HomeMy WebLinkAboutGN113 - FS-5 - For Reference OnlyCWPHASE DESCRIPTION
EQUIPMENT SCHEDULE
ITEM EXIST
FUTURE
QUAN
NEW
VOLT COMMENTS
ELECTRICAL SCHEDULE
NEMA
NUMBERKW AMP
CONN.
TYPEHP ITEM CFM
EXH.
PLUMBING SCHEDULE
MBTU
HW
MAX.
GPHHW
1 20F.
HW
1 40F.
WASTE
DIR. INDR. SI=E
GAS COMMENTS COMMENTS
MECHANICAL SCHEDULE
EXH.
SI=E S.P.
EXH.
1 WALK-IN COOLER 1 NEW
WALK-IN FREE=ER2 1 NEW
WORKTABLE7 1 NEW
COOKER/WARMERS4 NEW
WASHER/DRYER1 3 1 NEW
BAG-IN BOX SODA SYSTEM1 5 1 NEW
HAND SINKS1 3 NEW
DISHTABLES/UTENSIL SINKS20 SET NEW
PRE-RINSE SPRAY ASSEMBLY22 1 NEW
PRE-RINSE SPRAY ASSEMBLY23 1 NEW
DISHWASHER25 1 NEW
BOOSTER HEATER21 NEW
FIRE SUPPRESSION SYSTEMS28 2 NEW
MOP SINK32 1 NEW
-ANITORS CHEMICAL SYSTEM33 1 NEW
REACH-IN FREE=ER34 1 NEW
REFRIGERATED WORKTABLE41 1 NEW
BUN TOASTER43 1 NEW
CUSTOM MEAT REFRIGERATOR48 1 NEW
EXHAUST HOOD (GRILL)41 NEW
GRIDDLE51 1 NEW
FRY STATION HEAT LAMP58 1 NEW
EXHAUST HOOD (FRYERS)51 NEW
FRYERS0 4 NEW
A.) BUILT IN FILTER 1 NEW
CUSTOM FISH REFRIGERATOR1 1 NEW
CUSTARD MACHINE3 1 NEW
A.) REMOTE COMPRESSORS 1 NEW
B.) HOPPER COMPRESSOR 1 NEW
ICE MACHINE AND BIN1 NEW
ICE MAKERA 1 NEW/
ASTRO BLENDERS3 NEW
D.) COIL CONTROL
C.) CONDENSING UNIT
B.) COIL
A.) BOX
1 NEW
1 NEW
1 NEW
1 NEW
NEW1
1 NEW
1
1
NEW
NEWA.) BOX
B.) COIL
C.) CONDENSING UNIT
208
1 1 5
3
1
1 1 5
1 1 5
1
1
1 1 /21.8
3.0
1 .5
DIR.
DIR.
DIR.
DIR.
EC TO FURNISH AND INSTALL A THREE POLE SINGLE THROW SWITCH. MOUNTED ON THE REAR
LOCATED ON BUILDING ROOF. VERIFY EXACT LOCATION WITH GC.
EC TO WIRE FROM --BOX TO COIL CONNECTION POINT FROM MAIN PANEL.
EC TO CONNECT DOOR LIGHT SWITCH ASSEMBLY AND (2) EXTRA INCANDESCENT LIGHTS.
1 "
208
208
208 1
1 1 5 1
3
1
3.0
5.0
1 .
1 3.7
DIR.
DIR.
DIR.
DIR.1 "
LOCATED ON BUILDING ROOF. VERIFY EXACT LOCATION WITH GC.
EC TO FURNISH AND INSTALL (2) DCO ON WALL AS SHOWN ON ROUGH-IN.1 1 5 1 DIR.
1 1 5 1 CORD UNITS PLUG IN AT VARIOUS LOCATIONS ON THE PLAN.
BY OWNER. VERIFY ALL REQUIREMENTS.
1 1 5 1 2.0
3 #
1 /2"
3 #
1 /2"
3 #
1 1 /2"
3 #
1 1 5 1 1 3.0 DIR.LEASED MACHINE. VERIFY ALL REQUIREMENTS WITH SUPPLIER.
.0208 38.03 DIR.3/4"REQUIRES 1 1 0 SOFT HW. FEC TO PROVIDE TWO TEMPERATURE/PRESSURE GAUGES
PRESSURE REDUCING VALVE AND PRESSURE RELIEF VALVE TO PC FOR INSTALLATION.
EACH SYSTEM REQUIRES A DEDICATED 24 HOUR CIRCUIT. EC TO INTERCONNECT SHUNT TRIP
BREAKERS FOR ITEMS 48 51 0 0A (OPTIONAL) 1 . BY HVAC. VERIFY ALL REQUIREMENTS1 1 5 1 DIR.FEC TO FURNISH MECHANICAL GAS SHUT-OFF VALVE TO PC FOR INSTALLATION.
1 1 5 1 1 2.0 CORD
1 1 5 1
1 1 5 1 1 3.0 CORD
1 1 5 1 1 /4 CORD
1 1 5 1 1 /4 CORD
1 500 1 2"1 .1 8"
1 1 5 1 1 5.5 DIR.
1 500 1 2".51 8"
1 1 5 1 4 #
.5
1 1 5 1 1 5.0 CORD
3208 DIR.3.0
3 #
11 1 5 1 /4
208 3 3.0
3 #
.0
3 #
1 2.5
3 #
7.0
208 1 DIR.
1 1 5 1 1 .0 DIR.
1 1 5 1 3 #
2.1 CORD
1 B
2B
1 3
1
20
22
23
25
2
28
32
33
4
51
5
0
3
1 /2"3/4"
3 #
450
TOTAL
1 1 /4"
1 35 3/4"
1 /2"BY CHEMICAL SUPPLIER. VERIFY ALL CONNECTIONS AND BACKFLOW REQUIREMENTS.
BY PC. FAUCET REQUIRES AN ATMOSPHERIC VACUUM BREAKER AND HOSE BIB TYPE OUTLET.1 /2"1 /2"2"
3/4"2"DOWN 24" BEFORE TRAPPING. CONNECT WASTE TO GREASE TRAP. DISCHARGE IS 74 GAL/HR.
PC TO EXTEND 3/4" 1 40 HW FROM ITEM 2 TO DISHWASHER. REQUIRES A 4" HUB DRAIN. EXTEND
1 /2" 1 /2"
1 /2" 1 /2"
1 /2"3 #
2"
BY OWNER. VERIFY ALL REQUIREMENTS.
4 #
1 .44
7 1 /2" 1 /2" 2"
1 /2"
2 #
CHEMICAL SUPPLIER. VERIFY CONNECTIONS AND BACKFLOW REQUIREMENTS WITH SUPPLIER.
ONE HW IS FOR THE SANITI=ING SYSTEM. SYSTEM IS FURNISHED AND INSTALLED BY THE
1 2" X
1 2" X
LIGHTS AND THE HEATED AIR VENT.
EC TO CONNECT DOOR LIGHT DOOR/LIGHT SWITCH ASSEMBLY TWO EXTRA INCANDESCENT
1 .0
2 #
EC TO FURNISH AND INSTALL A GFCI AT EACH LOCATION.
EC TO FURNISH AND INSTALL (2) D.O. ON WALL AS SHOWN ON ROUGH-IN. OTHER BLENDER
25A DISHWASHER CONDENSATE HOOD 1 NEW. VERIFY
IF REQUIRED
BY SODA EQUIPMENT SUPPLIER. VERIFY ALL REQUIREMENTS
EC TO FURNISH AND INSTALL (1 ) D.O. ON WALL AS SHOWN ON ROUGH-IN.1 .011 1 5
--BOX ON WALL TO CONNECTION ON STATION IN SEALTITE.
EC TO FURNISH AND INSTALL A SHUNT TRIP BREAKER INTERWIRED TO ITEM 28. WIRE FROM
INSTALL ALL CODE COMPLYING BACKFLOW DEVICES. SEE DETAIL ON SHEET FS-2.
FILTERED WATER FROM MAIN WATER FILTER. PC TO FURNISH AND
BY HVAC. VERIFY350.1 27"7" X
7"25A
1 /2"WATER IS FOR OPTIONAL WATER FAUCET. FROM ITEM 75 ROUGH-IN.
BY HVAC. VERIFY REQUIREMENTS.
BY OTHERS. VERIFY ALL REQUIREMENTS.
ALL REQUIREMENTS.
ALL REQUIREMENTS.
BY HVAC. VERIFY
ALL REQUIREMENTS.
BY HVAC. VERIFY
VERIFY ALL LOCAL CODES CONDITIONS
AND ALL ARCHITECTURAL PLANS BEFORE
BIDDING.
CORD1 .32 11 1 5
HOOD MUST BE ELECTRONICALLY INTERLOCKED TO ITEM 51 . BY HVAC. VERIFY REQUIREMENTS.
HOOD MUST BE ELECTRONICALLY INTERLOCKED TO ITEM 0. BY HVAC. VERIFY REQUIREMENTS.
5BUN WARMER 1 NEW 1 1 5 1 2.1 CORD
1 0.0
7.0
1 #
D.) COIL CONTROL EC TO FURNISH AND INSTALL A THREE POLE SINGLE THROW SWITCH.
4 WATER FILTER SYSTEM 1 NEW 4 3/4"
3 #
ON DRAWING FS-2.
WATER FILTER FURNISHED BY FOODSERVICE CONTRACTOR. PC TO INSTALL SEE DETAIL
EYE WASH STATION30 1 NEW 30 1 /2"1 /2"PC TO FURNISH AND INSTALL A HOT AND COLD WATER MIXING VALVE OUTGOING WATER TO BE
BETWEEN 70-75 DEGREES F. EYEWASH STATION FURNISHED BY FEC INSTALLED BY PC.1 1 /4"
REFRIGERATED DRAWER BASE37 1 NEW 1 1 5 1 4.0 CORD -20P
1 4.0 CORD1 /2 EC TO FURNISH AND INSTALL S.O. 48" AFF. DROP FROM CEILING.
EC TO FURNISH AND INSTALL S.O. 48" AFF. DROP FROM CEILING.
5-1 5P
5-1 5P
5-1 5P
5-1 5P
5-1 5P
5-1 5P
5-1 5P
5-20P
5-20P
5-20P
1 /2"A 1 /2"INSTALL ALL CODE COMPLYING BACKFLOW DEVICES. SEE DETAIL ON SHEET FS-2.
FILTERED WATER FROM MAIN WATER FILTER. PC TO FURNISH AND
ICE MAKER REMOTE CONDENSERA 1 208 1 1 1 .5 DIR.
5 WORKTABLE 1 NEW 1 1 5 1 1 .0 DIR.EC TO FURNISH AND INSTALL D.O. AS SHOWN ON ROUGH IN
MOUNTED ON THE REAR WALL OF FREE=ER.
WALL OF COOLER.
OPTIONAL
NEW/
OPTIONAL
PLUGS INTO ITEM 3
WASTE OIL RECOVERY SYSTEM1 2 1 NEW BY OWNER. VERIFY ALL REQUIREMENTS.1 2 3/4" BLACK IRON PIPING. SEE DETAIL ON P-1 . BY OWNER. VERIFY ALL REQUIREMENTS.1 1 5 1 20.0 CORD 5-1 5P
A.) WASTE OIL CONTROLS 1 NEW BLANK --BOX INSTALLED NEAR FRYERS 8"AFF. CONDUIT TO STUB UP ABOVE FINISHED CEILING.
EQUIPMENT BY OWNER. VERIFY ALL REQUIREMENTS WITH MANUFACTURER.
3/4"
CORD 5-1 5P
DIR/
2 #
1 .0
4 #
1 2.0
CORD
MICROWAVE OVEN32 NEW
DRAINS TO CLEARWATER WASTE HUB DRAIN IN 1 " DIA. COPPER PIPE PER ALL LOCAL
CODES. DRAIN TO BE TRAPPED OUTSIDE OF THE BOX. BY REFRIGERATION CONTRACTOR.
EC TO FURNISH AND INSTALL A D.O. FOR THE DRAIN LINE HEAT TAPE.
EC TO WIRE FROM ROUGH-IN TO COIL CONNECTION POINT DRAINS TO CLEARWATER WASTE HUB DRAIN IN COPPER PIPE PER ALL LOCAL CODES. DRAIN TO
BE TRAPPED OUTSIDE OF THE BOX. BY REFRIGERATION CONTRACTOR.
208 1 1 .4 CORD3.2 EACH UNIT REQUIRES A DEDICATED ISOLATED CIRCUIT.-20P
FEC TO FURNISH FLEX GAS LINE KITS. PC TO FURNISH AND INSTALL A GAS PRESSURE
REGULATOR. EQUIPMENT REQUIRES 7"-" W.C. AT CONNECTION. SEE DETAIL ON SHEET FS-2.
2#
FEC TO FURNISH FLEX GAS LINE KITS. PC TO FURNISH AND INSTALL A GAS PRESSURE
REGULATOR. EQUIPMENT REQUIRES 7"-" W.C. AT CONNECTION. SEE DETAIL ON SHEET FS-2.
2#
1 5 3/4"ITEMS 7 1 03 AND 1 04 IN THE PEPSI SODA LINE BUNDLES. BACKFLOW PREVENTION BY PC
FILTERED COLD WATER FROM ITEM 4 WATER FILTER. PEPSI TO RUN FILTERED WATER OUT TO
UPPER HEATED HOLDING UNIT41 A FUTURE NEW 1 1 5/1 30.0 DIR.EC TO ROUGH IN AND COVER A --BOX ABOVE THE FINISHED CEILING FOR FUTURE USE.
LOWER HEATED HOLDING STATION 41 B FUTURE NEW 208 1 30.0 DIR.EC TO ROUGH IN AND COVER A --BOX ABOVE THE FINISHED CEILING FOR FUTURE USE.
208
1 8.5
ALL REQUIREMENTS TO BE CONFIRMED WITH OWNER AND REFRIGERATION CONTRACTOR. EC TO
FURNISH AND INSTALL (4) HUBBELL NHC1 307 CONNECTORS AT WALL CORDS FROM THE
CONNECTORS TO THE MACHINE CONNECTION POINT (3) HUBBELL HBL781 0D SWITCHES FOR
MOTOR CONTROL AND ONE HUBBELL #1 221 W SWITCH FOR HOPPER REFRIGERATION CONTROL.
MOUNT SWITCHES IN END OF WALL. EC TO FURNISH AND INSTALL (4) HUBBELL MX1 050X FLIP
COVERS WITH LOCKING TABS. CORDS ARE FURNISHED BY THE EC OTHER PARTS LISTED BY
NATIONAL ACCOUNT. AT ROOF CONDENSERS EC TO FURNISH AND INSTALL (3) THREE
WEATHERPROOF FUSED DISCONNECTS. VERIFY LOCATION WITH GC.
LOCATED ON BUILDING ROOF. VERIFY LOCATION WITH GC. EC TO FURNISH AND INSTALL
WEATHERPROOF FUSED DISCONNECT.
CORD
DIR/
CORD
REQUIRES A 3 WIRE SERVICE WITH 1 1 5V FOR NEUTRAL.
VERIFY ALL REQUIREMENTS
EC TO FURNISH AND INSTALL A SHUNT TRIP BREAKER INTERWIRED TO KITCHEN FAN
CONTROL CENTER.
EC TO FURNISH AND INSTALL A SHUNT TRIP BREAKER INTERWIRED TO KITCHEN FAN
CONTROL CENTER.
EC TO FURNISH AND INSTALL A SHUNT TRIP BREAKER INTERWIRED TO KITCHEN FAN
CONTROL CENTER.
FS-5
SheetWARNING!: These plans are for the exclusive use of Culver Franchising System, LLC and authorized franchise holders only. No part of these plans or the design they represent may be duplicated or reproduced without permission ofCulver Franchising System, LLCDate Revision BySCHEDULE
MEP
Date:
Drawn By:
Project No.
Contents:Sheet
V. YoungCULVER FRANCHISING SYSTEM, LLCPROTOTYPE PLANSCulver Franchising
System, LLC
1240 Water Street
Prairie du Sac, WI 53578
608-643-7980
METRO L - 2022Jan. 1, 2022
Metro L - 2022
SEE SCHEDULE ON SHEET E201 SEE SCHEDULE ON SHEET P103
01/13/23