Loading...
HomeMy WebLinkAbout06050196 Sewer CLAY TOWNSHIP REGIONAL WASTE DISTRICT SANITARY SEWER PERMIT [ x ] Conditional Permit [] Final Permit INDIVIDUAL LOTS/EXISTING BUILDINGS Project Title: Primary Location: Village of WestClay Stratford Assisted Living Center Lot# The Stratford Companies Street addre~s: ~ 6(4* Sf, Zip: ^'. 46032.~.~&~~County:,Hamilton. ,- ,....,..-.--.-.,...-.....:::;,~~- -"-~~~~,;~:.~""~ Owner/Builder: City:~Carmel Interceptor Charges Paid: $31,006.00 PRI:$4425.00 EDU Fee: $321,750.00 Application fee: $3000.00 PLEASE NOTE: Installation of building sewer shall be per the specifications of the Clay Township Regional Waste District (see reverse) and any conditions noted below. All installations shall be inspected by District personnel during "open trench" phase and before backfilling with sand or stone to six inches above the pipe. NO footing or foundation drains, or other sources of ground or stormwater, shall be permitted to enter the District's sanitary sewer system. The District will assume no Iiabilitv for drains which are below the Qrade level of the nearest downstream manhole nor for laterals which are extended beneath drivewavs or sidewalks. The permit holder (property owner, developer or builder) will be responsible for damages to the District's sewer system. This includes damages to manholes, castings, manhole lids and the like; caused by construction activity on the' building site which is the subject of this permit Ins ections by the District are MANDATORY and shall be arranged by contacting the District's office at 844-9200 2 urs in advance. All new construction will be placed on billing six months after connection has been made or water is connected, whichever comes first . The District reserves the right to inspect all sump pump connections to ensure no illegal ections have been made. . I have received a copy of Ordinance No. 9-13-99 and agree to follow all District standards; Buildh'lg s a [ ] crawl space [ ] slab or [ ] basement that [ ]will be finished with grinder pump installed to I c ply with elevation requirements [ ]rough-in plumbing with Qrinder pump installed during construction, rough-in plumbing only and Qrinder pump will not be installed during construction, [ ] no plumbing in basement. (Please check appropriate box.) Manholes shall remain accessible at all times. If a manhole is buried, it shall be the er/homeowner responsibility to correct per District standards. I Conditional Permit Terms: [x] NO CONNECTION to the sewer until further notification. [ ] Certificate of Insurance must be on fil~ with CTRWD listed as certificate holder [ ] 48 hours notice before work starts on' manhole core drilling or cuts of active lines and District inspector must inspect all work before covered. [ ] All District fees will be paid in full. [ ] Approval pending Districts review of plans. [ ] Copies of approved permits from appropriate county or city agencies for work in the right-of-way road cuts or are required. [ ] No occupancy until further notification [ ] .2006. 1 fa1ar with the District's specifications and agree to accept respon;sibility for all ~ ~.' . I I I/s 41p-,? 'Ton'! Ki!erf cf4! Dlcf aw -3DW , 4-> AffJ-w I- Phone '~a r; L Le'TLe Permit issued this 9th day of May, 2006. ves 2 site plans submitted ' or Permit valid only with CTRWD seal in red ink. any.ener Director of Administration & Customer Service Please note chan es on lateral s Permit.rev.05-05-06cf