Loading...
HomeMy WebLinkAboutElevationsF I N I S H K E Y :CP1CC11K E Y N O T E S :CONCRETEPRE-CAST CONCRETE PANELCUSTOM VERTICAL/HORIZONTAL TEXTURE FINISHCONCRETECAST-IN-PLACE CONCRETEFINISH TO BE DETERMINEDCONCRETEGLASS FIBER REINFORCED CONCRETE - GFRCGLASSSTOREFRONT GLAZING SYSTEMCLEAR ANODIZED ALUMINUM FRAMESGLASSTEMPERED GLASS GUARD RAILMETALALUMINUM WALL PANELMETALVERTICAL ACCENT ELEMENTS -ALUMINUM RECTANGLE TUBEMETALALUMINUM HANDRAILMETAL LOUVERSMETALOVERHEAD FLUSH STYLE STEEL DOORPAINTPAINTED CONCRETECOLOR TO BE DETERMINEDCG1GL1GL2AL1AL2AL3ST1PT1PORTION OF ELEVATION SHOWN ON ANGLEGARAGE ENTRY OPENINGELEVATOR OVERRUN5' SOFFIT OVERHANGSGARAGE LEVEL ELEVATION SHOWN IN FOREGROUNDENTRY COLONNADEPODIUM ACCESS DRIVE SHOWN IN FOREGROUNDNO GLAZING AT GARAGE LEVEL OPENINGSPROJECTED CONCRETE ENTRY SURROUNDCONTINUOUS LIGHTING WASH REVEALPRIMARY BUILDING ENTRANCECONTINUOUS ALUMINUM RAILINGBUILDING SIGNAGE2345687109111213AL4CG1[896] 58'-0"T/4TH FLOOR[882] 44'-0"T/3RD FLOOR[868] 30'-0"T/2ND FLOOR[852] 14'-0"T/1ST FLOOR[838'] 0'-0"T/GARAGE[910] 62'-0"T/ROOF[919] 71'-0"T/ROOFAL2CP1CC1PT1CG1AL2CP1AL312[896] 58'-0"T/4TH FLOOR[882] 44'-0"T/3RD FLOOR[868] 30'-0"T/2ND FLOOR[852] 14'-0"T/1ST FLOOR[838'] 0'-0"T/GARAGE[910] 62'-0"T/ROOF[919] 71'-0"T/ROOF31011GL1CG1CP1GL2CC1PT1CC1CC1ST1AL1AL2CP1AL34AL2GL1CP1AL2CC176AL2CP1AL2CP1176310492991313IMI Headquarters | Zoning Presentation01/18/2023SOUTH ELEVATION1/16" = 1'NORTH ELEVATION1/16" = 1' F I N I S H K E Y :CP1CC11K E Y N O T E S :CONCRETEPRE-CAST CONCRETE PANELCUSTOM VERTICAL/HORIZONTAL TEXTURE FINISHCONCRETECAST-IN-PLACE CONCRETEFINISH TO BE DETERMINEDCONCRETEGLASS FIBER REINFORCED CONCRETE - GFRCGLASSSTOREFRONT GLAZING SYSTEMCLEAR ANODIZED ALUMINUM FRAMESGLASSTEMPERED GLASS GUARD RAILMETALALUMINUM WALL PANELMETALVERTICAL ACCENT ELEMENTS -ALUMINUM RECTANGLE TUBEMETALALUMINUM HANDRAILMETAL LOUVERSMETALOVERHEAD FLUSH STYLE STEEL DOORPAINTPAINTED CONCRETECOLOR TO BE DETERMINEDCG1GL1GL2AL1AL2AL3ST1PT1PORTION OF ELEVATION SHOWN ON ANGLEGARAGE ENTRY OPENINGELEVATOR OVERRUN5' SOFFIT OVERHANGSGARAGE LEVEL ELEVATION SHOWN IN FOREGROUNDENTRY COLONNADEPODIUM ACCESS DRIVE SHOWN IN FOREGROUNDNO GLAZING AT GARAGE LEVEL OPENINGSPROJECTED CONCRETE ENTRY SURROUNDCONTINUOUS LIGHTING WASH REVEALPRIMARY BUILDING ENTRANCECONTINUOUS ALUMINUM RAILINGBUILDING SIGNAGE2345687109111213AL4[896] 58'-0"T/4TH FLOOR[882] 44'-0"T/3RD FLOOR[868] 30'-0"T/2ND FLOOR[852] 14'-0"T/1ST FLOOR[838'] 0'-0"T/GARAGE[910] 62'-0"T/ROOF[919] 71'-0"T/ROOFCC1PT131045CG1GL2GL1CP1AL2AL2CP1611[896] 58'-0"T/4TH FLOOR[882] 44'-0"T/3RD FLOOR[868] 30'-0"T/2ND FLOOR[852] 14'-0"T/1ST FLOOR[838'] 0'-0"T/GARAGE[910] 62'-0"T/ROOF[919] 71'-0"T/ROOFCG1GL2GL1CP1AL2AL1AL2CP131041313AL4IMI Headquarters | Zoning Presentation01/18/2023EAST ELEVATION1/16" = 1'WEST ELEVATION1/16" = 1'IMI Headquarters | Zoning Presentation01/18/2023 IMI Headquarters | Zoning Presentation01/18/2023PROPERTY LINEEAST ELEVATIONPROPERTY LINEPROPERTY LINEPROPERTY LINEWEST ELEVATION1/32" = 1'1/32" = 1'