Loading...
HomeMy WebLinkAboutCorrespondence '-D u Johnson, Sue E From: Sent: To: Stahl, Gayle H Thursday, December 06,200112:33 PM Akers, William P; Candy Feltner; Gary Hoyt; John South; Jon Dobo; Laurence Lillig; Ramona Hancock; Scott Brewer; Steve Broerman; Steve Cash; Sue Ellen Kendall, Jeff A; Lillard, Sarah N Pre-Submittal for The Dental Office Cc: Subject: The Dept. of Community Service, Building & Code Enforcement division, has received a request to schedule a pre-submittal meeting for the purpose of obtaining a building permit. Project: The Dental Office (aka CH Land Office Building) @ 13331 Meridian Corners Blvd. Meeting Date: Tuesday, Dec. 11 2001 Time: 2pm Related Planning & Zoning docket numbe~nd TAC October 2001 Representative: Tim Atkinson, RDJ Custom Homes If there are concerns that might affect the issuance of this permit, please REPL Y TO ALL on this e-mail. 1 w u Johnson, Sue E From: Sent: To: Steven Cash [stC@co.hamilton.in.us] Thursday, December 06, 2001 3:35 PM ghoyt@ci.carmel.in.us; GStahl@ci.carmel.in.us; jdobosiewicz@ci.carmel.in.us; IIillig@ci.carmel.in.us; rhancock@ci.carmel.in.us; sbrewer@cLcarmel.in.us; sjohnson@cLcarmel.in.us; WAkers@ci.carmel.in.us; Steve Broermann; candy. feltner@ctrwd.org; john-south@iaswcd.org JKendall@cLcarmel.in.us; slillard@ci.carmel.in.us Re: Pre-Submittal for The Dental Office Cc: Subject: The Surveyor's Office TAC comments need to be addressed. >>> "Stahl, Gayle H" <GStahl@cLcarmel.in.us> 12/06/01 12:33PM >>> The Dept. of Community Service, Building & Code Enforcement division, has received a request to schedule a pre-submittal meeting for the purpose of obtaining a building permit. Project: The Dental Office (aka CH Land Office Building) @ 13331 Meridian Corners Blvd. Meeting Date: Tuesday, Dec. 11 2001 Time: 2pm Related Planning & Zoning docket numbers: 113-01 ADLS and T AC October 2001 Representative: Tim Atkinson, RDJ Custom Homes If there are concerns that might affect the issuance of this permit, please REPLY TO ALL on this e-mail. 1 w o Johnson, Sue E From: Sent: To: Hoyt, Gary A Thursday, December 06, 2001 1 :05 PM Stahl, Gayle H; Akers, William P; 'Candy Feltner'; Hoyt, Gary A; 'John South'; Dobosiewicz, Jon C; Lillig, Laurence M; Hancock, Ramona B; Brewer, Scott I; 'Steve Broerman'; 'Steve Cash'; Johnson, Sue E Kendall, Jeff A; Lillard, Sarah N RE: Pre-Submittal for The Dental Office Cc: Subject: The fire department requested a Knox Box for the Dentist office on Oct. 17th TAC. meeting. Gary A. Hoyt, Rre Marshal Carmel Rre Prevention Bureau (317) 571-2600 -Original Message- From: Stahl, Gayle H Sent: Thursday, December 06,2001 12:33 PM To: Akers, William P; Candy Feltner; Gary Hoyt; John South; Jon 0000; Laurence Lillig; Ramona Hancock; Scott Brewer; Steve Broerman; Steve Cash; Sue Ellen Cc: Kendall, Jeff A; Lillard, Sarah N Subject: Pre-Submittal for The Dental Office The Dept. of Community Service, Building & Code Enforcement division, has received a request to schedule a pre-submittal meeting for the purpose of obtaining a building permit. Project: The Dental Office (aka CH Land Office Building) @ 13331 Meridian Comers Blvd. Meeting Date: Tuesday, Dec. 11 2001 Time: 2pm Related Planning & Zoning docket numbers: 113-01 ADLS and TAC October 2001 Representative: Tim Atkinson, RDJ Custom Homes If there are concerns that miqht affect the issuance of this permit, please REPL Y TO ALL on this e-mail. 1 w (;) Johnson, Sue E From: Sent: To: Candy Feltner [Candy.Feltner@ctrwd.org] Thursday, December 06, 2001 2:06 PM ghoyt@ci.carmel.in.us; GStahl@ci.carmel.in.us; jdobosiewicz@ci.carmel.in.us; IIillig@cLcarmel.in.us; rhancock@ci.carmel.in.us; sbrewer@cLcarmel.in.us; sjohnson@ci.carmel.in.us; WAkers@cLcarmel.in.us; sjb@co.hamilton.in.us; stc@co.hamilton.in.us; john-south@iaswcd.org JKendall@cLcarmel.in.us; slillard@ci.carmel.in.us Re: Pre-Submittal for The Dental Office Cc: Subject: The District has issued a conditional permit. Candy Feltner Customer Service Manager >>> "Stahl, Gayle H" <GStahl@cLcarmel.in.us> 12/06/01 12:33PM >>> The Dept. of Community Service, Building & Code Enforcement division, has received a request to schedule a pre-submittal meeting for the purpose of obtaining a building permit. Project: The Dental Office (aka CH Land Office Building) @ 13331 Meridian Corners Blvd. Meeting Date: Tuesday, Dec. 11 2001 Time: 2pm Related Planning & Zoning docket numbers: 113-01 ADLS and T AC October 2001 Representative: Tim Atkinson, RDJ Custom Homes If there are concerns that might affect the issuance of this permit, please REPLY TO ALL on this e-mail. 1 o o Transmittal Schneider Historic Fort Harrison. 8901 Otis Avenue Indianapolis, IN 46216-1037 . Telephone: 317/826-7100 . 800/898-0332 . www.schneidercorp.com TO: Jon Dobosiewicz City of Carmel Dept. of Community Services One Civic Square Carmel, IN 46032 FROM: Matt Oman FAX: 826-7200 DIRECT DIAL: 826-7271 WE ARE SENDING YOU: D Attached Via: D Mail D Fed Ex DATE: JOB#: PROJECT: RE: 11-21-01 3882.001 Dental Office Revised Landscape Plan FAX#: NUMBER OF PAGES: TELEPHONE #: 571-2426 571-2417 D UPS IZI Courier D Pick Up D Other D Fax # Copies Date Description 1 11-20-01 24"x36" Revised Site Construction Plans THE ABOVE ARE TRANSMITTED as checked below: D For approval D As requested D FOR BIDS DUE IZI For your use 0 For review and comment D Other REMARKS: COPY TO: File If enclosures are not as noted, kindly notify us at once. Offices in Indianapolis, Avon, Carmel, and Lafayette, Indiana l\indycis~obsI3k\38821001 ldocsltransmitlalsldobosiewicz1121 01.doc " <' ... .W u CITY OF CARMEL Department of Community Services One CMc Square Carmel, IN 4C032 (317) 571.2417 Fax: (317) 571-2426 Fax To: .lJw~ ~O+S . Fax: 513 -' 53@5 From: Re: E]2 1 c., 1Je(J+. -e.p00+ Pages: <; Date: 11. 16.0/ Phone: cc: o Urgent 0 For Review 0 P.lease Comment 0 Please Reply C1 Please Recycle ~~ 1<.~~ ,\ ~- (:)\ ~L- S .' C.~L~ S" 0 - 0 I c. A ~ V I cn1> I'L~ 6,rA&I'T"'r 51 - 01 ~L..s )'6 <a -00 "Z.. ~i=PA u \IV' I -:--f i\..,.~ U) ~~ Schneider November 15, 2001 Scott Brewer City of Carmel, Urban Forester Department of Community Services One Civic Square Carmel, IN 46032 RE: Dental Office Project TSC Job #3882.001 Dear Mr. Brewer: w /\\"'<5~1 ' /6, \ \i'~2 __Li.;~"., tl: ~tCr ~<(~..).\.' (.:J .~f(J/ll,1ytb \',::;" /.--! II ~ - I \(~:'. bO(tn ~t7'?1 /.i.~.. './-,1 \ /.-.., '-'" , \:J, 1",-/ / "} '-'" / .:",." ~ '~.~".~~-) ~._" This letter will detail actions we have taken in response to your October 24 review letter. Please also find a revised landscape plan indicating these changes. The following is our response to the specific review comments: 1. The note "Guy wires, hose and stakes to be removed one year after planting" has been added to each tree planting detail. 2. Note 19 has been added to the General Notes stating that "All installed plantings shall be appropriately watered for a minimum period of one year to allow for their establishment." 3. The note "Root flares to be planted at or slightly above grade" has been added to each planting detail. 4. Shade trees have been added along both sides of the entrance road. Please contact me with any questions regarding this submittal. Respectfully, Matthew S. Oman, RLA Project Coordinator s:\3k\3781\OO1\docs\conespondencelbrewer111501.doc ~ o~c S--G THE SCHNEIDER CORPORATION Historic Fort Harrison 8901 Otis Avenue Indianapolis, Indiana 46216-1037 317-826-7100 Toll free 800-898-0332 Fax 317-826-7200 www.schneidercorp.com , u u " CITY OF CARMEL Department of Community Services One CMc Square Cannel, IN oI(S:l32 (317) 571.2417 Fax: (317) 571.2426 ,Fax Ta: ~~~ \~i~L. Fax: -S I~-S~~S From: ~ll"-'~ ~ Pages: Phone: Date: '\-f::)\-~r ReI ~~~ ~~ ~\'\O'\'''"'',.... eel . ~....~,. '"'0-, tl"'9o ...., Cl Urgent Cl For-Review [J P.lease Comment 0 Please Reply a Please Recycle ~ ~\-~~ r&; ~..'Ci. : .Q.~ '-~~ ~~,~ ~~~ , \ \?-ct:) , ~~L..S ~) C. _ L. u u CITY OF CARMEL DEPARTMENT OF COMMUNITY SERVICES Division of Planning & Zoning TRANSMITTAL Date: 1 November 2001 To: E. Davis Coots of Coots Henke & Wheeler fax: 317/573-5385 ph. 317.571.2417 fax. 317.571.2426 From: Laurence M. Lillig, Jr. Planning Administrator Department of Community Services One Civic Square Carmel, IN 46032 Re: Victory Beauty Systems (50-01 CA & 51-01 ADLS Amend) 1437 Keystone Way East Mr. Coots, On Thursday, October 25, 2001, I e-mailed Wanda Taylor of your office a copy of the Department's proposed Commitments for the aforementioned project. I hope you have had time to review the document in the interim. If you have any comments or concerns regarding the document, please contact either myself or Jon Dobosiewicz. I have also attached a hard copy of that document for your use. In that same e-mail, I also requested that Ms. Taylor apprise you of the Department's need for certain documentation relating to this site. The ftrst is a copy of the most recently recorded deed to the property. The second was a copy of the previously recorded Commitments for this site with Book, Page and Instrument Number information. Please provide these documents no later than the Tuesday, November 6, 2001, meeting of the Special Study Committee. ted__m~tter, ~11as-asked-pte-toC7reI;n4l(LY-Qu to~ontact him as soon as __'- _ ~C~C_prQj~~ts~ Th~r~.jsJ)~~~d~~ ----~ --.---- --~ --.-- --- e'o If you have questions regarding these comments please contact me at (317) 571-2417. ___L_n To: W~~ Fax: S~ ~ :5Q. ~ -Fax Phone: Q) o CITY OF CARMEL Department of Community Services One CMc square Carmel, IN 4E032 (317) 571-2417 Fax: (317) 571.2426 From: -~~~ ~ y. I <S:) . ';;).. ~ -0 , . Pages: Date: Re: \\-LI ~~n.''-''~~&:;\I~ CCI [J Urgent [J For Review [J Please Comment tJ Please Reply tJ Please Recycle ?\--e. ~~. ~&.:;; tt ~~~ ~D. \ ~8-cc~; ~'* \)AU.~ ~f!"'-(:)-St; (~l ) ~~rr- ~~. \\~-Q\ ~~~', ~~ ,--..~~ O~'C-..Ar" ~~'"'-~.~~ (-~~) . 1- 4:~ W Q City of Carmel DEPT. OF COMMUNITY SERVICES October 24,2001 Matt Oman Schneider Corporation 8901 Otis Avenue Indianapolis, IN 46216-1037 RE: Landscape Plan Review for CH Land, Inc and CMC Properties, Inc Dear Matt: As during the TAC review on October 17,2001, and our subsequent phone conversation, my comments on these two properties are as follows: CH Land Inc (Dental Office) 1. Planting Notes: a note shall be included which requires the removal of all stakes and wires within one year. A note shall also be included that details that amount and manner by which installed plants receive enough water for their establishment. 2. Planting Details: on each detail a note shall be added that requires the root flares of the plant material to be planted at or slightly above grade level. 3. Along the entrance road through the property to the CMC Inc. site, both sides of the road should be landscaped at this time, including large maturing street trees. Attached is a list of recommended street trees. C~CPropertiesInc 1. This project falls under the U. S. 31 Highway Overlay Guidelines. Foundation p1antings are required for the buildings proposed, and plans for such need to be submitted for review. Also planting strips with landscaping are required around the parking lot perimeter in addition to the site perimeter buffering requirements, as per Appendix A of the Carmel/Clay Zoning Ordinance. In areas along the parking lot perimeter, where other landscape requirements intersect the parking lot perimeter- planting strip, the parking lot perimeter requirement can be waived. This waiver only includes buildings being constructed as part of the current project and submittal. 2. Junipers and currants are both listed as species to be planted on the project. Both species are alternate hosts of a problematic fungal disease called Rust. There is a high chance that both species would become infected and pass the disease back and ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 .. ~ Q forth between each other. It is recommended that one or the other species be eliminated from this planting plan. 4. Planting Notes: a note shall be included which requires the removal of all stakes and wires within one year. A note shall also be included that details that amount and manner by which installed plants receive enough water for their establishment. 5. Planting Details: on each detail a note shall be added that requires the root flares of the plant material to be planted at or slightly above grade level. 6. The proposed detention pond should be landscaped with appropriate trees, shrubs, and wetland plants. 7. Any and all sidewalks, paths, patios, and plazas need to be shown on the plans as well. These changes need to be made in writing and by amended plans. If you have any additional questions, please contact me by phone (317) 571-2478, or via email at Sbrewer@ci.carmel.in.us. Sincerely, ..-..:s;~..&/L(Zive/L.. Scott Brewer Urban Forester, City of Carmel DOCS CC: E. Davis Coots, Coots, Henke, and Wheeler Jon Dobosiewicz, DOCS ___1______ (J) ~ ~~/~ .Oif~~ - 0 - """" JS ""Sl~ ~ c.tI\'\C- /lttt.,. Q JDp7k . c....c f'fllfC..... C+1 ~ ---rQ ~, ~ hl.... ,I ~.I~ · II1Y"'" n ~ p- ~~~S ~ - .- <:A. $"7" n-:- '7'!> - u ~I ~'f.~ '. ,,'~{Of c~ff>" "\"~~";:\ '(j U~<" L If 'I :.\,:,J '~ \ I;,',' \0-~ ~i(:' ..1?/(...- co' ,.' ."'.---''ON....!'' Q) (j City of Carmel DEPARTMENT OF ENGINEERING October 16, 2001 Mr. E. Davis Coots Coots, Henke & Wheeler 255 East Cannel Drive Carmel, IN 46032 RE: Dental Office Building/Meridian Corners Blvd. - Project Review #2 Dear Mr. Coots: We have reviewed the subject drawing and revisions. It appears that some of the issues pointed out by the City of Carmel Engineering Dept. on the plans received July 24, 2001 have been addressed. However, we did not receive a letter from you or The Schneider Corporation summarizing the plan changes that where made in response to the comments in the first Project Review Letter from the City of Carmel Engineering Dept. dated Sept. 18,2001. We would like to have a written response to the comments made in the Sept. 18, 20011etter as well as the following additional comments: 1. We would like to see some details on the Meridian Corners Blvd. entrance and median work. A right-of-way asphalt section detail should also be provided within this set of plans. 2. Will the new entrance affect any part of the existing median? 3. The "Future Right Turn Lane" area should be crosshatched or delineated and detailed as to how and when this work will occur. 4. Signage should be indicated in the area of the entrance to safely guide traffic through entrance and exit movements. For example: "Keep Right" sign in median and a "Do Not Enter" sign at the exit from the Park Meadows Subdivision. 5. In addition to existing edge of pavement grades, spot elevations or flowline elevations should be provided at the any swale or grass area within the right-of-way. 6. Note #3 on sheet C101 should be revised to read "Any part ofthe sanitary or storm sewer trenches rwming under paved areas or within 5 feet of paved City streets to be backfilled with granular material." 7. The easterly limits of construction of the entrance roadway should be shown. 8. Where does the drainage go? The structures on the plans have not been nwnbered to correspond with the Storm Structure Schedule. From the Storm Structure Schedule on sheet C102 it appears that the drainage is being released into the existing storm sewer to the west along Meridian Corners Blvd. If this is the case, the existing pipe and structures should be shown and sizes indicated. Additionally, existing pipe flow should be determined so that it can be verified exactly what added flow the existing system will handle. 9. It appears that no detention is being provided for this site. The calculations indicate that the lack of detention on the Dentist Office site is balanced by a detention volume and release rate that is more conservative than required on the CMC site. The City can't approve this "credit" method if the downstream facilities can't handle additional runoff. 10. If storm drainage from this site is going to be discharged onto the site to the south to drain to the retention facility on the CMC Development to the east, the swale that will direct this flow should be detailed. If it is not going to drain to the south, what is the purpose of the pipe stub out? 11. Details should be provided on how the construction of this development will be phased in relationship to the CMC Development. ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571.2441 .._ . I J.~ .\ o Q Mr. E. Davis Coots October 16, 2001 Page 2 The City of Cannel Engineering Department feels that it would be beneficial to have a meeting with the Design Engineer (The Schneider Corp.) to discuss the City's concerns and facilitate any necessary design changes in a timely manner. Please contact Kate Weese, City Engineer, or me at 571-2441 to schedule a convenient meeting date and time. Sincerely, 7f~~ Michael T. McBride Assistant City Engineer cc: M. Kate Weese, City Engineer Dick Hill, Assistant Director Laurence Lillig, Department of Community Services Jon Dobosiewizc, Department of Community Services Steve Cash, Hamilton County Surveyor's Office Matt Oman, The Sclmeider Corporation ~ ........-- r-4!1 ...~".;,,,.- - W I <:J:1---1-~~~DE!Ej cJ1;_du,1 ~.~ I I - I . D~ ~~ -r:3> I , ~ 4\,"- o ..... ~ 10 . i ... .. gt:>~ 1..1I~Ds'1!p~_~ ~H_<<=- ! . "~ ~ NbJ: WI7Jt./I-J .3J. ~__. . 32.o'D .$..c. -, b~~ l>EELU:; ~ ~_fi I CAe. ,c:::~~1!L._6_ I W'1h,.",~_ rn"~71-. , ....: L_ 'PAvL,.. - ~Co~ _"'~_I_~~___ . -~ I j, ~ - ~~~_ IM.b_LK~W~ . ~. '-~.s: e:dp,"'~_~_~()(l6}(_-:tt>_~~ -- .~-~-~ I ~. ?Avt, - WIIJ~()~ __~tr\jtJVM. c:.,.'-~ ~. e-)C~~ 1--- L~et\9~C_~._ f-' ~.~L...1>I!.-___.~']):.. ;1___6. ~ b\~nN_~ ...._~- -- - - \ . . ~-r\C>>.) _~~'- - .s~: ~~----------------- ~rp t7D&~~ _~ I-------~-~ ~._-----_..---+_..~.._-----~-- ."- ' - .- -_._- - I u Icf6/o1 ~ ~ f'~S'" -f!ffl./I) ~S---- ..--.----.-------- ~__u~r_s.t..I,~~ . ~.Y~'-S-H~~~--=-= ~_~_c._f! ". HJ J!:t!f:. ~ (L) u City of Carmel Fire Department Headquarters 2 CIVIC SQUARE CARMEL, INDIANA 46032 317/571.2600 ~\. 'R~LD V '...:<~ / ~ ,,( ~~ </ , ~ '- J ~~<<)~ '~;'jl \~\ ~<$J ~. I \:-:\ ~~ 'i;0\.;S ~> ~ .". E. Davis Coots Coots, Henke and Wheeler 255 East Carmel Dr. Carmel, IN 46032 RE: Proposed Dental Office at 131st St. & US 31 LETTER OF APPROVAL The undersigned has reviewed the proposed plans for Proposed Dental Office at 131 sl St. & US 31 and has approved the plans subject to the following: 1. We are requesting that a Knox Box be installed on the building for fire department emergency access. An application for this secure box can be obtained through our office. 2. It appears that the building will be sprinklered. A meeting will need to be set up for the location of the fire department connection. We are also requiring Knox fire department connection caps for the fire department connection. 3. We are requesting an outside entrance to the riser room for our access. 4. 5. 6. Please respond to the above noted condition(s) in writing and submit to our office prior to the scheduled Technical Advisory Meeting for this project. Date: October 3. 2001 By: Gary Hoyt, Fire Marshal Carmel Fire Department Fire Prevention Saves Lives and Property v w ;; Johnson, Sue E From: Sent: To: Jay Alley [Jay@ctrwd.org] Monday, October 15,200110:51 AM rfarrand@ccs.k12.in.us; DHiII@cLcarmel.in.us; DJenkins@ci.carmel.in.us; Ghoyt@ci.carmel.in.us; JKendall@ci.carmel.in.us; JLester@cLcarmel.in.us; JPFoster@ci.carmel.in.us; MFogarty@ci.carmel.in.us; ParksPrograms@ci.carmel.in.us; PPace@cLcarmel.in.us; PWilliams@ci.carmel.in.us; RAuler@ci.carmel.in.us; SJohnson@ci.carmel.in.us; WAkers@ci.carmel.in.us; rmcclain@cinergy.com; sprater@cmsenergy.com; sjb@co.hamilton.in.us; stc@co.hamilton.in.us; john- south@iaswcd.org; rahendricks@in-hc-Iepc.org; pamela. waggoner@iwcr.com; jeff.s. rice@msg.ameritech.com; cshupperd@vectren.com JSmeltzer@boselaw.com; Candy Feltner; rdoster@schneidercorp.com; rlauritsen@slmaco.com Re: Technical Advisory Committee Cc: Subject: Hello everyone: Following are CTRWD comments on the agenda items effecting our sanitary sewers or service area for the October 17 TAC meeting. Please feel free to copy and distribute this email or attach it to your meeting minutes. CMC & CH Land Properties To follow on our comments from last month's TAC meeting, the District has reviewed the plans and notes that the sewer connection is proposed through core drilling a manhole. District specifications need to be added to the plans and special permit conditions will apply for the core drill. Building permits should NOT be issued unless the District has issued its connection permit. Claybourne Estates The District has reviewed the plans and has been in discussions with the developer about sanitary sewer service. An offsite sewer extension, the location of which is being negotiated with the Hamilton County Highway Department, will be needed to serve this property. construction plans would still need to be reviewed by the District's consulting engineers. Once that review is complete, the plans will be ready to be submitted by the District to IDEM for State approval along with the District's plans for the offsite sewer extension. Papay Subdivision (136th Street East of Towne Road) The District has not received any plans for this proposed subdivision. Please advise the applicant to contact the District and provide plans for our review. The Sanctuary (1 06th & Crooked Stick Lane) The District has not received any plans for this proposed subdivision. Please advise the applicant to contact the District and provide plans for our review. Carpenter GMAC (790 West 122nd Street) The District has not received any plans for this proposed development plan amendment. Please advise the applicant to contact the District and provide plans for our review. UST A PUD (96th & Monon Greenway) Since corresponding with the applicant's attorneys in April and May 2001, the District has received no additional information on this project. The District has not received any construction plans for this proposed development. Please advise the applicant to contact the District and provide plans for our review. J. C. Sipe Jewelers (3000 East 96th Street) Please have the applicant contact the District to discuss the proposed sanitary sewer connection. The plans we received 1 ; Sh~w a connection directly to the s~r main along 96th Street which will not be Qwed since this is a large interceptor and is under the pavement of 96th Street. Connection via core drill to a manhole along Day Drive to the east is the preferred route for servicing this property. Special permit conditions will apply for the core drill and for work in the road right-of-way. Building permits should NOT be issued unless the District has issued its connection permit. We are a member of the IUPPS underground locate network so call 1-800-382-5544 before you dig! Please feel free to contact me if you have questions or need additional information. Please check our website for construction specification and permit information and let us know if there is other information we can provide which would be useful. Thanks! Jay W. Alley, Utility Manager Clay Township Regional Waste District Hamilton County, IN, USA http://www.ctrwd.org/ 317-844-9200 (phone) 317-844-9203 (fax) >>> "Johnson, Sue E" <SJohnson@cLcarmel.in.us> 10/05/01 11 :26AM >>> Please see attached September T AC minutes and October T AC agenda. <<T AC2001 sep.doc>> <<T AC2001-1 017 .rtf>> 2 18/12/2881 11:21 317-776-1181 HAMIL TON CO USDA_, . PAGE 82 11 fJ8 South 9,,, $trett Nobluvilk, I1V"4606ti.3745 Ph. (3"17) 773-1432 Fax (317) 776-1101 Drainage, Broslon and Sediment Control Plan Technical Review and Comment ProjectName: .DSU'riU. ()Jl:FICE tJ. /3J.,r'l Subinitt.edBy: J(4/SEC L,aNQ CbttP, ./ 1Z,'lbl i>4aQ tle.r;e'P~AM Sr. CAIeH16L. I#J ~LC3e /'Ie~ I p14~ sr. Hr. Lt:JJJelZr f)o.sreJ/!. . .s~NAle/.o~ CtJl2? '8101 Dr/.5 AuE. TI-IDIAAJI!f!!JblJ, :r~ I.//'ZI , RoviewOdBy. ~bN# 8. _~t)T# Plan Review Procedure: Site Visit Date: Locatioo: Leglll Description: S ,t:. Z if, Towoahip: ~ 11,1..1. Plan Review Date: 10'" Z .. () / Range: "3 e , . Civil ToWnship: t: LAy' The tedinlcid review tmd comments are intended to evaluate the C{)mpletenim Of the ~Iton QIfd sedilMtZl control planft1r. thspl'OJed. The erollon aM sediment control plan stIbmftted was not reviewed/or t~ adeqru:zcy of the eng/ttM:1-inq da~f1L .All praclices ~1lCluded in tlu: plan, as well a:r thos~ rec(Jm,;,~ in 1M. comments should be eval7JJ:lttld Q.f to dzeIr fllQ.flbl~1ty by a f1!Jalified Individual with structural practkfZS tkiign<<J by (I qualified e?gin~ The plem has not been rr1/e:wed for local, stale 01' federal pentltts th(lt may be retJUl1'ed to proc~ with this ,.' _, , p1'oject.. .A.dilJltoMi f71[011nation. f1rcludlng design cak:u/(lt;OtlS may be requested to ftu1her evaluate theerciSion sediment co"".ol plan.. . k ./ ' ~ . . . L-~ y~ ne erosion and ~Qt COtltroj plaIlhas ~ee.n reviewed. and it,hllS been determined that the pJ#ii:l' '@~61!)\ " \~~\ '. ' ,,~.~~ )(' Satisfies the minimum requirements, and intent of 327IAC 15.5 (Rule 5). NotificatioD ~i~l!~e fo~ard~\JS '" lhe IndIaDa Depanmeo' of BnVirollmtllWMan8g<minL \~,_ . D' Refer to the comments section for additional information. <:ji o ~ Does not sa~fY the minimum requirements and intent of 327IAC 15-5 (,Rule 5); deficiencies are noted in the checkliSt and in the comments section. Deficiencies constitute potential violation of the nIle and must b~ adequately addressed for eamplianee. The information necessary to satisfy the deficiencies must be submitted: . Please address revisions to the revjewer. Pr:opv,imple11l41lttltion of the. erosion tll1d st1liime/". control plan and InspectlolV'ofthe co~'i()n site by tlie developer or a npruent(ltive are 1'leCllS$flry to minimize off-site sedimentation. The developer should be: aware that urtforeseen constrllc#on acffvities and weather conditlo1l$ may effect the: performQl1Cfl of a practice or the IUwiol1 and sediment control plan. me pia" must be a flexible documen.t, with prC1l1isiofU to modify or subsrilUttz practices as necessary. (;~ : C. A elf .L Dot!.s $u&u.Yt>~ rO/li11 fl4" ,. -lJI/1212001 11 : 21 317-776-1-101 HAMILTON CO USDA,,-c PAGE 06 Projea~ame: ~USIUfE.SS PAR.I<. SubiD~BY: /~. QAII'S e...e~ CIJ.".$ "1IIJ1t~. tJ"'l!~ z.rs- E. C-AIl"6L DR. t!.AJUtSL., 'I':J .,t.()3~ 1108 South 9th Strut , Nobluvil'~ IN4606o:.174S b. ,~ . r ')0-' (2-:"':01 Ph. (3'17) 773-1432 l'J.j ~~\y;?/ ~\ Fax (317) 776.1101 ~' o~rt:j-? ~ -- ~ '\ .f} ~'\ s Drainage, Erosion and Sediment Control PI~"v <\)\J Tecbniea1Review and Comui~\ ~"'\~ . ,..... ~.J, '. V /.~>. ." '-..b, I , CONSER\1\TION DISTRICT :rbllN ZAN"" SeHAlllbJ!~ dMp. 8ftJJ Oris AUIf~IJ" .l:,.,DIAIJA. ~ ::zi.t "41.1' lte\'iewtdB)': :r6l-l# '13. Su7'1Y" Plan RevieW ProcedW'e: Site Visit Date: Location: (3/.J. .US' 3/ ' Legal Desqiption: . ~~.I"'. Z t. Township: 18 #. Plan Review Date: /Q~~-CI Range: :SE Civil Towmhip: e t.A " Ths tstJinicizI review tZnI/ commenb are intended to evaluate tM compld~ of the. !ZIYMiOTl tmJ sediment control p/imfor t1ieptQ}ect 'lhe uoslon and sediment control plQ1f IUbmllted was 1Iot reviewed for the ad8qvocy of the englneet'lltt da~gn. All practices ~clrvJed inlhe plan, as well Q3 those rel:ommimJe4tn the commehts should he evalJlllltea as to iMir feasibility 'by a qualified individual with structural practicu designed by a qualified engl12Ur. . . The pkrn h4s not bun rmewed/or JOt;al, slale or federal permits ihat may be reqrdred to proceed with this j.proJect. A.d4ltiontJ/. trifonnatfoh, including design calculations may 'be requated to ftmher evalllClle the erosion ledfm4nt (;()fl!rtrl plfUL' , " . The etosiOI1 and sediment OOIl1rO~ plan 'has been reviewed and it.has been determined that the plan: o Satisfies tile minimWl1 requirements.an~ intent of327IAC 15.5 (.Rule S). Notification will be !orwmtled to the lndilUm Department of Environmental'Management : 0 . . Refer to the cominents section for additional infonnation. g Does not sa~f:Y the' minimum ~irelXlents and intent of 32.7IA C 1 S-S (Rule 5): deficiencies are noted in the ebec:kliSt lUld in the comments sectio~. Deficlencies.constitute potential 'Violation of the rUle and must b~ adequately addressed for <:ompliancc. The information necessary to satisfy the defi~iencies must be submitted: . please address revisions to the reviewer. , Proper.implsmrmtation of tits erosion and Sediml!/~. control plan and inspect/onTolllrs constrUctton site by tne developei' or a representative are necusary 10 mifli",ize oJ/.site sedimenlation. The developeI'" should he aware that unforeseen C01JSl1'llctton activities anti wealher conditions may effect the performance of 0 practice or'the erosi()n and sediment control plOl'l.. The plan mu.rl be ajlexibie document. with prov/sioru to modifY or substiJute . pt~/icu t:I3 necessary. U1/12/2BB1 11: 21 317-77Gc1,lB1 . PROJJ!CT: "He. 8""1iI"~ PAfJ( Pap 2 of 3 Yes No ,. .0 'II (] .~ 0 '(1 0 . 0 Yes No o Ii 2A " 0 28 ~ 0 2C II b 'm ,8 0 HI 0 :11 0 & 0 " .0 Yes No 0 II 0 II Yes No 0' I. 4A lllI 0 .. 0 II 4C ,II 0 4D JJ 0 4& II 0 41' ID 0' 4G III 0 41I UII 0 41 o If'" 0 4J liD 0 41( HAMILTON CO USD'b PAGE 137 /~--::-- Ol , . . -0'~~' . J ARE THE FOLLoWING ITEMS ADEQUATELY ADDBESSltD OM THE p~~j> (.4Il Pft#u MIflIt In" .4pproprUIU. ~ &:tIJa, ",." Nol1la AtHHI) ~(~.! '~ ~~ ~ (lieM8 tlltlIlInI Nor Applbble to tAl8 ho)e<< tll'e ~ b1 NA) ~ ,g,r{j$ C\ ~ . . _ ~'V \,'" PROmCl INFORMATION . f~\ ~ <V\J\.)S tA . Project LocatiOD M" (Show ~ IPI relJl1ion to orhD'tD"fItU of the CONnty) \>\.::. lB NarrattveDaerlblDgtbeNaturellldParposeofdaeProJett ". . , Ie ~ Of'fIaoDed .dlor EDttiq ~ utilities, StnIctJIres. mpways, etc. ID ,Lot IIDdlor BulldiDg LocatiODl IE LaDduse 01 AdJaceat Area (Show the Bntire Up6t1W1m WtIt8l'.tMd fltfJi Adjacent Amu Wltldn JOO Feet olthe Properl)I Ltna) 21: 21' 2G TOPOGRAPHIC, DRAINAGE, AND GENERAL SITE F'EA'tURES E:dsdDg Vegetadon, (IdttntIh.,J .odin" ) IAcatlon and Name of All WetlaadJ, Lakes u.d Water Counel OD and A'CQ1ICeD.t to the Site 100 Year Floodplabas, lI100dway FriDges, and Jl'loodway. (J{ote (Nons) , Soik lDformmoo (If hydric 101l8 anr prest1llt. It I, tM tWpOftIlbllity oftJut OWII61'IJevcop.. to lrw&Ytigat4,tJre e;d,tBnf:e of wetlanrh and tQ obtlll" JWIIIlD fram thB llJ11IP'OJIrltlt, ~ent a,...) ~~ IIld PIaIUled ColltoUn lit an Interval Appropriate to IBdlcate DraiDagt Pattern. Locatio. of Specific Points Where Stonawater DilClwge wm Ltave the Site , Idadify All Receh1ag Waten (UDl8ch4rge 1$10 a $~ M.unJdpaI Sram! $CtIW, IJlJIltfIY tits , Nam. oJdw MrmicIpQl Oparator and the Ultimate Receiving Water) Potadi8l AI'eU Where Storm wate.. May Eater Gl'OlIIldwater (Note if None) lAJc:atfoD of Storaawater System (Irrolu. Culv.u. Storm Sewers, C~. and SWtlllIS) 2B 2I LAND DISTIJBBING ACTIVITIES 3,A Lotatioo ....4 Appto" Dilneat8iollS or AD Disturbed Are.. [i.fl., Corur1vction Umit.r] <dNlU ~ Jf~ COWl/' WID B~ Preserved Should be Clearl)1 DGiptetl) 3D Soil Stoc:kplletland or BoITOW Areas (Slum LocatlO1f8 or Note ffNUM) EROSION AND SEDIMENT CONTROL MEASURES Sequence of When Each Meuare WlD Be Implemeated (RelattvB ro Earth Dt.mubing MtMtlu) MOditoJiag .ad MaioteDanee QddellDes for Each Measure PerImeter Sedbaeat Control Meuures (Locatl()ll, ConnrucriOtr D(ltD[~ DimlJft#tnls. and SjNelfi(J(ltlonJ) Tempol'8l'J Seedla.g (Specijicatiom: Iftcluding Seed Mbt, Fertilizer, Ume. GPId Malch Rotu) TeJdponry El"08ioD IIIId Sedimeat COllt~l ~teS (l.ot:rdion, Can.rtnlction Demil. DimmJion" ahJ Specffications) Pel'llWleot ErotiOD aad SecIimeDt CoDtrol ftfeuures . (J.ot:tJtl'Otl, COMtnICtiM D.l. Dimt11l$lO/'l3, and Speclftcal101f8) Storin D..... JIlIet ProteedOIl (L<<atiOtr, Corrnrucdon Del4i1. Dtmen8JO/'I3. emd Sp8I:iftctllf.OftI) . StA)i1D,.ater Outlet ProtectioD (LoclItion, Con.Iruf:dOtr DfltDil, tJimlflUiOTU. rmd Spcdficdons) Suttle CoastractiOll EDtraau (t,ocanon. Comtnu:tifRI.Dstail. DtmfllllUm$. fI1td Spectftcattons) E...... ad SecUmeat Control onllldlvldual BalJdblg Lot8 (SpMifietlllOTU), PerallbU!ilt Seedio, (SpecfliCQtioru; lm:ltulillg Se:ed Mix. Ft!I'tilim'. Lime. 4tJ MrJ.cIr ~ bvlsed'4/97 '.. 48/12/288111:21 317-776,",181 V, HAMIL TON CO USD't) PAGE 8S ;!;/,.:" < ~;>' ."..../ '....../ ~ ~\ . ., ~',\.)! (~1 (;;4J~~~' ~-~~ ~.,~, (;:\ ~ (0<VS /\ \:l \/~\ ..<;...... '\';;:/), '(/~, ...........,' : .' Note; A./I erosion and sediment contt'o/11ISlJ$1J1'flS shown on 1M p/ONJ and referenced in this 1'eYtew mtDt meet the design Cl'iterla, standards. fmd specljicatlo1l8 outlined in the "Indiana Handbook/or Erosion, Control in Developing Areas" from the Indiana Department of Natural Ru()Urcu, Division ofSoi/ Conservation or similar GuiJam;(J DC1CU1M",16. . Ptoject: (It c,. Paae 3 of 3.... a.OSION AND SEDTMRNT CONTROL PLAN TECHNICAL RRvtFJV COMMENTS IItJl/~4s, PA~~ /r. rrl!'!'i (It &W$,.~u,-r/DN' $41..";tl.Nt::.1l "'EllS m 6/! ~/PQE FD4 77fI/5 .$,r.!!... I~. .r.,.,. '\Ie. A ~~IJ,JI~r I1A$l1V I~ AlElI)6/:) 1fJ~ "7'#IS ,$,71/!'. S,l~ r ~M'6 ~~I)/&.I~ ,~ ..Nbr ~U""1#4C~IWr: 5~A~84~"1S 4r /S/" jfML) t!ul.u,/(e.r ~<< NlJ7' . A......t:u4~. A .srtJNi: N()i2~E:J~ /~ ~8aJHJfe.l/MIJ. _WIIA'r I~ THe b.bl.,1NA~e ~LA.A/ ~~ T~ J.A~j) ~uH' l'.)~ 7'Wt..$ .P~o::rE..C , ~ co: C 4.R IffiL. no c..;5 5vIV4"'~ '/~E . v w CITY OF CARMEL Department of Community SelVices One Civic Square Carmel, IN 4SJ32 (317) 571-2417 Fax: (317) 571-2426 Fax To: t J... \ ~f":-\. t::::>~ Fax: :Si 3...-s~ S- From: ~~~~~ Pages: ~ Phone: Date: \D-\;L-O\ Re: 00:\. 7~ ~~~ ~i:~~'t CC: o Urgent 0 For" Review 0 Please Comment 0 Please Reply o Please Recycle ~~~~ ?~ 1 '" ~"'\ \~"'-CI ~ ~~~ ~~~ 0-'\.\. ~ ~ V"- \~\~ -- \:~,r--.... ~~ ~ . ~O~ ~~ ~c...o . /';"\ \,j .. .. .., \ .~, - (J.) u CARMEL/CLAY TECHNICAL ADVISORY COMMITTEE AGENDA I" ,,~ iI,2:ii ! " :".)J\_'l. ,:.Ji,,!i -(.",,-,)..:. 0U'Y ti/ Date: OCTOBER 17, 2001 \:;/ Place:Department of Community Services Conference Roo - , 3rd Floor - Carmel City Ball \ 9'00 a m. 1}'10 a m 10'00 am 10'20 a m 10'40 am 11'00 am 11 '30 a m NOON l'OOpm tlt'f!Cl/~ / T' I/~ ./p() bO'J' ~ '<;\. \ 16~ CMC & CH Land Properties (Development Plan) / 8 The sites are located northwest of West 13151 Street and North Meridian Street. zoned 8-5 and the CMC property is within the US 31 Overlay Zone. Filed by E. Davis Coots of Coots Henke & Wheeler for CH Land LLC and CMC. Both sites are Claybonrn Estates (primary Plat) The site is generally located at the northwest cOmer of Shelbourn Road and 13151 Street and on the south side of 13151 Street Y4 mile west of Shelbourn Road. The site is zoned S-I (Residential). Filed by James J. Nelson of Nelson & Frankenberger for Boomerang Development, LLC. Fecitt Subdivision (Primary Plat) The site is located at 14415 Cherry Tree Road. The site is zoned S-1 (Residential). Filed by Adam DeHart of Keeler-Webb Associates for Robert Fecitt. Papay Subdivision (Primary & SeeondaZ Plats) The site is located on the north side of 136 Street, Y4 mile east of Towne Road. The site is zoned S-l (Residential). Filed by Dave Barns of Weihe Engineers, Inc. for Anthony and Alice Papay. The Sanctuary (primary Plat) The site is generally located at the northeast corner of 106th Street and Crooked Stick Lane. The site is zoned S-1 (Residential). Filed by Dennis Olmstead ofStoeppelwerth & Associates for Glenn E. Christian. 136. Street and Rohrer Road Planned Unit Development District I Hunters Creek Office Park, LLC (pUD Rezone) The site is located at the southwest corner of Rohrer Road and Marana Drive. Filed by Charles D. Frankenberger of Nelson and Frankenberger for Hunters Creek Office Park, LLC. Carpenter GMAC (Development Plan Amendment) The site is located at 790 West 122nd Street. The site is zoned M-3. Filed by David Caveness of Carpenter Co., Inc. LUNCH, One Hour U.S. Highway 31 & 146. Street Planned Unit Development District (pUD Rezone) The site is located at the southwest comer of US Highway 31 and 146th Street. Filed by Paul G. Reis of The Reis Law Finn for the Lauth Property Group. Panhandle Eastern Pipeline Co ~as no company Facilities . mV?'1ed in this project s~~ -1Ito~-ol. 9 Date {e- qc 4:- A!F- 1Jr- 1c j..( Ie. 1C .; .,,""*\ ~ u o page 2 of2 Technical Advisory Committee Agenda October 17, 2001 1 .10 P m North Gray Road & 1461h Street Planned Unit Development District (pUD Rezone) ~ The site is located at the southeast corner of North Gray Road and 146th Street. Filed by Paul G. Reis of The Reis Law Firm for Hearthview Residential, LLC. tJ c.. 2.00 P m USTA PUD (ADLS; Construction Plans) The site is located on the northwest corner of East 96th Street and the Monon Greenway. The site rc is zoned PUDIPlanned Unit Development (Z-361). John Smeltzer of Bose McKinney & Evans for Midwest Youth Tennis Foundation, Inc. 2'30 P m J.C. Sipe Jewelers (UV-96-01; Construction Plans) The site is located at 3000 East 96th Street. The site is zoned S-2/Residence. Filed by Fred Simmons of Simmons & Associates for the Sipe Family LLC. IJ(C Panhandle Eastern Pipeline Co. has no company Facilities involved in this project ~..pctdJL JI}-/J8'-O! 519 Date Q.) o CITY OF CARMEL Department of Community SelVices One Civic Square Carmel, IN 4S032 (317) 571-2417 Fax: (317) 571-2426 Fax To: ~~ ~~\:"~ Fax: "5 73- ~~S From: ~"\A.. 8.0.... (J to ._ Pages: ~ Phone: Date: 1 c-~-O\ Re: a.r \ c::...~ ~~~~ cc: o Urgent 0 For Review 0 P.lease Comment 0 Please Reply o Please Recycle ~ ~ "" 'So. .. ~ tD. c=: '. ~. 00 . Q.~~ L ~\\ ~N~ () u E. DAVIS Coors. STEVEN H. HENKE JAMES K.WHEELER. Diana L. Cordray Clerk-Treasurer City of Carmel One Civic Square Carmel, IN 46032 T. JAY CURTS JAMES D. CRUM JEFFREY S. ZIPES ELIZABETH I. VANTASSEL JANICE R. MANDLA. MATIHEW L. HINKLE RE: CH Land Our File No.: 13664 SENGHOR-A MANNS J. KATHRYN. JENKINS DANIEL E. Coors Dear Diana: .CERTIFIED MEDIATOR u October 4,2001 a,~ RECEIVED <~ ocr 5,~ 2001 1=1 ?'l /;;,1 ~ DOCS /:-")/ \g,;>, .-0'/ ~/>/;r.r-rT,f0)/ ~~_~_~9--- Enclosed please fmd the Dedication & Deed of Public Rights-of-Way in the above referenced matter. Will you please put this on the next Board of Works meeting. Please give me a call with any questions or comments. Thank you for your assistance in this matter. EDC:wlt Enclosure cc: Craig Kaiser 255 East Carmel Drive Carmel, Indiana 46032-2689 317-844-4693 . FAX: 317-573-5385 Very truly yours, COOTS, HENKE & WHEELER, P.C, ~ ~I E. Davis Coots o , E. DAVIS COOTS. STEVEN H. HENKE 'JAMES K: WHEELER. Jon Dobosiewicz Department of Community Services . any Civil Square Carmel, IN 46032 T, JAY CURTS JAMES D. CRUM JEFFREY S. ZIPES . ELIZABETH I. VANTASSEL JANICE R. MANDLA. MATTHEW L. HINKLE' RE:CHLand,LLC Our File No.: 13664 SENGHOR A. MANNS J. KATHRYN JENKINS Dear Jon: DANIEL E. COOTS .CERllFIED MEDIATOR October 3, 2001 . . o , . . Enclosed isa recorded copy of the CQvenant Attendant to the. Rezoning O~dinance approved as it relates to CH Land, LLC.' . . . EDC:wlt Enclosure 255 East Carmel Drive Carms!; Indiana 46032"2689 317-844-4693 . FAX: 317-SnS38S Very truly yours, . . . '. COOTS, HENKE & WHEELER, P.C, ~.. ."...... . . .' , . , E. Davis Coots UJ u Dobosiewicz, Jon C Akers, Will" . , ctober 05, 2001 2:05 PM Dobosiewicz, Jon C Lillig, Laurence M TAC MEETING 10-17 From: Sent: To: Cc: Subject: Jon, I will not be able to attend the T AC meeting on October 17th. I will be out of town attending a conference in Florida. I do have a few comments that I would like to have you mention if you would. CMC & CH LAND PROPERTIES These two projects each be addressed off of Meridian Corners Blvd. Assignment will come at a later Date. CLAYBOURN ESTATES All the names on the primary plat will have to be approved by the county;layout looks ok as far as street cutoffs go: Only concern is name"Donavan Blvd"; it needs to be cut off at 131 st st, will need additional name for either North or South entrance off of 1315t(to replace Donavan Blvd). FECITT SUBDIVISION Is this a totally seperate structure: if so it will get a different address then what is stated on the plans. PAPAY SUBDIVISION No comment at this time....will assign an address when applying for permits. SANCTUARY No comment at this time; not recieved plans as of this date HUNTERS CREEK OFFICE PARK Is entrance a private drive?Prefer it not to be; if private drive each building will be assigned off of Marana Drive. CARPENTER GMAC not recieved anything on this as of today CLAY TERRACE No comments at this time tillater on in development process; will each building come in as it is individually constructed?; addresses will be assigned as each building as they come in; they will probably be assigned off of North Range Line Rd; make sure they are aware Range Line is 2 words not 1. HEARTHVIEW require 3 street names for development; 2 E/W names and 1 N/S name. no further comment tillater time. USTA address seems alright, but will have to make sure it fits with what is across street; will make it official at a later date; Make sure they put assigned address on monument sign or on the building. J.C. SIPE JEWELERS no comment Thanks alot for doing this Jon... Bill BILL AKERS Operations Supervisor Carmel Communications Center (317)571-2586 Fax 317-571-2585 cell # 847-8301 1 ,,---!!.I05/01 15: 26 FAX HAMILTON CO BWY. ......... Carmel DOCD 141 0011001 V 0 HAMILTON COUNTY HIGHWAY DEPARTMENT Octaber 5,2001 Mr. E. Davis CootG Coots. Henke & Wheeler 255 East Carmel Drive Cannel, Indiana 46032-2689 RE: CMC and CH Lend Properties Construction Plans N of 131et Street / W of US 31 Clay Township Dear Mr. Coots; en I I, .~ , ;') \ ...L, ',~ I ).."'" -' ~>' ~'-<,.(>)" 'v. f ' . / \ DOCS '1 ",l:b Oln 6 lhls letter serves to ac:knowledge receipt of a transmittal containing the plans for the above- mentioned projects. After reViewing the plans the Highway Department has the followIng cornments: 1. It appears that both projects, CMC Properties Business Park and the Dental Office, lie within the limits of the City of Carmel. Therefore, all further comments should be directed toward the City. If you have any information contrary to this statement, please contact me Immediately- If you have any questions or Q)mments conceming this lener, please feel free to contact me at anytime. Sincerely, /.!;J0:--- Staff Engineer 00: Laurence Llllig Steve Cash Sctlnelder Engineering - John C. Zant Jr. Schneider Engineering - Robert Doster 1700 South 10'. Street Nobles'Vllle. In. 46060 www.co.hallllltonJn.ulI Oftlce (317) 113-.,770 Fax (317) 776--9814 Q) Q C c8LJrlllel >:;~ -..;. .~~p&Jrtlllen t . ,. " ! RECE'VEn ~I:T 4 2001 DOCS ~ s# October 3, 2001 E. Davis Coots Coots, Henke & Wheeler 255 E. 'Carmel Drive Carmel, IN 46032-2689 RE: CH Land LLC - Zoning File No.: 13664 CMC Properties, Inc. File No.: 13291 Dear Mr. Coots: I have received and reviewed the information for the above-mentioned project. At the present time, I see nothing in the plans that would hamper law enforcement efforts. If we can be of any further assistance to you, please contact us. Respectfully, ~)).-l~:l Michael D. Fogarty -'--I Chief of Police MDF:vb cc: Dept. of Community Services (317) 571.2500 A Nationally Accredit rcement Agency Fax (317) 571.2512 "1: .. .. Q) w October 2,2001 E. DAVIS COOTS. STEVEN H. HENKE HAND DELIVERED SENGHOR A. MANNs CMCProperties, Inc. Our File No.: 13291 JAMES K WHEELER. T. JAY CURTS To the attached Carmel/Clay Technical Advisory Committee Members JAMES D. CRUM JEFFREY S. ZIPES ELIZABETH 1. VAN TASSEL MATTHEW L. HINKLE RE: CH Land, Inc. Our File No.: 13664 JANICE R. MANDLA. J. KATHRYN JENKINS DANIEL E. COOTS .CERTIFIED MEDIATOR Dear Member: Enclosed please find the Construction Plans for the above referenced matters for your review. Please give me a call if you have any questions or comments. Very truly yours, COOTS, HENKE & WHEELER, P.C, lL {!8e~ E. Davis Coots EDC:wlt Enclosure 255 Eilst Carmel Drive Carmel, Indiana 46032-2689 317-844-4693 . FAX: 317-573-5385 ~, Q) Q CARMEL/CLAY TECHNICAL ADVISORY COMl\fiTTEE ME:MBERS FOR PROJECT REVIEW STEVE CASH Hamilton County Surveyor Office One Hamilton Square, Suite 146 Hamilton County Judicial Center Noblesville IN 46060 Telephone: 776-8495 FX 776-9628 RON FARRAND Carmel/Clay Schools 5201 East 131st Street Carmel IN 46033 Telephone: 844-9961 FX: 844-9965 JOHN SOUTH Hamilton County Soil & Water Conserv. 1108 South 9th Street Noblesville IN 46060 Telephone: 773-1406 FX 776-1101 MICHAEL FOGARTY Office of Police Chief Three Civic Square Carmel IN 46032 Telephone: 571-2500 FX: 571-2512 GARY HOYT Office of Fire Chiet: Fire Station #1 Two Civic Square Carmel IN 46032 Telephone: 571-2600 FX: 571-2615 PAUL PACE Carmel City Utilities 130 First Avenue SW Carmel IN 46032 Telephone: 571-2648 FX: 571-2653 ALSO: BRIAN HOUGHTON Jones & Henry 2420 N. Coliseum Blvd., Suite 214 Ft. Wayne IN 46805 DICK HILL Dept. of Engineering One Civic Square Carmel IN 46032 Telephone: 571-2441 FX: 571-2439 CARlVIEL DEPARTMENT OF CO:MMUNITY SERVICES One Civic Square Carmel IN" 46032 Telephone: 571-2417 FX: 571-2426 L. JOE COOK Hamilton County Sheriff Dept. 18100 Cumberland Road Noblesville IN 46060 Telephone: 773-1872 FX: 776-9835 BILL AKERS Carmel Communications 31 First Avenue NW Carmel IN 46032 Telephone: 571-2580 FX: 571-2585 STEVE BROERMANN Hamilton County Engineering! Hamilton County Highway 1700 South 10th Street Noblesville IN 46060 Telephone: 773-7770 FX: 776-9814 y' Q) (,;) CARMEIJCLA Y TECHNICAL ADVISORY CO:MMITfEE MEMBERS FOR PROJECf REVIEW PAGE TWO JAYW.ALLEY Clay Township Regional Waste District P.O. Box 40638 Indianapolis IN 46240 Telephone: 844-9200 FX: 844-9203 JEFF RICE Ameritech 5858 No. College Avenue InmanapolisIN 46220 Telephone: 252-4274 FX: 252-5000 BARRY MCNULTY Hamilton County Health Dept. Hamilton County Judicial Center, Suite 30 Noblesville IN 46060-2229 Telephone: 776-8500 FX: 776-8506 PAM 'WAGGONER Inmanapolis Water Company P.O. Box 1220 Indianapolis IN 46206 Telephone: 263-6452 FX: 263-6452 JOHN LESTER Carmel/Clay Parks Department 1055 Third Avenue SW Carmel IN 46032 Telephone: 848-7275 FX: 571-2468 KEVIN WALKER Indianapolis Power & Light Company 3600 N. Arlington Ave. Inmanapolis IN 46218 Telephone: 261-5265 FX: 261-5201 RICK McCLAIN Cinergy 1441 South Gilford Carmel, IN 46032 Phone (317) 581-3052 Fax (317) 581-3031 SHARON PRATER Panhandle Eastern Pipeline Co. P.O. Box 38 Zionsville IN 46077 Telephone: 733-3213 FX: 733-3204 CHUCK SHUPPERD Indiana Gas Co. P.O. Box 1700 Noblesville IN 46060 Telephone: 776-5597 FX: 776-5553 ROBERT HENDRICKS Hamilton County Local Emergency Planning Committee 18100 Cumberland Road Noblesville IN 46060-1624 MARY SHULTZ Indiana Gas Company P.O. Box 1700 Noblesville IN 46060 Telephone: 776-5567 SCOTT BREWER Dept. of Community Services One Civic Square Carmel, IN 46032 Phone (317) 571-2417 Fax (317) 571- 2426 v CD w CARMEUCLAY TECHNICAL ADVISORY COMMITTEE MEMBERS FOR PRoner REVIEW PAGE THREE JEFF KENDALL Deputy Building Commissioner One Civic Square Carmel, IN 46032 Phone (317) 571-2444 Fax (317) 571-2439 REVISED: 03-23-2001 s:\tac\2001members '"' u u CITY OF CARMEL Department of Community Services One Civic Square Carmel, IN 4E032 (317) 571-2417 Fax: (317) 571.2426 'Fax To= ~~ COt:S\'S. Fax: S1)3-5~~S- Fram= ~~~---" 8 ~. c2. ". a '\ Pages: Phone= Date! Re= C(!. "t \). c.. wC'~~ ~o ""'" CC: o Urgent [J Far Review D P.lease Comment 0 Please Reply o Please Recycle ~\...'C..~~ . ~- -. . U~~'-A-~ ~E'Z-e~u- _ \ CO~ _O(:)~ ~ \ "-~~ ~~~~ - -. ~(::) - ~ , <!.J\ S I - C, ~\:.)\.... ~ . W Q City of Carmel DEPARTMENT OF ENGINEERING September 18,2001 Mr. E. Davis Coots Coots, Henke & Wheeler 255 East Carmel Drive Carmel, IN 46032 RE: Dental Office BuildinglMeridian Corners Blvd.-Project Review #1 Dear Mr. Coots: We have reviewed the drawings submitted for this project and offer the following comments: GENERAL INFORMATION 1. The project site is located within current City of Carmel Corporate Limits. 2. Jurisdictions: . Street and Right of Way - City of Carmel. . Water - Indianapolis Water Company Service Area . Sanitary Sewer - Clay Township Regional Waste District . Storm Sewer - Hamilton County Surveyor's Office 3. Board of Public Works and Safety Approval Requirements: . Commercial Curb Cut. Please provide an exhibit that shows the location of the curb cut and aceIVdecel1anes if applicable; appropriate dimensions including drive width, overall width at the street, acelVdecel dimensions, radii, etc.; and location of existing opposing curb cuts, if applicable. The exhibit should be 8 Y:z x 11 or of a size that can be reduced to 8 Y:z x 11 such as 8 Y:z x 14 or 11 x 17. . Temporary Construction Entrance. Same requirements as for the Commercial Curb Cut. . Consent to Encroach Agreement for any permanent improvement to be installed within dedicated right of way or within dedicated easements. . Right of Way Dedication . Secondary Plat (if applicable) I am enclosing a schedule for Board of Public Works and Safety meeting dates and agenda deadlines for your use. Please use the Engineering Department deadlines for submissions to the Board. Any submission to the Board requires prior final approval hy the Carmel Clay Plan Commission and/or the Board of Zoning Appeals and completion of review by the Technical Advisory Committee. All written requests to be place on the Board's agenda must include the appropriate Docket Numbers and the date (or dldes) of approval by the Plan Commission and/or BZA. 4. T AC Review/Drawings submitted for approval: We request that all comments and comment letters generated by this office be answered in writing and be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for construction until all issues have been resolved. The design engineer must certify all drawings submitted for final approval. TIus office will require three-sets of approved drawings after all issues have been resolved. TIle drawings will be stamped approved and signed by the City Engineer. The Developer/Owner will receive one-set which is to be maintained on the construction site at all times. ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2441 I' CD o Mr. E. Davis Coots September 19,2001 Page 2 Our Public Works Inspector will receive one-set and one-set will be maintained in the Department of Engineering. If more than three-sets are requested to be approved, the additional sets must be submitted with the three required sets. 5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated right of way will require a Consent to Encroach Agreement between the OwnerlDeveloper and the City of Carmel. This Agreement requires Board of Public Works and Safety approval. 6. I am including copies of the following with this correspondence: . Commercial Project Approval Procedures. . Performance Release Procedure. . Permit Data, Contacts, etc. . Commercial Permitting Procedures. I will send a copy of our Residential Subdivision and Commercial Irrigation System Requirements upon request. BONDING REQUIREMENTS 7. Upon initial review, it appears the following bonding requirements will apply to this project: Performance Guarantees . Sidewalk (in right of way) . Monuments & Markers (if platted) Please provide individual, detailed certified Engineers Estimates for 100010 of the cost of labor and materials for the above improvements. Post individual Performance Guarantees in the amount of the Engineer's Estimates. Three-year Maintenance Guarantees will be required upon release of the Performance Guarantees. Street CutlRight of Way Permit and Bonding Requirements Any work in dedicated right of way will require a Street Cut!Right of Way Permit and a License and Permit Bond. The bond amount will be determined by the number of instances of work in the right of way (curb cut, storm sewer work, etc.) @ $2,000.00 per instance. From the drawings submitted, it appears there are at least four instances of work in the right of way including a commercial curb cut, a temporary construction entrance, water service line installation and sanitary sewer service line installation. PROJECT COMMENTS 8. Please prepare dedication documents for the additional15-feet of right of way. 9. Show and identify/dimension existing right of way lines on both sides of Meridian Corners Boulevard on all sheets. TIle existing right of way is 45-foot half, 90-foot total. With the dedication of an additionaI15-feet, the new right of way will become 60-foot half (south halt). 10. Please include either an asphalt path or sidewalk in the right of way of Meridian Corners Boulevard. II. A median cut, or what appears to be a median cut, is indicated on Meridian Corners Boulevard for the temporary construction entrance. This would be a Board of Works issue. However, this office would not recommend approval of the temporary construction entrance as indicated on the plans. 12. The City Engineer has not approved the entrance road or its location/alignment as indicated on the plans. 13. Is the entrance road intended to be private? If so, provide a right of way pavement section in the general details. The minimum acceptable right of way pavement section is 10" stone, 3" binder and I W'surface. Also, remove that portion of what appears to be a median from the Meridian Corners right of way (new right of way). 14. If the entrance road is intended to be dedicated, City of Carmel standards will apply. 15. In either case, this office requests that the road plans and specifications be included with this project. (l) o Mr. E. Davis Coots September 19,2001 Page 3 16. We must have all entrance issues resolved, including: . Permanent roads . Temporal)' construction . Medians and/or curb cuts . Drainage of road pavement modifications to existing road and structures. 17. We will not accept the Plan Note on Sheet ClO1. The entrance road will either 1) Be built prior to these plans being approved or 2) Be on a set of approved plans for the adjacent site or whatever site "others" is referring to. We do not allow for "pending" conditions or approvals to be placed on proposed plans. This decision and the arrangements for whom and when the entrance road shall be constructed will be made prior to approval for this project. 18. What are the plans or intended use ofthe south portion of the lot, south of the entrance road? Any future development shall only have access to the "Entrance Road" and should align with curb cuts. 19. On Sheet C 1 02, the end section appears as a half moon in the north travel lane of the entrance road. Label or indicate the connection pipe. What will happen to tIus stonn pipe/structure? 20. What is to become of the curb inlet, the pipe, the end section, the curbing on Meridian Comers Boulevard that is indicated to be in the construction path of the entrance road? 21. Drainage for tIus site shall be accomplished showing connections to existing facilities, or to structures/pipes that are part of an adjacent, approved site. The sinlilar "by others" note is not acceptable, as tile City cannot be guaranteed that drainage from this development could impact City streets, as this is tIle current drainage flow pattern. 22. Please provide proposed grading plans for the entire site, including areas seeded, etc. As stated previously, storm sewers/storm drainage for this site is under the jurisdiction of the Hamilton County Surveyor. We request that this office be included in the distribution of drainage cales and to be copied on drainage issues effecting this and the adjacent site(s). 23. Regarding Plan Notes 1,2 and 3 on Sheet C102, what is tile development time period for tile CMC property in relation to this site? Will plans be forthcoming for the CMC site? 24. Regarding the General Notes on Sheet CIOI and C102, there are references to the City of Lawrence, Citizens Gas and Coke Utility and the City of Indianapolis, all of which need to be corrected. 25. Please remove the responsibility statement above the certification on Sheet CIOO on all future drawings submitted to tIlis office for review and/or approval. Many of these questions would have been answered if either "Entrance Road" plans (in full) had been provided or the CMC plans had been presented or received approval prior to this development. Then the notes would refer to "under construction" or "built by others". The above comments are based upon tile Engineering Department's initial review. Please provide our office with a follow up letter and revised plans, indicating all revisions. A second review will focus only on revised items. It is critical that our office be made aware of all modifications made on tile plans being re-submitted, particularly if any such changes are considered "new" or fall outside of our initial review. If you have questions, please contact Kate Weese or me at 571-2441. i7~ Dick Hill, Assistant Director Department of Engineering c.D o Mr. E. Davis Coots September 19,2001 Page 4 Enclosures cc: M. Kate Weese, City Engineer (w/o encl.) Mike McBride, Assistant City Engineer (w/o encl.) Laurence Lillig, Department of Community Services (w/o encl.) Jon Dobosiewizc, Department of Community Services (w/o encl.) Steve Cash, Hamilton County SUlveyor's Office (w/o encl.) Bob Doster, The Schneider Corporation S:\PROJREVO 1 \DENTOFFMERCOR - I U) U ')Ii /61 C.11 l...~ - I - ~~~.U.......,. I I . Co,,~~ lrf..r>cJ4 ~ Or CoJtJ~.s I ~. W"/'I'r II:"" ~ J:lC!(.!,!~'" - r I ;:B~ ~ llG8:.t:r:...t'!.... ~ ~~fi- 2...~rL . - ; 'I. / ~ . :~. ---- J. --- \Yk~ ~, 7€- W'.c...c.- ~ :Tl) - 1/~/C>1 I iA-.L 'W ~ ""-'- C"fS..E.._W~ ~. It E.. ~ ~~rlOlol S;, I " - -- -- - - - - ---------------.- .-.--, ----~--~-----_.----~.._----_._--- I -----.. - - L--__ -- ------ .-- -----_--.._----------._.~,._.----- -- ..~-' ----- - - ~------~--~- - --~ - ..~> -,,- () Q City of Carmel DEPARTMENT OF ENGINEERING September 18,2001 Mr. E. Davis Coots Coots, Henke & Wheeler 255 East Carmel Drive Carmel, IN 46032 RE: Dental Office BuildinWMeridian Corners Bh'd.-Project Review #1 Dear Mr. Coots: We have reviewed the drawings submitted for this project and offer the following comments: GENERALINFO~ATION 1. The project site is located within current City of Carmel Corporate Limits. 2. Jurisdictions: . Street and Right of Way - City of Carmel. . Water - Indianapolis Water Company Service Area . Sanitary Sewer - Clay Township Regional Waste District . Storm Sewer - Hamilton County Surveyor's Office 3. Board of Public Works and Safety Approval Requirements: . Commercial Curb Cut. Please provide an exhibit that shows the location of the curb cut and acelVdecellanes if applicable; appropriate dimensions including drive width, overall width at the street, acelVdecel dimensions, radii, etc.; and location of existing opposing curb cuts, if applicable. The exhibit should be 8 'is x 11 or of a size that can be reduced to 8 'is x 11 such as 8 'is x 14 or 11 x 17. . Temporary Construction Entrance. Same requirements as for the Commercial Curb Cut. . Consent to Encroach Agreement for any permanent improvement to be installed within dedicated right of way or within dedicated easements. . Right of Way Dedication . Secondary Plat (if applicable) I am enclosing a schedule for Board of Public Works and Safety meeting dates and agenda deadlines for your use. Please use the Engineering Department deadlines for submissions to the Board. Any submission to the Board requires prior final approval by the Carmel Clay Plan Commission and/or the Board of Zoning Appeals and completion of review by the Technical Advisory Committee. AU written requests to be place on the Board's agenda must include the appropriate Docket Numbers and the date (or dates) of approval by the Plan Commission and/or BZA. 4. T AC Review/Drawings submitted for approval: We request that all comments and comment letters generated by this office be answered in writing and be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for construction until all issues have been resolved. The design engineer must certify all drawings submitted for final approval. Tlus office will require three-sets of approved drawings after all issues have been resolved. Tile drawings will be stamped approved and signed by the City Engineer. The Developer/Owner will receive one-set which is to be maintained on the construction site at all times. ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571.2441 ;; ~ o Mr. E. Davis Coots September 19,2001 Page 2 Our Public Works Inspector will receive one-set and one-set will be maintained in the Department of Engineering. If more than three-sets are requested to be approved, the additional sets must be submitted with the three required sets. 5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated right of way will require a Consent to Encroach Agreement between the OwnerlDeveloper and the City of Carmel. This Agreement requires Board of Public Works and Safety approval. 6. I am including copies of the following with this correspondence: . Commercial Project Approval Procedures. . Performance Release Procedure. . Permit Data, Contacts, etc. . Commercial Permitting Procedures. I will send a copy of our Residential Subdivision and Commercial Irrigation System Requirements upon request BONDING REOUIREMENTS 7. Upon initial review, it appears the following bonding requirements will apply to this project: Performance Guarantees . Sidewalk (in right of way) . Monuments & Markers (if platted) Please provide individual, detailed certified Engineers Estimates for 100% of the cost of labor and materials for the above improvements. Post individual Performance Guarantees in the amount of the Engineer's Estimates. Three-year Maintenance Guarantees will be required upon release of the Performance Guarantees. Street Cut/Right of Way Permit and Bonding Requirements Any work in dedicated right of way will require a Street CutlRight of Way Permit and a License and Permit Bond The bond amount will be determined by the number of instances of work in the right of way (curb cut, storm sewer work, etc.) @ $2,000.00 per instance. From the drawings submitted, it appears there are at least four instances of work in the right of way including a commercial curb cut, a temporary construction entrance, water service line installation and sanitary sewer service line installation. PROJECT COMMENTS 8. Please prepare dedication documents for the additional 15-feet of right of way. 9. Show and identifY/dimension existing right of way lines on both sides of Meridian Comers Boulevard on all sheets. The existing right of way is 45-foot half, 90-foot total. With the dedication of an additional 15-feet, the new right of way will become 6O-foot half (south half). 10. Please include either an asphalt path or sidewalk in the right of way of Meridian Comers Boulevard. 11. A median cut, or what appears to be a median cut, is indicated on Meridian Comers Boulevard for the temporary construction entrance. This would be a Board of Works issue. However, this office would not recommend approval of the temporary construction entrance as indicated on the plans. 12. The City Engineer has not approved the entrance road or its location/alignment as indicated on the plans. 13. Is the entrance road intended to be private? If so, provide a right of way pavement section in the general details. The minimum acceptable right of way pavement section is 10" stone, 3" binder and 1 '12" surface. Also, remove that portion of what appears to be a median from the Meridian Corners right of way (new rigllt of way). 14. If the entrance road is intended to be dedicated, City of Carmel standards will apply. 15. In either case, this office requests that the road plans and specifications be included with this project. .. GJ Q Mr. E. Davis Coots September 19, 2001 Page 3 16. We must have all entrance issues resolved, including: . Pennanent roads . Temporary construction . Medians and/or curb cuts . Drainage of road pavement modifications to existing road and structures. 17. We will not accept the Plan Note on Sheet CI01. The entrance road will either 1) Be built prior to these plans being approved or 2) Be on a set of approved plans for the adjacent site or whatever site "others" is referring to. We do not allow for "pending" conditions or approvals to be placed on proposed plans. This decision and the arrangements for whom and when the entrance road shall be constructed will be made prior to approval for this project. 18. What are the plans or intended use of the south portion of the lot, south of the entrance road? Any future development shall only have access to the "Entrance Road" and should align with curb cuts. 19. On Sheet CI02, the end section appears as a half moon in the north travel lane of the entrance road. Label or indicate the connection pipe. What will happen to tins stoon pipe/structure? 20. What is to become of the curb inlet, the pipe, the end section, the curbing on Meridian Comers Boulevard that is indicated to be in the construction path of the entrance road? 21. Drainage for tins site shall be accomplished showing connections to existing facilities, or to structures/pipes that are part of an adjacent, approved site. The sinlilar "by others" note is not acceptable, as the City cannot be guaranteed that drainage from this development could impact City streets, as this is the current drainage flow pattern. 22. Please provide proposed grading plans for the entire site, including areas seeded, etc. As stated previously, storm sewers/storm drainage for this site is under the jurisdiction of the Hamilton County Surveyor. We request that this office be included in the distribution of drainage cales and to be copied on drainage issues effecting this and the adjacent site(s). 23. Regarding Plan Notes 1, 2 and 3 on Sheet C102, what is the development time period for the CMC property in relation to this site? Will plans be forthcoming for the CMC site? 24. Regarding the General Notes on Sheet ClOl and C102, there are references to the City of Lawrence, Citizens Gas and Coke Utility and the City of Indianapolis, all of which need to be corrected. 25. Please remove the responsibility statement above the certification on Sheet CIOO on all future drawings submitted to this office for review and/or approval. Many of these questions would have been answered if either "Entrance Road" plans (in full) had been provided or the CMC plans had been presented or received approval prior to this development. Then the notes would refer to "under construction" or "built by others". The above comments are based upon the Engineering Department's initial review. Please provide our office with a follow up letter and revised plans, indicating all revisions. A second review will focus only on revised items. It is critical that our office be made aware of all modifications made on the plans being re-submitted, particularly if any such changes are considered "new" or fall outside of our initial review. If you have questions, please contact Kate Weese or me at 571-2441. ~~ Dick Hill, Assistant Director Department of Engineering , o Q Mr. E. Davis Coots September 19,2001 Page 4 Enclosures cc: M. Kate Weese, City Engineer Mike McBride, Assistant City Engineer Laurence Lillig, Department of Community Services Jon Dobosiewizc, Department of Community Services Steve Cash, Hamilton County Surveyor's Office Bob Doster, The Schneider Corporation S:\PROJREVOl \DENTOFFMERCOR 09/17/2001 10:29 317-776-1101 HAMILTON CO USDA ~ PAGE 03 1108 $011.111 9th Street Noblesvllle, 1/'f4606~J745 Ph. (3"1'7) 173-1432 Fax (317) 776-1101 ' Drainage. &o$ion and Sediment Control Plan TechnicalReview ami Comment ProjeetNam~: -P~Nr41. O~FI&E. SUbinitted By: k A'~.IL LAND ~H~ANr. Q.I/t)/ tJlJI 1f~/uDIA~ Sr. C.ARdA<<, ~ 'I'-Cg2... Hr. l2oJt.A."" f)D:Jr6~ St:JINEJD." ~P.. life' 077S ~lll!NlJl:... :tNnlA.U4~1~ .:TAl "'I" i Reviewed By: :.rbI/II 5. 'StJu7H Plan RevieW ProccdlUC: Site Visit Date: LoGation: lff!tz'OIlUJ rd'u~~ Legal Description: . s.c... z (. ToWU$bip: I A II Range: Plan Reyiew Date: '-11-..1) I .? 18- Civil ToW!1ship: CJ..4J' 11le tedim<<4 review and comments 01'8. lnteJ1tk4 to evaluate the comp1etene.n OJ 1M poslon and sediment conlr'ol planf(Jr, the pilDJect ~ eTO.$fon and sediment ~ofltrol plan submitted was not reviewedjor thtl. adequacy olthe ~ Jaign. All prat:rlt;:es Incl;J.ded tll flit plan, as well as/hose recom,;.endMJ In ihe commenu should be eIIalu4td as ilJ ihet1 feattbt/tty by a qualified indtvldual with structural pracrtces deSigned by a qualified engineer. Th6 plan has "or been reviewed lor local, state Dr federal permits that may be rtV[uJl'fId to procu.d wlth this ptaject. Adi1iIionaN'1formatlon, including desigTI calculations may be requested to fig1hf!1' tzValut;Jte the erosion. sediment co~l plan. ' . . ~ n,e croSiql), and. sediment c:on1to~ plan bas been reviewed and it.has been detem1ined that the plan: ,]it Satisfies the mmimlUb requi1ements,and intent of327IAC 15-5 (R.ule S). Notificatiou wiD be forwarded 'to the Indiana D"partment of Environmental' Management . 0 , ,Refer to the commen~ section for additional infonn~t1on. o Does not sa~fSr the lninimum requirement:!; and intent of 327IAC 1 S-S (Rule' 5); deficiencies are noted in the checldiSt and in the comments s~ion. Deficiencies,constitute potential violation of the rule and must be adequately addressed for compliance. The information necessary to satisfy the deficiencies rnU$t be . . Submitted: . Please address revisions to tbe reviewer. Propel' ,i1Irplenten1atlon. of the eroston and sed/mer. control plan and inspectioM of tM Construction site by tJie developer or a representatiVe are nec~df)l to minimize off-site sedimentatio11. The developer sh.ould be aware thai ilnfdreseen construct/on acllvl/ler and weDlMr conditions mA2y effect the peif01'mance of Q praClicll. or lhe erosion and sedimettl control plan. 'the plan must be a /la/ble dOCW1lent, with provisiolU to modifjl or substitllte pn:cticu as ntJCessl11')l. CC: CAe,,&.. oocS $~II"'t'~~ O'.Ue' COCDrs F4I1l "'S'?~-SI8S- 1'1L4 v u Johnson, Sue E From: Sent: To: Jay Alley [Jay@ctrwd.org] Monday, September 17,2001 1 :39 PM rfarrand@ccs.k12.in.us; AKeeling@cLcarmel.in.us; DHiII@cLcarmel.in.us; Ghoyt@ci.carmel.in.us; GStahl@ci.carmel.in.us; JDobosiewicz@ci.carmel.in.us; JKendall@cLcarmel.in.us; JLester@ci.carmel.in.us; JPFoster@cLcarmel.in.us; KHahn@cLcarmel.in.us; LLillig@ci.carmel.in.us; MFogarty@cLcarmel.in.us; MHollibaugh@ci.carmel.in.us; PPace@ci.carmel.in.us; RAuler@ci.carmel.in.us; RHancock@ci.carmel.in.us; SBrewer@ci.carmel.in.us; SJohnson@ci.carmel.in.us; slillard@ci.carmel.in.us; WAkers@ci.carmel.in.us; sprater@cmsenergy.com; sjb@co.hamilton.in.us; stC@co.hamilton.in.us; john-south@iaswcd.org; cshupperd@vectren.com Candy Feltner; rlauritsen@slmaco.com CTRWD Comments Re: September 19 TAC Agenda Cc: Subject: Hello everyone: Following are CTRWD comments on the agenda items effecting our sanitary sewers or service area for the September 19 TAC meeting. Please feel free to copy and distribute this email or attach it to your meeting minutes. Village of West Clay, Section 6501-B (Secondary Plat) The District has received the plat and has no comments at this time since construction plans would still need to be reviewed by the District's consulting engineers. Once that review is complete, the plans will be ready to be submitted by the District to IDEM for State approval. CH Land ADLS (Development Plan) The District has reviewed the plans for this project and notes that the developer is proposing a 6" lateral sewer tie-in directly to an existing manhole. District specifications will need to be followed for such a connection and building permits should NOT be issued unless the District has issued its connection permit. College Hills PUD Text Amendment The District has no comments relative to the text of the proposed PUD ordinance. We have previously provided comments on a number of construction related issues including sewer capacity in the area, capping of individual private wells, and proper abandonment of individual private septic systems which will be effected by this project. Hilton Garden Inn (Revised Development Plan) It is unclear if this property will require sewer service from the District or not. From the location description (southeast comer of Meridian and West Main Street) it is more likely within the service area for Carmel Utilities. However, please have the applicant provide plans for the District to review so that we can make a definitive determination. We are a member of the IUPPS underground locate network so call 1-800-382-5544 before you dig! Please feel free to contact me if you have questions or need additional information. Please check our website for construction specification and permit information and let us know ifthere is other information we can provide which would be useful. Thanks! Jay Jay W. Alley, Utility Manager Clay Township Regional Waste District Hamilton County, IN, USA http://www.ctrwd.org/ 317-844-9200 (phone) 317-844-9203 (fax) 1 v u CARMEL/CLAY TECHNICAL ADVISORY CO AGENDA Date: SEPTEMBER 19, 2001 Place:Department of Community Services Conference Room 3rd Floor - Carmel City Hall 9'OOllm 9-10 a m 10'00 II m 10'10 II m 11'00 II m 11 '10 am Village ofWestClay, Section 6501-B (Secondary Plat) The site is located southeast of West 131H Street and Towne Road. The site is zoned PUD/Planned Unit Development. Filed by Keith Lash of the Schneider Corporation for Brenwick TND Communities, LLC. VaUeybrook Subdivision, Section 2, Lots 66 & 67 (Replat) The site is located at the south end of Deer Ridge Place in the Valleybrook Subdivision. The site is zoned S-I/Residence - Low Density. Filed by Dave Barns of Weihe Engineers, Inc. for W. Steele Gudal. CH Land ADLS (Development Plan) The site is located northwest of West 13181 Street and North Meridian Street. BS/Business on 1.87:1: acres. Filed by E. Davis Coots of Coots Henke & Wheeler for CH Land LLC. 1c. +- The site is zoned .-1 '1~ Docket No. 106-01 OA; CoUege Hills PUD - Ordinance Amendment Petitioner seeks favorable recommendation of a text amendment to a PUD/planned unit development district on 20.5:1: acres. The site is located northwest of East 96th Street and North College Avenue. The site is zoned PUD. Filed by Charles D. Frankenberger of Nelson & Frankenberger for Gershman Brown & Associates. Hilton Garden Inn (Jlevi!led Development Plan) The site is located at the southeast corner of U. S. 3 I and West Main Street (East 13151 Street). The site is zoned B-2/Business within the US 31IMeridian Street Overlay Zone. Filed by James J. Nelson of Nelson & Frankenberger for Meridian Hotel Partners, LLC. Northview Christian Life (Special Use Amendment) Petitioner seeks Special Use Amendment approval in order to establish three (3) 10S6-square-foot modular buildings. The site is located at 5535 East 13151 Street. The site is zoned S-I/Residence - Low Density. Filed by James J. Nelson of Nelson & Frankenberger for Northview Christian Life Church, Inc. P~'r'!' :;'. II land/A t:"''''tA has no ce':'ID ,;"" ~.f'i1 Pipeline Co . 'I' any Fa '/" . inVOlved '. '.' Clltles ,-.-:5 ~n thIS project S!gne>d- }~~ - 9-1i:..~ Date 1c- 1- 9<:- 11\ ~ u E. DAVIS COOTS' . September 11, 2001 STEVEN H. HENKE . JAMES K. WHEELER' JEFFREY S. ZIPES . ELIZABETH I. VAN TASSEL , Jon Dobosiewicz Department of COrnrhtrnity Services One Civil Square Carmel, IN 46032 . T. JAY CURTS JAMES D. CRUM JANI<:;E R.MANDLA' MATTHEW L. HINKLE SENGHOR A. MA)'INS ].KATHRYN JENKINS' RE: CII Land LLC Our FileNo.: 136"64 DANIEL E. COOTS Dear Jon: 'CERTIFIED MEDIATOR . .. . ., . . Enclos~d please find the Declaration Grahting;Road Right of Way' in the. . above referenced. matter. Please give me a call if yOu have any other questions or comments. Thank you,. Very truly yours, . . . COOTS, HENKE & WHEELER, P.C, C~(~/k E. Davis Coots EDC:wlt Enclosure . cc: Craig Kaiser . 255 East Cannel Drive Carmel, Indiana 46032-2689 " 317-844-4693 . FAX: 317-573-5385 /tji '''Coot~, ' , . 'Henke , heeler w v" September 11, 2001 E. DAVIS COOTS. STEVEN H: HENKE T. JAY CURTS Jon Dobosiewicz " " Department of Community 'Services One Civil Square ' Carmel, IN 46032 <<!,JJ '),. '4<~ tEl" 1'1.('/,1:-, , II I) 4/f~,lDOI ,c.,J' ..' JAMES K.. WHEELER. JAMES D.CRUM JEFFREY S. ZIPES , , 'ELIZABETH I. VANTASSEL' JANICE R. MANDLA.' . MATTHEW L. HINKLE 'RE: CHL~p.dLLC ," . Our' File No.:.13664 SENGHOR A MANNS J. KATHRYN JENKINS DANIEL E. COOTS . Dear Jon: .c'ERTIFII';D MEDIATOR ,Enclosedaretwenty (20) ADLS packets being submitted to.you on the' captioned matter. . , As I advised you by voicemail, the covenant for this property approved by the Plan Commission and submitted to the City Council was, executed in its originaf form and tend~red to the Clerk-Treasurer with instrudions from the CoUncil to ' record it wherttheproperty was rezoned. Since I do not haye a recorded copy back from the Recordet'sOffice orthe Clerk-Treasiller's office,I cannot comply with your directive that '-'the Petitioner" submit copies to you by September 19,' 200 1. I do enclose an executed copy; however, it does not contain, any recording information since that.has' not occurred by the. Clerk-Treasurer' s . Office. , . . . , " . I pave ~kedS,chIieiderEngineering to detail the information you seek on ,the plans submitted designated "by others". Enclosed isa copy Qfthe Application for Architectural 'Design Lighting and Signage (sic) omitting ;any reference to' an amendment. , I enclose a copy of the legal description for the additional fifteen foot (15') ,Right of Way DediCation for Meridian Comers Boulevard .and will prepare the dedication'document once closing occurs on the putchaseofthe property by CH Land from Estridge. I am sure yc>u appreciate that we cannot dedicate right-of-way 255 East Carmel Drive Carmel, Indiana 46032-2689 317-844-4693 FAX: 317-573-5385 ~ ." .~., o September .11, 2001 . Page 2. . Letter to Jon Dobosiewicz llntiltitleis acquired; however, we have made the commitment to make such dedication as a condition to the approval process. ' Very truly yours, , COOTS, HENKE & WHEELER, P.C, f: /)~ ~/c-, I ~ K Davis Coots EDC:wlt Endosure cc: Craig Kaiser' G.) (j CITY OF CARMEL Department of Community Seevices One CMc Square Carmel, IN 4SJ32 (317) 571.2417 Fax: (317) 571.2426 Fax To: ~ ~I~ Fax: 5"3-S~~S ~ --. Re: '"""~ \ ~ Q From: ~ ~ Pages: ~ Datel ~ - \ a - C:) , f\~~~~ eel Phone: o Urgent 0 Far" Review 0 Please Comment CJ Please Reply D Please Recycle .~\-=~~ ~ <::::::."\"" ~ /o'.c.u ~\\ ~ D 1-\ ~ 'L ';:, (\dh~ G U'''i>''"'~ ~L ..." ). "') ~<,,; ~ o Ci tyARD2fcfs~!!llel ACCEPTANCE OF DEDICATION & DEED OF PUBLIC RIGHTS-OF-WAY WHEREAS, the foregoing Grantor having filed with the City of Carmel, Indiana ("City"), its Dedication and Deed of certain real property ("Property") to the City for the purpose of establishing City rights-of-way, which Dedication and Deed is attached hereto and incorporated herein as Exhibit "A" hereinabove set forth; AND WHEREAS, the City believes that said fee simple conveyance of property is desirable and necessary and in the City's best interests; NOW THEREFORE, the City, by and through its Board of Public Works and Safety, hereby accepts said Dedication and Deed, and orders that the Instrument of Dedication and Deed described herein be recorded in the Recorder's Office of the County of Hamilton, State of Indiana, and that said described real property be, and the same hereby is, declared open and dedicated to the City. SO ORDERED: CITY OF CARMEL BOARD OF PUBLIC WORKS & SAFETY James Brainard, Mayor Date: Billy Walker Date: Mary Ann Burke Date: ATTEST: Diana L. Cordray, IAMC, Clerk-Treasurer Date: Instrument prepared by: Douglas C. Haney, Carmel City Attorney, One Civic Square, Carmel, Indiana 46032 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2400 ~ u DEDICATION & DEED OF PUBLIC RIGHTS-OF-WAY THIS INDENTURE WITNESSETH: That (Jointly and individually the "Grantor"), the fee simple owner(s) of the following described real property ("Property") described in attached Rxhihit A, incorporated herein by this reference, which Property is located in the City of Carmel, Hamilton County, State of Indiana, hereby grants, conveys and warrants in fee simple and with no reversionary rights whatsoever retained, all of Grantor's rights, title, and interest in the Property, to the City of Carmel, Indiana ("Grantee"), subject to all existing easements and rights-of-way of record, for the sum of One Dollar ($1.00) and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged.. This conveyance of real estate is not subject to Indiana gross income tax. IN WITNESS WHEREOF, Grantor has executed this Instrument on the day of , 2001. "GRANTOR" By: (Authorized Signature) (Printed Name and Title COUNTY OF } } } STATE OF INDIANA Before me, the undersigned NOTARY PUBLIC in and for said County and State, personally appeared the above and acknowledged executing the foregoing Dedication and Deed of Public Right-of-Way. Witness my hand and Notarial Seal this _ day of , 2001. Notary Public Notary Public (printed) MY COMMISSION EXPIRES: COUNTY OF RESIDENCE: Instrument prepared by: Douglas C. Haney, Carmel City Attorney, One Civic Square, Carmel, Indiana 46032. 09/07/01 08:48 FAX ~ HAMILTON CO BWY. (.) Carmel DOCD 1aI 001/001 HAMILTON COUNTY HIGHWA Y DEPARTMENT September 7, 2001 Mr. e. Davis Coots Coots. Henke & Wheeler, P.C. 255 East Carmel Drive Carmel, Indiana 46032-2689 RE: Dental Offices 131" Street and Meridian Street Clay Township Dear Mr. Coots: This letter serves to acknowledge receipt of a transmittal containing the plal"lS for the abOve- mentioned project. After reviewing the plans the Highway Department has the following comments: 1. It appears that this project lies entirely within the limits of the City of Carmel, therefore, all futLlre comments should be directed toward the City. If you have any Infonnatlon contrary to this statement, plesse contact the undersigned Immediately. If yeLl have any questions or comments concsming this letter, please feel free to contact me at anytime. 7'lg~~ Steven J. BroermClnn Staff Enginesr co: Laurence Llllig Steve Cash G:\USERS\SB\2001Tac:\09-07-01dentalofflce.cloc 1100 Soutb 1011I Street NoblesvllJe, In. 46060 lnYw.co.hamlltonJn..,s Office (317) 773.7770 Fax (317) 776-9814 .,., u Q ""V ". Johnson, Sue E From: Sent: To: Subject: Dobosiewicz, Jon C Friday, September 07,2001 9:27 AM Johnson, Sue E FW: Docket Number Assignment - ADLS; CH Land Office Building -----Original Message----- From: Dobosiewicz, Jon C Sent: Friday, September 07,20019:25 AM To: Johnson, Sue E Cc: Lillig, Laurence M; Hahn, Kelli A; Hollibaugh, Mike P Subject: Docket Number Assignment - ADLSi CH Land Office Building Sue Ellen, Please issue the necessary Docket Number for the CH Land Office Building ADLS. It will be the following: ~Ol ADLS $700 + $65 ($35 per acre ;1.87 ac.) "';::.~ ,," cP"~,J ~ ,~" <:::;>P..sI'1 u ~ .lIiY'~1, _.,r- ?~'\. t'"\'~ ~ c...r Dock t ; CH Land Office Building \C U Petiti ner seeks Architectural Design, Lighting, Landscaping & Signage for a Office Building. The site is located north t of West 131 st Street and North Meridian Street. The site is zoned B-5/Business. Filed by E. Davis Coots of Coots Henke & Wheeler for CH Land LLC. The petition will tentatively be placed on the October 16,2001 Plan Commission agenda under New Business. We will need 20 information packets in our office no later than October 5,2001 to be mailed out to Commission members with the meeting Agenda. The information for distribution to committee members should contain reduced versions of (color) elevations of the building, sign elevations in color and a site plan at a minimum. At this time I have not received copies of the recorded covenant for this property in addition to a copy of a dedication of right-of-way. These two items were a condition of the rezone. If copies of these documents are not received from the petitioner by September 19, 2001 (the day ofTAC) this item will not be placed on the Plan Commission Agenda for October 16th. In addition, the site plan submitted with the application is not complete. The areas illustrated as, "by others" can be constructed by whomever the property owner has an agreement with. However, the detailed construction drawings for these improvements shall be included on the plans for this site. To date, the applicant as not requested to meet with the Department to discuss the logistics of how the overall site will develop. In addition, the application that was submitted was a ADLS Amendment. This is not an amendment. The application must be filed as an ADLS. We will accept a new application form from the applicant as opposed to a refileing. At this time there should be no expectation on the part of the applicant that this item will appear on the October 16th Plan Commission agenda. I will provide the applicant with information regarding the action necessary to proceed. The timeliness of satisfying the rezone conditions and of filing a complete site construction plan are the responsibility of the applicant. The preparation of the documents necessary for the dedication of the right-of-way is not a process that can be addressed overnight and our department has not received to date the survey and legal 1 7' d~SCriPtion for our review prior ~he applicant proceeding with the dedicQn. All of the information contained within this transmittal has been previously understood by the applicant and his representatives through previous Plan Commission proceedings and action taken by the City Council in the presence of the petitioner. Our department will not be placed in a position to continue to process this petition until the above referenced matters are fully addressed. Please contact Mr. Coots by fax at 573-5385 and Craig Keiser at with this information. Once the docket is assigned please return the file to my office. Thanks, Jon 2 ...~ , o o CITY OF CARMEL Department of Community Services One Civic Square Carmel, IN 4Ei032 (317) 571-2417 Fax: (317) 571-2426 Fax To:D~ ~ From: ~~ ~ ~ -f)~ \ Fax: S '1~-'5~~"S Pages: Phone: Date: Re: Q.,'t L~~ ~r\c..d" ~&')&a..Q"~~ cc: o Urgent o For Review [J P.lease Comment 0 Please Reply o Please Recycle ~~8!:r::>-............. c::::;...r e- r::::...~ r.:........~."t) I '"' 'P-c::. . ~ ~,<- ~- A \'.~ IIi"Y2- . )~~ ~~~ -:PA-\~ --:;;- ..:. f-" \~'"'.,.) :;'"'";. , l) o CITY OF CARMEL Department of Community Seroices One Civic Square Carmel, IN 46032 (317) 571-2417 Fax: (317) 571-2426 Fax Q /-A,.... A IJ, ,---- 8Y3..gLjsl To: From: ~~ 3 g-l-~ I Fax: Pages: Phone: Re:Q\'\- ~? &)rr1CA" ~'L.O.~ Date: CC: o Urgent 0 For" Review 0 Please Comment 0 Please Reply o Please Recycle ~L"~" ~ p...~c. ~ r.::::. t ~c. -L \\-Au-e; ~.....~ ~r.:::...\'E;~ ,\,t:l. '"b~ ~~. o w o Carmel artmen t September 5, 2001 E. Davis Coots Coots, Henke & Wheeler 255 E. Carmel Drive Carmel, IN 46032..2689 RE: CH Land LLC - Zoning File No.: 13664 Dear Mr. Coots: I have received and reviewed the information for the above-mentioned project. At the present time, I see nothing in the plans that would hamper law enforcement efforts. If we can be of any further assistance to you, please contact us. Respectfully, ~d)).4 Michael D. Fogart~ Chief of Police MDF:vb cc: Dept. of Community Services rcement Agency Fax (317) 571-2512 (317) 571-2500 A Nationally Accredit ~:!:~L _1. ",'\.,>7 "" ",:/ ~ st RECEIVED SEP 6 2001 DOCS E.DAVlSCWrS. STEVEN RHENKE v September 4, 2001 o T. JAY CURTS Carmel Dep'!rtment of CommUllity Services One Civic Square Carmel, IN 46032 ~ ~ ~ 11I,- - JAMES K. WHEELER. JAMES D. CRUM JEFFREY S. ZIPES ELIZABETH 1. VAN TASSEL JANICE R. MANDLA. Re: CD Land LLC- Zoning Our File No.: 13664 MA'Q'HEW L. HINKLE To Whom It May Concern: , SENGHOR A MANNS J. KATHRYN JENKINS Enclosed'please find drawings regarding the dental office building that is being builtat US 31 and 13}St Street DANIEL E. COOTS .CERTIFIED MEDIATOR , . Please contactmy office if you have any questions with regard to the above referenced matter. Thank you. EDC/ jrnk Enclosure( s) K:\EDC\commusa. wpd 255 East Carmel Drive Carmel, Indiana 46032-2689 317-844-4693 FAX: 317-573-5385 Sincerely, COOTS, HENKE & WHEELER, P.C. E. Davis Coots AUG-21-2001 TUE 04:18 PH C~ HENKE & WHEELER FAX NO. 3175735385 U P. 01 COOTS, HENKE & WHEELER Attorneys at Law 255 East Carmel Drive Carmel, Indiana 46032-2634 Telephone: 317-844-4693 Facsimile: 317-573-5385 DATE: August 21, 2001 5 CI! ~ ~ ~. ., FACSIMILE TRANSMITTAL COVER SHEET TO: Laurence Lillig, Jr. COMPANY: FAX NO. 571-2426 FROM: E. Davis Coots SUBJECT: CD Land COMMENTS: Attached is an ADLS that we would like you to consider for the September 18lh date. Will you please let me know if that is possible. I would greatly appreciate your assistance in this matter. Will be sent via Regular Mail Will be sent via Overnight Courier X Facsimile Communication Only HARD COpy CONFIDENTIALITY NOTICE: This cover sheet and the materials enclosed with this transmission are the confidential property of the sender, and the materials are privileged communications intended solely for the receipt, use, benefit, and information of the intended recipient indicated above. lfyou are not the intended recipient, you are hereby notifled that any review, disclosure, distribution, or the taking of any other action in reliance upon the contents of this transmission is strictly prohibited and may result in lega/liability on your part. If you have received this transmission in error, please notify the sender at the above telephone number and arrangefor return of the original transmission, without retaining a copy, to the sender at the address above, at sender's expense. OUR FILE NO.: 13664 M:\ WLT\T' AXCOVER\lillila.wpd -___L___ ______~_ u Q City of Carmel August 9, 2001 Cannel City Council Annexation and Land Use Committee Attn: Wayne Wilson, Chairman RE: Pending CMC (Z-363-0l) and CH Land (Z-364-0l) rezone petitions Dear Councilor Wilson: This letter is in response to comments and concerns raised regarding the above referenced petitions. The Department Report to the Cannel/Clay Plan Commission on June 19 (see 1st attachment) indicates that it was the intent ofthe Department to make the City Council aware of concerns regarding the nexus between the DePauw parcel and the granting of the rezone for the CMC and CH Land petitions. This intent was forwarded in the form ofthe Certification of Plan Commission's Recommendation (see 2nd attachment). It appears that all of the pertinent information regarding this request has not been forwarded to the City Council members. ill order to clear up any confusion the Department would like to see the following addressed/considered to the satisfaction ofthe City Council prior to action on the two rezone requests: 1. That the applicant dedicates or will dedicate right-of-way pursuant to the Thoroughfare Plan along both Meridian Comers Boulevard and 1315t Street. 2. That the applicant provided sufficient evidence that they commit to file ADLS for CH Land property (see 3rd attachment). The attachment is an unsigned copy. 3. That the applicant provided sufficient evidence that they will construct access onto Meridian Comers Boulevard in accordance with the plan proposed by the City Engineer (see 3rd attachment). The attachment is an unsigned copy. 4. That the applicant submit documentation whereby DePauw would agree to reserve the property covered under Docket Number 188-00 Z for future State Highway Improvements (see letter dated June 21, 2001, from the DePauw attorney, the 4th attachment and the 5th attachment which it is our understanding is a work in progress, also unsigned). Page 1 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 u o Copies of this transmittal will be provided to members of the Land Use and Annexation Committee this afternoon as well as Mr. Coots. I will also copy John Molitor. This is information the Department feels is necessary for review by the City Council in making any decision regarding the proposed rezone. The Department recommends that the rezones be approved subject to the following: 1. Dedication of right-of-way pursuant to the thoroughfare plan. Along Meridian Comers Boulevard there exists a 90-foot wide right-of-way. The Ordinance requires a 120-foot wide right-of-way. We would request the City Council approve the rezone requests subject to the dedication of an additional 15 feet of right- of- way along the full extent of the DePauw parent tract and the CH Land tract as identified in the Thoroughfare Plan. In fairness to the petitioner the Plan Commission did not address this issue. However, Staff had discussed the issue with the petitioner. At this time we feel it is necessary and the Council has the authority to request it under the existing Thoroughfare Plan. In addition, the Department will require additional right-of-way to be dedicated on the site along 131 st Street when the applicant submits a Development Plan Application for that site. As an alternative, the City Council may desire that the applicant commit to dedicate the subject right-of-way for 131 st Street as part ofthe rezone. Whichever the case, the Department would recommend requiring a legal description as well as a general survey ofthe area to be dedicated. This description should then be reviewed by the City Engineer to confirm its accuracy. 2. Commitment to file ADLS for CH Land Property The applicant has submitted a draft of a covenant agreeing to ADLS for the CH Land parcel. However, we do hot have a signed copy of the covenant. A recorded copy ofthis covenant should be presented in commitment fonn by the applicant prior to action on the rezone by the City Council. 3. Construction of entrance onto Meridian Corners Boulevard The applicant has submitted a draft of a covenant agreeing to construct the improvements as proposed (see 1 st attachment, third page) subject to final approval by the City Engineer. However, we do hot have a signed copy ofthe covenant. A recorded copy of this covenant should be presented in commitment fonn by the applicant prior to action on the rezone by the City Council. 4. Execution of the document prepared by John Molitor (see 5th attachment) This document concerns the reservation of the real estate described under the application filed under Docket Number 188-00 Z (the area ofland required to be reserved for Pending State Highway Improvements). The fourth attachment to this letter is from the attorney representing DePauw and is the basis for the drafting of the commitment. It is the understanding ofthe Department that this document is a work in progress. A recorded copy of this document, once completed, should be presented by the applicant prior to action on the rezone by the City Council. Page 2 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 o Q If you have any questions or in may be of assistance please do not hesitate to call. For your convenience I will attend the Annexation and Land Use Committee Meeting on August 9th at 7 p.m. Sincerely, Jon C. Dobosiewicz Planning Administrator C: Carmel City Council Land Use Committee Members E. Davis Coots, Esq. John Molitor, Esq. File: 186-00 Z, 187-00 Z, 188-00 Z DePauwRezone-l.rtf Page 3 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 CJ) u City of Carmel Fire Department Headquarters 2 CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2600 E. Davis Coots Coots, Henke and Wheeler 255 East Carmel Dr. Carmel, IN 46032 RE: Proposed Dental Office at 131st St. & US 31 LETTER OF APPROVAL The undersigned has reviewed the proposed plans for Proposed Dental Office at 131st St. & US 31 and has approved the plans subject to the following: 1. We are requesting that a Knox Box be installed on the building for fire department emergency access. An application for this secure box can be obtained through our office. 2. Is the building going to require a sprinkler system installed for fire protection? If so a meeting will need to be set up for the location of the fire department connection. 3. If the building is to be sprinklered we are requesting an outside entrance to the riser room for our access. 4. What is the total square footage of the basement? 5. 6. Please respond to the above noted condition(s) in writing and submit to our office prior to the scheduled Technical Advisory Meeting for this project. Date: November 15. 2000 By: Gary Hoyt, Fire Marshal Carmel Fire Department Fire Prevention Saves Lives and Property