Loading...
HomeMy WebLinkAboutF100 - Foundation Plan01. EXISTING FOUNDATION WALL. 02. EXISTING FOOTING. 03. NEW FOUNDATION WALL - 8" OR 10" REINFORCED CONCRETE TBD. 04. NEW 12" X 24" REINFORCED CONCRETE FOOTING WITH (2) #5 HORIZONTAL BARS AND #4 VERTICAL BARS. VERTICAL BARS TO CORRESPOND WITH ANCHOR BOLT LOCATIONS. 05. DEMO EXISTING FOUNDATION WALL + FOOTING - PREP FOR NEW CONDITIONS - REF: SLAB PLAN + FIRST FLOOR PLAN 06. EXISTING FOUNDATION DRAIN 07. NEW FOUNDATION DRAIN - TIE INTO EXISTING FOUNDATION PLAN NOTES X A. FIELD VERIFY ALL CONDITIONS - INCLUDING GRADING. B. REFER TO ARCHITECT IF THERE ARE ANY DISCREPANCIES TO PLANS AND ACTUAL FIELD CONDITIONS. C. TYPICAL NEW FOOTINGS: (SIZE PER DETAIL) REINFORCED CONCRETE FOOTING WITH (2) #5 CONTINUOUS HORIZONTAL BARS AND #4 VERTICAL BARS EVERY 4'-0" O.C. & MAX 8" FROM EACH SIDE OF CORNER. VERTICAL BARS ARE TO CORRESPOND WITH ANCHOR BOLT LOCATIONS. BOTTOM OF FOOTINGS TO BE A MINIMUM OF 30" BELOW FINISH GRADE - TYPICAL (STEP AS NECESSARY FOR SPECIFIC SITE LOCATION). D. REVIEW ALL STRUCTURAL ISSUES WITH STRUCTURAL ENGINEER. FOUNDATION GENERAL NOTES 03 A300 01 A300 05 03 04 01 02 07 06 02 A300 04 A300 03 A300 01 A300 02 01 01 01 03 04 1' - 0"6' - 6 1/2"7' - 6 1/2"6' - 5 3/4" 4' - 9 5/8" 02 A300 04 A300 17' - 1"5' - 2 1/2"10' - 6 1/4"1' - 4 1/4"15' - 7 1/2" 1' - 0"9' - 4 1/2" 11" 4' - 4"4' - 9 5/8"3' - 1 1/8" 7' - 3" 11 1/4"10' - 4 1/2" 11" 4' - 4" 5' - 2 1/2"5' - 7 1/2"5' - 2 1/2"01. EXISTING SLAB. 02. NEW SLAB MODIFICATION. 03. NEW CONCRETE SLAB - TURN DOWN WHERE APPLICABLE. 04. NEW CONCRETE STEP. SLAB PLAN NOTES X A. FIELD VERIFY ALL CONDITIONS. B. REFER TO ARCHITECT IF THERE ARE ANY DISCREPANCIES TO PLANS AND ACTUAL FIELD CONDITIONS. C. ALL STRUCTURAL CONDITIONS TO BE REVIEWED BY STRUCTURAL ENGINEER. ANY MODIFICATIONS TO ARCHITECT'S DESIGN INTENT MUST BE APPROVED BY ARCHITECT. D. FRAMING PLANS ARE INDICATED TO SHOW DESIGN INTENT & SPECIAL CONDITIONS ONLY - NOT EVERY DETAIL OF STANDARD SYSTEM. SLAB PLAN GENERAL NOTES CD1 DOCUMENTS: THESE DOCUMENTS ARE BASIC CONSTRUCTION DOCUMENTS FOR USE IN COMPLETING SCOPE PRICING. ONCE WE CONFIRM SCOPE PRICING, WE WILL COMPLETE "CD2" DOCUMENTS FOR CONSTRUCTION AND PERMITTING. SHEET NUMBER: SHEET TITLE: PROJECT NAME: CONSULTANT:Copyright HAUS Architecture LLC, 2022; Scope Documents Per Sheet A000 DRAWN BY: CHECKED BY: PROJECT NUMBER: FILE NAME: COPYRIGHT:HAUS - 2022 MARK: DATE: DESCRIPTION:317.652.2828HAUS-ARCH.COMcreate@haus-arch.com841 E 64th Street #201Indianapolis, IN 46220STATUS 10000 Upton Court,Carmel, IN 4608010.21.22 CD1 EGR/HEM CAS 2022_27 A103PRIVATERESIDENCEFoundationPlan + SlabPlanNOT FOR CONSTRUCTION 1/4" = 1'-0"01 Foundation Plan 1/4" = 1'-0"02 First Floor Slab Plan 12/27/22