Loading...
HomeMy WebLinkAboutGN112 - FS-4 - For Reference Only4 1/2"-8"-3"-" 25"8-11"2"8 -4" OUTLINE FOR STEEL EQUIPMENT CURB BASE. CURB FURNISHED BY FEC TO GC GC TO INSTALL. VERIFY ALL DIMENSIONS AND DETAILS Z/ FEC SEE DETAIL 2 ON FS-4 OUTLINE FOR STEEL EQUIPMENT CURB BASE. CURB FURNISHED BY FEC TO GC GC TO INSTALL. VERIFY ALL DIMENSIONS AND DETAILS Z/ FEC SEE DETAIL 2 FS-4 DEPRESS CONCRETE SLAB IN THIS AREA 7" PAD MUST BE LEVEL CENTER LINE OF CENTER PARTITION GC TO PROVIDE BACKING ABOVE FINISHED CEILING VERIFY MOUNTING REQUIREMENTS/LOCATIONS MONITOR BRACKET FROM ABOVE BY OWNER VERIFY MOUNTING REQUIREMENTS/LOCATIONS25A DINING 101 ENTRY 103 HALL 10CUSTOMER ORDER AREA105DRINKS CONDIMENTS 102 SUNDAE ASSEMBLY 111 ENTRY 10 MEN 107 WOMEN 108 MOP ROOM 118 OFFICE 117 DRY GOODS 115 KITCHEN 112DISHWASHING113PREP AREA114EMPLOYEE TOILET 11 UTILITY ROOM 11 COOLER 120 FREE=ER 121CUSTOMER SERVICE110DRIVE-THRU SERVICE 104 4 5-11"13-5"42"42"22"31"2 1/2"8-"4"20"20"SECTION THRU ITEMS 47,53, 80 AND 81 32"3-4"3"3" ISOMETRIC FOR ITEM 47 CUSTOMER SIDE40" FINISHED3" FINISHED4 1 2" FI NISH E D FRY DUMP STATION ITEM 53 S/S SET COUNTER ITEM 80 HEATED PASS-THRU ITEM 81 18 GA. S/S CHANNEL CAP TRIM AT PERIMETER OF PASS-THRU WINDOW ITEM VENTILATION CONNECTION SCHEDULE 25A 475 CFM 7" [ 7" DUCT CONNECTION .127" S.P. AT DUCT COLLAR VERIFY IF REQUIRED 41500 CFM 12" [ 12" DUCT CONNECTION 1.18" S.P. AT DUCT COLLAR 51500 CFM 12" [ 12" DUCT CONNECTION .518" S.P. AT DUCT COLLAR41"12-2"22"88" 31"7-4 1/2"-10 1/2"5"21-3"-7 1/2" -7 1/2" 4" 2" 4" 1-3" 2"4"4"14-5 1/2"GENERAL NOTES 1.HOODS ARE TO BE FURNISHED AND INSTALLED BY THE HVAC CONTRACTOR. FEC TO COORDINATE ALL DETAILS OF COOKING EQUIPMENT WITH THE HVAC CONTRACTOR. FOODSERVICE BUILDING WORKS PLAN - METRO L - 2022 PROTOTYPE SCALE: 1 4" = 1'-0" STEEL CURB. FURNISHED BY FEC. INSTALLED BY GC. FEC TO COORDINATE SI=E AND LOCATIONS FINISHED FLOOR CONCRETE FLOOR SECTION THRU ITEMS 80, 93 AND 94 SECTION THRU ITEM 90 FINISHED FLOOR CONCRETE FLOOR STEEL CURB. FURNISHED BY FEC. INSTALLED BY GC. FEC TO COORDINATE SI=E AND LOCATIONS COUNTERS 113 AND 114 SIMILAR IN CONSTRUCTION. THESE COUNTERS RECEIVE A 5" STEEL CURB DETAIL - STEEL CURBS NTS 2 FS-4 DETAIL - HEATED PASS-THRU NTS 1 FS-4 23 1/2" 1 1/2"7-10" I.D. MINIMUM8-2"12" INSULATION FOR FROST BREAK AT PERIMETER BY GC S/S COVE BASE BY FEC WALK-IN COOLER/FREE=ER PANELS BY FEC COOLER/FREE=ER DOOR BY FEC AD-USTABLE DOUBLE SWEEP GASKET BY FEC 2" [ BOX FRAME BY GC REDWOOD OR TREATED MATERIAL ONLY 14" WOOD FILLER BY GC VERIFY FLOORING FLOORING MATERIAL BY GC CONCRETE BY GC 4" SLAB EXTRUDED POLYSTYRENE INSULATION FOR USE UNDER CONCRETE BY GC CONCRETE SUB-FLOOR BY GC HEAVY DUTY S/S THRESHOLD AND ANTI-SWEAT HEATER BY FEC PARTITION SECTION BY FEC VINYL SCREED BY FEC S/S COVE BASE BY FEC FLOORING MATERIAL BY GC CONCRETE BY GC 12" INSULATION WATERTIGHT SEAL FORMED BY 15 MIL WATER BARRIER Z/ MANUFACTURERS RECOMMENDED PRESSURE SENSITIVE TAPE BY GC BUILDING CEILING 2"BULKHEAD BY GC SECTION THRU CENTER PARTITION SECTION THRU WALLSECTION THRU DOOR CONCRETE SUB-FLOOR BY G.C. 2" BOX FRAME BY GC REDWOOD OR TREATED MATERIAL ONLY A 2" MIN. CLEARANCE IS REQUIRED BETWEEN COOLER/FREE=ER PANELS BUILDING WALLWOOD FILLER BY G.C. 2 LAYERS # 2" HIGH DENSITY EXTRUDED POLYSTYRENE INSULATION BY GC 4" 58" GYP BOARD DETAIL - WALK-IN COOLER/FREEZER FLOOR NTS 3 FS-4 WATERTIGHT SEAL FORMED BY 15 MIL WATER BARRIER Z/ MANUFACTURERS RECOMMENDED PRESSURE SENSITIVE TAPE BY GC 12" INSULATION FOR FROST BREAK AT PERIMETER BY GC FS-4 SheetWARNING!: These plans are for the exclusive use of Culver Franchising System, LLC and authorized franchise holders only. No part of these plans or the design they represent may be duplicated or reproduced without permission ofCulver Franchising System, LLCDate Revision ByDate: Drawn By: Project No. Contents:Sheet V. Young FRONT LEFT SIDE RIGHT SIDE REAR SEE SITE PLAN FOR NORTH ORIENTATION Culver Franchising System, LLC 1240 Water Street Prairie du Sac, WI 53578 608-643-7980 FOODSERVICE BUILDING WORKS PLANMETRO L - 2022CULVER FRANCHISING SYSTEM, LLCJan. 1, 2022 Metro L - 2022 PROTOTYPE PLANSSEE DETAILS 3, 4, & 5 ON SHEET FS-1 FOR HEATED PASS THROUGH DETAILS SEE DETAIL 2 / FS-1 FOR ITEM 90 DETAIL SEE COUNTER BASE DETAIL A3 / A103 WALK-IN SLAB DETAILS GIVEN AT DETAILS D3, D4, & D5 ON SHEET S101. CLEARANCE NOTED ON CEILING PLAN, A102, AND SECTION H7 / A202 SEE FOUNDATION PLAN S101 FOR DEPRESSED SLABSEE DUCT PLAN @ SHEET M101 & AIR BALANCE TABLE SHEET M201 SEE FINISH PLAN A103 FOR FOOD SERVICE COUNTER BASES BRACKETS NOTED ON CEILING PLAN SHEET A102 01/13/23