Loading...
HomeMy WebLinkAboutSite Plan ExhibitSITE FRONTAGE EXHIBIT 841842843844838839841842843844846841842843844846847848 849848849841842843844846847848849838838847848849 838839841842843844846846846846847848849841842843844846847848849831832833834 836837838839841842843831832833834836837838839838838839839845840845840845850850840845850840840845850850850845830835840830835840840W 111TH STREETFRAN CI S C A N H E A L T H US 31 ILLINOIS STREET SANITARY SEWER EASEMENT (30' WIDE) 1100'-0" EASTERN PROPERTY LINE WIDTH (19.55 ACRES TOTAL IMI HEADQUARTERS SITE) 410'-2" (PRINCIPAL BLDG: 1 FRONTAGE) ZONING DISTRICT: MC (MERIDIAN CORRIDOR) ORDINANCE 5.07.D.3, ARCHITECTURAL STANDARDS MASSING SITE CALCULATION SUMMARY PRINCIPAL BUILDING 1 SQUARE FOOTAGE: 62,451 SQ FT EASTERN PROPERTY LINE WIDTH ALONG US-31: 1100.00' TOTAL EASTERN BLDG FRONTAGE CALC: 825.00'/1100.00' = 75% ·PRINCIPAL BLDG: 1 = 410.16' (410'-2") ·PRINCIPAL BLDG: 2 = 414.84' (414'-10") WESTERN PROPERTY LINE WIDTH ALONG ILLINOIS ST: 856.92' TOTAL WESTERN BLDG FRONTAGE CALC: 825.00'/856.92' = 96% ·PRINCIPAL BLDG: 1 = 410.16' (410'-2") ·PRINCIPAL BLDG: 2 = 414.84' (414'-10") 856'-11" WESTERN PROPERTY LINE WIDTH (19.55 ACRES TOTAL IMI HEADQUARTERS SITE) 414'-10" (PRINCIPAL BLDG: 2 FRONTAGE)69'-8"50'-0"US-31SETBACK20'-0" SIDE YARD SETBACK30'-0"FRONTYARDSETBACK30'-0" FRONT YARD SETBACK 20' - 0 " SI D E YA R D SE T B A C K STORMWATER POND WALKING TRAILS FU T U R E D R I V EFUTURE DRIVEWALKING TRAILS PROPERTY LINE PROPERTY LINEPROPERTY LINEPROPERTY LINEPRINCIPAL BLDG: 1 PHASE 1 4-STORY OFFICE BUILDING PRINCIPAL BLDG 2: PHASE 2 FUTURE DEVELOPMENT BUILDING FOOTPRINT FUTURE DEVELOPMENTIMI Headquarters | Zoning Presentation 01/18/2023 SITE PLAN 1" = 60'