Loading...
HomeMy WebLinkAboutGN113 - FS-5 - For Reference OnlyCWPHASE DESCRIPTION EQUIPMENT SCHEDULE ITEM EXIST FUTURE QUAN NEW VOLT COMMENTS ELECTRICAL SCHEDULE NEMA NUMBERKW AMP CONN. TYPEHP ITEM CFM EXH. PLUMBING SCHEDULE MBTU HW MAX. GPHHW 1 20ƒF. HW 1 40ƒF. WASTE DIR. INDR. SI=E GAS COMMENTS COMMENTS MECHANICAL SCHEDULE EXH. SI=E S.P. EXH. 1 WALK-IN COOLER 1 NEW WALK-IN FREE=ER2 1 NEW WORKTABLE7 1 NEW COOKER/WARMERS4 NEW WASHER/DRYER1 3 1 NEW BAG-IN BOX SODA SYSTEM1 5 1 NEW HAND SINKS1 3 NEW DISHTABLES/UTENSIL SINKS20 SET NEW PRE-RINSE SPRAY ASSEMBLY22 1 NEW PRE-RINSE SPRAY ASSEMBLY23 1 NEW DISHWASHER25 1 NEW BOOSTER HEATER21 NEW FIRE SUPPRESSION SYSTEMS28 2 NEW MOP SINK32 1 NEW -ANITORS CHEMICAL SYSTEM33 1 NEW REACH-IN FREE=ER34 1 NEW REFRIGERATED WORKTABLE41 1 NEW BUN TOASTER43 1 NEW CUSTOM MEAT REFRIGERATOR48 1 NEW EXHAUST HOOD (GRILL)41 NEW GRIDDLE51 1 NEW FRY STATION HEAT LAMP58 1 NEW EXHAUST HOOD (FRYERS)51 NEW FRYERS0 4 NEW A.) BUILT IN FILTER 1 NEW CUSTOM FISH REFRIGERATOR1 1 NEW CUSTARD MACHINE3 1 NEW A.) REMOTE COMPRESSORS 1 NEW B.) HOPPER COMPRESSOR 1 NEW ICE MACHINE AND BIN1 NEW ICE MAKERA 1 NEW/ ASTRO BLENDERS3 NEW D.) COIL CONTROL C.) CONDENSING UNIT B.) COIL A.) BOX 1 NEW 1 NEW 1 NEW 1 NEW NEW1 1 NEW 1 1 NEW NEWA.) BOX B.) COIL C.) CONDENSING UNIT 208 1 1 5 3 1 1 1 5 1 1 5 1 1 1 1 /21.8 3.0 1 .5 DIR. DIR. DIR. DIR. EC TO FURNISH AND INSTALL A THREE POLE SINGLE THROW SWITCH. MOUNTED ON THE REAR LOCATED ON BUILDING ROOF. VERIFY EXACT LOCATION WITH GC. EC TO WIRE FROM --BOX TO COIL CONNECTION POINT FROM MAIN PANEL. EC TO CONNECT DOOR LIGHT SWITCH ASSEMBLY AND (2) EXTRA INCANDESCENT LIGHTS. 1 " 208 208 208 1 1 1 5 1 3 1 3.0 5.0 1 . 1 3.7 DIR. DIR. DIR. DIR.1 " LOCATED ON BUILDING ROOF. VERIFY EXACT LOCATION WITH GC. EC TO FURNISH AND INSTALL (2) DCO ON WALL AS SHOWN ON ROUGH-IN.1 1 5 1 DIR. 1 1 5 1 CORD UNITS PLUG IN AT VARIOUS LOCATIONS ON THE PLAN. BY OWNER. VERIFY ALL REQUIREMENTS. 1 1 5 1 2.0 3 # 1 /2" 3 # 1 /2" 3 # 1 1 /2" 3 # 1 1 5 1 1 3.0 DIR.LEASED MACHINE. VERIFY ALL REQUIREMENTS WITH SUPPLIER. .0208 38.03 DIR.3/4"REQUIRES 1 1 0ƒ SOFT HW. FEC TO PROVIDE TWO TEMPERATURE/PRESSURE GAUGES PRESSURE REDUCING VALVE AND PRESSURE RELIEF VALVE TO PC FOR INSTALLATION. EACH SYSTEM REQUIRES A DEDICATED 24 HOUR CIRCUIT. EC TO INTERCONNECT SHUNT TRIP BREAKERS FOR ITEMS 48 51  0 0A (OPTIONAL) 1 . BY HVAC. VERIFY ALL REQUIREMENTS1 1 5 1 DIR.FEC TO FURNISH MECHANICAL GAS SHUT-OFF VALVE TO PC FOR INSTALLATION. 1 1 5 1 1 2.0 CORD 1 1 5 1 1 1 5 1 1 3.0 CORD 1 1 5 1 1 /4 CORD 1 1 5 1 1 /4 CORD 1 500 1 2"1 .1 8" 1 1 5 1 1 5.5 DIR. 1 500 1 2".51 8" 1 1 5 1 4 # .5 1 1 5 1 1 5.0 CORD 3208 DIR.3.0 3 # 11 1 5 1 /4 208 3 3.0 3 # .0 3 # 1 2.5 3 # 7.0 208 1 DIR. 1 1 5 1 1 .0 DIR. 1 1 5 1 3 # 2.1 CORD 1 B 2B 1 3 1  20 22 23 25 2 28 32 33 4 51 5 0 3 1 /2"3/4" 3 # 450 TOTAL 1 1 /4" 1 35 3/4" 1 /2"BY CHEMICAL SUPPLIER. VERIFY ALL CONNECTIONS AND BACKFLOW REQUIREMENTS. BY PC. FAUCET REQUIRES AN ATMOSPHERIC VACUUM BREAKER AND HOSE BIB TYPE OUTLET.1 /2"1 /2"2" 3/4"2"DOWN 24" BEFORE TRAPPING. CONNECT WASTE TO GREASE TRAP. DISCHARGE IS 74 GAL/HR. PC TO EXTEND 3/4" 1 40ƒ HW FROM ITEM 2 TO DISHWASHER. REQUIRES A 4" HUB DRAIN. EXTEND 1 /2" 1 /2" 1 /2" 1 /2" 1 /2"3 # 2" BY OWNER. VERIFY ALL REQUIREMENTS. 4 # 1 .44 7 1 /2" 1 /2" 2" 1 /2" 2 # CHEMICAL SUPPLIER. VERIFY CONNECTIONS AND BACKFLOW REQUIREMENTS WITH SUPPLIER. ONE HW IS FOR THE SANITI=ING SYSTEM. SYSTEM IS FURNISHED AND INSTALLED BY THE 1 2" X 1 2" X LIGHTS AND THE HEATED AIR VENT. EC TO CONNECT DOOR LIGHT DOOR/LIGHT SWITCH ASSEMBLY TWO EXTRA INCANDESCENT 1 .0 2 # EC TO FURNISH AND INSTALL A GFCI AT EACH LOCATION. EC TO FURNISH AND INSTALL (2) D.O. ON WALL AS SHOWN ON ROUGH-IN. OTHER BLENDER 25A DISHWASHER CONDENSATE HOOD 1 NEW. VERIFY IF REQUIRED BY SODA EQUIPMENT SUPPLIER. VERIFY ALL REQUIREMENTS EC TO FURNISH AND INSTALL (1 ) D.O. ON WALL AS SHOWN ON ROUGH-IN.1 .011 1 5 --BOX ON WALL TO CONNECTION ON STATION IN SEALTITE. EC TO FURNISH AND INSTALL A SHUNT TRIP BREAKER INTERWIRED TO ITEM 28. WIRE FROM INSTALL ALL CODE COMPLYING BACKFLOW DEVICES. SEE DETAIL ON SHEET FS-2. FILTERED WATER FROM MAIN WATER FILTER. PC TO FURNISH AND BY HVAC. VERIFY350.1 27"7" X 7"25A 1 /2"WATER IS FOR OPTIONAL WATER FAUCET. FROM ITEM 75 ROUGH-IN. BY HVAC. VERIFY REQUIREMENTS. BY OTHERS. VERIFY ALL REQUIREMENTS. ALL REQUIREMENTS. ALL REQUIREMENTS. BY HVAC. VERIFY ALL REQUIREMENTS. BY HVAC. VERIFY VERIFY ALL LOCAL CODES CONDITIONS AND ALL ARCHITECTURAL PLANS BEFORE BIDDING. CORD1 .32 11 1 5 HOOD MUST BE ELECTRONICALLY INTERLOCKED TO ITEM 51 . BY HVAC. VERIFY REQUIREMENTS. HOOD MUST BE ELECTRONICALLY INTERLOCKED TO ITEM 0. BY HVAC. VERIFY REQUIREMENTS. 5BUN WARMER 1 NEW 1 1 5 1 2.1 CORD 1 0.0 7.0 1 # D.) COIL CONTROL EC TO FURNISH AND INSTALL A THREE POLE SINGLE THROW SWITCH. 4 WATER FILTER SYSTEM 1 NEW 4 3/4" 3 # ON DRAWING FS-2. WATER FILTER FURNISHED BY FOODSERVICE CONTRACTOR. PC TO INSTALL SEE DETAIL EYE WASH STATION30 1 NEW 30 1 /2"1 /2"PC TO FURNISH AND INSTALL A HOT AND COLD WATER MIXING VALVE OUTGOING WATER TO BE BETWEEN 70-75 DEGREES F. EYEWASH STATION FURNISHED BY FEC INSTALLED BY PC.1 1 /4" REFRIGERATED DRAWER BASE37 1 NEW 1 1 5 1 4.0 CORD -20P 1 4.0 CORD1 /2 EC TO FURNISH AND INSTALL S.O. 48" AFF. DROP FROM CEILING. EC TO FURNISH AND INSTALL S.O. 48" AFF. DROP FROM CEILING. 5-1 5P 5-1 5P 5-1 5P 5-1 5P 5-1 5P 5-1 5P 5-1 5P 5-20P 5-20P 5-20P 1 /2"A 1 /2"INSTALL ALL CODE COMPLYING BACKFLOW DEVICES. SEE DETAIL ON SHEET FS-2. FILTERED WATER FROM MAIN WATER FILTER. PC TO FURNISH AND ICE MAKER REMOTE CONDENSERA 1 208 1 1 1 .5 DIR. 5 WORKTABLE 1 NEW 1 1 5 1 1 .0 DIR.EC TO FURNISH AND INSTALL D.O. AS SHOWN ON ROUGH IN MOUNTED ON THE REAR WALL OF FREE=ER. WALL OF COOLER. OPTIONAL NEW/ OPTIONAL PLUGS INTO ITEM 3 WASTE OIL RECOVERY SYSTEM1 2 1 NEW BY OWNER. VERIFY ALL REQUIREMENTS.1 2 3/4" BLACK IRON PIPING. SEE DETAIL ON P-1 . BY OWNER. VERIFY ALL REQUIREMENTS.1 1 5 1 20.0 CORD 5-1 5P A.) WASTE OIL CONTROLS 1 NEW BLANK --BOX INSTALLED NEAR FRYERS 8"AFF. CONDUIT TO STUB UP ABOVE FINISHED CEILING. EQUIPMENT BY OWNER. VERIFY ALL REQUIREMENTS WITH MANUFACTURER. 3/4" CORD 5-1 5P DIR/ 2 # 1 .0 4 # 1 2.0 CORD MICROWAVE OVEN32 NEW DRAINS TO CLEARWATER WASTE HUB DRAIN IN 1 " DIA. COPPER PIPE PER ALL LOCAL CODES. DRAIN TO BE TRAPPED OUTSIDE OF THE BOX. BY REFRIGERATION CONTRACTOR. EC TO FURNISH AND INSTALL A D.O. FOR THE DRAIN LINE HEAT TAPE. EC TO WIRE FROM ROUGH-IN TO COIL CONNECTION POINT DRAINS TO CLEARWATER WASTE HUB DRAIN IN COPPER PIPE PER ALL LOCAL CODES. DRAIN TO BE TRAPPED OUTSIDE OF THE BOX. BY REFRIGERATION CONTRACTOR. 208 1 1 .4 CORD3.2 EACH UNIT REQUIRES A DEDICATED ISOLATED CIRCUIT.-20P FEC TO FURNISH FLEX GAS LINE KITS. PC TO FURNISH AND INSTALL A GAS PRESSURE REGULATOR. EQUIPMENT REQUIRES 7"-" W.C. AT CONNECTION. SEE DETAIL ON SHEET FS-2. 2# FEC TO FURNISH FLEX GAS LINE KITS. PC TO FURNISH AND INSTALL A GAS PRESSURE REGULATOR. EQUIPMENT REQUIRES 7"-" W.C. AT CONNECTION. SEE DETAIL ON SHEET FS-2. 2# 1 5 3/4"ITEMS  7 1 03 AND 1 04 IN THE PEPSI SODA LINE BUNDLES. BACKFLOW PREVENTION BY PC FILTERED COLD WATER FROM ITEM 4 WATER FILTER. PEPSI TO RUN FILTERED WATER OUT TO UPPER HEATED HOLDING UNIT41 A FUTURE NEW 1 1 5/1 30.0 DIR.EC TO ROUGH IN AND COVER A --BOX ABOVE THE FINISHED CEILING FOR FUTURE USE. LOWER HEATED HOLDING STATION 41 B FUTURE NEW 208 1 30.0 DIR.EC TO ROUGH IN AND COVER A --BOX ABOVE THE FINISHED CEILING FOR FUTURE USE. 208 1 8.5 ALL REQUIREMENTS TO BE CONFIRMED WITH OWNER AND REFRIGERATION CONTRACTOR. EC TO FURNISH AND INSTALL (4) HUBBELL NHC1 307 CONNECTORS AT WALL CORDS FROM THE CONNECTORS TO THE MACHINE CONNECTION POINT (3) HUBBELL HBL781 0D SWITCHES FOR MOTOR CONTROL AND ONE HUBBELL #1 221 W SWITCH FOR HOPPER REFRIGERATION CONTROL. MOUNT SWITCHES IN END OF WALL. EC TO FURNISH AND INSTALL (4) HUBBELL MX1 050X FLIP COVERS WITH LOCKING TABS. CORDS ARE FURNISHED BY THE EC OTHER PARTS LISTED BY NATIONAL ACCOUNT. AT ROOF CONDENSERS EC TO FURNISH AND INSTALL (3) THREE WEATHERPROOF FUSED DISCONNECTS. VERIFY LOCATION WITH GC. LOCATED ON BUILDING ROOF. VERIFY LOCATION WITH GC. EC TO FURNISH AND INSTALL WEATHERPROOF FUSED DISCONNECT. CORD DIR/ CORD REQUIRES A 3 WIRE SERVICE WITH 1 1 5V FOR NEUTRAL. VERIFY ALL REQUIREMENTS EC TO FURNISH AND INSTALL A SHUNT TRIP BREAKER INTERWIRED TO KITCHEN FAN CONTROL CENTER. EC TO FURNISH AND INSTALL A SHUNT TRIP BREAKER INTERWIRED TO KITCHEN FAN CONTROL CENTER. EC TO FURNISH AND INSTALL A SHUNT TRIP BREAKER INTERWIRED TO KITCHEN FAN CONTROL CENTER. FS-5 SheetWARNING!: These plans are for the exclusive use of Culver Franchising System, LLC and authorized franchise holders only. No part of these plans or the design they represent may be duplicated or reproduced without permission ofCulver Franchising System, LLCDate Revision BySCHEDULE MEP Date: Drawn By: Project No. Contents:Sheet V. YoungCULVER FRANCHISING SYSTEM, LLCPROTOTYPE PLANSCulver Franchising System, LLC 1240 Water Street Prairie du Sac, WI 53578 608-643-7980 METRO L - 2022Jan. 1, 2022 Metro L - 2022 SEE SCHEDULE ON SHEET E201 SEE SCHEDULE ON SHEET P103 01/13/23