HomeMy WebLinkAboutAddendum #2 to drawings & specs 891-021 • July 11, 1990 ADDENDUM NUMBER TWO (TELEPHONE) to the drawings and specifications prepared by the Everett I. Brown Company for ADDITION TO AND RENOVATION OF CARMEL HIGH SCHOOL - PHASE IA for Cannel Clay Schools, Cannel,Indiana. All Contractors bidding on this project shall read all of the items covered below and shall comply with all of the requirements as set forth, including any necessary refinements or additions generated by this Addendum and required by the intent of the original contract documents. All Contractors shallacknowledge ontheiro that r .�.rs a...... .. bid :�:: they have received this Addendum and included the appropriate content of same within their bid proposal. CONTRACTORS NOT RECEIVING ADDENDUM NUMBER ONE, PLEASE NOTIFY THE ARCHITECT'S OFFICE IMMEDIATELY. For the convenience of the bidders, bid categories possibly affected in price and/or construction by the various items in this Addendum are listed at the beginning of each item. 1. ALL CONTRACTS: In Addendum Number One, the date of issue should be corrected to read July 6, 1990, instead of June 6, 1990. 2. CONTRACT#1: Sheet#C-2: A. Change the quantity of dumped riprap from 96.5 square feet to 1,100 square feet north of 136th Street. Add 150 square feet of dumped riprap to the culvert outlet area south of 136th Street as shown on plan. 3. CONTRACTS#1.#2: Sheet#C-8: A. Plan Note #4 is part of Contract #1. 4. CONTRACTS #2,#3: Sheet #C-4: A. Add four (4) additional handicapped parking spaces and signs in the next parking bay directly north of the four (4) handicapped spaces shown on plan. 5. CONTRACT#4: Sheet #M-6: A. Revise the 12" ST outletting from DS #11-S to MH #4-S and MH #5-S as follows and per the drawing included with this Addendum: 1. Provide only 180' of 12" ST between DS #11-S and MH #4-S; ® rout at the same location and slope shown. Page#1 891-021 • 2. Place MH #4-S 180' downstream of DS #11-S, with invert elevation in E. 838.80' and invert elevation out W. 838.70'; verify rim elevation and depth with existing grade. (Revise storm manhole schedule). 3. Locate MH #5-S in existing paved parking approximately 159' west; verify location of existing 18" ST and construct MH #5-S at that location; verify rim elevation and depth with existing grade. (Revise storm manhole schedule). 4. Provide 159' of 12" ST at 5.4% slope (verify) between MH #4-S and MH #5-S; refer to Plan Note #9 for cutting existing pavement. (Delete the 100' of 12" ST at 5.4% slope.) 5. Provide Item #25, C. of Addendum Number One in DS #11-S. 6. CONTRACT#5: Sheet#E-3: A. On the Incandescent/HID Fixture Schedule, the following light fixture manufacturer catalog numbers are approved equals for the types shown. Add them to the schedule. Colors to be per Specifications Section 16530, Paragraph 2.02. Type K-1 Sterner FK 25A-10-5-N-400H spider mount -30'pole • McGraw-Edison ZSF-21654 Mtd on S530X Type K-2 Sterner FK 25A-10-3-N-400H spider mount - 30' pole w/shield McGraw-Edison ZSF-21644 Mtd on S530X Type K-3 Sterner FK 30-10-5-N-1000H spider mount -35'pole McGraw-Edison ZSF-31754 Mtd on S635X Type K-4 Musco Musco Sportscluster 2 Sports Pole System Type K-5 Musco Musco Quartz Type K-6 Sterner 865-EC-S-RM-250H-277 finish as selected McGraw-Edison FL-1151-S-FA55 Type K-7 Sterner FK 25A-10-5-N-400H spider mount - 20'pole McGraw-Edison ZSF-21634 Mtd on S520X • Type K-8 Hubbell MHS-0250H-168/MHS-21 Lumark MHSF-T7-250 with S2C2WPP Page#2 891-021 • 7. CONTRACT#5: Specification Section 16540 - Sports Lighting: A. In Section 3.01, change subparagraph A to read as follows: "A. Concrete pole bases provided under separate contract (future Phase IB work). This separate contract to be bid at a later date." 8. CONTRACT#7: Sheet #C-3: A. Two sliding gates shown, but not denoted, near the visitors' side ticket booth, shall be sliding gates for 16' openings. 9. CONTRACT#7: Sheet#C-4: A. Change plan note designation AC to "8" located approximately 4" above the title plot plan. 2 10. CONTRACT#7: In Addendum Number One, Item #38, change the 210'length to 510'. 11. CONTRACT#8: Specification Section 02811 - Underground Sprinkler System: A. In Section 3.03, Item F, add subparagraph 5 as follows: "5. Bury depths shown are minimum. Irrigation piping shall be buried deeper as required to avoid conflicts with underdrain, storm, water, gas, sanitary, electrical, etc. Refer to page 14 of Addendum Number One for the underdrain system detail." B. In Section 3.03, Item L, add the following: "Wire each control valve separately, complete from the controller to the valve." 12. CONTRACT#8: Sheet #M-7: A. Provide a 6" sleeve to accommodate a 4" irrigation line at the drive and the track crossing. Provide an additional 1-1/4" sleeve for control wiring at each crossing, two (2) total. Provide two (2) 4" spare sleeves as shown. Total sleeves required: two (2) 4", two (2) 6", and two (2) 1-1/4". • Page#3 891-021 1 4) EXISTING 159' OF 12"ST 18"ST VERIFY AT 5. 4% SLOPE (VERIFY ) HH Aa-S --- /. ............0477"......; .--/ 0 MH #5-S O • 180' OF 12"ST AT 1. 0% SLOPE EXITING PAvED PARKING O 0 Y Y REVISION TO SHEET M- 6 SCALE: 1 " = 30 ' st, .R _ 6Rply'4y `4, V�.--STE. ije :.:7 I • NO. \ 1 MI ` 20912 =cc STATE OF it.? - en pIAtk,N ,A10 ''a;�nH NON ADDITION TO AND RENOVATION OF CARMEL HIGH SCHOOL PHASE 1A 0 ..../Z-10,4_,_ �4" - ADDENDUM tt2 J UL Y 1 1 , 1 990 E. I . B. JOB u 891 - 021 Page#4 V891-021 II Pages 1 through 5, inclusive, constitute the total makeup of ADDENDUM NUMBER TWO. EVERETT I. BROWN COMPANY i� ' fs _ Page#5