000.00 $ - 51 Water Fountain EA $7 500 00. 4 $ 30,000.00 4,00 $ 30,000.00 $ - 52 Bike Rack,Type 1 EA $500.00 71 $ 35,500.00 71 00 $ 35,500.00 S - 53 Bike Rack,Type 2 EA $600.00 32 $ 19,200.00 3700 $ 22,200.00 $ 3,000.00 54 Bike Rack,Type 3 EA $7,500.00 2 $ 15,000.00 2 00 $ 15,000.00 $ - 55 Bike Fix Station EA $2,500.00 I $ 2,500.00 1.00 $ 2,500 00 $ - 56 Relocate Trike Rental Station LS $10,000.00 1 $ 10,000.00 - $ - $ (10,000.00) 57 Bike/Pedestrian Counter LS $50,000 00'� 1 $ 50,000.00 100 $ 50,000.00 $ - 58 Bench,Type I EA $2,00000' 20 $ 40,000.00 20.00 $ 40,000.00 $ - 59 Bench,Type 2 EA $3,000.00 0 7 $ 2 i 000.00 7.00 $ 21,000.00 S - 60 Bench,Type 3 EA $2,500 00 2 $ 5,000.00 2 00 $ 5,000.00 $ - 61 Bench,Type 4 LA S7,50000 6.0 $ 45,000A0 6.00 $ 45,000.00 S - 62 Bench,Type 5(Limestone Block) CFT $15000 410.0 $ 61,500.00 418.00 $ 62,700.00 $ 1,20000 63 Bench,Type 6 LS S45,000 00 1.0 $ 45,000.00 1.00 S 45,000.00 $ - 64 Litter/Recycle Receptacle LA S2,60000 40.0 $ 104,000.00 40.00 $ 104,000.00 $ - 65 Table,Type 1,32"Round EA $400.00 20.0 $ 8,000.00 20.00 S 8,000.00 $ - 66 Chair,Type 1,Metal Chair EA $30000 40.0 $ 12,000.00 40.00 $ _ 12,000.00 $ - 67 Chair,Type 2,Metal Chair EA $30000 32.0 $ 9,600.00 32.00 $ 9,600.00 $ - 68 Umbrella,9'Octagon EA $5,000.00 3.0 $ 15 000.00 3.00 S 15,000.00 $ - 69 Planter,Type I EA $1,500.00 2.0 $ 3,000.00 2.00 $ 3,000.00 $ 70 Planter,Type 2 EA $1,100.00 20 $ 2,200 00 ---- 2.00 $ 2200.00 $ DocuSign Envelope ID:90B4CA35-810E-4B4C-8A71-145F6440AD8E 16-ENG-22 Monon Boulevard Phase 2 FINAL CHANGE ORDER#3 TABLE Dem Original Original Final No. Description Unit Unit Price Quantity Amount Quantity Final Amount Over/Under 71 Planter,Type 3 EA $750 00 2.0 $ 1,500.00 2 00 S 1,500.00 $ - 72 Table Game,Ping Pong _ _ EA S12,500.00 1.0 $ 12,500.00 1.00 $ 12,500.00 $ - 73 Bocce Ball Court EA $125,000 00 I.0 S 125,000.00 1.00 $ 125,000.00 $ - _ 74 Shuffleboard Court EA $45,000.00 1.0 ' S 45,000.00 1.00 $ 45,000.00 $ - 75 Topsoil,Amended-Planting Soil CYD S100.00 4920.0 S 492,000.00 4,024.81 $ 402,481.09 $ (89,519.00) 76 Topsoil,Structural CYD_ $100.00 1060.0 S 106,000.00 1,112 23 $ 111,223.00 $ 5,223.00 77 Topsoil,Suspended Pavement Assembly SET $50.00 10280.0 S 514,000.00� 8,688 55 $ 434,427.50 S (79,572.50) 78 B-Borrow CYD $50.00 3900 S 19,500,00 - $ - S (19,500.00) 79 Plant,Deciduous Tree,Single Stem,3"Cal. EA S600.00 169.0_ S 101,400.00 170.00 $ 102,000 00 $ 600.00 80 Plant,Deciduous Tree,Single Stem,2.5"Cal. EA $480.00 26.0 $ 12,480.00 28.00 S 13,440.00 5 960.00 81 Plant,Deciduous Tree,Multi-Stem,12'HT EA S460.00 10.0 S 4,600.00 10.00 $ 4,600.00 S - 82 Plant,Deciduous Tree,Multi-Stem,8'HT EA $410.00 15 0 S 6,150 00 15 00 $ 6,150,00 $ - _ 83 Plant,Deciduous Tree,Multi-Stem,6'HT EA S320.00 2.0 $ 640.00 2 00 $ 640.00 $ - _ 84 Plant,Evergreen Tree,8'HT EA S520 00 35 0 $ 18,200.00 35.00 $ 18,200.00 S - 85 Plant,Deciduous Shrub,30"B&B 7 Gallon EA S60.00 88.0 S 5,280.00_ 74 00 $ 4,440.00 S (840.00) 86 Plant,Deciduous Shrub,5 Gallon EA 545.00 348.0 $ 15,660.00 166.00 $ 7,470.00 S (8,190.00) 87 Plant,Deciduous Shrub,3 Gallon EA $37.00 79.0 $ 2,923.00 231.00 $ 8,547.00 $ 5,624.00 88 Plant,Evergreen Shrub,5 Gallon EA $50.00 70.0 $ 3,500.00 38.00 $ _ 1,900.00 $ (1,600.00) 89 Plant,Perennial,3 Gallon 4 Inch Pot EA S8.00 186.0 $ 1,488.00 642.00 $ 5,136.00 $ 3,648.00 _90 Plant,Perennial,I Gallon EA $13.00 9853 0 $ 128,089.00 10,487.00 $ 136,331.00 $ 8,242.00 91 Plant,Ornamental Grass,I Gallon EA $13.00 1,858 $ 24,154.00 _ 1,62200 $ 21,086.00 $ (3,068.00) 92 Plant,Annual,12"Containter EA $15.00 40 $ 600.00 40.00 $ 600.00 S - _93 Plant,Perennial,Bulb EA $2.00 34,703 $ 69,446.00 31,741 00 $ 63,482.00 $ (5,924.00) 94 Sodding,Nursery SYS _ $7.88 2,324 $ 18,313.12 1,169.31 $ 9,214.16 $ (9,098.96) 95 Mobilization&Demobilization for Seeding EA S100.00 I S 100.00 - S - $ (100.00) 96_Mulch,Hardwood Shredded Bark CYD $85.00 190 $ 16,150 00 185.00 $ 15,725.00 $ (425.00) 97 Mulch,Stone SIT $10.00 1,080 _ S 10,800.00 750.00 $ 7,500.00 $ (3,300 00) 98 Irrigation System LS S150,000 00 I $ 150,000 00 1.00 $ 150,000.00 S - 99 Field Office MO S499.99 15 $ 7,500.00 16061 $ 80,303.57 S 72,803.57 100 Field Office Equipment _ MO S500.00 15 $ 7,500.00 - $ - $ (7,500.00) 101 Pipe,Type 4,Circular,4 in,HDPE LFT $18.00 1,753 $ 31,554.00 2,022.00 $ 36,396.00_$ 4,842.00 102 Pipe,Type 4,Circular,6 in,HDPE LFf $19.00 984 $ 18,696 00 963.00 $ 18,297.00 S (399.00) 103 Pipe,Type 2,Circular,6 in,HDPE LIT $19.00 369 $ 7,011..00: 291.00 $ 5,529.00 $ (1,482.00) 104 DELETED -- 0 $ - - $ - $ - 105 Pipe,Type 2,Circular,I8 in,RCP LFT $60.00 231 $ 13,860.00 174.25 $ 10,455.00 $ (3,405.00) 106 Pipe,Type 2,Circular,24 in,RCP LFT $75.00 249 $ 18,675.00 192.65 $ 14,448.75 $ (4,226.25) 107Pipe_Type 2,Circular,30 in,RCP LET $95.00 54 $ 5,13009 i 91.00 $ 8,645.00 S 3,515.00 108 Pipe,Type 2,Circular,36 in,RCP LFT S110.00 89 $ 9,790.00 71 50 $ 7,865.00 $ (1,925 00.) 109 Manhole,H-4 EA 55,000.00 1 $ 5,000.00, 1.00 $ 5,000.00 $ - 110 Manhole,C-4 £A $4,000.00 1 $ 4,000.00, 1.00 $ 4,000.00 $ - 111 Manhole,1-4 EA $6,000.00 I $ 6,000.00' 1.00 $ 6,000.00 $ - _112 Manhole,K-4 EA $6,000.00 2 $ 12,000.00 1.00 $ 6,000.00, $ (6,000.00) 113 Manhole,C-7 EA $3,600.00 I $ 3,60000 1.00 $ 3,600.00 $ - 114 Manhole,L-4 EA $8,000.00 2 $ 16,000.00 3.00 $ 24,000.00 $ 8,000.00 115 Inlet, EA $2,250.00 3 $ 6,750_00 2.00 $ 4,500.00 $ (2,250.00) 116 Inlet,F-7 EA $2,300.00 1 $ 2,300 00 1.00 $ 2,300.00 $ - 117 Concrete End Section,15 in. EA $1,500_00 I $ 1,500.00 1 00 $ 1,500.00_$ - , 118 Nyloplast Drain Basin,18" EA $1,500.00 3 $ 4,500.00 3.00 $ 4,500.09 $ - 1 19 Overflow Cleanout EA_ $500.00 I $ 500.00 1.00 $ 500.00 $ - 120 Underdrain Cleanout EA S500.00 9 $ 4,500.00 II.00 $ 5,500.00_$ 1,000.00 121 Existing Structure Connection EA $1,000.00 12 $ 12,060.00 - $ - $ (12,000.00) 122 Geotextdes for Permeable Paver Trench SYS $2.00 1,134 $ 2,268.00 1,454 93 $ 2,909.86 $ 641.86 • 123 Aggregate for Permeable Paver Trench,No.2,Washed _CYD $75.00 971. $ 72,825.00 756.92 $ 56,769.00 $ (16,056.00) 124 Geotextiles for 4"Silva Cell Underdrain _ SYS $1.50 1,150 $ 1,72590_ 803.09 $ _ 1,204.64 $ (520.37) 125 Aggregate for 4"Silva Cell Underdrain,Washed CYD $100.00 95 $ 9,500.00 66 78 $ 6,678.00 S (2,822 00) 126 Stormsewer Casting,Adjust To Grade EA S750.00 10 $ 7,500.00_ 7 00 S 5,25000 $ (2,250.00) 127 Structure Flood EA S500.00 25 $ 12,500.00 15.00 $ 7,500.00 $ (5,000.00) 128 12"Ductile Iron Water Main LIT $100.00 771 $ 77,100.00 707 50 $ 70,750.00 $ (6,350.00) 129 8"Ductile Iron Water Main LFT $90.00 18 $ 1,620.00 6 00 $ 540.00 $ (1,080.00) _ 130 Structure Backfill,Water Main CYD $75.00 548 $ 41,100.00 239 82 S 17,986.50 $ (23,113.50) 131 12"Gate Valve EA $3,000.00 2 $ 6,000.00 2 00 $ 6,00000 S - 132 Complete Hydrant Assembly EA S5,250.00 I $ 5,250.00_ 2 00 S 10,500.00 $ 5,250.00 133 8"Connection EA S1,750.00 I S 1,750.00 1.60 S 1,750.00 $ - -134 12"Connection EA $2,500.00. I $ 2,500.00 - $ - $ (2,500.00) 135 Water Valve,Adjust to Grade EA $250 00 3 S 750.00 - S - $ (750.00), 136 Road Closure Sign Assembly EA S200.00 5 ! 5 1,000.00 2,00 S 400.00 $ (600.00) 137 Construction Sign _ EA $159.00 8 S 1,200.00 _ 5 16.00 $ 2,400.00 S 1,20000 138 Barricade III-B LET $100 24 5 360.00J 24.00 S 360.00 S - 139 Maintenance of Traffic LS $900,000.40 1 S 900,000.00 I 00 $ 900,00000 $ - 140 Monon Trail Construction Signage EA S150.00 10 S 1,500.00 10.00 $ 1,500.00 S - DocuSign Envelope ID:90B4CA35-810E-4B4C-8A71-145F6440AD8E 16-ENG-22 Murton Boulevard Phase 2 FINAL CHANGE ORDER#3 TABLE !Item -ti Original Original Final No Description Unit unit Price Quantity Amount Quantity Final Amount Over/Under 141 Sign Post,Square,Type I,Reinf Anc Base LFT S21.00 207.5 S 4,357.50 121 50 $ 2,551 50 $ 11.806.00) 142 Decorative Street Sign Assembly EA $2,000.00 3 $ 6,000.00 3.00 S 6,000 00 $ - 143 Sign,Sheet,with legend 0.080" SET $23.00 78 $ 1,794.00 58.00 $ 1,334.00 $ [460.00) 144 Sign,Sheet,with legend 0.100" SET $24.00 25 S 600.00 - $ _ - $ (600.00) 145 Utility Manhole,3'Diameter EA $3,000.00 7 $ 21,000.00 4.00 $ 12,00000 $ {9,000.00) 146 Conduit,PVC 4",Schedule 40 LFT $18 00 1,812 $ 32,616.00 923.00 $ 16,614.00 $ (16,002.00) 147 Conduit,4"lnnerduct w+4 x I'Innerducts LFT $20.00 796 $ 15,920.00 77100 $ 15,420.00 S (500.00) 148 Utility Structure,Adjust to Grade EA $750 00 1 $ 750.00 2 00 $ 1,500 00 5 750 00 149 Sanitary Manhole,Adjust Casting to Grade EA $1,000 00 2 $ 2,000.00 - $ - S {2,000 00) 150 Greywater Dump Station EA $5,000.00 1 $ 5,000.00 1.00 $ 5,000.00 S - 151 Mechanically Core Existing Structure,Sanitary EA $750.00 1 $ 750.00 1.00 $ 750.00 S - 152 Construction Fence cv/Screening,8 ft.. _ LFT $10.00 3,400 $ 34,000 00 2,055.00 $ 20,550 00 $ (13,450.00) 153 Tree Preservation Fence EA $500.00 4 $ 2,000.00 - $ - $ (2,000.00) 154 Audio,Speakers LS $75,000.00 1 $ 75,000.00 - $ - $ (75,000.00) 155 Handhole,Lighting,Polymer Concrete EA $850 00 10 $ 8,500.00 13.00 5 1 1,050.00 S 2,550.00 156 Handhole EA $2,50000 1 $ 2,500.00 3.00 $ 7,500.00 $ 5,000.00 157 Luminaire,Type SI EA $7,700,00 22 $ 169,400,00 22.00 S 169,400 00 S - 158 Luminaire,Type$2 EA $16,400.00 7 $ 114,80000 7.00 S 114,800.00 S - 159 Luminaire,Type S3 EA $13,500,00 7 5 94,500 00 _ 7.00 S _ 94,500.00 $ - 160 Luminaire,Type S4 EA $15 600.00 2 S 31,200,00 2.00 S 31 200.00 S - 161 Luminaire,Type S5 EA S5,500 00 14 5 77,000 00 14.00 S 77,000 00 $ - 162 Luminaire,Type S6 EA $7,750.00 2 S 15,500,00 2.00 S 15,500.00 S - 163 Luminaire,Type Si EA $3,400.00 29 $ 98,600.00 29.00 S 98,600 00 $ - 164 Luminaire,Type$8 EA $1,700.00 56 S 95,200.00 56.00 $ 95,200.00 S - 165 'Luminaire,Type S9 EA $1,100,00 6 ' $ 6,600,00 6.00 S 6,600.00 $ - 166 Luminaire,Type S 10 LFT $990,00 50 $ 49,500.00 40.10 S 39,699.00 $ (9,801 00) 167 Charging Station EA S1,500.00 4 $ 6,000.00. 4.00 $ 6,000 00 $ - 168 Receptacle,Pedestal GFCI,Type 1 EA $62500 42 $ 26,250.00 42.00 S 26,250.00 $ - 169 Receptacle,Pedestal GFCI_Type 2 EA $625.00 35 $ 21,875.00 35.00 $ 21,875.00 $ - 170 Receptacle,Ground Box GFCI ,EA S925 00 4 $ 3,700 00 4.00 $ 3,700.00 $ - 171 Wire,No.6 Copper,3/C in Conduit LFT $2.60 2,600 $ 6,760.00 911.00 $ 2,368.60 $ (4,391 40) 172 Wire,No 8 Copper,3/C in Conduit LET $2.20 3,000 $ 6,600.00 6,002.00 $ 13,204.40 $ 6,604 40 173 Wire,No.10 Copper,3/C in Conduit LFT $1.80 15,945 $ 28,701.00 51,834.00 $ 93,301 20 $ 64,600.20 174 Conduit,PVC 1" LFT $5.00 1,660 $ 8,300.00 17,810 50 $ 89,052.50 $ 80,752.50 175 Conduit,PVC 1_25" LFI' $6.00 510 $ 3,060.00 210 25 $ 1,26150 $ (1,798.50) 176 Conduit,PVC 2" LFT S8.00 300 $ 2,400.00 640.00 $ 5,120.00 S 2,720 00 177 Service Point,Type 11 EA S11,000.00 2 $ 22,000.00 2.00 $ 22,000.00 $ - 1 78 Modified Electrical Service Point EA $2,500.00 2 $ 5,000.00 2.00 $ 5,000.00 $ - 179 DELETED -- 0 0 $ - - $ S - 180 Lighting Control System EA $8,000.00 3 $ 24,000.00 3.00 $ 24,000.00 $ - l81 Sign Type 10,Kiosk EA $10,c00.00 3 $ 30,000.00 3.00 $ 30,000.00 $ - 182 Sign Type 20,Pillar EA $4,75000 10 $ 47,500.00 10.00 $ 47,500.00 5 - 183 Sign Type 21,Pillar EA $4,750 00 3 $ 14,250.00 5.00 $ 23,750.00 $ 9,500,00 184 Sign Type 40,Regulatory(Round) EA $1,500.00 19 $ 28,500.00 11.00 $ 16,500.00 $ (12,000.00) 185 Sign Type 40,Regulatory(Round),Double Sided EA $1,500.00 17 $ 25,500.00 18.00 $ 27,000.00 $ 1,500.00 186 Sign Type 41,Regulatory(Rectangle) EA $1,000.00 5 $ 5,00000 5.00 $ 5,000.00 $ - 187 Sign Type 41,Regulatory(Rectangle),Double Sided EA $1,000.00 6 $ 6,000.00 5 00 $ 5,000.00_ $ (1,000.00) 188 Sign Type 50,Art Installation EA $1,00000 3 $ 3,000.00 3.00 $ 3,000.00 $ - 189 Sign Type 60,Etiquette EA $1,250.00 10 $ 12,500 00 5.00 $ 6,250.00 $ (6,250.00) 190 Sign,Relocate Mileage Marker EA $1,250.00 1 $ 1,250.00 l 00 $ 1,250.00 $ - 191 Curb,Granite,6"Wide,Type 4 _LFT $190.00 15 $ 2,850.00 5 00 5 950.00 $ (1,900.00) 192 Irrigation Repave LS $1,500.00 1 $ _1,500.00 - $ - $ (1,500.00) 193 Pipe,Type 2,Circular,8 in,HOPE LFT $40.00 13 S 520.00 13 00 $ 520.00 $ - 194 Pipe,Type 2,Circular,15 in,RCP LFT $65 0fl 53 $ 3,445.00 25.00 $ 1,625.00 $ (1,820 00) 195 Utility Box,4'x4'x4',Split Box EA $7,500.00 1 $ 7,500.00 1.00 $ 7,500.00 $ - 196 Pavers,Type 3b SET $32.00, 85 $ 2,720.00 85.00 $ 2,720.00 $ - 197 Pavers,Type 6 Modified SET $13.00 793 $ 10,309.00 - $ - 5 (10,309 00) 198 Conduit,Steel,Galvanized,2 inch LFT $16.00 800 $ 12,800.00 240.00 $ 3,840.00 $ (8,960.00) 199_Water Line,3/4 inch LET $27.00 300 $ 8,100.00 375 60 $ I0,I41.20 $ 2,041 20 200 Water Line,1 inch LFT $30.00 397 $ I.1,910.00 410 00 $ 12,300.00 $ 390 00 201 DELETED -- 0 0 S - $ - $ 202 DELETED -- 0 0 S - - $ - $ - 203 Water Back Flow Preventer,3/4 inch EA $1,250.00 2 $ 2,500.00 2.00 $ 2,500.00 $ - 204 Water Back Flow Preventer,I inch EA $1,350.00_ 1 $ 1,350.00 1.00 $ 1,350.00 $ - 20$ Pipe,Type 2,Circular,4 in,HOPE LFT $30.00 251 $ 7,530.00 185.00 $ 5,550_00 $ (1,980.00( 206 LIMA Base,25 0 mm(Undistributed) TON $92.00 171 $ 15,732.00 14109 S 12,980.28 $ (2,751.72) 207 Subgrade Treatment,Type IV(Undistributed) SYS $20 00_ 1,033 $ 20,660.00 - $ - $ (20,660 00) 208 Pavers,Type 3 Modified SET $13.00 1,397 S 18,161 00 1,397.00 $ 18,161 00 5 209 Pavers,Type4 Modified SET $12 00 129 $ 1,54800 17 45 $ 209 40 $ (1,338.60) 210 Pavers,Type 5 Modified SET $14.00 171 S 2,394.00 168.70 $ 2,361 80 $ {32 20) DocuSign Envelope ID:90B4CA35-810E-4B4C-8A71-145F6440AD8E 16-ENG-22 Monon Boulevard Phase 2 FINAL CHANGE ORDER#3 TABLE «' Description Unit Unit Price Original Original Final Final Amount Over/tinder No, Quantity Amount Quantity i 211 Pavers,Type 3b Modified SFT $12.00 15 S 180.00 15.00 $ 180.00 S - 212 Water Service EA S750.00 3 S 2,250.00 3.00 $ 2,250.00 $ - Al-1 Poured-in-Place Rubber Surfacing SFT $20.00 655 $ 13,100.00 1,1.17.80 $ 22,356.00 S 9,256.00 AI-2 Artificial Turf,Standard. SFT $22.00 550 $ 12,100.00 481.10 $ 10,584.20 S (1,515.80) Al-3 Artificial Turf,with Concrete Base SFT $445.00 175 $ 77,875.00 170.26 $ 75,765.70 5 (2,109.30) Al-4'Artificial Turf,Fall Rated _ SET $25.00 25 $ 625.00 38.80 $ 970.00 S 345.00 Al-5 Concrete Header LET $7000 241 $ 16,87000 119.50 $ 8,365.00 1 S (8,505.00) Al-6 Limestone Block CFT $350.00 4 $ 1,400.00 4.00 $ 1,400.00 $ - AI-7 Luckey Climber LS $299,618.75 I $ 299,618 75 1.00 S 299,618.75 S - Al-8 Slide LS $17,500.00 1 $ 17,50000 1.00 $ 17,500.09 $ - Al-9 Playground Grotto LS S28,000,00 1 $ 28,000.00 1,00 $ 28,000.00 $ - A1-10 Climbing Holds LS $4,500.00 1 $ 4,500.00 1.00 S 4,500 00 S - Al-1I Decorative Wall Panel LS S67,500.00 1 $ 67,50000 1.00 S 67,500.00 S - A1-12 Topsoil,Amended-Planting Soil CYD $100.00 -100 S (10,00000) - $ - $ 10,000.00 Al-13 Plant,Deciduous Tree,Single Stem,3"5"Cal. EA $1,000.00 1 $ 1,000.00 1.00 $ 1,000.00 $ A1-14 Sodding,Nursery SYS $5 00 -200 $ (1,00000) - $ - $ 1,000.00 Al-15 Mulch,Hardwood Shredded Bark CYD $85.00 0.25 $ 21.25 - $ - $ (21.25) _Al-16IrrigationSystem LS $250.00 -1 $ (250.00) - $ - $ 250.00 Al-17 Nyloplast Drain Basin,8"Slotted EA $1,250.00 3 $ 3,750.00 2.00 $ 2,590.00 $ (1,250.00) Al-18 Nyloplast Drain Basin,8"Solid EA $1,250.00 4 S 5,000.00 - $ - $ (5,000.00) Al-19 Pipe,Type 4,Circular,4 in_,HDPE LET $10.00 218 $ 2,180.00 - S - $ (2,180.00) Al-20 Plant,Perennial,1 Gallon EA $13.00 10 $ 130.00 - $ - S (130.00) Al-21 Plant,Perennial,Bulb EA $2,00 40 S 80,00 40.00 $ 80.00 $ - A2-1 Sidewalk,Concrete SYS $80.00 -110 $ (8,800.00) - $ - $ 8,800 00 A2-2 PCCP,6 in. SYS $95.00 280 S 26,600 00 266.69 $ 25,335.55 $ (1,264.45) A2.3 Pavers,Type 2 SFT $20.00 -975 $ (19,500,00) - $ - $ 19,500.00 A2-4 Pavers,Type 11 SFT $39.00 2470 $ 96,330.00 2,398 00 S 93,522.00 S (2,808.00) A2-5 Pavers,Type I2 SFT $39.00 140 $ 5,460.00 136.00 $ 5,304.00 $ (156.00) A2-6 Pavers,Type 13 SFT $39.00 40 $ 1,560.00 32.00 $ 1,248.00 $ (312.00) A2-7 Trench Drain,Type 2 LET $450.00 68 S 30,600.00 68.00 $ 30,600.00 $ - A2-8 Water Feature _ LS $441,239.00 1 $ 441,239.00 1.00 S 441,239.00 $ - A2-9 Limestone Block CFT $145.00 716 $ 103,820.00, 694.60 $ 100,717.00 $ (3,103.00) A2-10 Limestone Block with Bubbler CFT $165.00 103 $ 16,995.00 115.60 $ 19,074.00 $ 2,079.00 A2-11 Table,Type 1,32"Round EA $400.00 9 S 3,600 00 9.00 $ 3,600.00 $ - A2-12 Chair,Type 1,Metal Chair EA $300.00 20 $ 6,000.00 20.00 $ 6,000 00 $ - A2-13 Chair,Type 2,Metal Chair EA $300.00 12 $ 3,600.00 12.00 $ 3 60000 $ - A2-14 Umbrella,9'Octagon EA 54,900.00 4 $ 19,690.00 4.00 S 19,600.00 $ - A2-IS Plant,Deciduous Tree,Single Stem,3"Cal. EA S700.00 I $ 70000 - $ - $ (700.00) A2-16 Plant,Deciduous Shrub,3 gallon,Min.18"10 Gallon EA $65.00 18 $ 1,170.00 - $ - $ (1,170.00) A2-17 DELETED -- 0 0 $ - - S - $ - A2-18 Plant,Perennial,1 Gallon EA $13.50 466 $ 6,291 00 1.00 $ 13.50 $ (6,277.50) A2-19 Plant,Ornamental Grass,1 Gallon EA $13.00 78 S 1,014.00 - $ - $ (1,014.00) A2-20 Plant,Perennial,Bulb EA $2.00 3,989 $ 7,978.00 3,989.00 S 7,978,00 S - A2-21 Sodding,Nursery SYS $5.00 -350 $ (1,75000) - $ - $ 1,750.00 A2-22 Mulch,Hardwood Shredded Bark CYD S85.00 7 $ 595.00 - $ - $ (595.00) A2-23 Mulch,Stone SFT $6.00 80 $ 48000 - $ - $ (480.00) A2-24 irrigation System LS $1,000.00 -1 S (1,000.00) - $ - $ 1,000.00 S A2-25 Luminaire,Type S7 EA $3,400.00 2 $ 6,800.00 2.00 $ 6,800.00 $ - A2-26 Luminaire,Type S8 EA $1,700.00 8 $ 13,60000 8.00 $ 13,600.00 $ - A2-27 Wire,No. 1 10 Copper,3/C in Conduit LFT $18.00 440 $ 7,920.00 440.00 $ 7,920.00 A2-28 Sign Type 60,Etiquette EA $1,250.00 2 S. 2,500.00 - $ - $ (2,500.00) A2-29 2"Sanitary Forcemain LFT $15.00 204 $ 3,06000 204.00 $ 3,060.00 S - A2-30 Backfill for Sanitary Forcemain LFT $10.00 142 $ 1,42000 142.00 $ 1,420.00 $ - A2-31 Sanitary Forcemain Connection EA $500.00 1 $ 500.00 1.00 $ 500.00_S - A2-32 6"Sanitary Lateral LFT $25.00 46 $ 1,150.00 32.00 $ 800.00 $ (350.00) A2-33 Backfill for Sanitary Lateral LET S25.00 47 $ 1,175 00 47.00 $ 1,175.00 S - A2-34 6"Sanitary Cleanout,Type I EA S750.00 2 S 1,500.00 1_00 $ 750.00 $ (750 00) A2-35 6"Sanitary Cleanout,Type II EA $750,00 I $ 750.00 ' - $ - $ (750 00) A2-36 Trench Dram,Type I LFT $400.00 32 S. 12,80000 322.00 $ 12,800.00 $ - A2-37 Nyloplast Drain Basin,12" EA S1.250.00 I $ 1,250.00 l 00 $ 1250.00 $ - A2-38 Pipe,Type 2,Circular,6 in.,HDPE LFT $12.00 139 $ 1,668.00 - $ - $ (1,668.00) A2-39 DELETED -- 0 0 $ - - $ - _$ A2-40 Wire,No.3 Copper,3/C in Conduit LFT $52.00 340 $ 17,680.00 340.00 $ 17 680.00 $ - A2-41 Existing Structure Connection EA $1,250.00 1 $ 1,250,00 1.00 $ 1,250.00 $ - A2-42 Pipe,Type 2,Circular,3 in,HDPE LFT $15.00 14 S 210.00 - $ - $ (210.00) A2-43 Pipe,Type 2,Circular,4 in,HDPE LET S16.00 -35 $ (560.00) - $ - $ 560 00 A2-44 Water Lute,1 inch LET $25.00 62 $ 1,550.00 62.00 $ 1,550 00 S - A2-45 DELETED -- 0 0 $ - - $ - $ - A2-46 Water Back Flow Preventer,I inch EA 51,250.00 I $ 1,250.00 1.00 $ 1,250.00 $ - A2-47 Pipe,Type 4,Circular,4 in,HDPE LET $15.00 -87 $ (1,305.00) - $ - S 1,305 00 DocuSign Envelope ID:90B4CA35-810E-4B4C-8A71-145F6440AD8E 16-ENG-22 Monon Boulevard Phase 2 FINAL CHANGE ORDER#3 TABLE Item Original Original Final No. Description Unit Unit Price Quantity Amount Quantity Final Amount Over/Under A2-48 Water Service EA $1,250.00 ➢ $ 1,25000 1.00 S 1,250.00 S - A3-I Tension Cable Trellis LS $5,790.00 1 $ 5,790.00 1.00 S 5,790.00 $ - A3-2 Plant,Vine,5 Gallon EA S45.00 38 S 1,71000 68.00 $ 3,060.00 $ 1,350.00 A3-3 Irrigation System LS 1590.00 1 S 500.00 - $ - $ (500.00) A4-I Screen Fence LFT $1,000.00 169 $ 168,470.00 167.00 S I67,00000 $ 0,470.00) A4-2 Tension Cable Trellis LS $8,740 00 1 $ 8,740.00 1.00 $ 8,740 00 S - A4-3 Plant,Vine,5 Gallon EA $45.00 62 $ 2,790.00 62.00 $ 2,79000 $ - 213 MI Insurance Temporary Access Walk LS $14,316.53 1 $ 14,316.53 1 00 $ 14,316 53 $ - 214 Push Conduits Under 1st Street SW(Morphey) LS $3,57500 I $ 3,575.00 1.00 $ 3,575 00 $ - 215 ASI#9 Foundation Modifications LS $7,623.00 1 $ 7,623.00 1.00 $ 7,623.00 $ - 216 Lower Light Pole at Main Street(Huston) LS $3,906.00 I $ 3,906.00 I.00 $ 3,906 00 $ _ - 217 Added CCTV and Cabling(Huston) LS S88,279.00 1 $ 88,279.00 1,00 S 88,27900 $ - 2I8 Eco Counter Display Upgrade LS $1,602.00 1 $ 1,60.2.00 1.00 $ 1,602.00 $ - 219 Red Oak Trees,Increase Size to 4"Caliper EA $258.50 4 S 1,034.00 4.00 $ 1,034.00 $ - _ 220 6th Street After Hours Flooding Response LS $728.50 L S 728.50 1.00 $ 728.50 S - 221 Greentree-Drainage/Curb Work-12/12/2018 LS S3,427.00 1 S 3,427.00 1.00 S 3,427.00 S - _ 222 5th Street NE Sod-12/20/2018 LS $3,976.46 I $ 3,976.46 1.00 S 3,976.46 S - 223 Modify Sir.600A-Core for Pipe Extension _LS $330.00 1 $ 330.00 100 S 330.00 S - 224 Vive Winter Maintenance-12/7/2018 LS $1,038.13 1 $ 1,038.13 I 00 S 1,03813 S - 225 Vive Winter Maintenance-1/16/2019 LS $1,743.50 1 $ 1,743.50 1 00 S _ 1,743.50 S - 226 Additional Irrigation Work-1/16/2019 LS $3,774.00 1 S 3,774.00 1.00 S 3,774.00 S - 227. Vise Winter Maintenance-1/22/2019 LS $78650 1 $ 786.50 1.00 $ 786.50 S - 228 Vise Winter Maintenance-2/1/2019 LS $1,245."'5 1 $ 1,245.75 1.00 $ 1,245.75 $ - 229 Vive Winter Maintenance-2/15/2019 LS $1,089.00 1 $ 1,089.00 1.00 $ 1089.00 S - 230 Regulatory Sign Frames-2/15/2019 LS $24,025.79 I $ 24,025 79 1.00 $ 24,025.79 $ __ _ - 231 Vive Winter Maintenance-3/4&3/5/2019 LS S275.00 1 $ 275.00 1.00 $ _ _ 275.00 S - 232 ASI#16;Retrofit Concrete Curbback LFT $43.90 1906,75 $ 83,706 33 1,926..25 $ 84,562.38 $ 856.05 233 Communications Cabinet,and Foundation EA $9,836.57 2 $ 19,673.14 2.00 $ 19,673.14 $ - 234 A51 816;March 2019 Excavation T&M LS $5,143.00 1 $ 5,14300 1.00 $ 5,143.00 $ - 235 ASI u16,April 2019 Excavation T&M LS $928.00 1 $ 928.00 1.00. $ 928.00 $ - 236 ,May 2019 T&M LS S5,017.19 1 S 5,017.19 1.00 $ 5,017.19___$ - 237 6th Street Tree Removal LS $4,261.66 1 $ 4,261 66 1.00 $ 4,261.66 $ - 238 May 2019 Huston T&M LS $8,909.00 1 $ 8,909.00 1.00 $ 8,909.00 $ - 239 Calumet Revised 4"Concrete SYS S48.28 26.56 $ 1,282.32 26.56 $ 1,282.32 $ - 236a May 2019 T&M Revised Cost LS $54.00 1 $ 54.00 1.00 $ 54.00 $ - 238a May 2019 Huston T&M Revised Cost LS (S164.33) 1 $ (164.33) 1.00 $ _ (164 33) $ - 240 Light to Salt Barn L5 S1,005.40 1 S 1,005 40 1.00 $ 1,005.40 $ - I 241 Main Street and Monon Trail Planter(Turnesol) LS $660 80 1 y S 660.80 1.00 $ 660.80 S - 242 New Display for Ped Counter LS $2,061.11 1 $ 2,061.11 1.00 S 2,061 11 $ - 243 Various T&M July LS $6,684.34 1 $ 6,684.34 1.00 $ 6,684.34 $ - 244 Light FoundatmnRemove/Replace EA $1,850.00 1 S 1,850.00 1.00 $ _ 1,850.00 $ - 245 Center Green Additional Prep Work-White Construction COL $1.00 69292 64 S 69,292.64 75,546.20 S 75,546.20 $ 6,253.56 246 Center Green Additional Paver Work-Smock Fenster SET $39.02 7600 $ 296,552.00 7,600.00 $ 296,552.00 S - 247 Midtown West Silva Cell Repair 001 $1.00 98798.41 S 98,798.41 98,798.41 $ 98,798.41 ' $ - 248 Microphone Connections at Pedestals-8/19/2019 Is $4,688.86 i $ 4,688.86 1.00 $ 4,688.86 $ - 249 Veterans Way Sod Repair-8/27/2019 LS S1,402.26 1 $ 1,402.26 1.00 $ 1,402.26 S - 250 Elm St Water Valve Extension-8/28/2019 Ls. $1,846.19 1 $ 1,846 19 1.00 S 1,846.19 $ - 251 Histonc Society Storm Lid-9/3/2019 LS _ $881.13 I $ 881.13 1.00 $ 881 13 $ - 252 ASI#16 Revised Curb,Granite,12"Wide,Type 1 _ LFT $159 44 7-0.45 $ 122,840.55 770.45 $ 122,840.55 S - 253 Phase 2 Luckey Climber Foundation I5• $5,730.00 1 8 5,730.00 1.00 $ 5,730,00 S - 254 Misc.T&M for Railyard,1st St and Art Piece#2 LS $5,502.08 1 $ 5,502.08 1.00 $ 5,502.08 S - 255 Phase 2 Smock T&M-I0/30/19 LS S42,811.92 1 $ 42,811.92 1.00 $ 42,811.92 S 256 T&M Misc for October 2019 Ls $6,686.25 1 $ 6,686,25 1.00 S 6,686.25 S - 257 Type l Tree Grate-Single-11/5/2019 LS $5,605.00 1 $ 5,605.00 1.00 $ 5,605.00 S - _ _ 258 12"Granite Curb-Epoxy Stainless Steel Dowels EA $5.65 514 S 2,904.10 514.00 S 2,904 10 S - 259 Decorative Play Wall Ring Assemblies LS 512,765.70 1 $ 12,765'70 1.00 $ 12,765 70 S - 260 Broady Campbell-Reset Granite Curb Damaged by Snow Plo LS $2,013.00 1 $ 2,013.00 1.00 $ 2,013.00 S - 261 Concrete Sidewalk Removal at Service Point MJ/JC Ilan is $996.00 1 $ _ 996.00 1.44 $ 1,436.00 S 440.00 262 Huston Electric Railyard Added Work 8/5;2019 LS $7,609 96 1 $ 7,609.96 1.00 $ 7,609 96 S - 263 Kafka Granite Chips for Permeable Cleaning L5 $5,448 7.1 1 $ 5,448.74 1.00 $ 5,448.74 S - 264 Vive Winter Maintenance-2/16/2019,2/18/_019,2(20.2019 LS $970.75 1 $ 970.75 100 S 970 75 S - 265 2nd Street Planter Boxes LS $1,0I 5 56 0 S - 1 00 S 1,01$.56 5 1,015 56 266 Veterans Way and 6th Street Water Valve Replacement LS $1,276 33 0 $ - _ 1.00 5 1,27633 5 1,276 33 267 ASI-19 Grade Work Bocce Ball and Shuffleboard Ls $2,391 33 0 $ - 1.00 S 2,391 33 S 2,391.33 268 Skate Stoppers-2/03/2020 L5 $6,012.05 0 $ - 1.00 S 6,012 05 S 6.012 05 269 ASI Sign Escalation Cost L5 S45,242 75 0 $ - 1.00 $ 45,242 75 S 45,242 75 270 2nd Street Landscaping LS $8,120 35 0 $ - 1.00 $ 8,120.35 S 8,120 35 271 ASI-14 Transfer Wall Handle LS $i 391 00 0 S - 1.00 $ 1,391.00 5 1,391 00 272 Mexican Beech Pebbles CET $102.66 0 S - 59.30 $ 6,087 74 S 6,087 74 273 Nylopast Repair/Hydrant Valve Adjustment _L5 $3;28 76 0 S - 1.00 $ 3,728 76 $ 3,728 76 274 SFC Extra's(Skale Stops/Vault Lid Pavers/Spray Plaza) Ls $5,199.74 0 S - 1 00 S 5,l99 74 S _ 5,199 74 275 Communication Building Steps 'LS $3,800.00 0 S - 1 00 $ _ 3,800.00 S 3,800.00 276 Huston Light Shields and Installation L5 $870,00 0 S - 1.00 S 870 00 S 870 00• DocuSign Envelope ID:90B4CA35-810E-4B4C-8A71-145F6440AD8E 16-ENC-22 Monon Boulevard Phase 2 FINAL CHANGE ORDER 143 TABLE Item Original Original Final No. Description Unit UnitPrice Quantity Amount Quantity Amount Over/Under 277 CES Added Scope T&M LS $4,984.10 0 S - 100 S 4,984 10 S 4,984 10 278 Huston Added Work Miscellaneous LS - $16,023.70 0 $ - 1 CO S 16,023.70 S 16,023 70 279 Miscellaneous T&M DOt $1.00 0 S - _ 36,977 28 S 36,977 28 $ 36,977 228 280 Phase 2-Attic Stock Materials _ DOL $1.00 0 $ - 39,098.49 $ 39,098 49 S 39,098.49 281 6661 St Blue Spruce - EA $1,320.00 _ 0 $ - I.00 $ 1,32000 S 1,320.00 282 NI idlown Plaza-Forever Lawn DOL $I.00 120000 $ 120,000 00 123,267 54 $ 123,26754 $ 3,267.54 283 Louvered Screen Ga5eID8l approach DOL S1.00 70000 $ 70,000.00 84,26990 $ 84,269.90 $ 14,269.90 5 15,187,192.65 $ 15,176,898.27 $ 116,294.38)