Loading...
HomeMy WebLinkAboutCover Sheet for Site PlansCOVER SHEETL000PROJECT LOCATIONSCALE: N.T.S. Revision Date Description Date: Project No: Drawn by: Checked by:21-1513AMY, SG, SSDTF2023-01-275825 Lawton Loop E. Dr. | Indianapolis, IN 46216 317-485-6900 | www.context-design.com N O T F O R C O N S T R U C T I O N Permit Documents for the PARKWOOD CROSSING VILLAGE GREEN 550 E 96th St, Indianapolis, IN 46280Know what'sbelow.before you dig.CallRRPO Property Management, LLCand Parkwood Crossing550 E 96th StreetCarmel, IN 46280PLANS PREPARED FOR:PLANS PREPARED BY:PERMIT DOCUMENTSFORVILLAGE GREENPARKWOOD CROSSINGCARMEL, IN 46280UTILITY STATEMENTThe underground utilities shown have been located from field survey information and existing drawings.The surveyor makes no guarantees that the underground utilities comprise all such utilities in the area,either in-service or abandoned. The surveyor further does not warrant that the underground utilitiesshown are in the exact location indicated although the surveyor does certify that they are located asaccurately as possible from information available. The surveyor has not physically located theunderground utilities.SHEET INDEXDescriptionSheet #TITLE SHEETL000CIVIL SERIESEXISTING CONDITIONS AND DEMO PLANC2.0EROSION CONTROL PLANC4.0EROSION CONTROL DETAILSC4.1GRADING, DRAINAGE AND UTILITY PLANC5.0LANDSCAPE SERIESMATERIALS AND NOTES PLANL101LAYOUT PLANL201GRADING PLAN (PUTTING GREEN)L301PLANTING SCHEDULE AND DETAILSL400PLANTING PLANL401SITE DETAILSL600SITE DETAILSL601VICINITY MAPSCALE: N.T.S.REVDATEDESCRIPTION5825 Lawton Loop E. Dr. | Indianapolis, IN 46216317-485-6900 | www.context-design.comUTILITY AND AGENCY CONTACT LISTPLANNING AND ZONING:City of CarmelRachel Keesling (317) 571-2417URBAN FORESTRY:City of CarmelDaren Mindham (317) 571-2444ENGINEERING DEPARTMENT:City of CarmelAlex Jordan (317) 571-2441WATER:Citizens Energy GroupChris Kehl (317) 263-6418SEWER:Citizens Energy GroupChris Kehl (317) 263-6418ELECTRICITY:AES IndianaDan Davenport (317) 261-5497SOILS MAPN.T.S.UbaAUkbB2PROJECT LOCATIONPROJECT LOCATIONUcfA1.It is the Contractors responsibility to review and coordinate the work of all Sub-contractors, Trades and Suppliers withthe requirements of the contract before commencing construction, and to assure that all parties are aware of allrequirements, regardless of where the requirements occur in the contract documents, which might affect the work ofthat party.2.Existing conditions shown are from available record drawings and or visual field surveys. The Contractor shall verifyactual existing conditions at the site prior to beginning Work. The Contractor shall notify the Landscape Architect ofany discrepancies.3.The Contractor shall obtain all required permits and similar releases required for the construction and occupancy ofthe project. The contractor shall furnish copies of all such items to the Owner and Landscape Architect within 10 daysof receipt of such items. If permits are issued subject to certain conditions or revisions to the work or if permits aredelayed for any reason, the Contractor shall notify the owner and Landscape Architect.4.The Contractor shall take precautions to maintain and protect new work as well as existing systems and elementswhich are to remain. Any damage to such systems and elements shall be immediately repaired in a manneracceptable to the landscape architect. If satisfactory repairs cannot be made, the contractor shall replace systemsand elements with "like new" quality acceptable to the landscape architect. All repairs and replacement cost shall bethe financial responsibility of the Contractor.5.The Contractor is responsible to comply with applicable laws, codes, regulations and ordinances of the place (city,county, district and state) where the project is located - although such requirements may not be reflected by thesecontract documents.250 East 96th Street, Suite 580 | Indianapolis, IN 46240317-218-9560 | www.kimley-horn.com