Loading...
HomeMy WebLinkAboutGN110 - FS-2 - For Reference Only4"4"2"45"3"7"8"31"4"4"8" 11 -0"4"4"24"5"3"8"1"8"8"47"5"8"7 -"12 -10"11 -""5"4"""10 -7"1 -2"1"13 -5"48"8"8" PVC SLEEVE UNDER FLOOR KEEP DRY DURING CONSTRUCTION SEAL BOTH ENDS AFTER SODA LINE INSTALLATION PVC SLEEVE UNDER FLOOR KEEP DRY DURING CONSTRUCTION SEAL BOTH ENDS AFTER SODA LINE INSTALLATION 1" DIA. COPPER DRAIN LINES BY FEC. LINES MUST BE TRAPPED OUTSIDE OF THE REFRIGERATED/FRO=EN SPACES INTERIOR WASTE OIL SYSTEM BY OWNER. SEE DETAILS ON SHEET P-1 VERIFY REQUIREMENTS WATER FILTER OUT WATER FILTER INLET VERIFY ALL REQUIREMENTS FOR BAG IN BOX SYSTEM AND SODA LINE RUNS WITH SODA SUPPLIERREFRIGERATION CHASE NO PLUMBING IN THIS SPACE WATER FILTER SEE DETAIL VERIFY ALL PLUMBING REQUIREMENTS Z/OWNER FOR THESE AREAS 85.1 11" 85.385.4 25" 85.5 85.5 85.5 21 - 1"7"8 5"A.3 103.2 A.2 15D 15C .2 75.2 3.2 75.3 80A.2 80D.1 80D.2 80D.3 84.3 8.3 51 1.1 1.2 1.3 25.2 2.2 0 1.3 1.2 12 0 1.1 15.3 7.3 7.27.1 20.2 30.1 30.3 30.2 30 2.1 12A 23.3 23.1 25.1 20.2 20.2 22.3 22.1 20.3 20.1 13 4.315B15A 33.2 3.33.2 3.1 1B 2B 11" 11" ITEM PLUMBING CONNECTION SCHEDULE 1B 3" HUB DRAIN (CLEARWATER WASTE) STUB-UP 3" AFF 2B DRAINS TO HUB DRAIN LISTED FOR ITEM 1B 7.1 12" HW 14" AFF 7.2 3" HUB DRAIN STUB-UP " AFF 7.3 12" CW 14" AFF 12 34" BLACK IRON PIPE 24" AFF. FROM ABOVE. OUT TO ITEM 12A 12A 34" BLACK IRON PIPE " AFF. FROM ABOVE. IN FROM ITEM 12 13 WASHER AND DRYER BY OWNER VERIFY REQUIREMENTS 15.3 34" CW 30" AFF FROM ITEM 4 FLITER 15A " PVC SLEEVE STUB-UP 12" AFF OUT TO ITEM 15C 15B " PVC SLEEVE STUB-UP 12" AFF OUT TO ITEM 15D 15C " PVC SLEEVE STUB-UP 8" AFF FROM ITEM 15A 15D " PVC SLEEVE STUB-UP 8" AFF FROM ITEM 15B 1.1 12" HW 20" AFF (TWO LOCATIONS) 1.2 1 12" DW 20" AFF (TWO LOCATIONS) 1.3 12" CW 20" AFF (TWO LOCATIONS) 20.1 34" HW 14" AFF CONNECTS TO FAUCET AND SANITI=ER SYSTEM 20.2 2" DW 10" AFF (THREE LOCATIONS) 20.3 34" CW 14" AFF CONNECTS TO FAUCET 22.1 34" HW 14" AFF 22.3 34" CW 14" AFF 23.1 34" HW 14" AFF PROVIDE A 12" TEE FOR ITEM 25.1 23.3 34" CW 14" AFF CONNECTS TO ITEM 23 25.1 12" HW FROM ITEM 23.1 FOR CHEMICAL FEED SYSTEM 25.2 4" HUB DRAIN STUB-UP 3" AFF 2.1 34" HW 14" AFF BRANCH THRU BOOSTER TO DISHWASHER 30 12" MIXED H/C WATER 20" AFF FROM MIXING VALVE WATER TO BE 70-75 DEGREES F. 30.1 12" HW IN CEILING ABOVE EYE WASH STATION 30.2 1 14" DW 24" AFF 30.3 12" CW IN CEILING ABOVE EYE WASH STATION 32 MOP SINK AND H/C WATER FAUCET BY PC SEE FAUCET NOTES ON DRAWING P1 33 MIXED HOT AND COLD WATER THRU ITEM 32 FAUCET 51 34" N. GAS 18" AFF 0 1 14" N. GAS 18" AFF TWO LOCATIONS SEE GAS PIPING DETAIL 3/FS-2 3.2 3" HUB DRAIN STUB-UP 3" AFF 4.3 34" CW 0" AFF BRANCH TO ITEMS 15  A 84 8 - SEE DETAIL 2/FS-2 .2 3" HUB DRAIN STUB-UP 3" AFF .3 34" CW " AFF BRANCH THRU MAIN FILTERS ITEM 4 TO ICE MAKER A.2 DRAINS TO HUB DRAIN LISTED FOR ITEM 103.2 A.3 34 CW 14" AFF. BRANCH THRU MAIN FILTERS ITEM 4 TO ICE MAKER (OPTIONAL ITEM) VERIFY Z/ EQUIPMENT SUPPLIER 75.2 DRAINS TO HUB DRAIN LISTED FOR ITEM 3.2 75.3 34" CW 18" AFF 80A.2 3" HUB DRAIN STUB-UP 8" AFF 80B.2 3" HUB DRAIN STUB-UP 8" AFF 80D.1 12" HW 20" AFF 80D.2 1 12" DW 20" AFF 80D.3 12" CW 20" AFF 84.3 34" CW 28" AFF CONNECTS TO ITEM 84 THRU MAIN WATER FILTER ITEM 4 85.1 34" HW 4" BELOW FINISHED CEILING W/ SHUT OFF VALVE 85.3 34" CW 4" BELOW FINISHED CEILING W/ SHUT OFF VALVE 85.4 (3) 2" SCHEDULE 40 PVC SLEEVES THROUGH FINISHED CEILING. 85.5 (3 LOCATIONS) - 2" SCHEDULE 40 PVC SLEEVE FROM ABOVE FINISHED CEILING TO EXTERIOR OF BUILDING. SEE DETAIL "A" ON P-1. 3.1 1/2" HW 20" AFF. 3.2 1 1/2" DW 20" AFF. 3.3 1/2" CW 20" AFF. .2 3" HUB DRAIN STUB-UP 8" AFF .3 FILTERED CW FROM ITEM 15 THROUGH SODA LINE BUNDLE 7.3 FILTERED CW FROM ITEM 15 THROUGH SODA LINE BUNDLE 8.3 12" CW 28" AFF. CONNECTS TO ITEM 8 THRU MAIN EATER FILTER ITEM 4 103.2 3" HUB DRAIN STUB-UP 8" AFF 103.3 FILTERED CW FROM ITEM 15 THROUGH SODA LINE BUNDLE 104.3 FILTERED CW FROM ITEM 15 THROUGH SODA LINE BUNDLE 113.2 PC TO EXTEND DRAIN CONNECTION TO HUB DRAIN LISTED FOR ITEM 103.2 GENERAL NOTES 1.PC TO FURNISH AND INSTALL MIXING VALVE FOR ITEM 30 EYE WASH STATION. 2.SEE SHEET P-1 FOR FLOOR DRAIN LOCATIONS AND OTHER REQUIREMENTS. 3.WHERE DIMENSIONS ARE SHOWN TO EXTERIOR OF BUILDING THEY ARE SHOWN TO INSIDE FACE OF EXTERIOR WALL. EXTERIOR WALL THICKNESS AND FOUNDATION DETAILS MUST BE VERIFIED. 4.PC TO SEAL ALL PLUMBING PENETRATIONS THRU WALK-IN COOLER/FREE=ER WALL AND CEILING PANELS. FEC 1.FEC TO FIELD VERIFY ALL ROUGH-IN LOCATIONS AT EARLY DATE TO ENSURE CORRECT PLACEMENTS AND QUANTITY. NOTE ANY CHANGES AND SUBMIT TO THE ARCHITECT AND CONSULTANT FOR APPROVAL. 2.FEC TO COORDINATE Z/ PC ON EXISTING EQUIPMENT PLUMBING REQUIREMENTS. PLUMBING CONTRACTOR 1.HEIGHTS LISTED ON ROUGH-IN SCHEDULE ARE TO THE CENTER LINE OF THE ROUGH-IN. ALL DIMENSIONS ARE FROM FINISHED WALLS AND FLOORS. 2.WHERE POSSIBLE ROUGH-INS ARE TO BE CONCEALED IN THE WALL AND STUBBED OUT AT THE HEIGHT INDICATED. 3.WHERE AN OPEN SITE (HUB DRAIN) IS SPECIFIED THE CONTRACTOR IS TO TERMINATE THE DRAIN PIPING OVER CENTER OF DRAIN PER STATE AND LOCAL CODES. 4.PROVIDE ALL WATER SUPPLY AND DRAIN LINES DRAIN FITTINGS FLOOR DRAINS VALVES TRAPS UNIONS TAILPIECES PRESSURE REDUCING VALVES CHECK VALVES SHOCK ABSORBERS PVC CONDUIT FOR BEVERAGE AND REFRIGERATION LINES AS REQUIRED. PROVIDE GREASE TRAPS OR INTERCEPTORS SI=ED PER CODE TO HANDLE LISTED VOLUMES AS INDICATED ON PLUMBING/MECHANICAL SCHEDULE SHEET. IT SHALL BE THE RESPONSIBILITY OF THE PLUMBING ENGINEER TO SPECIFY AND DETAIL THE REQUIREMENTS FOR CODE COMPLYING BACKFLOW/REDUCED PRESSURE DEVICES AS REQUIRED BY STATE AND LOCAL CODES. THE PLUMBING ENGINEER IS RESPONSIBLE FOR COORDINATION AND FEES REQUIRED FOR APPROVAL OF DEVICES. 5.INSTALL ALL FAUCETS SPRAY UNITS LEVER WASTE DRAINS VACUUM BREAKERS CHECK VALVES FLOW CONTROL VALVES TROUGH WATER INLETS WATER FILTERS STRAINERS PRV VALVES T/P GAUGES FURNISHED BY THE FEC/KEC AS SHOWN ON THE MECHANICAL SCHEDULES. EXPOSED PIPING AND FIXTURES SHALL NOT SHOW TOOL MARKS. HORI=ONTAL PIPING SHALL BE A MINIMUM OF " AFF. ALL EXPOSED PIPING ABOVE 34" AFF TO BE CHROME PLATED. .COORDINATE Z/ BEVERAGE MACHINE PURVEYORS FOR PLUMBING REQUIREMENTS ON PURVEYOR/SUPPLIER FURNISHED EQUIPMENT. 7.THE FIRE/FUEL GAS SHUT-OFF SOLENOID VALVE IS PROVIDED BY HVAC AND INSTALLED BY PC/MC. 8.ALL FEED SUPPLY PIPING SHUT-OFF VALVES AND DRIP LEGS ARE PROVIDED BY GAS PIPING CONTRACTOR. .GAS PIPING CONTRACTOR TO PROVIDE GAS SERVICE TO FOODSERVICE EQUIPMENT AT A MAXIMUM OF 14" W.C. FOODSERVICE EQUIPMENT CONTRACTOR (FEC) TO FURNISH REGULATORS FOR EQUIPMENT THAT REQUIRE PRESSURES BELOW 14" W.C. GAS PIPING CONTRACTOR TO INSTALL THE REGULATORS FURNISHED BY FEC AS INDICATED ON THE FOODSERVICE MECHANICAL/ELECTRICAL/PLUMBING SCHEDULE (M.E.P.). 10.FEC TO FURNISH ALL SPECIFIED FLEX GAS HOSE/RESTRAINING CABLE KITS TO THE GAS PIPING CONTRACTOR FOR INSTALLATION AS INDICATED IN THE SPECIFICATIONS AND ON THE M.E.P. SCHEDULE SHEETS. 11.OPEN SITE HUB DRAINS ARE REQUIRED. DIMENSIONS SHOWN ON THIS PLAN ARE FOR HUB DRAINS. IF FLOOR SINKS ARE A CODE REQUIREMENT VERIFY LOCATIONS WITH EQUIPMENT SUPPLIER BEFORE FLOOR SLAB POUR FEC TO SEAL ALL PLUMBING PENETRATIONS THRU WALK IN COOLER/FREE=ER WALL AND CEILING PANELS -8 1/4"80B.2 10 -2"HALL 10CUSTOMER ORDER AREA105DINING 101 DRINKS CONDIMENTS 102 DRIVE-THRU SERVICE 104 SUNDAE ASSEMBLY 111 ENTRY 10 MEN 107 WOMEN 108 MOP ROOM 118 OFFICE 117 DRY GOODS 115 KITCHEN 112DISHWASHING113PREP AREA114EMPLOYEE TOILET 11 UTILITY ROOM 11 COOLER 120 FREE=ER 121 ENTRY 103 CUSTOMER SERVICE110PLUMBING SYMBOLS HW HOT WATER CW COLD WATER DW DIRECT WASTE H.D.HUB DRAIN G GAS AFF ABOVE FINISHED FLOOR PWC EXTERIOR POWER WASHER CONNECTION VERIFY ALL PLUMBING REQUIREMENTS WITH OWNER8"32 .3 35 -10" 7" 13 -2" 8 -11"13 -8"4"4"14"33"113.2 10"8"20 - 1/4" FOODSERVICE PLUMBING PLAN - METRO L 2022 PROTOTYPE SCALE: 1 4" = 1'-0" GENERAL NOTES 1.PLUMBING CONTRACTOR TO FLUSH ALL LINES OF FOREIGN MATTER BEFORE FILTER CARTRIDGE INSTALLATION. 2.DO NOT USE SOLID PIPING TO WATER BOOSTER. 3.VERIFY PLYWOOD BACKING IN WALL Z/ GC BEFORE MOUNTING BOOSTER. 4.PROVIDE UNIONS ON BOTH SIDES OF BOOSTER PUMP AND WATER FILTER. 5.IF PEX PIPING REQUIRED PER LOCAL CODES ON ANY FILTERED WATER SUPPLY LINES A 1" DIA. MINIMUM LINE SI=E IS TO BE USED. ICE MACHINE TO BE DIRECT NO TEE S. ALL FITTINGS TO BE FULL FLOW. DO NOT REDUCE LINE SI=E AT FITTINGS. EVAPORATOR COIL COPPER DRAIN LINE P-TRAP OPEN SITE DRAIN VAPOR SEAL GENERAL REFRIGERATION DRAIN NOTES 1.REFRIGERATION CONTRACTOR TO FURNISH AND INSTALL 1" COPPER DRAIN LINE DRAIN LINE HEAT TAPE WITH A 30 WATTS/FOOT RATING AND 1" ID ARMAFLEX PIPE INSULATION ON FREE=ER ONLY. 2.RUN PIPE WITH A 1/2" 1 PITCH. 3.SEAL ANY AND ALL PIPING PENETRATIONS. PC TO PROVIDE 34" UNION TYPE FITTINGS ON EITHER SIDE OF BOOSTER PUMP TANK FURNISHED AND INSTALLED BY PEPSI 34" MIN. INCOMING WATER SUPPLY COPPER INCOMING WATER SUPPLY BUILDING WALL IN MECHANICAL ROOM SHUT-OFF VALVES AS REQUIRED 34" MIN. DIA. COPPER WATER FILTER BYPASS CIRCUIT SHUT-OFF VALVES AS REQUIRED CUNO DP20 WATER FILTER BY FOODSERVICE EQUIPMENT SUPPLIER 34" DIA. COPPER FILTERED DESCALED WATER OUT TO ICE MAKERS COFFEE MAKER ICED TEA ITEMS  A 84 8 34" DIA. FILTERED WATER OUT TO ITEM 15 BAG IN BOX AREA. PEPSI TO RUN FILTERED WATER OUT TO SELF-SERVE SODA STATION ITEMS  7 103 104 BYPASS SHUT-OFF VALVES AS REQUIRED DETAIL - WALK IN DRAIN LINE NTS 1 FS-2 SCHEMATIC - WATER FILTER ICE, SODA, BEVERAGE EQUIPMENT NTS 2 FS-2 VENT REGULATOR PER ALL LOCAL CODES KEEP ELBOWS TO MINIMUM AND DO NOT REDUCE MECHANICAL GAS SHUT-OFF VALVE BY MC VERIFY LOCATION AND GAS PRESSURES Z/ FIRE SYSTEM INSTALLER 785 MBTU AT 2# INCOMING GAS PRESSURE BTU LOAD FOR GRILL AND FRYERS ONLY ITEM 4 EXHAUST HOOD BY HVAC 34" TO FEED ITEM 51 GRIDDLE 7"-" W.C. GAS PRESSURE AT CONNECTION GAS PIPING ROUGH-IN FOR ITEMS 51 AND 0 SEE SHEET FS-2 FOR EXACT LOCATIONS AND HEIGHTS 1 14" TO FEED ITEM 0 FRYERS 7"-" W.C. GAS PRESSURE AT CONNECTION ITEM 5 EXHAUST HOOD BY HVAC CLOSURE PANELS BY HVAC 1 14" GAS PIPING BRANCH TO TWO CONNECTIONS FOR ITEM 0 DO NOT REDUCE TRUSS BEARING AT 10 -0" VERIFY GAS PRESSURE OUT TO ITEMS 51 AND 0 GENERAL NOTES 1.GAS PRESSURE REGULATOR TO BE A MINIMUM OF 120" AWAY FROM EQUIPMENT. MAINTAIN 1 12" PIPE SI=E TO EQUIPMENT DROPS. KEEP ELBOWS TO A MINIMUM. 2.GAS PRESSURE REGULATOR BY M.C. REGULATOR MUST BE AD-USTABLE AND MUST HAVE MINIMUM OF 1 12" OUTLET. FINISHED CEILING AT 8 -0" MAINTAIN CONSTANT FLOWING PRESSURE AT EQUIPMENT CONNECTION DETAIL - NATURAL GAS PIPING AT COOKLINE NTS 3 FS-2 OPEN SITE HUB DRAIN TRAPPED BELOW FLOOR HARD PIPED DRAIN FROM EQUIPMENT CONNECTION BY PC DRAIN SHUT-OFF VALVE BY PC AIR GAP BETWEEN EQUIPMENT DRAIN AND SITE DRAIN PER LOCAL CODES REMOVABLE CABINET BOTTOM DETAIL - OPEN SITE DRAIN PIPING AT CABINET BASE NTS 4 FS-2 2# HIGH PRESSURE GAS BUILDING DELIVERY RECOMMENDED. IF A LOW PRESSURE SYSTEM IS REQUIRED BY LOCAL CODES OR UTILITIES 11" WC GAS PRESSURE IS REQUIRED TO THE GRILL AND FRYER AREA HUB DRAIN DETAIL 8" X 8" FLOOR SINK WITH REMOVABLE STRAINER HARD PIPED DRAIN FROM EQUIPMENT CONNECTION BY PC DRAIN SHUT-OFF VALVE BY PC RECESS IN EQUIPMENT CURB. VERIFY EXACT LOCATION WITH FOODSERVICE EQUIPMENT SUPPLIER REMOVABLE CABINET BOTTOM FLOOR SINK DETAIL AIR GAP BETWEEN EQUIPMENT DRAIN AND SITE DRAIN PER LOCAL CODES FLOORING MATERIAL IN RECESS HUB DRAINS ARE REQUIRED FOR OPEN SITE DRAINS. IF FLOOR SINKS ARE REQUIRED BY LOCAL CODES. VERIFY EXACT LOCATIONS WITH FOODSERVICE EQUIPMENT SUPPLIER3"4"4"8 -1"28" FS-2 SheetWARNING!: These plans are for the exclusive use of Culver Franchising System, LLC and authorized franchise holders only. No part of these plans or the design they represent may be duplicated or reproduced without permission ofCulver Franchising System, LLCDate Revision ByDate: Drawn By: Project No. Contents:Sheet V. Young Culver Franchising System, LLC 1240 Water Street Prairie du Sac, WI 53578 608-643-7980 FOODSERVICE PLUMBING PLANMETRO L - 2022CULVER FRANCHISING SYSTEM, LLCJan. 1, 2022 Metro L - 2022 PROTOTYPE PLANSFRONT LEFT SIDE RIGHT SIDE REAR SEE SITE PLAN FOR NORTH ORIENTATION PLUMBING CONNECTION SCHEDULE INFORMATION IS PROVIDED ON SHEET P103 PLUMBING SCHEDULE THIS INFORMATION IS PROVIDED IN PLUMBING NOTES ON SHEET P103 WALK-IN DRAIN LINE DETAIL IS PROVIDED ON SHEET P103 WATER FILTER SCHEMATIC IS INCLUDED ON SHEET P302 SEE SHEET P103 FOR FOOD SERVICE PLUMBING ROUGH-INS SEE GAS PIPING PLAN & DETAIL ON P102; GAS PIPING ISOMETRIC ON P302 01/13/23