Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
S200- Framing Second Floor
DN DN A 5.01 B 5.01 BEDROOM #3 BEDROOM #4 W.I.C. 9'-4 1/2" CLG. HALL BATH W.I.C. W.I.C. LAUNDRY9'-4 1/2" CLG. OWNERS BATH 9'-4 1/2" CLG. OWNERS SUITEOPEN TO BELOW W.I.C. BATH #4 BEDROOM #2 9'-4 1/2" CLG. 8'-1" CLG.2'0"2'8"2'4"2'4"2'4"2'6"2'6"2'6"2'4"2'4"2'0"2'4"3050 FIXED 3050 FIXED3050 FIXED 3060 S/H 3060 S/H 3050 S/HHVAC CHASE 2'0"2'-5 1/2"49'-3" 24'-1 1/2" 17'-5 1/2" 7'-8"2050 S/HTEMP.13'-1"13'-1"3'-9"3'-9"5 1/2"15'-0 1/2"9" 9"202A 202G 1'-4" 2'-3 1/2"5'-0"7'-10"9'-2 1/2"5'-0"2'-10"15'-1"18'-11" 14'-1" 3'-7"7'-1"8'-3 1/2" 9'-6 1/2" 7'-5 1/2" 3'-1" 2'-11" 3 1/2" 5 1/2" 6'-2" 20'-1"14'-11"18'-8 1/2"2'-7"4'-3 1/2"3'-0"1'-10"7'-8 1/2"3'-9"3'-9"5'-4 1/2"7'-2"3'-11"2'0"2'4"7'-11"11'-11 1/2"3'-7"3'-11"5'-0" 4'-7"9'-6" 202K202K 202K 202N 10'-0 1/2" CLG. 9'-4 1/2" CLG. TYP. 2'-0" 3'-1" 1'-0" 2'-6"1'-8"4'-0"1'-4"7'-0"3'-2"202Q 202Q 6'-0"3'-6" MUDPAN 1'-1" 4'-0" 202C3 1/2"49'-3" 18'-6 1/2"30'-8 1/2" 3'-7 1/4" 5'-6" 5'-6" 3'-11 1/4" 4'-0"26'-8 1/2" 3050 S/H 3050 S/H 3050 S/H 3050 S/H2'4"37'-3"TEMP.5'-1"6'-11"43'-3"7'-7 1/2"33'-2"14'-1"5'-8 1/2"4'-7"12'-1"1'-0" 3'-4 1/2"6'-0"13'-5"5'-6" 8" RAIN CAN SHOWER (DROP CEILING 6") W/ TRAY CEILING 9'-1"22'-8 1/2"5'-5 1/2"3060 S/H2-STORY STONE FIREPLACE WALL 10'-2" SEE DETAIL M/D2.1 FOR WALL ATTIC ACCESS DETAILS L.T. R/I 3050 S/HRESIDENCE FOR:Sheet InformationHouse Name: Series: Plan No.: Job Number:Drawing Date: Coord Name: Coord Phone: Drawing Scale: 1/8" = 1'0" Contract Drawn By: ( ) The Drees Company. All Rights Reserved. Space for Architect Seal 900 East 96th Street, Suite 100, Indianapolis, IN 46240 Phone: [317] 347-7300 Born on Date: CDs Drawn By: Copyright © MODEL 14391 KELSO COURT ALBANY VILLAGE ESTATES ALV-0037-00 11/18/2022 MPH 2.02F Elevation "C" Second Floor Framing Plan 859-578-4290 the AYDEN EWT 09/14/21 BLC 2021 2021 General Notes: 1. REFER TO SHEET 0N.1 FOR GENERAL NOTES. 2. ALL SECOND FLOOR CEILINGS TO BE 8'-1" ABOVE SUBFLOOR UNLESS OTHERWISE NOTED. 3. FRAME TOP OF ALL WINDOWS AT 1'-0 1/4" BELOW TOP OF PLATE UNLESS OTHERWISE NOTED. 4. ALL DROPPED, INTERIOR HEADERS (FALSE AND BEARING) ARE DROPPED 1'-0" FROM CEILING. 5. REFER TO SELECTION SHEETS FOR FLOORING MATERIAL PRIOR TO CONSTRUCTING STAIRS TO DETERMINE RISER HEIGHTS. 6. REFER TO SHEET 2.02S FOR STRUCTURAL INFORMATION. Key Notes: 202A 2x6 BALLOON FRAMED WALL - SEE SHEET 2.02S FOR MORE INFO 202C SLOPE WALL EVEN WITH TOP OF STAIR STRINGER, RAILING ABOVE 202G FRAME TOP OF WINDOW(S) AT TO 2'-0 1/4" BELOW TOP PLATE 202K DO NOT LOCATE TRUSS ABOVE PLUMBING WALL 202N 22-1/2" x 32" ATTIC ACCESS PANEL IN CEILING 202Q PROVIDE 4-1/2" H. SHOWER CURB REISSUED: 11/29/2022 02/09/23