HomeMy WebLinkAboutDE100 - Demo ElevationsFirst Floor (Slab)
100' ‐ 0"
T.O. Footing
98' ‐6"
T.O. Ridge 2
121' ‐8"
01 01
03
04 0505 05
9"
First Floor (Slab)
100' ‐0"
T.O. Footing
98' ‐6"
T.O. Ridge 1
115' ‐3 15/16"
T.O. Ridge 2
112' ‐6 7/8"
T.O. Ridge 2
121' ‐8"
01 05 0607 07 06 01 01 09 10
First Floor (Slab)
100' ‐0"
T.O. Footing
98' ‐6"
T.O. Ridge 1
115' ‐3 15/16"
T.O. Ridge 2
121' ‐8"
02 06 05 02
First Floor (Slab)
100' ‐0"
T.O. Footing
98' ‐6"
T.O. Ridge 1
115' ‐3 15/16"
T.O. Ridge 2
112' ‐6 7/8"
T.O. Ridge 2
121' ‐8"
05 06 05
ELEVATION GENERAL NOTES
DEMO ELEVATION NOTES
01. DEMO EXISTING OPENING - PREP FOR NEW CONDTIONS.
02. PREP FOR NEW OPENING.
03. DEMO FIREPLACE - PATCH ROOF AS NEEDED.
04. DEMO ANGLED WALL - PREP FOR NEW CONIDITIONS.
05. DEMO EXISTING SIDING THIS LOCATION - PREP FOR NEW CONDITIONS.
06. PREP BRICK FOR PAINT (TYPICAL) - REF: NEW ELEVATIONS.
07. DEMO EXISTING LIGHT FIXTURE THIS LOCATION. PREP FOR NEW CONDITIONS.
08. DEMO EXISTING PATIO / DECK.
09. EXISTING GUTTER / DOWNSPOUT - PAINT TO MATCH NEW SIDING + TRIMS.
10. PREP EXISTING VINYL SIDING + TRIMS FOR PAINT (TYPICAL) - FINAL COLOR TBD
X
A. DASHED LINE REPRESENTS ITEMS TO BE REMOVED. COORDINATE ALL DEMOLITION
WITH COMPLETE SET OF DRAWINGS & WITH EXISTING STRUCTURAL CONDITIONS.
B. CALL ARCHITECT WITH ANY DISCREPANCIES DISCOVERED BETWEEN DRAWINGS
AND ACTUAL CONDITIONS OR ANY OTHER QUESTIONS.
C. MECHANICAL, PLUMBING, AND ELECTRICAL TRADES TO REVIEW ACTUAL
CONDITIONS TO DETERMINE THE LEVEL OF DEMOLITION THAT WILL BE REQUIRED.
D. PATCH AND REPAIR EXISTING SURFACES TO REMAIN AS REQUIRED TO RECEIVE NEW
FINISHES.
E. REFER TO STRUCTURAL DRAWINGS (FOUNDATION PLANS + FRAMING PLANS) FOR
CLARIFICATION OF STRUCTURAL CONDITIONS.
F. SOME ITEMS FROM THE DEMOLITION MAY WARRANT SALVAGE. COORDINATE THESE
ITEMS WITH CONSTRUCTION MANAGER (DOORS / HARDWARE / WINDOWS, ETC).
G. PROTECT ALL ITEMS AND FINISHES INDICATED TO REMAIN.
H. NOTE SALVAGED ITEMS MAY BE SALVAGED BY OWNER, ARCHITECT, NOT-FOR-
PROFIT, OR SALVAGE SHOP TBD.
First Floor (Slab)
100' ‐0"
T.O. Footing
98' ‐6"
First Floor Plate Height
110' ‐0"
T.O. Ridge 1
115' ‐3 15/16"
T.O. Ridge 2
112' ‐6 7/8"
T.O. Ridge 2
121' ‐8"
05 01 06
EXISTING BEAM TO BE
COVERED WITH NEW
STRUCTURE / EIFS DESIGN
05 06 0805 01 04
CD1 DOCUMENTS:
THESE DOCUMENTS ARE BASIC CONSTRUCTION
DOCUMENTS FOR USE IN COMPLETING SCOPE
PRICING. ONCE WE CONFIRM SCOPE PRICING,
WE WILL COMPLETE "CD2" DOCUMENTS FOR
CONSTRUCTION AND PERMITTING.
SHEET NUMBER:
SHEET TITLE:
PROJECT NAME:
CONSULTANT:Copyright HAUS Architecture LLC, 2022; Scope Documents Per Sheet A000 DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
FILE NAME:
COPYRIGHT:HAUS - 2022
MARK: DATE: DESCRIPTION:317.652.2828HAUS-ARCH.COMcreate@haus-arch.com841 E 64th Street #201Indianapolis, IN 46220STATUS
10000 Upton Court,Carmel, IN 4608010.21.22 CD1
EGR/HEM
CAS
2022_27
A102PRIVATERESIDENCEDemoElevationsNOT FOR
CONSTRUCTION
3/16" = 1'-0"03 North Elevation (Demo)
3/16" = 1'-0"01 South Elevation (Typical)
3/16" = 1'-0"02 East Elevation (Demo)
3/16" = 1'-0"04 West Elevation (Demo)
3/16" = 1'-0"06 N/S Section Elevation 2 (Demo)
3/16" = 1'-0"05 N/S Section Elevation 1 (Demo)
12/27/22