HomeMy WebLinkAboutCorrespondence
CD
Q
TRANSMITTAL
NO vJ /'
~y~
DATE: 5/18/06
TO: City of Carmel-Department of Community Services
Attention: Christine
One Civic Square
Carmel, Indiana 46032
,~~
~p. ~'^
, .? v <.'t)
A $,a
</Oc:r ~
PROJECT: Schafer Powder Coating
\
PROJECT #: BR005002
Z 5
u
w
< ~
u
w
D:: i
u
'"
D:: ~
<(
'"
:J !5
U: I
a::owx
O"'U<(
o~ou:
Li~>;'!:l
I 1-~C5~
~:;!;g;~
~O~t--:
w~t--:~
~ul~M
l/"):J(V)
ffi5
z~
z1i3
00
Uz
M
t.J')
<Xl
THE EOl..:l..:OVVING 1'5 BEING TRANSI"1ITTED:
~ Drawings
o ,Specifications
o Originals
o Samples
o Media
o Other
2 copies of building elevations for Schafer Powder Coating
~ ^
FeR THE EOl..:l..:OVVING^PlJRPOSE: :~, , ":'"
D For your information
D For signature
D Returned for corrections
D As requested
D Reviewed as submitted
o Returned after loan
181 For your use
o Reviewed as noted
o Other
Per your request to Greg Snelling
~ ~V(L4idM dA, ~
- ;:::. _ ~ ~(V~~tV' di7
Jv;idtJ. 4t)1t1.~ '!' r ~
Vf,tbvt U;f~ {r> ~,
FROM:
Shawn M. Curran, RA
cc: Scott Brewer, File
w
Q
TRANSMITTAL
NO)J
fi6
z
<(
a::
a::
DATE: 3/23/06
1:
o
v
W
a:
::J
>-
V
w
>-
I
v
a:
<(
Z
~
::::> a
. ~
u. ~
TO: City of Cannel-Department of Community Services
Matt Griffin
One Civic Square
Carmel, Indiana 46032
PROJECT ~ BR005002
a::oUJX
o-oU<(
oSlou.:
-'v>'"
u-<(CSlXl
t:;z",~
-~~~
~o~r--:
UJ:f:r--:'::::
~uj'::::""
U1:jM
ffi~
ZUJ
Za5
82
""
..,..,
'"
PROJECT: Schafer Powder Coating
THE FOLLOWING IS BEING TRANSMITTED:
18I Drawings
o Specifications
o Originals
o Samples
o Media
o Other
.1 updated copy of elevations showing location of dumpster enclosure and roof top units
FOR THE FOLLOWING PURPOSE: "
o For your information
o For signature
o Returned for corrections
o As requested
o Reviewed as submitted
o Returned after loan
~ For your use
o Reviewed as noted
o Other
Per your earlier e-mail (attached)
FROM:
Shawn M. Curran, RA
cc: Scott Brewer, File
Page 1 of 1
(J.)
w
Curran, Shawn
r
From: Griffin, Matt L [mgriffin@carmel.in.gov]
Sent: Thursday, January 26, 20064:44 PM
To: Greg Snelling
Cc: Curran, Shawn
Subject: RE: Schafer Powder Coating (05120015 TAC)
Greg,
The elevations do not show HVAC locations (to verify their screening), nor do they include the trash enclosure screening.
We will need to see both.
Matthew L. Griffin, AICP
Planning Administrator
Department of Community Services
.- IJ~.ed h I f
__ ~ ~ ~ \(1M) ve-~'
(p r t-C; hi- f....
() ahrrVtM1 ~ ~
City of Carmel
One Civic Square
Carmel, IN 46032
phone: 317.571.2417
fax: 317.663.3208
email: mgriffin@carmel.in-..9Q-.t
From: Greg Snelling [mailto:gsnelling@snellingeng.com]
Sent: Monday, January 23,20062:38 PM
To: Griffin, Matt L
SUbject: Schafer Powder Coating (05120015 TAC)
Matt, I am in the process of responding to TAC comments for the subject project and wanted to update you regarding your
specific comments:
1. Shawn Curran will be sending building elevations showing screening.
2. Shawn will also be sending a breakdown of interior use and office area.
3. We discussed the handicap ramp locations at the T AC meeting in December. I think I mentioned that they are
shown with a keynote on your plans. If you need anything else regarding the ramps, please contact me.
As soon as I have approval from all other agencies, I will contact Jeff Kendall to initiate the ILP and I'm sure he will be
contacting you. Have a good afternoon. Thanks.
Greg Snelling, PE
Snelling Engineering, LLC
13295 Meridian Comers Blvd. Suite 142
Carmel, IN 46032
(317) 663-3206 (telephone)
(317) 663-3208 (fax)
3/23/2006
~
Q
City of Carmel
Via email: gsnelling@snellingeng.com
Original by mail
December 19, 2005
Gregg Snelling
Snelling Engineering, LLC
13295 Meridian Comers Blvd.
Ste. 142
Carmel, IN 46032
copy
RE: Schafer Powder Coating (Docket #05120015 TAC)
Dear Mr. Snelling:
This letter is in response to your T AC application for Schafer Powder Coating. Comments and
concerns are as follow:
1. Please provide building and trash enclosure elevations. All HV AC and trash
enclosures must be completely screened from view.
2. Provide breakdowns of interior use. How much square footage is dedicated to
office use?
3. Identify ramps in relation to the handicap accessible parking.
Please wait to submit revised materials until after the Technical Advisory Committee (TAC) has
met on this application. The resubmitted materials should include edits addressing the above
comments along with any requirements that arise from the T AC meeting. Additional comments
may be made after the requested revisions have been submitted.
05120015 TAC Schafer Powder Coating
Page 1
ONE CIVIC SQUARE
CARMEL, INDIANA 46032
317/571-2417
u
u
Page 1 of 1
DeVore, Laura B
From: Griffin, Matt L
Sent: Monday, December 19, 2005 10:26 AM
To: DeVore, Laura B
Subject: FW: Schafer Powder Coating Landscape plans TAC Comments
Laura,
Print - put in file (its on the T AC cart).
From: Brewer, Scott I
Sent: Sunday, December 11, 20054:19 PM
To: Gregory Snelling (gsnelling@snellingeng.com)
Cc: Griffin, Matt L; Greg Hoyes [grh@co.hamilton.in.us]
Subject: Schafer Powder Coating Landscape plans TAC Comments
Dear Gregory:
I will not be at the TAC meeting in December. Please contact me if you have any questions. The following are
my comments on the landscape plans:
1. The County Surveyor will not allow plantings below top of bank for the detention area. Please adjust the
tree planting locations so that they are at or very near the top of bank. If you need suggested locations, I
can provide a plan for adjusting their locations.
2. For species diversity reasons please change 1/3 of the Autumn Blaze red maples to alternative species.
They can be a combination of the shade tree species already on the plan.
Please reply to these comments in writing and amended plans.
Scott Brewer, City Forester
Environmental Planner, DOCS
City of Carmel,
One Civic Square
Carmel, IN 46032
PH: 317-571-2478
FAX: 317-571-2426
12/21/2005
(D
u
Griffin, Matt L
Subject:
Griffin, Matt L
Thursday, December 15, 2005 4:39 PM
DeVore, Laura B
'Greg Snelling'; Brennan, Kevin S; Brewer, Scott I; Conn, Angelina V; Hancock, Ramona B;
Hollibaugh, Mike P; Holmes, Christine B; Keeling, Adrienne M; Littlejohn, David W; Morrissey,
Phyllis G; Tingley, Connie S
Docket No. Assignment: (TAC) Schafer Powder Coating (05120015 TAC)
From:
Sent:
To:
Cc:
I have notified the petitioner, updated the file, and issued the necessary docket number for (T AC) Carmel Water
Operations Facility.
It is the following:
Docket No. 05120015 T AC Schafer Powder Coating
T AC Application Fee: $257.05
Total Fee: $257.50
Docket No. 05120015 TAC Schafer Powder Coating
The applicant seeks to create a 47,600 sq. ft. office warehouse on 3.45 acres.
The site is located at 4518 West 99th Street and is zoned 11/1ndustrial.
Filed by Greg Snelling of Snelling Engineering for Resorts Condominiums International, LLC.
Petitioner, please note the following:
1. This item will be on the December 21, 2005, agenda of the Technical Advisory Committee (T AC).
2. Mailed and published public notice does not need to occur.
3. Proof of Notice is not needed.
4. The Filing Fee must be paid on or before December 21, 2005. Failure to do so will result in this application being
tabled to the January 18, 2005, Technical Advisory Committee Meeting.
5. This item will be reviewed administratively.
PETITIONER: refer to your instruction sheet for more detail. A review letter will be forthcoming.
Mr. Snelling can be contacted at 317.663.3206 (317.663.3208)
Matthew Griffin, AICP
Planning Administrator
Department of Community Services
City of Carmel
One Civic Square
Carmel, IN 46032
P 317.571.2417
f 317.571.2426
1
(j)
u
OS!::2 06/
S- T4C
Construction/Stormwater Pollution Prevention Plan
. Technical Review and Comment (Form 1)
Project Name: Schafer Powder Coatings
Plan Submittal Date: 12/08/05
Project Location Description: 4518 West 99th Street
Latitude and Longitude: Lat- 39-55'-58" N Long- 86-14'-19" W
Civil Section:
Hydrologic Unit Code:
County: Hamilton
5120201120080
=
Q
....
....
~
S
...
cS
=
....
~ City: Indianapolis
~
.S Phone:
...
~
7
Project Owner Name: Schafer Powder Coatings
Contact:
Address: 4518 W. 99th Street
State: IN
Zip:
FAX:
E-Mail:
Plan Preparer Name: Greg Snelling
Affiliation: Snelling Engineering
Address: 13295 Meridian Comers Blvd.
City: Carmel
Phone: 317-663-3206
Suite 142
State: IN
317-663-3208
Zip: 46032
FAX:
E-Mail:
Review Date: 12/19/05
~ Principal Plan Reviewer: John B. South P.E. CPESC
.~ Agency: Hamilton County Soil and Water Conservation District
~
~ Address: 1108 South 9th Street
; City: Noblesville
~ Phone: 317-773-2181
Assisted By:
FAX:
State: IN
317-776-1101
Zip: 46060
E-Mail: john-south@iaswcd.org
PLAN IS ADEQUATE: A comprehensive plan review has been completed and it has been determined that the
plan satisfies the minimum requirements and intent of 327 lAC 15-5.
o Please refer to additional information included on the following page(s).
o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NO/. A co 0 the NOI must also be sent to the Reviewin Authority (e. . SWCD, DNR).
o A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day
review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and
revisions to the plan may be required at that time to address deficiencies.
o Please refer to additional information included on the following page(s).
o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NO/. A NOI must also be sent to the SWCD,
o PLAN IS DEFICIENT: Significant deficiencies were identified during the plan review.
o Please refer to additional information included on the following page(s).
o DO NOT file a Notice of Intent for this project.
o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re-
submitted, and notification has been received that the minimum requirements have been satisfied.
Plan Revisions
should be mailed or delivered to the Principal Plan Reviewer identified
in the Plan Review Section above.
DNR, Division of Soil Conservation
Page 1 of 1
Revised 12/09/03, Form 1
\
.-D
u
SNELLING
ENGINEERING, LLC
Letter of Transmittal
13295 Meridian Corners Blvd., Suite 142
Carmel, IN 46032
Ph: (317) 663-3206. Fax: (317) 663-3208
gsnell i ng@snellingeng.com
To: Scott Brewer
DOCS
One Civic Square
Carmel, IN 46032
Date: December 6, 2005
Project: Schafer Powder Coating
WE ARE SENDING YOU VIA:
DMail
D Overnight Delivery
D Courier
X Hand Delivery
The following:
COPIES DATE DESCRIPTION
1 12-5-05 Construction Plans
1 12-5-05 Secondary Plat
THESE ARE TRANSMITTED as checked below:
D For approval
D For your use
X For review and comment D As requested
REMARKS:
The enclosed information is submitted for the 12-21-05 T AC meeting in Carmel.
From: Gregory S. Snelling, PE
Page 1 of 1
u
u
Greg Snelling
_~_~~_~_m~~.~~~.~.~_'.~'~~~~~~~W_'W~~N~."~~~_~.~~~W'W~~_~m~YmU_~w_<..U_~'''~.~-~
From:
Sent:
To:
Greg Snelling [gsnelling@snellingeng.com]
Monday, December 05, 2005 11 :28 AM
'Akers, William P'; 'jblanchard@carmel.in.gmt'; 'JDuffy@carmel.in.gov'; 'Duncan, Gary R';
'Redden, Nick'; 'MFogarty@carmel.in.gov'; 'mwestermeir@carmel.in.gov';
'GHoyt@carmel.in.gov';' 'jt/@co.hamilton.in.us'; 'Brooke Gajownik';
'jason. kirkman@mybrighthouse.com'; 'dgroves@cinergy.com'; 'shunter@cinergy.com';
'jennifer. marlett@veoliawaterna.com'; 'RF arrand@ccs.k12.in.us';
'tmmagee@panhandleenegery.com'; 'mawood@panhandleenergy.com';
'ron. morris@aes.com'; 'gilko@crossroadsengineers.com'; 'dklingensmith@carmel.in.gov';
'Cynthia. I. klaiber@usps.gov'; 'cshupperd@vectren.com'
Cc: 'Griffin, Matt L'
Subject: New Project for Carmel TAC
Attachments: Schafer Powder Coating.zip
The attached plans are in pdf format for review prior to the December 21, 2005 Technical Advisory Committee
meeting in Carmel. Hard copies are being sent to the Urban Forester, DOCS, County Highway Dept., County
Surveyor, SWCD and Clay Township Regional Waste District. Please let me know if you received a digital copy
and would like a hard copy instead. Thank you.
Greg Snelling, PE
Snelling Engineering, LLC
13295 Meridian Corners Blvd. Suite 142
Carmel, IN 46032
(317) 663-3206 (telephone)
(317) 663-3208 (fax)
12/6/2005
I
c-rnurts fnm H... c.. Sllcnif( 0lRcL
CARMEL TECHNICAL ADVISORY COMMITTEE
AGENDA
la.20am
Date:
Place:
December 21, 200S
Deparbnent of Community Services Conference Room
3rd l100r - Carmel City Hall
9:00 AM
Time:
~
Carmel Science & Tech Park, blk 12, lot 5. Velocity Sports Performance
The applicant seeks use variance approval for an athletic training facility.
Docket No. 05120006 UV W Chapter 2OD.Ol permitted uses
The site is located at 1402 Chase Ct. and is roned M- 3/Manufacutring.
Filed by Charlie Frankenberger of Nelson & Frankenberger for BP Sports. LLC.
No comments
2:.1Jl..a.m.
University Higb School of Indiana
The applicant seeks special use amendment approval for a high school expansion.
Docket No. 05120007 SUA; W Chapter 5.02; Special Uses
The site is located at 2825 W 1161h St. and is zoned S-llResidence.
Filed by Bill Wendling of Campbell. Kyle. Proffitt, LLP.
No comments
~ Docket No. 05120012 DP/ADLS: Arden Townhomes
The applicant seeks approval for a 9O-unittownbome development on 12.7 acres.
The site is located at 1940 E I 36th St. and is zoned PUDlPlanned Unit Development.
Filed by Jim Shinaver of Nelson & Frankenberger for Buckingham Properties, Inc.
Changes to street names have been made per phone conversation with Rich Kelly, EMH&T. No
comments.
!l:.lS..a.m. Docket No. 05110020 DP/ADLS: Old Meridian Place
The applicant seeks to create 129 townhomes and a mix of office and retail uses on 25
acres.
The site is located at 12852 Old Meridian Street and is roned OM/SFA.
Filed by Jon Isaacs for Centex Homes.
..No Street names noted on plans. If the townhomes and retail are to be addressed off of the
private drives, street names will still need to be approved. Please see to Bill Akers
at Carmel Communications to coordinate the street name approval process. Letter
has been sent to Ed Fleming at Stoeppelwerth. (see attached PDF) .
~
Docket No. 05120015 T AC Schafer Powder Coating
The applicant seeks to create a 47,600 sq. ft. office warehouse on 3.45 acres.
The site is located at 4518 West99,h Street and is zoned IllIndustrial.
Filed by Greg Snelling of Snelling Engineering for Resorts Condominiums International,
LLC.
..did not receive plans. Could not comment.
lll:lL5.a.m.
Docket No. 05120016 SP: Five Star Estates
The applicant seeks to plat 5 lots on 5 acres.
The site is located at 2200 W. 13lst Street and is zoned S IlResidential.
Filed by Greg Snelling of Snelling Engineering. LLC for Prime Lots. LLC.
.. "Five Star Court" is NOT an approved street name. Please submit a new list of
street names to Bill Akers at Carmel Communications before the subdivision is
recorded. Letter has been sent to Snelling Engineering (see attached PDF).
Docket No. 05120017 TAC: Orchard Park Elementary School
The applicant seeks to construct 4 additional classrooms.
The site is located at 10404 Orchard Park Drive South. The site is roned S2lResidence.
Filed by Karen Collins. PE. of Cripe Engineering for CarmeVClay Schools.
.. Did not receive plans. Could not comment.
c
c
.-D
(;)
SNELLING
ENGINEERING, LLC
Letter of Transmittal
13295 Meridian Corners Blvd., Suite 142
Carmel, IN 46032
Ph: (317) 663-3206. Fax: (317) 663-3208
gsnell i ng@snellingeng.com
To: Jennifer Bruner
Clay Township Regional Waste District
10701 North College Avenue, Suite A
Indianapolis, IN 46280
Date: December 5, 2005
Project: Schafer Powder Coating
WE ARE SENDING YOU VIA:
o Mail
Overnight Delivery
o Courier
x Hand Delivery
The following:
COPIES DATE DESCRIPTION
1 12-5-05 Construction Plans
THESE ARE TRANSMITTED as checked below:
o For approval
o For your use
X For review and comment 0 As requested
REMARKS:
The enclosed information is submitted for the 12-21-05 TAC meeting in Carmel.
From: Gregory S. Snelling, PE
.-J)
Q
SNELLING
ENGINEERING, LLC
Letter of Transmittal
13295 Meridian Corners Blvd., Suite 142
Carmel, IN 46032
Ph: (317) 663-3206. Fax: (317) 663-3208
gsnell ing@snellingeng.com
To: John South, PE
Hamilton County SWCD
11 08 South 9th Street
Noblesville, IN 46060
Date: December 5,2005
Project: Schafer Powder Coating
WE ARE SENDING YOU VIA:
o Mail
o Overnight Delivery
o Courier
X Hand Delivery
The following:
COPIES DATE DESCRIPTION
1 12-5-05 Construction Plans
1 12-5-05 Drainage Report
THESE ARE TRANSMITTED as checked below:
o For approval
o For your use
X For review and comment 0 As requested
REMARKS:
The enclosed information is submitted for the 12-21-05 TAC meeting in Carmel.
From: Gregory S. Snelling, PE
(J
u
SNELLING
ENGINEERING, LLC
Letter of Transmittal
1329S Meridian Corners Blvd., Suite 142
Carmel, IN 46032
Ph: (317) 663-3206. Fax: (317) 663-3208
gsnell ing@snellingeng.com
To: Mike McBride
Hamilton Coun1:y Highway
1700 South 1011i Street
Noblesville, IN 46060
Date: December 5, 2005
Project: Schafer Powder Coating
WE ARE SENDING YOU VIA:
o Mail
o Overnight Delivery
o Courier
X Hand Delivery
The following:
COPIES DATE DESCRIPTION
1 12-5-05 Construction Plans
THESE ARE TRANSMITTED as checked below:
o For approval
o For your use
X For review and comment 0 As requested
REMARKS:
The enclosed information is submitted for the 12-21-05 T AC meeting in Carmel.
From: Gregory S. Snelling, PE