Loading...
HomeMy WebLinkAboutC023 - Civil Site Utilities DetailsC8.4UTILITY DETAILSREVISIONS AND ISSUESPREPARED FOR:PROJECT NO. SHEET NO.CHECKED BY:DRAWN BY:DEGDESIGNED BY:DWG NAME:PROJECT NO.:W220058DATEBY01.31.2022BTDATE:DEGSTEVEN SCOTT RUCKER P.E. 11300279ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.S MA PART OF THE SOUTHWEST QUARTER, SECTION 31, TOWNSHIP 18 NORTH, RANGE 4 EAST, HAMILTON COUNTY, INDIANAW22.0058431 E CARMEL DRIVE, CARMEL, IN 46032CULVER'SCARMEL, IN04.29.2022 DEGTAC COMMENT REVISIONS105.13.2022 AMQLANDSCAPE COMMENT REVISIONS206.24.2022 BTREMOVE PARKING ISLAND AND TRANSFORMER3TAC COMMENT REVISIONS 2407.07.2022 DEGWQ TREATMENT TRAIN & WATER COMMENTS508.12.2022 DEGADDED FIRE HYDRANT & FDC AND DRY LINE608.25.2022 DEGRELOCATED IRRIGATION VALVE & METER709.29.2022 DEGSWPPP2 UPDATE TO CLARIFY WQ UNIT & EASEMENT810.06.2022 DEGCRE REVIEW COMMENT REVISIONS910.24.2022 DEG UNDERGROUND DETENTION SYSTEM TOP OF STONE - 830.63 TOP OF CHAMBER - 829.63 BOTTOM OF CHAMBER - 827.10 BOTTOM OF STONE BASE - 826.60 DETENTION VOLUME = 4,670 CUFT STAGING ELEVATIONS 2-YEAR = 827.73 10-YEAR = 828.31 100-YEAR = 830.09 01/13/23