HomeMy WebLinkAboutDE100 - Demo ElevationsFirst Floor (Slab) 100' ‐ 0" T.O. Footing 98' ‐6" T.O. Ridge 2 121' ‐8" 01 01 03 04 0505 05 9" First Floor (Slab) 100' ‐0" T.O. Footing 98' ‐6" T.O. Ridge 1 115' ‐3 15/16" T.O. Ridge  2 112' ‐6 7/8" T.O. Ridge 2 121' ‐8" 01 05 0607 07 06 01 01 09 10 First Floor (Slab) 100' ‐0" T.O. Footing 98' ‐6" T.O. Ridge 1 115' ‐3 15/16" T.O. Ridge 2 121' ‐8" 02 06 05 02 First Floor (Slab) 100' ‐0" T.O. Footing 98' ‐6" T.O. Ridge 1 115' ‐3 15/16" T.O. Ridge  2 112' ‐6 7/8" T.O. Ridge 2 121' ‐8" 05 06 05 ELEVATION GENERAL NOTES DEMO ELEVATION NOTES 01. DEMO EXISTING OPENING - PREP FOR NEW CONDTIONS. 02. PREP FOR NEW OPENING. 03. DEMO FIREPLACE - PATCH ROOF AS NEEDED. 04. DEMO ANGLED WALL - PREP FOR NEW CONIDITIONS. 05. DEMO EXISTING SIDING THIS LOCATION - PREP FOR NEW CONDITIONS. 06. PREP BRICK FOR PAINT (TYPICAL) - REF: NEW ELEVATIONS. 07. DEMO EXISTING LIGHT FIXTURE THIS LOCATION. PREP FOR NEW CONDITIONS. 08. DEMO EXISTING PATIO / DECK. 09. EXISTING GUTTER / DOWNSPOUT - PAINT TO MATCH NEW SIDING + TRIMS. 10. PREP EXISTING VINYL SIDING + TRIMS FOR PAINT (TYPICAL) - FINAL COLOR TBD X A. DASHED LINE REPRESENTS ITEMS TO BE REMOVED. COORDINATE ALL DEMOLITION WITH COMPLETE SET OF DRAWINGS & WITH EXISTING STRUCTURAL CONDITIONS. B. CALL ARCHITECT WITH ANY DISCREPANCIES DISCOVERED BETWEEN DRAWINGS AND ACTUAL CONDITIONS OR ANY OTHER QUESTIONS. C. MECHANICAL, PLUMBING, AND ELECTRICAL TRADES TO REVIEW ACTUAL CONDITIONS TO DETERMINE THE LEVEL OF DEMOLITION THAT WILL BE REQUIRED. D. PATCH AND REPAIR EXISTING SURFACES TO REMAIN AS REQUIRED TO RECEIVE NEW FINISHES. E. REFER TO STRUCTURAL DRAWINGS (FOUNDATION PLANS + FRAMING PLANS) FOR CLARIFICATION OF STRUCTURAL CONDITIONS. F. SOME ITEMS FROM THE DEMOLITION MAY WARRANT SALVAGE. COORDINATE THESE ITEMS WITH CONSTRUCTION MANAGER (DOORS / HARDWARE / WINDOWS, ETC). G. PROTECT ALL ITEMS AND FINISHES INDICATED TO REMAIN. H. NOTE SALVAGED ITEMS MAY BE SALVAGED BY OWNER, ARCHITECT, NOT-FOR- PROFIT, OR SALVAGE SHOP TBD. First Floor (Slab) 100' ‐0" T.O. Footing 98' ‐6" First Floor Plate Height 110' ‐0" T.O. Ridge 1 115' ‐3 15/16" T.O. Ridge  2 112' ‐6 7/8" T.O. Ridge 2 121' ‐8" 05 01 06 EXISTING BEAM TO BE COVERED WITH NEW STRUCTURE / EIFS DESIGN 05 06 0805 01 04 CD1 DOCUMENTS: THESE DOCUMENTS ARE BASIC CONSTRUCTION DOCUMENTS FOR USE IN COMPLETING SCOPE PRICING. ONCE WE CONFIRM SCOPE PRICING, WE WILL COMPLETE "CD2" DOCUMENTS FOR CONSTRUCTION AND PERMITTING. SHEET NUMBER: SHEET TITLE: PROJECT NAME: CONSULTANT:Copyright HAUS Architecture LLC, 2022; Scope Documents Per Sheet A000 DRAWN BY: CHECKED BY: PROJECT NUMBER: FILE NAME: COPYRIGHT:HAUS - 2022 MARK: DATE: DESCRIPTION:317.652.2828HAUS-ARCH.COMcreate@haus-arch.com841 E 64th Street #201Indianapolis, IN 46220STATUS 10000 Upton Court,Carmel, IN 4608010.21.22 CD1 EGR/HEM CAS 2022_27 A102PRIVATERESIDENCEDemoElevationsNOT FOR CONSTRUCTION 3/16" = 1'-0"03 North Elevation (Demo) 3/16" = 1'-0"01 South Elevation (Typical) 3/16" = 1'-0"02 East Elevation (Demo) 3/16" = 1'-0"04 West Elevation (Demo) 3/16" = 1'-0"06 N/S Section Elevation 2 (Demo) 3/16" = 1'-0"05 N/S Section Elevation 1 (Demo) 12/27/22