HomeMy WebLinkAbout06060049 Sq. Ft.
k. All sidewalks and driveways
I. Sewer and water lines, septic system, (tanks & filed system) and/or well locations
m. Drainage flow arrows
n. All drainage swales and subsurface facilities (retention / detention areas, etc...)
o. Sump pump -- Show sump pump pitts) and discharge line locations
p. Geothermal heat pump discharge locations
*NOTE: If land is not within a platted subdivision, a legal description is required.
" --. . . ~.
FURTHER NOTES / NOTICES:
:>> CARMEL ZONING ORDINANCE Z-289, SECTION 29.04.02 (3): "The Director shall approve or deny the Improvement
Location Permit within five (S) working days of the receipt of the written application form and accompanying
materials. The Improvement Location Permit shall be issued when the proposed structure, improvement, or use and
its location conform in all respects to this ordinance."
:>>
,
:>> IN ADDmON TO THE ABOVE-USTED SUBMffiAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED
WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY
INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF
COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED.
:>> ADDmONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF
THE SUBMffiED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE. NATURE AND EXTENT
OF THE WORK PROPOSED AND TO DETERMINE COMPUANCE WITH ALL APPUCABLE CODES AND ORDINANCES.
SUBMffiAL OF ADDmONALL Y REQUESTED/REQUIRED INFORMATION, AFTER THE INmAL SUBMffiAL, WILL
EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW.
:>> THE OFFICE OF BUILDING & CODE ENFORCEMENTRECOGNIZES ANY ROOM/AREA DESIGNATED ON
CONSTRUCTION PLANS AS A "BONUS ROOM" TO BE UNOCCUPIABLE. UNFINISHED SPACE. IF AN AREA SO
LABELED IS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS
DETERMINED THAT AN UNFINISHED, "BONUS ROOM" AREA IS TO BECOME A FINISHED AREA AFTER THE ,
ISSUANCE OF THE PERMIT, THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING &
CODE ENFORCEMENT.
ALL CONSTRUCTION IS SUBJECT TO FIELD INSPECTION, AND SHOULD NOT BEGIN PRIOR TO THE
ISSUANCE OF THE BUILDING PERMIT. ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED,
INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION. Beginning prior to obtaining
a buiiding permit and/or proceeding with construction beyond the stage of a required inspection without approval
constitutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29.06.08.
BVILDING & CODE ENFORCEMENT; CITY OF CARMEL. One Civic 5'1'; Carmel, IN 46032. ph. (317) 571-2444.
I, the undersigned, certify that all of the above listed information is shown completely and accurately on the
attached plot or site plan(s), construction plans, and any other submitted documentation, submitted with the
building permit application to the City of Carmel/Clay Township Department of Community Services. I further'
certify that the joining of water supply piping shall be made with lead-free solders and fluxes. Failure to comply
will result in a replacement of the system. (Plumbing Code P-509-5) Under the penalties of Perjury (Indiana
Code 35-44-2-1), I also hereby affirm, under oath, that all of the information I have provided in the table below is
true and accurate, to the best of my knowiedge and belief, and that I have not knowingly or intentionally
provided or omitted any information that would tend to hide, obscure, or otherwise mislead the Dept. of
Community Services regarding the truth of the matters addressed therein.
BASEMENT 1 st Floor 2"' Floor 3rd Front '-Rear Total Sq. TOTA~
(Finished and Floor Porch POI ch-e.:. Ft. of
Unfinished) -5uMeom Garages
I \?s~ 'd- P\ 146L\ / l'6d ~'1. ,^\,rcJl) 'l6\-\ 1..\ '~lQ)
1\..0
~~
APPUCANT'S SIGNATURE
-t-0iL~ ~ ~c0\eU
NAME PRINTEO
(0 ks l()(p
DATE
S:PermitsjFORMS/RESIDENTIAL PROCEDURES
2of2
SINGLE FAMILY / TOWN HOME / TWO-FAMILY
PERMITTING PROCEDURES
New Structures, Additions, Remodels, & Accessory Structures
SUBMITTAL REQUIREMENTS:
1. COMPLETED RESIDENTIAL IMPROVEMENT LOCATION PERMIT APPLICATION, which also
includes the reverse side of this procedure sheet. These can be picked up at our office, or you can
request one to be mailed to you. These are 3-part, carbon forms. A sample of this document appears on our
website at: www.carmel.in.aov through the Dept. of Community Services link, in the Building & Code Enforcement
section. (A copy of this procedure sheet can also be found in that section.)
2. CONSTRUCTION PLANS:
a. NEW STRUCTURES, TWO (2) SETS OF PLANS MUST BE SUBMffiED* AND SHOULD INCLUDE:
I. Building Elevations (from all four sides)
il. Foundation plan
ill. Floor plan
iv. Typical wall section
(All cross-sections must be properly detailed and labeled. At least one cross-section
must show R-values of building materials, listed and totaled out to the side, to ensure
compliance with the Indiana Energy Codes: IfminimumR-values are not met on cross-
section, an Energy Code Compliance Worksheet must be completed.
V. If Manufactured Trusses are used, truss diagrams must be included with the building
plans, for all trusses being used. Truss diagrams must be STAMPED with the seal of the
registered architect or engineer who is responsible for that design. ONLY Indiana
registrations will be recognized.
*NOTE: The first building of a Town Home project or a Two-Family new structure which is part of an incoming
project that involves the construction of multiple buildings under a master permitting system, have additional
submittal requirements, and will require a Pre-Submittal meeting. Please contact Sarah Lillard at (317) 571-2475
or slillard@carmel.in.govto obtain further information regarding this procedure and a list of requirements.
b. ADDITIONS. REMODELS. or ACCESSORY STRUCTURES. TWO (2) SETS OF PLANS MUST
BE SUBMITTED AND SHOULD INCLUDE:
I. Building Elevations from a minimum of two (2) sides**
ii. Items listed under a. il. - a. v. above.**
**NOTE: For interior remodels, Building Elevations will not be required and a foundation plan may not be
required, depending on the nature of the remodel.
3. SEWER AND WATER PERMITS FOR NEW STRUCTURES. You will need to determine which utility
company provides services to your construction site, and provide a copy of the utility permit. HOWEVER, we do not
require copies of your Indianapolis Water permit.
a. Carmel Utilities: A sewer and/or water permit should be purchased at the office of Building & Code
Enforcement, prior to or at the time you are submitting your building permit application.
b. Ciav Townshio Reoional Waste District; (317) B44-9200.
c. Indianaoolis Water Comoanv (or Veolia Water); (317) 639-1501.
d. Hamilton County Health Deot. (for Well or Septic permits); (317) 776-B500
4. ONE (1) COPY OF THE SUBDIVISION CONSTRUCTION/DEVELOPMENT PLAN. Your plan should
show the lot where work is to occur, and the surrounding lots. You do NOT need to provide plans for the
entire subdivision. Sometimes referred to as an "as-built," this plan should show the lot in question, the
surrounding lots, the building pad or building pad elevation, and the ground topography lines.
5. TWO (2) COPIES OF A SITE (OR PLOT) PLAN SHOWING THE FOLLOWING REQUIRED
INFORMATION:
Name and address of designer of plan, with date
Name and address of property owner
Lot number and subdivision name, or applicable general description
Lot drawn to scale-all dimensions
Lot / Property lines
Minimum front building setback line, per approved development plan (include all front yard)
All roads, alleys, rights-of-way, etc...
Any applicable flood plain area (Certificate of Elevation, if necessary)
I. Building pad elevation and lot corner eievations
j. All accessory buildings / structures - existing or proposed
***Continued on reverse...
. .' ....~ ~~.
....,.!~~,
,."r..:-
-. .
'':'\
S:Permits/FORMS/RESIDENTIAL PROCEDURES
10f2