HomeMy WebLinkAboutSite Plan ExhibitSITE FRONTAGE EXHIBIT
841842843844838839841842843844846841842843844846847848
849848849841842843844846847848849838838847848849
838839841842843844846846846846847848849841842843844846847848849831832833834 836837838839841842843831832833834836837838839838838839839845840845840845850850840845850840840845850850850845830835840830835840840W 111TH STREETFRAN
CI
S
C
A
N
H
E
A
L
T
H
US 31
ILLINOIS STREET
SANITARY SEWER EASEMENT (30' WIDE)
1100'-0" EASTERN PROPERTY LINE WIDTH (19.55 ACRES TOTAL IMI HEADQUARTERS SITE)
410'-2" (PRINCIPAL BLDG: 1 FRONTAGE)
ZONING DISTRICT: MC (MERIDIAN CORRIDOR)
ORDINANCE 5.07.D.3,
ARCHITECTURAL STANDARDS MASSING
SITE CALCULATION SUMMARY
PRINCIPAL BUILDING 1 SQUARE FOOTAGE: 62,451 SQ FT
EASTERN PROPERTY LINE WIDTH ALONG US-31: 1100.00'
TOTAL EASTERN BLDG FRONTAGE CALC: 825.00'/1100.00' = 75%
·PRINCIPAL BLDG: 1 = 410.16' (410'-2")
·PRINCIPAL BLDG: 2 = 414.84' (414'-10")
WESTERN PROPERTY LINE WIDTH ALONG ILLINOIS ST: 856.92'
TOTAL WESTERN BLDG FRONTAGE CALC: 825.00'/856.92' = 96%
·PRINCIPAL BLDG: 1 = 410.16' (410'-2")
·PRINCIPAL BLDG: 2 = 414.84' (414'-10")
856'-11" WESTERN PROPERTY LINE WIDTH (19.55 ACRES TOTAL IMI HEADQUARTERS SITE)
414'-10" (PRINCIPAL BLDG: 2 FRONTAGE)69'-8"50'-0"US-31SETBACK20'-0" SIDE YARD SETBACK30'-0"FRONTYARDSETBACK30'-0"
FRONT
YARD
SETBACK
20'
-
0
"
SI
D
E
YA
R
D
SE
T
B
A
C
K
STORMWATER POND
WALKING
TRAILS
FU
T
U
R
E
D
R
I
V
EFUTURE DRIVEWALKING
TRAILS
PROPERTY LINE
PROPERTY LINEPROPERTY LINEPROPERTY LINEPRINCIPAL BLDG: 1
PHASE 1
4-STORY OFFICE BUILDING
PRINCIPAL BLDG 2:
PHASE 2
FUTURE DEVELOPMENT
BUILDING FOOTPRINT
FUTURE DEVELOPMENTIMI Headquarters | Zoning Presentation
01/18/2023
SITE PLAN
1" = 60'