HomeMy WebLinkAboutGN112 - FS-4 - For Reference Only4 1/2"-8"-3"-"
25"8-11"2"8 -4"
OUTLINE FOR STEEL EQUIPMENT CURB BASE. CURB FURNISHED
BY FEC TO GC GC TO INSTALL. VERIFY ALL DIMENSIONS AND
DETAILS Z/ FEC SEE DETAIL 2 ON FS-4
OUTLINE FOR STEEL EQUIPMENT CURB BASE. CURB
FURNISHED BY FEC TO GC GC TO INSTALL. VERIFY ALL
DIMENSIONS AND DETAILS Z/ FEC SEE DETAIL 2 FS-4
DEPRESS CONCRETE SLAB IN THIS
AREA 7" PAD MUST BE LEVEL
CENTER LINE OF CENTER
PARTITION
GC TO PROVIDE BACKING ABOVE
FINISHED CEILING VERIFY MOUNTING
REQUIREMENTS/LOCATIONS
MONITOR BRACKET FROM ABOVE
BY OWNER VERIFY MOUNTING
REQUIREMENTS/LOCATIONS25A
DINING
101
ENTRY
103
HALL
10CUSTOMER ORDER AREA105DRINKS CONDIMENTS
102
SUNDAE ASSEMBLY
111
ENTRY
10
MEN
107
WOMEN
108
MOP ROOM
118 OFFICE
117
DRY GOODS
115
KITCHEN 112DISHWASHING113PREP AREA114EMPLOYEE TOILET
11
UTILITY ROOM
11
COOLER
120
FREE=ER
121CUSTOMER SERVICE110DRIVE-THRU SERVICE
104
4
5-11"13-5"42"42"22"31"2 1/2"8-"4"20"20"SECTION THRU ITEMS 47,53, 80 AND 81
32"3-4"3"3"
ISOMETRIC FOR ITEM 47 CUSTOMER SIDE40" FINISHED3" FINISHED4
1 2" FI NISH
E
D
FRY DUMP
STATION
ITEM 53
S/S SET
COUNTER
ITEM 80
HEATED PASS-THRU
ITEM 81
18 GA. S/S CHANNEL CAP
TRIM AT PERIMETER OF
PASS-THRU WINDOW
ITEM VENTILATION CONNECTION SCHEDULE
25A 475 CFM 7" [ 7" DUCT CONNECTION .127" S.P. AT DUCT COLLAR VERIFY IF REQUIRED
41500 CFM 12" [ 12" DUCT CONNECTION 1.18" S.P. AT DUCT COLLAR
51500 CFM 12" [ 12" DUCT CONNECTION .518" S.P. AT DUCT COLLAR41"12-2"22"88"
31"7-4 1/2"-10 1/2"5"21-3"-7 1/2"
-7 1/2"
4"
2"
4"
1-3"
2"4"4"14-5 1/2"GENERAL NOTES
1.HOODS ARE TO BE FURNISHED AND INSTALLED BY THE HVAC CONTRACTOR.
FEC TO COORDINATE ALL DETAILS OF COOKING EQUIPMENT WITH THE HVAC
CONTRACTOR.
FOODSERVICE BUILDING WORKS PLAN - METRO L - 2022 PROTOTYPE
SCALE: 1 4" = 1'-0"
STEEL CURB. FURNISHED
BY FEC. INSTALLED BY GC.
FEC TO COORDINATE SI=E
AND LOCATIONS
FINISHED
FLOOR
CONCRETE
FLOOR
SECTION THRU ITEMS 80, 93 AND 94
SECTION THRU ITEM 90
FINISHED
FLOOR
CONCRETE
FLOOR
STEEL CURB. FURNISHED
BY FEC. INSTALLED BY GC.
FEC TO COORDINATE SI=E
AND LOCATIONS
COUNTERS 113 AND 114
SIMILAR IN CONSTRUCTION.
THESE COUNTERS RECEIVE
A 5" STEEL CURB
DETAIL - STEEL CURBS
NTS
2
FS-4
DETAIL - HEATED PASS-THRU
NTS
1
FS-4 23 1/2"
1 1/2"7-10" I.D. MINIMUM8-2"12" INSULATION FOR FROST
BREAK AT PERIMETER BY GC
S/S COVE BASE BY FEC
WALK-IN COOLER/FREE=ER
PANELS BY FEC
COOLER/FREE=ER DOOR BY FEC
AD-USTABLE DOUBLE SWEEP
GASKET BY FEC
2" [ BOX FRAME BY GC REDWOOD OR
TREATED MATERIAL ONLY
14" WOOD FILLER BY GC VERIFY FLOORING
FLOORING MATERIAL BY GC
CONCRETE BY GC
4" SLAB EXTRUDED POLYSTYRENE
INSULATION FOR USE UNDER
CONCRETE BY GC
CONCRETE SUB-FLOOR BY GC
HEAVY DUTY S/S
THRESHOLD AND
ANTI-SWEAT
HEATER BY FEC
PARTITION SECTION BY FEC
VINYL SCREED BY FEC
S/S COVE BASE BY FEC
FLOORING MATERIAL BY GC
CONCRETE BY GC
12" INSULATION
WATERTIGHT SEAL FORMED BY 15
MIL WATER BARRIER Z/
MANUFACTURERS RECOMMENDED
PRESSURE SENSITIVE TAPE BY GC
BUILDING CEILING
2"BULKHEAD BY GC
SECTION THRU CENTER PARTITION SECTION THRU WALLSECTION THRU DOOR
CONCRETE SUB-FLOOR BY G.C.
2" BOX FRAME BY
GC REDWOOD OR
TREATED MATERIAL ONLY
A 2" MIN. CLEARANCE IS REQUIRED
BETWEEN COOLER/FREE=ER
PANELS BUILDING WALLWOOD FILLER BY G.C.
2 LAYERS # 2" HIGH DENSITY
EXTRUDED POLYSTYRENE INSULATION
BY GC
4"
58" GYP BOARD
DETAIL - WALK-IN COOLER/FREEZER FLOOR
NTS
3
FS-4
WATERTIGHT SEAL FORMED BY 15
MIL WATER BARRIER Z/
MANUFACTURERS RECOMMENDED
PRESSURE SENSITIVE TAPE BY GC
12" INSULATION FOR FROST
BREAK AT PERIMETER BY GC
FS-4
SheetWARNING!: These plans are for the exclusive use of Culver Franchising System, LLC and authorized franchise holders only. No part of these plans or the design they represent may be duplicated or reproduced without permission ofCulver Franchising System, LLCDate Revision ByDate:
Drawn By:
Project No.
Contents:Sheet
V. Young
FRONT
LEFT SIDE
RIGHT SIDE
REAR
SEE SITE PLAN FOR
NORTH ORIENTATION
Culver Franchising
System, LLC
1240 Water Street
Prairie du Sac, WI 53578
608-643-7980
FOODSERVICE
BUILDING WORKS
PLANMETRO L - 2022CULVER FRANCHISING SYSTEM, LLCJan. 1, 2022
Metro L - 2022 PROTOTYPE PLANSSEE DETAILS 3, 4, & 5 ON SHEET FS-1 FOR HEATED PASS THROUGH DETAILS
SEE DETAIL 2 / FS-1 FOR
ITEM 90 DETAIL
SEE COUNTER BASE
DETAIL A3 / A103
WALK-IN SLAB DETAILS GIVEN AT DETAILS D3, D4, & D5 ON SHEET S101.
CLEARANCE NOTED ON CEILING PLAN, A102, AND SECTION H7 / A202 SEE FOUNDATION PLAN S101
FOR DEPRESSED SLABSEE DUCT PLAN @ SHEET M101 &
AIR BALANCE TABLE SHEET M201
SEE FINISH PLAN A103 FOR
FOOD SERVICE COUNTER BASES
BRACKETS NOTED ON
CEILING PLAN SHEET A102
01/13/23