Loading...
HomeMy WebLinkAboutTraffic Study_May 1992 TRAFFIC IMPACT STUDY MILLBROOK HAMILTON COUNTY, INDIANA Prepared For: C. P. MORGAN COMPANY and ESTRIDGE DEVELOPMENT COMPANY Prepared By: PFLUM, KLAUSMEIER & GEHRUM CONSULTANTS Indianapolis, IN Cincinnati, OH May, 1992 CONTENTS PAGE INTRODUCTION 1 EXISTING SITE CONDITIONS 1 EXISTING TRANSPORTATION FACILITIES 1 99th Street 1 106th Street 4 SR 431 (Keystone Avenue) 4 SITE GENERATED TRAFFIC 4 IMPACT OF SITE GENERATED TRAFFIC IN EXISTING FACILITIES 7 RECOMMENDATIONS AND CONCLUSION 7 TABLES PAGE SITE GENERATED TRAFFIC 4 FIGURES PAGE 1. GENERAL SITE LOCATION 2 2. 99TH STREET AT KEYSTONE AVENUE 3 3. 106TH STREET AT KEYSTONE AVENUE 5 4. PRELIMINARY SITE PLAN 6 5. INBOUND TRAFFIC VOLUMES 8 6. OUTBOUND TRAFFIC VOLUMES 9 APPENDIX 1783/R-23/02 TRAFFIC IMPACT STUDY HAMILTON COUNTY, INDIANA INTRODUCTION This Traffic Impact Study was prepared for the C. P. Morgan Company (CPM) and the Estridge Development Company (EDC). Each company proposes to develop a residential neighborhood on separate portions of a 63 acre site west of Keystone Avenue (SR 431) between 99th Street and 106th Street in Hamilton County. This Traffic Impact Study conforms with the Applicants Guide - Transportation Impact Studies For Proposed Development as prepared for the Carmel Plan Commission. EXISTING SITE CONDITIONS The location of the 63 acre site is shown by Figure 1. The site has frontage on both 99th Street and 106th Street. Although adjacent to Keystone Avenue, access to that street is restricted. The site is naturally separated by Carmel Creek and its associated flood plain. Three distinct neighborhoods are proposed in the development plan. The flood plain will serve as an open area for the benefit and enjoyment of the neighborhood residents. The neighborhood to the north of Carmel Creek will contain 23 single family home sites and will be developed by the C. P. Morgan Company. An interior street system will connect with 106th Street at two proposed intersections. There will be two neighborhoods south of Carmel Creek. These will be developed by the Estridge Development Company. One will have 88 home sites and the other will contain 9 home sites. The nine large lots have been designed to preserve trees and the original homesite. Each neighborhood will be served by an independent internal street system and will each have one proposed intersection on 99th Street. EXISTING TRANSPORTATION FACILITIES 99th Street 99th Street is a Local Street according to the Carmel Thoroughfare Plan between Keystone Avenue and Westfield Boulevard. On an average weekday the total daily traffic (eastbound plus westbound) is nearly 1500 vehicles adjacent to the proposed development site. Traffic volumes recorded on April 23, 1992 and April 24, 1992 indicated AM peak hour volumes of 54 eastbound vehicles and 78 westbound vehicles. The PM peak hour volumes were found to be 57 eastbound and 123 westbound. 99th Street is nearly 20' wide with no defined shoulders. The street widens to a total width of 54 feet at Keystone Avenue as shown by Figure 2. Stop signs on 99th Street control traffic at the intersection. - 1 - ESTATES ATE_S r % iAmilaN 1A" j' rnCHERYjfCT •�`'1'/ . . 4 [-11h/Y,. )OIZDAN Job \ cc -,��� ,,, VVOUDS .� / + 2,' Forest �Py, ``` �� I a �i, , c-u Dale ES c� j Agri.. ; Iostn ST. I f V SITE o woCT J Fire Stati _, —_... - - - 4Q� '°Cy o • 1'- I,I I -�4q�� 9° o ! HACKBER�i� ..._ .�j'� � Ill, '�` --}�� ..._ ONP�i,490 �� SPRING CTi • • - D /T �� �� [ [Il_L i ' a �: !Q , 1 3 c:4^ <0' Q --� _STTES - , ' ' ' _ ..._ e R S TIMBER o( ' / - ,.',I < a` S' _,D -RI } }LIC;I-ITS / Q .- 1 JO].ST ST c) Id /oo -' IMOERHEIGHTS . ›- 4 ' ( p4 ' 1 ' ,� _CaLLN I3 iRI§ION_-_R.R - , ' z f CENTENNAR' v ~ J(ZFWOOI , 1�ON V IgggIIP, i\IkEVVOOIb REEK L_A1L I_} _ E Ci N I 9 H D L i ..... , ,,, G R , LIGHTS Sis1 . . . frF 1 BIRCHW000 CTCHES[TR ON a .Kokno,0 gip. COLONY CT DRp I ,^ } [AMII 1"ON0 ‘ o 17E o is 3 ( � o 111)?�Z ( �%t33RICf- o cc ac W '3 z `: T `,� HE1Gi [ ['� o I• s o x z 98TH j ST g �J Ail, - . G L, N -I. :x� V PI A.5A N 10 0 98TF{, ST ( WAY cc I. cc • 3 ;a 3 a = I I La Salle EA o A a a Square o ES TA §' z ca v, i X r gi /lV ZI l.lii . . . QHoP R u ROQ !cc o 465 cc t zQ z _ o t ! Q ( ST 10 � LA � of o - ?�- � n � rT, p QIAN1 � OA NDRl < a ST _ TN ..,,, o� cc I r- - , ��OR/ /, 0 F7 &F -- FIGURE I GENERAL SITE LOCATION -2- S 70' 200' 30 ___. 123 PM M.P.H. `i 78 AM 885 DAILY 27' 991h St. 20' 'L -; 12' (-- 27' 608 DAILY .4 104 112' 54 AM 57 PM 15' x m -i 0 m PI FIGURE 2 99th Street at Keystone Ave. Hamilton County -3- 106th Street 106th Street is a Secondary Thoroughfare according to the Carmel Thoroughfare Plan. It is continuous between River Avenue to the east and US 421 to the west. Traffic volumes recorded on April 23 and 24, 1992 indicated an average daily traffic volume of nearly 7000 on weekdays adjacent to the site. The AM peak hour volumes were 208 eastbound vehicles and 451 westbound vehicles. The PM peak hour volumes were 468 eastbound and 344 westbound. Pavement markings on 106th Street indicate a 10' wide eastbound lane and an 11' wide westbound lane. 106th Street widens as it approaches Keystone Avenue as shown in Figure 3. This intersection is currently signalized as part of a computer controlled traffic signal system between I-465 and Smokey Row Road (136th Street). SR 431 (Keystone Avenue) SR 431 (Keystone Avenue) is a divided Expressway with access controlled by the Indiana Department of Transportation. Two travel lanes in each direction are provided north of 99th Street, and three lanes in each direction are provided south of 99th Street. Auxiliary left and right turn lanes are provided at both 99th and 106th Streets. A traffic signal at 106th Street is a part of an interconnected system of signals along SR 431. SITE GENERATED TRAFFIC The site generated traffic has been estimated in accordance with the 5th Edition of Trip Generation as published by the Institute of Transportation Engineers. As described earlier, three separate neighborhoods have been established in the development. The C. P. Morgan neighborhood consists of 23 home sites. One of the Estridge Development Company neighborhoods has 9 home sites and the other contains 88 home sites. The 23 home site area will have two ingress/egress points on 106th Street. The other two areas will have one ingress/egress point each that intersects with 99th Street. This is shown in Figure 4 which is a reprint of a preliminary site plan for the development. For purposes of this report only, the access points on 106th Street to the 23 home sites has been identified as intersection lA and 1B. Intersection 2 serves the 9 home site area from 99th Street and intersection 3 on 99th Street provides access to the 88 home site area. Table 1 below provides the results of the Site Generated Traffic estimation. TABLE 1 Site Generated Traffic AM Peak PM Peak Daily In Out In Out In Out Intersection lA and 1B 23 home sites 6 17 19 10 124 124 Intersection 2 9 home sites 3 7 8 4 56 56 Intersection 3 88 home sites 19 53 62 34 459 459 TOTAL 28 77 89 48 639 639 - 4 - i 35 CARMEL M.P.H. VIP BAPTIST CHURCH 344 PM I 451 AM 3441 DAILY 10G Ih 10' 3500 DAILY 208 AM 468 PM 120' 80' 60' 55' 33' cn 267' in KING OF GLORY CHURCH FIGURE 3 106th Street at Keystone Ave: (S.R. 431) Hamilton County —5— 13 Intersection IA IB Z q ,21'xRDAN,w000s i y F \ i \ ...._______N I Milk __---— --- -- • \ S C. -• — 11 .-, I C ji-----I I \\ \ 1 Z ! • •4 " i ... Li 11[1.1 .1'117 1 \ S ,I .s .. i . t .;. Wr 1 I I 4%•____________---'__,_ 1 : 2 q ..." ' • 1 • • i, ii A @ A i 6 g. —IV— , E Ikl, I . `7" ' ' ..n. sn w I : I 1.." . `,...- - % ' ... 1 1 . # 1 P i f — f '11111111174*, 1 ‘E4ttN4PON,P0.4Alith .... \ \ r W.W.I Aff A I IN I a 8 : A- t t A I wil )113.ii . . v. . . ., . wits e A 3 g F. i 2 u bt u It ti I 8 : I _ 1 .. 4 Ili ti 4T 'N . I LAKCYMOD GAMINS 1 Intersection 2 Intersection 3 FIGURE 4 Preliminary Site Plan —6— The distribution of the site generated traffic is shown by Figures 5 and 6 for AM and PM peak hours. The distribution of site traffic to and from various directions considers the configuration of the street network and opportunities for employment and shopping. IMPACT OF SITE GENERATED TRAFFIC ON EXISTING FACILITIES Analyses were performed on each of the four new unsignalized local intersections of the proposed development. The analyses were performed using the computer software based on the 1985 Highway Capacity Manual. Summary reports are included in the Technical Appendix for all intersections, for the AM and PM peak hours. A general statement can be made that the impact on 99th Street and 106th Street due to the site generated traffic will be insignificant. Both 99th Street and 106th Street are expected to continue to operate at Level of Service (LOS) A during peak hours and throughout the day. The average right turning vehicle leaving the proposed development from any driveway is expected to experience LOS A at all times. Left turning vehicles exiting the development from driveways 2 and 3 are expected to experience LOS A at all times. Left turning vehicles exiting the development at intersections 1A and 1B will experience LOS B during the AM peak hour and LOS C during the PM peak hour. The impact of the site generated traffic at the intersections on Keystone Avenue at 106th Street and 99th Street is also expected to be insignificant. It is expected that 30 additional vehicles will pass through the signalized intersection on Keystone Avenue at 106th Street due to the development during AM and PM peak hours. There is ample left turn and right turn storage capacity on Keystone Avenue at 99th Street to service the existing plus site generated traffic. It is unlikely that a traffic signal will be warranted upon complete build out of the development. Representatives of the Indiana Department of Transportation should monitor this location in the future. RECOMMENDATIONS AND CONCLUSION The residential development as proposed by the C. P. Morgan Company and the Estridge Development Company will have a very small impact on the surrounding transportation system. This results from the fact that there are three distinct neighborhoods and the associated ingress/egress points intersect two separate streets. The 88 homesite neighborhood and the 9 homesite neighborhood are served by 99th Street which is currently experiencing very low volumes of average daily traffic. The 23 homesite neighborhood will be served by 106th Street at two locations. The intersections formed by these two new drives will distribute the relatively light volumes of traffic generated by this neighborhood. - 7 - 2 2 (5) (6) I 3 0% /0**".3°% ' 106th St. 20% ? 20% 2 t 1 11 J 111.11('-14-41111: 1177- '111'<:1:11-1111;11111's-----: "4-.::1141.....:11" . '. • I ' 1 1 :NI : LP--1%4 \ \ \ 1 • I 1 V-3f I 11, \ I, I I s •• N :..—'::::: ' .1 it I N - **kfilA : -........„ \ i tIA tri 3 p ---'—N %K _ _ .0 , - --,.. r LI i .. . T . ,h, /e#10IN 4 mi' -4411111114 I 1 il 1 °A 31 i IQ II... '". .." 0 i , •IU) ,............. (4, A ^,. 1 •••,..6 li r_i ..\. ___Al..____I itottais ..i, r it v ii 44100•Ap, st ' tr41 i 1 1 a a Z.: 2 I ilil el ii w to le e "• i 6 . — fl e--- , 6 1....:j 11 fr 70% TO 99th St. % WI IVOOD CAI ttS---........ CS • 143) i 30%----9 30 1 6 (2) ((7) FIGURE 5 Inbound Traffic Volumes A.M. 8 (P.M.) Peaks -8- 3 4 (2) (2) y 20 20 .,, 5 r 1 xl, I' 3oX I06th St, 1 30X I • -- lf._-- 1(3)1 /-- t -;i ; 1 ,V r 11 ' a •I I \I 1 c -11 i F- I I I I I I 1 a I A I - _ !. p 11 tl \ L.L......., 1 7 lal 1 2ti "Aili-;'-- e - S �,, � (1 . r S 1 .I L I • 1 . „ . • 1I,, --,...„. •r....'1. i. . ci ic -,-. ------< ,...!--7 1 I O ♦ ._. . - - ... �rT 1 • 1 �' • Iy '>S T L „ -\f" -;„J. \f4 ' Li/ yyyi . ' i 4i . - �,,N a 1ar � •` i ,1 r � tl 1 W e it a ,I t r i i s. 4, ;Apo; 8 • ' /:0 'I _ 1 i • . / , ',/\ ----, liciti y x ■ y. 'I � . i , _ _ 1Y1..11 MA ,�/� � I A Y I N. I a d 1— •' A o t A R / iiyi `r 1 \ r r y r l e e i 7y i a a , . ,.. wiw 1 ..., .: ....„. 2 ...,:,....,____:::::::„.„.::;4,- •c . ...--- -- _ — 30 (10) .1 q a ; 111 r 99th St. I 30 .1 woo G' NW;•-- 37 (24) 70% 70% • 5 (3) FIGURE 6 Outbound Traffic Volumes A.M. 8(P.M.) Peaks -9- After reviewing the site plan, including access points and internal roadway system, no additional recommendations for improvement are made. The standard acceleration/deceleration tapers shown for the new access points are sufficient and the extension of the eastbound right turn lane between intersections 1A and 1B is appropriate. In conclusion, the results of this study do not indicate a significant impact on the transportation system surrounding this proposed development, due to the anticipated site generated traffic. - 10 - 1783/R-23/02 APPENDIX 1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1 ********************************************************************* IDENTIFYING INFORMATION _____________________________________________________________________ AVERAGE RUNNING SPEED, MAJOR STREET. . 35 PEAK HOUR FACTOR. . . . . . . . . , . . . . . . . . . . . . 85 AREA POPULATION. . . . . . . . . . . . . . . . . . . . . . 1000000 NAME OF THE EAST/WEST STREET. . . . . . . . . 106th NAME OF THE NORTH/SOUTH STREET. . . . . . . DRIVEWAY 1 NAME OF THE ANALYST. . . . . . . . . . . . . . . . . . T. FORD DATE OF THE ANALYSIS (mm/dd/yy) . . . . . . 04-30-92 TIME PERIOD ANALYZED. . . . . . . . . . . . . . . . . AM PEAK OTHER INFORMATION. . . . WESTERN DRIVE TO 106TH STREET ' INTERSECTION TYPE AND CONTROL ___________________________________________ ----------------- INTERSECTION TYPE: T-INTERSECTION MAJOR STREET DIRECTION: EAST/WEST CONTROL TYPE NORTHBOUND: STOP SIGN TRAFFIC VOLUMES ........................... .........___________________________________________________________ EB WB NB SB __..... ... LEFT 0 2 3 -- THRU 209 451 0 -- RIGHT 3 0 5 - NUMBER OF LANES .................___ ......__________________________________________________________ EB WB NO SB LANES 1338IS H190T 01 HIAI8O N0131SEIM ^ ^ ^ ^NOIlVW8OANI WHY) AV36 WV f 36-02-t0 ^ ^ ^ ^ ^SISAlUM 3101 JO 3WIl ONU 31VD T AUMMIHO ^ ^ ^ ^l33H1S HlOOS/Hl8ON 3H1 JO 3WVN 4490T ^ ^ ^ ^ ^ ^13381S lG301/1SVII 3Hl JO 3WWN _____________________________________________________________________ NOIlt/W8OJNI SNIAAIlN3OI 02 ^9 00 ^0 02 ^9 08 ^9 8N SlASI HONIW 09 ^t 00 ^0 09 ^1.-1 0UG 8M SlJ31 8OMW 03 00 ^0 03 ^q 0UG 8N SlHBI8 HONIW ____________ ___________ ________ ______________ 6vS It/JI1I83 1N3WlSOCDw min-im (3-0T eIqel) -lVNI:A ^lSIO lH8IS O31SOvOv S3O7m 8viO8wl _____________________________________________________________________ S6VS =3I1I83 -- --- ........... ONOO81-1lOO1-3 0 0 0 {DVOO8HI801lI 0 0 0 ONOO8lSM 0 0 0 0NnO8lSv--.�3 ___________ _ _____________ ___________ S31JA38OlOW to S0113I613A S.AU ONt/ NOIlUNI8W03 % SA3O8l OS % _____________________________________________________________________ NOIlISO6WO3 3-13I1-13A - --- N 03 06 00 ^0 ONOO8H180N N 03 06 00^0 ON[ o81SmiM N 03 06 O0 ^0 ONOO81Sw _________________ ____ ___________ ________ SN8Ol 1H8I8 8Os SN8O1 1H9I8 8OI B-l8NU Mt/8S 3NVI NOIlV831333V (m) SOIOvU 88O3 N8Ol lHSIU lN33836 ...............______ _-----------------------------_------ ____________________ 3_eDe� GHOlJud lN3W1SOvOki CAPACITY AND LEVEL-OF-SERVICE Page 3 _____________________________________________________________________ PUTEN- ACTUAL FLOW- TIAL MOVEMENT SHARED RESERVE RATE CAPACITY CAPACITY CAPACITY CAPACITY MOVEMENT v (pcph) c (pcph) c (pcph) c (pcph) c - c - v LOS p M SH R SH _ .........______ _________ ____________ ____________ ------ MINOR STREET NB LEFT 4 343 343 > 343 > 339 > B > 559 > 549 >A RIGHT 6 901 901 > 901 > 894 > A MAJOR STREET WB LEFT 3 986 986 986 983 A IDENTIFYING INFORMATION _____________________________________________________________________ NAME OF THE EAST/WEST STREET, . . . . . 106th NAME OF THE NORTH/SOUTH STREET. , . . DRIVEWAY 1 DATE AND TIME OF THE ANALYSIS 04-30-92 ; AM PEAK OTHER INFORMATION. . . . WESTERN DRIVE TO 106TH STREET 1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1 ********************************************************************* IDENTIFYING INFORMATION ` _____________________________________________________________________ AVERAGE RUNNING SPEED, MAJOR STREET. . 35 PEAK HOUR FACTOR. . . . . . . . . . . . . . . . . . . . . . 85 AREA POPULATlON. . . . . . . . . . . . . . . . . . . . . . 1000000 NAME OF THE EAST/WEST STREET. . , . . . . . , 106th NAME OF THE NORTH/SOUTH STREET. . , . . . . DRIVEWAY 1 NAME OF THE ANALYST. . . . . . . . . . . . . . . . . . T. FORD DATE OF THE ANALYSIS (mm/dd/yy) . . . . . . 04-30-92 TIME PERIOD ANALYZED. . . . . . . . . . . . . . . . . PM PEAK OTHER INFORMATION. . . . WESTERN DRIVE TO 106TH STREET INTERSECTION TYPE AND CONTROL __________________________________________________________ INTERSECTION TYPE: T-INTERSECTION MAJOR STREET DIRECTION: EAST/WEST CONTROL TYPE NORTHBOUND: STOP SIGN TRAFFIC VOLUMES ____________________________________________________________ ________ EB WB NB SB LEFT 0 5 2 -- 114RU 472 344 0 -- RIGHT 4 0 3 -- NUMBER OF LANES _____________________________________________________________________ EB WB NB SB _______ _______ _______ LANES 1 1 1 -- ADJUSTMENT FACTORS Page-2 _____________ _______________________________________________________ PERCENT RIGHT TURN CURB RADIUS (ft) ACCELERATION LANE GRADE ANGLE FOR RIGHT TURNS FOR RIGHT TURNS _______ __________ ________________ _________________ EASTBOUND 0. 00 90 20 N WESTBOUND 0. 00 90 20 N NORTHBOUND 0. 00 90 20 N .......... - - VEHICLE COMPOSITION _______________________________________________________ ___ % SU TRUCKS % COMBINATION AND RV 'S VEHICLES % MOTORCYCLES ----------- ------------- ------------- EASTBOUND 0 0 0 WESTBOUND 0 0 0 NORTHBOUND 0 0 0 SOUTHBOUND ............. --- --- CRITICAL GAPS ___________________________ ------------------------------------------ TABULAR VALUES ADJUSTED SIGHT DlST. FINAL (Table 10-2) VALUE ADJUSTMENT CRITICAL GAP ______________ ________ ___________ --------------- MINOR RIGHTS NB 5.70 5. 20 0. 00 5. 20 MAJOR LEFTS WB 5. 10 4. 60 0. 00 4. 60 MINOR LEFTS WB 6' 80 6. 38 0. 00 6. 30 IDENTIFYING INFORMATION _____________________________________________________________________ NAME OF THE EAST/WEST STREET. . . . . . 106th NAME OF THE NORTH/SOUTH STREET. . . . DRIVEWAY 1 DATE AND TIME OF THE ANALYSIS. . . . . 04-30-92 ; PM PEAK OTHER INFORMATION. . . . WESTERN DRIVE TO 106TH STREET . CAPACITY AND LEVEL-OF-SERVICE Page-3 .....................................IL........................ ........... POTEN- ACTUAL FLOW- TIAL MOVEMENT SHARED RESERVE RATE CAPACITY CAPACITY CAPACITY CAPACITY MOVEMENT v (pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS p M SH R Ski .................._.............. _________ ____________ __________ MINOR STREET NB LEFT 3 26O 258 > 258 > 256 > C > 401 > 394 >B RIGHT 4 633 633 > 633 > 629 > A MAJOR STREET WB LEFT 6 741 741 741 734 A IDENTIFYING INFORMATION __________________________________________________________ NAME OF THE EAST/WEST STREET. . . . . . 106th NAME OF THE NORTH/SOUTH STREET. . . . DRIVEWAY 1 DATE AND TIME OF THE ANALYSIS. . . . . 04-30-92 ; PM PEAK OTHER INFORMATION. . . . WESTERN DRIVE TO 106TH STREET / 1985 HCM: UNSIGNALlZED INTERSECTIONS Page-1 ********************************************************************* IDENTIFYING INFORMATION _____________________________________________________________________ AVERAGE RUNNING SPEED, MAJOR STREET. . 35 PEAK HOUA FACTOR. . . . . . . . . . . . , . . . . . . . . , 85 AREA POPULATION, . , . . . . . . . . . . . . . . . , . . . 1000000 NAME OF THE EAST/WEST STREET. . . . . . . . . 106th NAME OF THE NORTH/SOUTH STREET. . . . . . . DRIVEWAY 1A NAME OF THE ANALYST. . , . . . . . . . . . . . . . . . T. FORD DATE OF THE ANALYSIS (mm/dd/yy) . . . . . . 04-30-92 TIME PERIOD ANALYZED. . . . . . . . . . . . , . . . . AM PEAK OTHER INFORMATION. . . . EASTERN DRIVE TO 106TH STREET INTERSECTION TYPE AND CONTROL _....................................__________________________________________________________ INTERSECTION TYPE: T-INTERSECTION MAJOR STREET DIRECTION: EAST/WEST CONTROL TYPE NORTHBOUND: STOP SIGN TRAFFIC VOLUMES __________________________________________________________________ __ EB W8 N8 SB ____ LEFT 0 2 4 -- THRU 208 453 0 -- RIGHT 1 0 5 -- NUMBER OF LANES _____________________________________________________________________ EB WB NB SB __..................... _______ LANES 1 1 1 -- ADJUSTMENT FACTORS Page 2 --------------------------------------------------------------------- PERCENT RIGHT TURN CUR8 RADIUS (ft} ACCELERATION LANE GRADE ANGLE FOR RIGHT TURNS FOR RIGHT TURNS _______ __________ ________________ ____________ ____ ' EASTBOUND 0. 00 90 20 N WESTBOUND 0.00 90 20 N NORTHBOUND 0. 00 90 20 N VEHICLE COMPOSITION ..................__________________________________________________________ % SU TRUCKS % COMBINATION AND RV'S VEHICLES % MOTORCYCLES _ _________ _____________ ------------ EASTBOUND 0 0 0 WESTBOUND O 0 0 NORTHBOUND 0 0 O CRITICAL GAPS _____________________________________________________________________ TABULAR VALUES ADJUSTED SIGHT DIST. FINAL (Table 10-2) VALUE ADJUSTMENT CRITICAL GAP ______________ ________ ___ _______ ____________ MINOR RIGHTS ^ NB 5. 70 5. 20 0. 00 5. 2O MAJOR LEFTS WB 5. 10 4. 60 0. 00 4. 60 MINOR LEFTS NB 6. 80 6. 30 0. 00 6. 30 IDENTIFYING INFORMATION _____________________________________________________________________ NAME OF THE EAST/WEST STREET. . . . . . 106th NAME OF THE NORTH/SOUTH STREET. . . . DRIVEWAY 1A DATE AND TIME OF THE ANALYSIS. . . . . 04-30-92 ; AM PEAK OTHER INFORMATION. . . . EASTERN DRIVE TO 106TH STREET CAPACITY AND LEVEL OF-SERVICE Page-3 _____________________________________________________________________ POTEN- ACTUAL FLOW- TIAL MOVEMENT SHARED RESERVE RATE CAPACITY CAPACITY CAPACITY CAPACITY MOVEMENT v (pcph) c (pcph) c (pcph) c (pcph) c - c - v LOS p M Sid R SH _______ ________ _________ ____________ ____________ ---- MINOR STREET NB LEFT 5 343 343 > 343 > 337 > B > 523 > 511 >A RIGHT 6 903 903 > 903 > 897 > A MAJOR STREET W8 LEFT 3 986 986 986 984 A IDENTIFYING INFORMATION _____________________________ ------------------------------- NAME OF THE EAST/WEST STREET. . . . . . 106th NAME OF THE NORTH/SOUTH STREET. . . . DRIVEWAY 1A DATE AND TIME OF THE ANALYSIS. . . . . 04-30-92 ; AM PEAK OTHER INFORMATION. . . . EASTERN DRIVE TO 106TH STREET ' 1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1 ********************************************************************* IDENTIFYING INFORMATION _........__________________________________________________________ AVERAGE RUNNING SPEED, MAJOR STREET 35 PEAK HOUR FACTOR. . . . . . . . . . . . . . . . 85 AREA POPULATION . . . . . . . . . . . . . . . . . 1000000 NAME OF THE EAST/WEST STREET. . . 106th NAME OF THE NORTH/SOUTH STREET, . . . . . . DRIVEWAY 1A NAME OF THE ANALYST. . . . . . . . . . . . . . . . . . T. FORD DATE OF THE ANALYSIS (mm/dd/yy) . . , . . . 04-30-92 TIME PERIOD ANALYZED. . . . . . . . . . . . . . . . . PM PEAK OTHER INFORMATION. . . , WESTERN DRIVE TO 106TH STREET INTERSECTION TYPE AND CONTROL .........._....................................__________________________________________________________ INTERSECTION TYPE: T-INTERSECTION MAJOR STREET DIRECTION: EAST/WEST CONTROL TYPE NORTHBOUND: STOP SIGN TRAFFIC VOLUMES _____________________ _______________________________________________ EB WB NB SB ____ ____ ____ LEFT 6 2 -- THRU 468 349 0 -- RIGHT 4 NUMBLR OF LANES -------------- --------------------------------- ------------------ EB Wli" NB S8 _..... _______ LANES 1 1 1 -- ' ADJUSTMENT FACTORS Page-2 __ _________________ ___________________________ __________________ ---- PERCENT RIGHT TURN CURB RADIUS (ft) ACCELERATION LANE GRADE ANGLE FOR RIGHT TURNS FOR RIGHT TURNS _______ __________ ________________ _________________ � EASTBOUND 0,00 90 20 N WESTBOUND 0. 00 90 20 N NORTHBOUND 0. 00 90 20 N SOUTHBOUND ----- --- --- - VEHICLE COMPOSITION -------------------------------______________________________________ % SU TRUCKS % COMBINATION AND RV 'S VEHICLES % MOTORCYCLES ___________ _____________ --------------- EASTBOUND 0 0 0 WESTBOUND 0 0 O NORTHBOUND 0 0 O SOUTHBOUND --- --- --- CRITICAL GAPS ____________________________________________________________________ TABULAR VALUES ADJUSTED SIGHT DI8T. FINAL (Table 10-2) VALUE ADJUSTMENT CRITICAL GAP ______________ ________ ___________ -------------- MINOR RIGHTS NB 5. 70 5.20 0. 00 5.20 MAJOR LEFTS WB 5. 10 4. 60 0. 00 4. 60 MINOR LEFTS NB 6. 80 6. 30 0. 00 6.30 IDENTIFYING INFORMATION ________________________________________ ____________________________ NAME OF THE EAST/WEST STREET. . . . . . 106th NAME OF THE NORTH/SOUTH STREET. . . . DRIVEWAY 1A _ DATE AND TIME OF THE ANALYSIS. . . . . 04-30-92 ; PM PEAK OTHER INFORMATION. . . . WESTERN DRIVE TO 106TH STREET CAPACITY AND LEVEL-OF-SERVICE Page-3 ...................___________________________________________ _____________________ POTEN- ACTUAL FLOW- TIAL MOVEMENT SHARED RESERVE RATE CAPACITY CAPACITY CAPACITY CAPACITY MOVEMENT v (pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS p M SH R SH _______ ______ ______ ____________ ----- MINOR STREET NB LEFT 3 259 257 > 257 > 254 > C > 400 > 394 >B RIGHT 4 637 637 > 637 > 633 > A MAJOR STREET W8 LEFT 8 745 745 745 737 A IDENTIFYING INFORMATION _____________________________________________________________________ NAME OF THE EAST/WEST STREET. . . . . . 106th NAME OF THE NORTH/SOUTH STAEET. . . . DRIVEWAY 1A DATE AND TIME OF THE ANALYSIS. . . . . 04-30-92 ; PM PEAK OTHER INFORMATION. . . . WESTERN DRIVE TO 106TH STREET 1985 HCM: UNSIGNALIZED INTERSECTIONS Page 1 ******»************************************************************** IDENTIFYING INFORMATION _____________________________________________________________________ AVERAGE RUNNING SPEED, MAJOR STREET. . 30 PEAK HOUR FACTOR. . . . . . . . . . . . . . . . . . . . . . 85 AREA POPULATION. . . . . . . . , . . . . . . . . . . . . . 1000000 NAME OF THE EAST/WEST STREET. . . . . . . . . 99TH STREET NAME OF THE NORTH/SOUTH STREET. . . . , . . RESIDENTIAL DRIVE #2 NAME OF THE ANALYST. . . . . . . . . . . . . . . . . . T. FORD DATE OF THE ANALYSIS (mm/dd/yy) . . . . . . 05-01-92 TIME PERIOD ANALYZED. . . . . . . . . . . . . . . . . AM PEAK OTHER INFORMATION. . . . INTERSECTION TYPE AND CONTROL .............________________________________________________________________ INTERSECTION TYPE: T-INTERSECTION MAJOR STREET DIRECTION: EAST/WEST CONTROL TYPE SOUTHBOUND: STOP SIGN TRAFFIC VOLUMES _____________________________________________________________________ EB WB NB SB LEFT THRU 62 94 -- 0 RIGHT 0 2 -- 2 NUMBER OF LANES ....._........._________________________________________________________________ EB WB NB SB ...................... LANES ADJUSTMENT FACTORS Page-2 _____________________________________________________________________ PERCENT RIGHT TURN CURB RADIUS (ft) ACCELERATION LANE GRADE ANGLE FOR RIGHT TURNS FOR RIGHT TURNS __________ ________________ _________________ EASTBOUND 0. 00 90 20 N WESTBOUND 0. 00 90 20 N NORTHBOUND ----- --- --- - SOUTHBOUND 0. 00 90 20 N ' VEHICLE COMPOSITION __________ ______________________ ___________________________________ % SU TRUCKS % COMBINATION AND RV 'S VEHICLES % MOTORCYCLES ___________ _____________ ---------------- EASTBOUND 0 0 0 WESTBOUND 0 0 0 NORTHBOUND ............ --- --- SOUTH8OUN[} 0 0 0 CRITICAL BAPS --------------------------------------------------------------------- TADULAR VALUES ADJUSTED SIGHT DIST. FINAL (Table 10-2) VALUE ADJUSTMENT CRITICAL GAP ______________ ________ ___________ -------------- MINOR RIGHTS SB 5.50 5. 00 0. 00 5. 00 MAJOR LEFTS EB 5100 4. 50 0.00 4. 50 MINOR LEFTS SB 6. 50 6.00 0. 00 6. 00 IDENTIFYING INFORMATION _____________________________________________________________________ NAME OF THE EAST/WEST STREET. . . . . , 99TH STREET NAME OF THE NORTH/SOUTH STREET. . . . RESIDENTIAL DRIVE #2 DATE AND TIME OF THE ANALYSlS. . . . . 05-01-92 ; AM PEAK OTHER INFORMATION. . . . CAPACITY AND LEVEL-OF-SERVICE Page-3 _____________ ___________________________________________________ POTEN- ACTUAL ` FLOW- TIAL MOVEMENT SHARED RESERVE RATE CAPACITY CAPACITY CAPACITY CAPACITY MOVEMENT v (pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS p M SH R SH _______ ________ _________ ____________ ____________ ---- MINOR STREET S8 LEFT 6 809 80B > 808 > 802 > A > 855 > 846 >A RIGHT 3 998 998 > 998 > 996 > A MAJOR STREET EB LEFT 1 1000 1000 1000 999 A IDENTIFYING INFORMATION _____________________________________________________ ------------------ NAME OF THE EAST/WEST STREET. . . . . . 99TH STREET NAME OF THE NORTH/SOUTH STREET. . . . RESIDENTIAL DRIVE #2 DATE AND TIME OF THE ANALYSIS. . . , . 05-01-92 ; AM PEAK _ OTHER INFORMATION. . . . ' | ' | 1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1 ********************************************************************* IDENTIFYING INFORMATION _____________________________________________________________________ AVERAGE RUNNING SPEED, MAJOR STREET. . 30 PEAK HOUR FACTOR. . . . . . . . . . . . . . . . . . . . . . 85 AREA POPULATION. . . . . . . . . . . . . . . . . . . . . . 1000000 NAME OF THE EAST/WEST STREET. . . . . . . . . 99TH STREET NAME OF THE NORTH/SOUTH STREET. . . . . . . RESIDENTIAL DRIVE #2 NAME OF THE ANALYST. . , . . . . . . . . , . . . . . . T. FORD DATE OF THE ANALYSIS (mm/dd/yy) . . . . . . 05-01-92 TIME PERIOD ANALYZED. . . . . ' , . . . . - . . . . . PM PEAK OTHER INFORMATION. . . ., INTERSECTION TYPE AND CONTROL __________________________________________________________________ / INTERSECTION TYPE: T-INTERSECTION MAJOR STREET DIRECTION: EAST/WEST CONTROL TYPE SOUTHBOUND: STOP SIGN TRAFFIC VOLUMES _____________________________________________________________________ EB WB NO SB LEFT THRU 74 133 -- 0 | RIGHT 0 6 -- 1 | | NUMBER OF LANES . ------________________________________________________-______________ EB WB NO SB _______ _______ _______ --------- LANES ADJUSTMENT FACTORS Page-2 _____________________________________________________________________ PERCENT RIGHT TURN CURB RADIUS (ft) ACCELERATION LANE GRADE ANGLE FOR RIGHT TURNS FOR RIGHT TURNS __________ ________________ _______ EASTBOUND 0. 00 90 20 N WESTBOUND 0. 00 90 20 N NORTHBOUND ----- --- --- - SOUTHBOUND 0. 00 90 20 N VEHICLE COMPOSITION _____________________________________________________________________ % SU TRUCKS % COMBINATION ' AND RV 'S VEHICLES % MOTORCYCLES ___________ _____________ --------------- EASTBOUND 0 0 0 WESTBOUND 0 0 0 NORTHBOUND --- -- --- SOUTHBOUND 0 0 0 CRITICAL GAPS _____________________________________________________________________ TABULAR VALUES ADJUSTED SIGHT DIST. FINAL (Table 10-2> VALUE ADJUSTMENT CRITICAL GAP ______________ _ ______ ___________ -------------- MINOR RIGHTS SB 5.50 5. 00 0. 00 5. 00 MAJOR LEFTS ` EB 5.00 4. 50 0. 00 4. 50 MINOR LEFTS SD 6. 5O 6. 00 0. 00 6.00 IDENTIFYING INFORMATION _____________________________________________________________________ NAME OF THE EAST/WEST STREET. . . . . . 99TH STREET NAME OF THE NORTH/SOUTH STREET. . . . RESIDENTIAL DRIVE 02 DATE AND TIME OF THE ANALYSIS. . . . . 05-01-92 ; PM PEAK OTHER INFORMATION. . . . ^ ^ ^ ^NOI1M8OANI 8FIHRO XWM6 W6 1 36-TO-GO ^ ^ ^ ^ ^SISAIVNV 3Hl JO 3WIl ONV 31M 3# 3AI8O MIlNBOISM ^ ^ ^ ^m3U1S H1OOS/H18ON 3Hl JO 3WUN 133HlS H166 ^lAM1S 1SMlSM 3H1 jO 314WN _____________________________________________________________________ NOIlVWUOJNI SNIAM1NEIOI v L66 000T 000T 000T 2 1=1371 8-H) 1338lS 8OCM V < 066 < T66 < T66 T66 T lHSI8 V< g6L < 008 < v < 8VL < 3OL < 3GL 29L 17 lA31 8S 1338lS 8ONlN ......._........_........_ __........ _____ HS 8 HS W d SOl x _ z = z (qdzd) z (qdzd) z (udzd) z (4dzd) » lN3W3AOW A1I3V6VJ AlI3W6V3 AlIJt/6W3 AlI3V6V3 31t/8 3AMSEI8 UR8VHS lN3W3AOW lvIl -MOV-1 MOl3w -N3lO6 _____________________________________________________________________ 2-eBe6 mums-AO-mAm DNV �lI3�6�3 1985 HCM: UNSlGNALIZED INTERSECTIONS Page-1 ********************************************************************* IDENTIFYING INFORMATION _____________________________________________________________________ AVERAGE RUNNING SPEED, MAJOR STREET. . 30 PEAK HOUR FACTOR. . . . . . ' . . ' . ' . . . ~ . . . . . 85 AREA POPULATION. . . . . . . . . . . . . . . . . . . . . . 1000000 NAME OF THE EAST/WEST STREET. . . . . . . . . 99TH STREET NAME OF THE NORTH/SOUTH GTREET. . . . . . . RESIDENTIAL DRIVE #3 NAMw OF THE ANALYST. . . . . . . . . . . . . . . . . . T. FORD DATE OF THE ANALYSIS (mm/dd/yy) . . . . . . 05-01-92 TIME PERIOD ANALYZED. . . . . . . . . . . . . . . . . AM PEAK OTHER INFORMATION. . . . INTERSECTION TYPE AND CONTROL _____________________________________________________________________ INTERSECTION TYPE: T-INTERSECTION MAJOR STREET DIRECTION: EAST/WEST CONTROL TYPE SOUTHBOUND: STOP SIGN TRAFFIC VOLUMES _____________________________________ _____________________________ EB WB NB SD LEFT 6 0 -- 37 THRU 61 80 -- 0 RIGHT 0 13 -- 16 NUMBER OF LANE8 _____________________________________________________________________ EB WB NB SB _______ _______ _______ -------- LANES ADJUSTMENT FACTORS Page-2 ________________ ----------------------------------------------------- PERCENT RIGHT TURN CURB RADIUS (ft) ACCELERATION LANE GRADE ANGLE FOR RIGHT TURNS FOR RIGHT TURNS ____ ________________ _________ _______ EASTBOUND 0. 00 90 20 N WESTBOUND 0. 00 90 20 N NORTHBOUND ----- --- --- - SOUTHBOUND 0. 00 90 20 N VEHICLE COMPOSITION __________________________________________________________ % SU TRUCKS % COMBINATION AND RV 'S VEHICLES % MOTORCYCLES ___________ _____________ -------------- EASTBOUND 0 0 0 WESTBOUND 0 O O NORTHBOUND --- --- ___ SOUTHBOUND O 0 0 CRITICAL GAPS _____________________________________________________________________ TABULAR VALUES ADJUSTED SIGHT DIST. FINAL (Table 10-2) VALUE ADJUSTMENT CRITICAL GAP ______________ ________ ___________ ______ -------- MINOR RIGHTS SD 5. 50 5. 00 0. 00 5. 00 MAJOR LEFTS EB 5. 00 4. 50 0. 00 4.50 MINOR LEFTS S8 6. 50 6. 00 0. 00 6. 00 IDENTIFYING INFORMATION ___________________________________________________________ NAME OF THE EAST/WEST STREET. 99TH STREET NAME OF THE NORTH/SOUTH STREET. . . . RESIDENTIAL DRIVE #3 DATE AND TIME OF THE ANALYSIS. . . . . 05-01-92 ; AM PEAK OTHER INFORMATION. . . . ^ ^ ^ ^NOIMW8OHNI 83Hl0 AV36 WU 1 36-TO-GO ^ ^ ^ ^ ^SISAWNU 3H1 AO 3WI1 aNU amO 20 MIND IMlNAOISM ^ ~ ^ ^1338lS HlOOS/H18ON 3Hl 00 3WVN 13381S H166 ^ ^ ^ ^ ^ ~l3381S lMM/lS% 3Hl JO 3WVN _____________________________________________________________________ NOIlVW8OANI SNIAMlNaO1 , U 366 000T 0001 000T B 1J31 8.3 1338lS 8OCuW V < W6 < 000T < 0001 000T T3 1H8IH U< T61 < 098 < U < 29L < TT8 < ITS bT8 8b 1A31 8S 13381S UONIW ___ ____________ ____________ _________ ________ _______ HS 8 HS W d SQl x _ z = z (qdzd) z (qdzd) z (4dzd) z (4dzd) ^ MMMOW A1IJMUJ AlI3v6v3 AlI3U6U3 AlI3V6V3 31t/H 3AWSM 038UHS lN3W3AOW WTI -MOld ivO1Jw -N3106 ______________________________________________________ ______________ 2-a5e6 33IA838-50-13AM GNU A1IJWM3 1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1 ********************************************************************* IDENTIFYING INFORMATION ____________________________________________________________________ AVERAGE RUNNING SPEED, MAJOR STREET. . 30 PEAK HOUR FACTOR. . . . . . . . . . . . . . . . . . . . . . 85 AREA POPULATION. . . . . . . . . . . . . . . . . . . . . . 1000000 NAME OF THE EAST/WEST STREET. . . . . . . . . 99TH STREET NAME OF THE NORTH/SOUTH STREET. . . . . . . RESIDENTIAL DRIVE #3 NAME OF THE ANALYST. . . . . . . T. FORD DATE OF THE ANALYSIS (mm/dd/yy) . . . . . . 05-01-92 TIME PERIOD ANALYIED. . . . . . . . . . . . . . . . . PM PEAK OTHER INFORMATION. . . . INTERSECTION TYPE AND CONTROL ___________________________________________________ _________________ INTERSECTION TYPE: T-INTERSECTION MAJOR STREET DIRECTION: EAST/WEST CONTROL TYPE SOUTHBOUND: STOP SIGN TRAFFIC VOLUMES ------------------------------------------------------------------------ EB WB NB SB _ ............... LEFT 17 0 -- 24 THRU 60 129 -- O RIGHT 0 43 -- 10 NUMBER OF LANES ___________________________________________________________ EB WB NB SB ........... ........................._ _................__ LANES ADJUSTMENT FACTORS Page-2 _____________________________________________________________________ PERCENT RIGHT TURN CURB RADIUS (ft > ACCELERATION LANE GRADE ANGLE FOR RIGHT TURNS FOR RIGHT TURNS __________ ________________ _________________ EASTBOUND 0. 00 90 20 N WESTBOUND 0. 00 90 20 N NORTHBOUND ----- --- ............. - SOUTHBOUND 0. 00 90 20 N VEHICLE COMPOSITION __________________________________________________ -------------------- % SU TRUCKS % COMBINATION AND RV 'S VEHICLES % MOTORCYCLES ___________ _____________ --------------- EASTBOUND 0 0 0 WESTBOUND 0 0 0 NORTHBOUND --- --- --- SOUTHBOUND 0 0 0 CRITICAL GAPS _____________________________________________________________________ TABULAR VALUES ADJUSTED SIGHT DIST. FINAL (Table 10-2) VALUE ADJUSTMENT CRITICAL GAP ______________ ________ ___________ ------------- MINOR RIGHTS S8 5. 50 5, 00 0. 00 5. 00 MAJOR LEFTS EB 5.00 4. 50 0. 00 4. 50 MINOR LEFTS SB 6. 5O 6. 00 0. 00 6. 00 IDENTIFYING INFORMATION ____________________________ ------------------------------------------ NAME OF THE EAST/WEST STREET. . . . . . 99TH STREET NAME OF THE NORTH/SOUTH STREET. . . . RESIDENTIAL DRIVE #3 DATE AND TIME OF THE ANALYSIS. . . . . 05-01-92 ; PM PEAK OTHER INFORMATION. . . . CAPACITY AND LEVEL-OF-SERVICE Page-� _____________________________________________________________________ POTEN- ACTUAL FLOW- TIAL MOVEMENT SHARED RESERVE RATE CAPACITY CAPACITY CAPACITY CAPACl / Y MOVEMENT v (pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS p M SH R SH ..........................._ _________ ....................... __...... ........ MINOR STREET SB LEFT 31 738 728 > 728 > 697 > A > 789 > 745 >A RIGHT 13 988 988 > 988 > 976 > A MAJOR STREET EB LEFT 22 1000 1000 1000 978 A IDENTIFYING INFORMATION _____________________________________________________________________ NAME OF THE EAST/WEST STREET. . . . . . 99TH STREET NAME OF THE NORTH/SOUTH STREET. . . . RESIDENTIAL DRIVE #3 DATE AND TIME {jF THE ANALYSIS. . . . . 05-01-92 ; PM PEAK OTHER INFORMATION. . . .