Loading...
HomeMy WebLinkAbout05020113 Correspondence ENCOMPASS NOTE PAD - 12/06/05 NOTES FOR:~ - PI DATE TIME NOTE TEXT 2005-02-22 15:12:07 STATE RELEASE #: 306558; First FDN only, released 11/23/04; then ARCH, ELEC, MECH, PLUM, STR, released on 12/20/04. SIX (6) CONDTIONS and 1 note. CONDITIONS regard Fire walls & barriers, ducts and duct penetrations, and the sprinkler system. These conditions may change when the occupancy class. is changed from S-1 to S-2. NOTE regards that this building is for the entlre building, which is warehouse area AND TWO TENANTS. This is a finished building. DOCKET #'s: 03120025 DSV; 03100015 DP; TAC 11/17/03; pre-sub. mtg 2/22/05. ************** Building will be sprinklered. 2-hour walls wlII be installed between tenant areas and warehouse areas. Rated doors will be needed in those areas. Vehicles will not be parked over night in the warehouse, and no high-piled combustible items will be kept there. ************** TENANT INFORMATION: -J.C. Hart is in what is marked on plans as Tenant #2. They will be suite #100. -Hoosier Contracting LLC is in what is marked on the plans as Tenant #1. They will be suite #160. *************** Plans include plans for all buildings. HOWEVER, ONLY BUILDING # 2 IS BEING BUILT AT THIS TIME; AND ONLY THE PLANS IN REFERENCE TO THIS BUILDING ARE BEING REVIEWED AND APPROVED AT THIS TIME. ***Builder will need to contact S.Brewer and J.Dobosiewicz regarding what amount of site will need to be in place for the Final Site inspection. 2005-03-08 11:08:52 Square footage is 19,270 on first floor, and 6,800 square feet on the 2nd floor/ mezzanine areas. TOTAL SQUARE FOOTAGE: 26,070. TOTAL LINES OF NOTES: 44 PAGE 1 OPERATOR slillard slillard