Loading...
HomeMy WebLinkAboutDrainage ReportCIVIL ENGINEERS LAND DEVELOPMENT CONSULTANTS DRAINAGE CONSULTANTS CERTIFIED FLOODPLAIN MANAGER 14020 Mississinewa Drive  Carmel, Indiana 46033  Phone: 317.324.8695  www.Fritz-Eng.com F:\2022\2211004 - Security Federal Bank Carmel\02 Civil\Engr\Drainage\FES-2211004 Drainage Report.docx STORMWATER TECHNICAL INFORMATION REPORT SECURITY FEDERAL BANK Project Location: 10880 N. MICHIGAN RD CARMEL, IN 46077 Prepared For: HOKANSON COMPANIES 10201 N. Illinois St, Ste 400 Carmel, IN 46290 Date: December 21, 2022 Last Revised: February 3, 2023 February 3, 2023 Page 1 of 103 TABLE OF CONTENTS TABLE OF CONTENTS .................................................................................................. 2 PROJECT DESCRIPTION .............................................................................................. 3 FEMA MAP OVERVIEW ................................................................................................. 3 WATERSHED DESCRIPTION ........................................................................................ 3 SOILS OVERVIEW ......................................................................................................... 3 TABLE 1 – PROJECT SOILS 3 ZONING INFORMATION ................................................................................................ 3 DEVELOPMENT STANDARDS ...................................................................................... 4 EXISTING CONDITIONS ................................................................................................ 4 TABLE 3 – EXISTING PEAK DISCHARGE RATES 5 PROPOSED CONDITIONS ............................................................................................. 5 STORMWATER DETENTION ......................................................................................... 5 STORMWATER QUALITY .............................................................................................. 6 STORMWATER PIPE DESIGN ....................................................................................... 6 SUMMARY ...................................................................................................................... 7 REFERENCES ................................................................................................................ 8 APPENDICES ................................................................................................................. 8 APPENDIX A – LOCATION MAP APPENDIX B – FEMA MAP APPENDIX C – SOILS DATA & MAP APPENDIX D – EXISTING DRAINAGE ANALYSIS APPENDIX E – PROPOSED DRAINAGE ANALYSIS APPENDIX F – KINDERCARE STORMWATER REPORT APPENDIX G –CHRISTIAN BROS STORMWATER REPORT February 3, 2023 Page 2 of 103 PROJECT DESCRIPTION Hokanson Companies is proposing a new bank and multi-tenant facility at 10880 N. Michigan Road in Carmel, Indiana. The facility will consist of a new building of approximately 9,650 sf, 3-story, with associated parking and utility service improvements. Access to the site will be provided from Redd Road along the western side of the site. For reference, the project site is located at approximately latitude 39°56’42''N and longitude 86º14’20”W. FEMA MAP OVERVIEW The project site is located within the FEMA Community Panel Map #18057C0205G dated November 19, 2014. Review of the map indicates the site is located within the Flood Designation ‘Zone X’ (unshaded). Therefore, the site is not subject to Flood Control Ordinance requirements. The FEMA Map is included in Appendix B. WATERSHED DESCRIPTION The project site is located within the ‘Eagle Creek-Long Branch/Irishman Run ‘ watershed as provided on the IndianaMap GIS system. The 14-digit Hydrologic Unit Codes (HUC) for this watershed Is 05120201120080. SOILS OVERVIEW The project site contains the soils listed in the following Table. The Hydrologic Soil Group (HSG) for each soil is also provided. The appropriate limits of each soil type are depicted in the Soils Map provided in Appendix C. TABLE 1 – PROJECT SOILS ZONING INFORMATION The site is within the corporate limits of the City of Carmel. The underlying Zoning Classification is B-3 and falls within the 421 Overlay district. The proposed use is permitted in the Zoning District. Soil Symbol Soil Name, Description HSG UmyA Urban land-Treaty complex B/D YbvA Brookston silty clay loam-Urban B/D UfnA Urban land-Crosby Treaty complex C/D February 3, 2023 Page 3 of 103 DEVELOPMENT STANDARDS The project site is located within the City of Carmel, Hamilton County, Indiana. Therefore, the proposed drainage improvements are subject to the standards of design and construction of the City of Carmel. Runoff will be modeled using Rational Method and HydroCAD version 10.00-24 utilizing the Type II rainfall distribution and rainfall depths from Table 201-3 of the Camel Stormwater Technical Standards Manual (Manual). EXISTING CONDITIONS The proposed development site is currently undeveloped with grass/weeds coverage. The subject site is part of a larger overall development known as the Michigan Road Retail Development. The subject master plan was part of the Aria Development of multi- family/apartments to the west of the subject site. The master plan drainage analysis for this site was provided in the Aria Development including the stormwater detention and water quality requirements. More specifically, this Lot was included in the master plan along with lots to the north and south totaling 5.86 Acres including the now constructed Redd Road. After removing the road improvements, the master plan parameters the commercial development lots are as follows: TABLE 2 – MASTER PLAN PARAMETERS FOR SUBJECT SITE Since the proposed project site is 1.47 acres and located with the noted “Commercial Development” area, the allowable CN=92.5 for developed conditions. The project site is part of a previously approved master planned storm sewer system that was designed and constructed to accommodate the commercial development of the subject parcel. As such, the primary focus of the existing conditions are how the existing conditions drain to that master planned system. The existing site has essentially three distinct drainage patterns as described below. EX1 - sheet drains the majority of the site to the west into and inlet onsite that conveys the runoff to the masterplan stormwater system. EX2 - sheet drains the southeast corner of the site east and south towards Michigan Road and the existing Christian Brothers Automotive facility to the south. Parameters Basin Name Area, Ac. Curve Number, ‘CN’ Time of Concentration, min. Fut Dev 5.86 92.8 7 Redd Road 0.94 91.3 7 Commercial Development 4.95 92.5 7 February 3, 2023 Page 4 of 103 EX-3 – sheet drains the remainder of the site to the north into the adjoining property where it enters that private stormwater system before connecting to the existing drainage system near Redd Road. TABLE 3 – EXISTING PEAK DISCHARGE RATES For clarity, a map of the existing drainage sheds and infrastructure is illustrated in Appendix D. PROPOSED CONDITIONS This project is proposing a new bank and multi-tenant facility of approximately 9,650 sf between Redd Road and Michigan Road in Carmel, Indiana. The facility will consist of a 3-story new building, along with associated parking and utility service infrastructure. Since the aforementioned master plan drainage systems included specific parameters for this development, the below are details how the proposed improvements fit within the previously approved drainage systems. Calculations for onsite stormwater infrastructure including pipe sizing for the 10-year Rational Method peak runoffs have been provided. The proposed improvements are consistent with the City of Carmel stormwater management standards. Runoff calculations for the proposed conditions are computed in Appendix using the minimum 5-minute Time of Concentration. A map of the proposed basins is provided in Appendix E. STORMWATER DETENTION As noted above, it is understood that the master plan analysis included this site within the detention basin analysis for the pond to the west behind the multi-family development. To confirm compliance, the weighted CN of the proposed improvements on this lot were analyzed and found to be CN=89. See below for the proposed conditions CN calculations. Peak Runoff Rate, cfs Basin Name 2-yr 10-yr 25-yr 100-yr EX1 1.17 1.54 1.81 2.31 EX2 0.28 0.37 0.43 0.55 EX3 0.25 0.33 0.39 0.49 TOTAL 1.70 2.24 2.63 3.35 February 3, 2023 Page 5 of 103 PR2 0.11 Ac. 94% 6% 0% Weighted CN= 75 4,639 SF 4,364 SF 275 SF SF PR3 0.21 Ac. 98% 2% 0% Weighted CN= 74 9,003 SF 8,818 SF 185 SF SF 621 0.36 Ac. 48% 52% 0% Weighted CN= 86 15,855 SF 7,600 SF 8,255 SF SF 611 0.16 Ac. 8% 59% 33% Weighted CN= 96 7,133 SF 590 SF 4,193 SF 2,350 SF 603 0.25 Ac. 7% 73% 20% Weighted CN= 96 10,803 SF 725 SF 7,903 SF 2,175 SF 602 0.38 Ac. 15% 85% 0% Weighted CN= 94 16,431 SF 2,514 SF 13,917 SF SF TOTAL PROPOSED ONSITE 1.47 Ac. 39% 54% 7% Weighted CN= 89 63,864 SF 24,611 SF 34,728 SF 4,525 SF The allowable master plan CN was 92.5. As a result, no further detention analysis is required. Reference Appendix G for the master plan drainage calculations. STORMWATER QUALITY The proposed site was included in the master drainage analysis for the downstream drainage system including Stormwater Quality. As demonstrated above, the proposed site improvements are within the master planned parameters and therefore no additional stormwater quality is required. Reference Appendix G for the master plan drainage calculations. STORMWATER PIPE DESIGN The proposed site was included in the Aria Development master drainage analysis for the downstream drainage system including stormwater piping from the site and Redd Road to the downstream detention basin noted above. Due to the existing downstream pipe network, the proposed improvements are less intense than those assumed for the master plan analysis for the downstream storm sewer pipe design. However, the next existing pipe downstream of our site from Structure 601 to the existing Redd Road curb inlet has been included in the analysis to demonstrate sufficient capacity. February 3, 2023 Page 6 of 103 Both of the above demonstrate that the proposed improvements are within the master plan design parameters and the downstream drainage system will have sufficient capacity to convey runoff from the proposed improvements. Inlet grate capacity calculations were performed for the onsite stormwater inlets to demonstrate sufficient capacity for the 10 year overland design flow to each with a maximum of 6” of ponding and each inlet 50% clogged. These calculations are provided based on removal of the underground roof drain connections since that flow in the pipe sizing calculations is not overland and therefore does not contribute to the inlet grate flow. Calculations for onsite stormwater infrastructure including pipe sizing for the 10-year Rational Method peak runoffs have been provided in Appendix E. A map of the proposed basins is provided in Appendix E. SUMMARY Hokanson Companies is proposing a new bank and multi-tenant facility at 10880 N. Michigan Road in Carmel, Indiana. The facility will consist of a new building of approximately 9,650 sf, 3-story, with associated parking and utility service improvements. Access to the site will be provided from Redd Road along the western side of the site. The above demonstrates that the proposed improvements are within the parameters of both previously approved analyzes. As a result of the onsite drainage analysis, the proposed improvements are not anticipated to have adverse impacts on the surrounding or downstream drainage systems. February 3, 2023 Page 7 of 103 REFERENCES 1. Hamilton County Soils Map (Web Soil Survey) 2. FEMA Flood Insurance Rate Maps, FEMA Website 3. Indiana Drainage Handbook 4. Carmel Stormwater Technical Standards 5. Hamilton County Surveyor’s Office Technical Standards & Details APPENDICES APPENDIX A – LOCATION MAP APPENDIX B – FEMA MAP APPENDIX C – SOILS DATA & MAP APPENDIX D – EXISTING DRAINAGE ANALYSIS APPENDIX E – PROPOSED DRAINAGE ANALYSIS APPENDIX F – KINDERCARE STORMWATER REPORT APPENDIX G –CHRISTIAN BROS STORMWATER REPORT February 3, 2023 Page 8 of 103 APPENDIX A – LOCATION MAP February 3, 2023 Page 9 of 103 NSITE VICINITY & ZONING MAPSITELOCATIONNNOT TO SCALECOUNTY LOCATION MAPSITE LOCATIONNOT TO SCALEB3B3B3February 3, 2023 Page 10 of 103 APPENDIX B – FEMA MAP February 3, 2023 Page 11 of 103 National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250 Feet Ü SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOOD HAZARD AREAS Without Base Flood Elevation (BFE) Zone A, V, A99 With BFE or DepthZone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mileZone X Future Conditions 1% Annual Chance Flood HazardZone X Area with Reduced Flood Risk due to Levee. See Notes.Zone X Area with Flood Risk due to LeveeZone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood HazardZone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 11/7/2022 at 2:40 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Legend OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 8 B 20.2 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. 1:6,000 86°14'42"W 39°56'56"N 86°14'4"W 39°56'28"N Basemap: USGS National Map: Orthoimagery: Data refreshed October, 2020 February 3, 2023 Page 12 of 103 APPENDIX C – SOILS DATA & MAP February 3, 2023 Page 13 of 103 Soil Map—Hamilton County, Indiana Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 11/7/2022 Page 1 of 34421870442189044219104421930442195044219704421990442189044219104421930442195044219704421990564850564870564890564910564930564950564970564990565010565030 564850 564870 564890 564910 564930 564950 564970 564990 565010 565030 39° 56' 44'' N 86° 14' 27'' W39° 56' 44'' N86° 14' 19'' W39° 56' 40'' N 86° 14' 27'' W39° 56' 40'' N 86° 14' 19'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84 0 40 80 160 240 Feet 0 10 20 40 60 Meters Map Scale: 1:872 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale.February 3, 2023 Page 14 of 103 MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Hamilton County, Indiana Survey Area Data: Version 23, Sep 3, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Aug 1, 2018—Sep 30, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Soil Map—Hamilton County, Indiana Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 11/7/2022 Page 2 of 3 February 3, 2023 Page 15 of 103 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI UfnA Urban land-Crosby-Treaty complex, fine loamy subsoil, 0 to 2 percent slopes 1.3 73.7% UmyA Urban land-Treaty complex, 0 to 1 percent slopes 0.4 24.9% YbvA Brookston silty clay loam- Urban land complex, 0 to 2 percent slopes 0.0 1.4% Totals for Area of Interest 1.8 100.0% Soil Map—Hamilton County, Indiana Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 11/7/2022 Page 3 of 3 February 3, 2023 Page 16 of 103 APPENDIX D – EXISTING DRAINAGE ANALYSIS February 3, 2023 Page 17 of 103 <><><><><><><>EEN85°28'09"E 387.12'S20°32'51"E 151 .67 ' S85°28'08"W 325.06'S04°31'52"E 33.57'S85°28'09"W 101.91'R=122.00'L=65.94'N00°23'46"E 115.74'12' 'WGGGEX1 1.01 Ac. EX3 0.22 Ac. EX2 0.24 Ac. PROJECT NO. CHECK:DRAWN: PLAN DATE: DESIGN: 14020 Mississinewa Drive Carmel, Indiana 46033 P: 317.324.8695 F: 317.324.8717 www.Fritz-Eng.com Fritz Engineering Services, LLC PROJECT: PROJECT LOCATION: SECTION, TOWNSHIP, RANGE: SECURITY FEDERAL BANK 12/21/2022 2211004 10880 N. MICHIGAN RD. CARMEL, INDIANA 46077 HAMILTON COUNTY S6, T17N, R3E SHEET NAME SHEET NO. 00 80'160' SCALE: 1" = 80' N EXH-1 EXISTING BASIN MAP AF AF KG LEGEND: PAVEMENT/GRAVEL GRASS/LANDSCAPE AREA BUILDING BASIN LIMITS February 3, 2023 Page 18 of 103 PROJECT NAME:SECURITY FEDERAL BANK FES PROJECT #:2211004 DATE:2/3/2023 STRUCTURE/BASIN I.D. TOTAL DRAINAGE AREA % Grass % Gravel/Pvmt % Rooftop Weighted (Ac.) 74.00 98.00 98.00 CN EX1 1.01 Ac.100%0%0%Weighted CN= 74 44,001 SF 44,001 SF SF SF EX2 0.24 Ac.100%0%0%Weighted CN= 74 10,461 SF 10,461 SF SF SF EX3 0.22 Ac.100%0%0%Weighted CN= 74 9,420 SF 9,420 SF SF SF TOTAL EXISTING 1.47 Ac.100%0%0%Weighted CN= 74 63,882 SF 63,882 SF SF SF WEIGHTED CURVE NUMBERS RUNOFF COEFFICIENTS CALCULATIONS F:\2022\2211004 - Security Federal Bank Carmel\02 Civil\Engr\Drainage\FES_Storm_Sewer_Design February 3, 2023 Page 19 of 103 PROJECT NAME:SECURITY FEDERAL BANK FES PROJECT #:2211004 DATE:2/3/2023 STRUCTURE/BASIN I.D. TOTAL DRAINAGE AREA % Grass % Gravel/Pvmt % Rooftop Weighted (Ac.)0.25 0.85 0.90 C EX1 1.01 Ac.100%0%0%Weighted C= 0.25 44,001 SF 44,001 SF SF SF EX2 0.24 Ac.100%0%0%Weighted C= 0.25 10,461 SF 10,461 SF SF SF EX3 0.22 Ac.100%0%0%Weighted C= 0.25 9,420 SF 9,420 SF SF SF TOTAL EXISTING 1.47 Ac.100%0%0%Weighted C= 0.25 63,882 SF 63,882 SF SF SF RUNOFF COEFFICIENTS CALCULATIONS WEIGHTED RUNOFF COEFFICIENTS F:\2022\2211004 - Security Federal Bank Carmel\02 Civil\Engr\Drainage\FES_Storm_Sewer_Design February 3, 2023 Page 20 of 103 PROJECT NAME:SECURITY FEDERAL BANK FES PROJECT #:2211004 DATE:2/3/2023 UP DOWN BASIN c A c*A Tc SUM Tc I Q I Q I Q I Q #(acres)(min)(c*A)(min)(in/hr)(cfs)(in/hr)(cfs)(in/hr)(cfs)(in/hr)(cfs) EX1 EX1 0.25 1.01 Ac.0.25 5 min.0.25 5.0 min.4.63 in/hr 1.17 cfs 6.12 in/hr 1.54 cfs 7.18 in/hr 1.81 cfs 9.13 in/hr 2.31 cfs EX2 EX2 0.25 0.24 Ac.0.06 5 min.0.06 5.0 min.4.63 in/hr 0.28 cfs 6.12 in/hr 0.37 cfs 7.18 in/hr 0.43 cfs 9.13 in/hr 0.55 cfs EX3 EX3 0.25 0.22 Ac.0.05 5 min.0.05 5.0 min.4.63 in/hr 0.25 cfs 6.12 in/hr 0.33 cfs 7.18 in/hr 0.39 cfs 9.13 in/hr 0.49 cfs DESIGN STORMS 10 25 100 COMPOSITE BASINS ADDITIONAL CALCULATIONS RATIONAL METHOD PEAK RUNOFF STRUCTURE BASINS 2 F:\2022\2211004 - Security Federal Bank Carmel\02 Civil\Engr\Drainage\FES_Storm_Sewer_Design February 3, 2023 Page 21 of 103 APPENDIX E – PROPOSED DRAINAGE ANALYSIS February 3, 2023 Page 22 of 103 <><><><><><><>EEN85°28'09"E 387.12'S20°32'51"E 151 .67 ' S85°28'08"W 325.06'S04°31'52"E 33.57'S85°28'09"W 101.91'R=122.00'L=65.94'N00°23'46"E 115.74'12' 'WGGGDRIVETHRUONLYDO NOT ENTERSTOP DRIVETHRUONLYDRIVETHRUONLYPIV o o oo o oPR3 0.21 Ac. PR2 0.11 Ac. PR1 1.15 Ac. PROJECT NO. CHECK:DRAWN: PLAN DATE: DESIGN: 14020 Mississinewa Drive Carmel, Indiana 46033 P: 317.324.8695 F: 317.324.8717 www.Fritz-Eng.com Fritz Engineering Services, LLC PROJECT: PROJECT LOCATION: SECTION, TOWNSHIP, RANGE: SECURITY FEDERAL BANK 12/21/2022 2211004 10880 N. MICHIGAN RD. CARMEL, INDIANA 46077 HAMILTON COUNTY S6, T17N, R3E SHEET NAME SHEET NO. 00 80'160' SCALE: 1" = 80' N EXH-2 PROPOSED BASIN MAP AF AF KG LEGEND: PAVEMENT/GRAVEL GRASS/LANDSCAPE AREA BUILDING BASIN LIMITS February 3, 2023 Page 23 of 103 <><><><><><><>EEN85°28'09"E 387.12'S20°32'51"E 151 .67 ' S85°28'08"W 325.06'S04°31'52"E 33.57'S85°28'09"W 101.91'R=122.00'L=65.94'N00°23'46"E 115.74'12' 'WGGGDRIVETHRUONLYDO NOT ENTERSTOP DRIVETHRUONLYDRIVETHRUONLYGAS METER PIV o o oo o o611 603 601 602 621 PROJECT NO. CHECK:DRAWN: PLAN DATE: DESIGN: 14020 Mississinewa Drive Carmel, Indiana 46033 P: 317.324.8695 F: 317.324.8717 www.Fritz-Eng.com Fritz Engineering Services, LLC PROJECT: PROJECT LOCATION: SECTION, TOWNSHIP, RANGE: SECURITY FEDERAL BANK 12/21/2022 2211004 10880 N. MICHIGAN RD. CARMEL, INDIANA 46077 HAMILTON COUNTY S6, T17N, R3E SHEET NAME SHEET NO.EXH-3 STORMWATER BMP MAP AF AF KG 00 80'160' SCALE: 1" = 80' N LEGEND: PAVEMENT/GRAVEL GRASS/LANDSCAPE AREA BUILDING BASIN LIMITS February 3, 2023 Page 24 of 103 PROJECT NAME:SECURITY FEDERAL BANK FES PROJECT #:2211004 DATE:2/3/23 DESIGN STORM:10 Year COMPOSITE BASINS TRAVEL UP DOWN BASIN c A c*A Tc I Q SUM Tc I Q TIME #(acres)(min)(in/hr)(cfs)(c*A)(min)(in/hr)(cfs)(min) 621 601 621 0.56 0.36 Ac.0.20 5 min.6.12 in/hr 1.25 cfs 0.20 5 min.6.12 in/hr 1.25 cfs 0.1 min. 611 601 611 0.82 0.16 Ac.0.13 5 min.6.12 in/hr 0.82 cfs 0.13 5 min.6.12 in/hr 0.82 cfs 1.3 min. 603 602 603 0.82 0.25 Ac.0.20 5 min.6.12 in/hr 1.24 cfs 0.20 5 min.6.12 in/hr 1.24 cfs 1.3 min. 602 601 602 0.76 0.38 Ac.0.29 5 min.6.12 in/hr 1.75 cfs 0.49 7 min.5.73 in/hr 2.81 cfs 0.6 min. 601 EX. INLET 601 0.85 0.00 Ac.0.00 5 min.6.12 in/hr 0.00 cfs 0.83 8 min.5.55 in/hr 4.60 cfs 0.4 min. STRUCTURE BASINS STORM SEWER DESIGN CALCULATIONS RATIONAL METHOD PEAK RUNOFF F:\2022\2211004 - Security Federal Bank Carmel\02 Civil\Engr\Drainage\FES_Storm_Sewer_Design February 3, 2023 Page 25 of 103 PROJECT NAME:SECURITY FEDERAL BANK FES PROJECT #:2211004 DATE:2/3/2023 DESIGN STORM:10 Year DESIGN MANN.CAP.FULL ACTUAL ACTUAL UP DOWN Q L DIA.SLOPE MTRL COEFF.Q VEL.DEPTH VEL. (cfs)(ft)(in)%n (cfs)(ft/s)(in)(ft/s)UP DOWN UP DOWN UP DOWN 621 601 1.25 26 LF 12 in.0.39%RCP 0.013 2.23 cfs 2.85 ft/s 6.4 in.2.91 ft/s 898.73 899.15 895.10 895.00 2.5 3.0 611 601 0.82 218 LF 12 in.0.46%RCP 0.013 2.42 cfs 3.10 ft/s 4.8 in.2.79 ft/s 900.06 899.15 896.40 895.40 2.5 2.6 603 602 1.24 206 LF 12 in.0.32%RCP 0.013 2.02 cfs 2.58 ft/s 6.7 in.2.70 ft/s 899.75 899.05 895.80 895.15 2.8 2.7 602 601 2.81 113 LF 15 in.0.31%RCP 0.013 3.61 cfs 2.95 ft/s 9.9 in.3.26 ft/s 899.05 899.15 895.05 894.70 2.6 3.0 601 EX. INLET 4.60 56 LF 24 in.0.13%RCP 0.013 8.02 cfs 2.56 ft/s 13.0 in.2.64 ft/s 899.15 894.10 894.03 2.82 STORM SEWER DESIGN CALCULATIONS PIPE SIZING CALCULATIONS RIM ELEV. STRUCTURE COVER (ft) INVERT ELEV. F:\2022\2211004 - Security Federal Bank Carmel\02 Civil\Engr\Drainage\FES_Storm_Sewer_Design February 3, 2023 Page 26 of 103 PROJECT NAME:SECURITY FEDERAL BANK FES PROJECT #:2211004 DATE:2/3/2023 STRUCTURE/BASIN I.D. TOTAL DRAINAGE AREA % Grass % Gravel/Pvmt % Rooftop Weighted (Ac.)0.25 0.85 0.90 C RUNOFF COEFFICIENTS CALCULATIONS WEIGHTED RUNOFF COEFFICIENTS PR2 0.11 Ac.94%6%0%Weighted C= 0.29 4,639 SF 4,364 SF 275 SF SF PR3 0.21 Ac.98%2%0%Weighted C= 0.26 9,003 SF 8,818 SF 185 SF SF 621 0.36 Ac.48%52%0%Weighted C= 0.56 15,855 SF 7,600 SF 8,255 SF SF 611 0.16 Ac.8%59%33%Weighted C= 0.82 7,133 SF 590 SF 4,193 SF 2,350 SF 603 0.25 Ac.7%73%20%Weighted C= 0.82 10,803 SF 725 SF 7,903 SF 2,175 SF 602 0.38 Ac.15%85%0%Weighted C= 0.76 16,431 SF 2,514 SF 13,917 SF SF 601 0.00 Ac.0%100%0%Weighted C= 0.85 SF SF SF SF 0.00 Ac.0%100%0% SF SF SF SF TOTAL PROPOSED ONSITE 1.47 Ac.39%54%7%Weighted C= 0.62 63,864 SF 24,611 SF 34,728 SF 4,525 SF F:\2022\2211004 - Security Federal Bank Carmel\02 Civil\Engr\Drainage\FES_Storm_Sewer_Design February 3, 2023 Page 27 of 103 PROJECT NAME:SECURITY FEDERAL BANK FES PROJECT #:2211004 DATE:2/3/2023 STRUCTURE/BASIN I.D. TOTAL DRAINAGE AREA % Grass % Gravel/Pvmt % Rooftop Weighted (Ac.) 74.00 98.00 98.00 CN WEIGHTED CURVE NUMBERS RUNOFF COEFFICIENTS CALCULATIONS PR2 0.11 Ac.94%6%0%Weighted CN= 75 4,639 SF 4,364 SF 275 SF SF PR3 0.21 Ac.98%2%0%Weighted CN= 74 9,003 SF 8,818 SF 185 SF SF 621 0.36 Ac.48%52%0%Weighted CN= 86 15,855 SF 7,600 SF 8,255 SF SF 611 0.16 Ac.8%59%33%Weighted CN= 96 7,133 SF 590 SF 4,193 SF 2,350 SF 603 0.25 Ac.7%73%20%Weighted CN= 96 10,803 SF 725 SF 7,903 SF 2,175 SF 602 0.38 Ac.15%85%0%Weighted CN= 94 16,431 SF 2,514 SF 13,917 SF SF TOTAL PROPOSED ONSITE 1.47 Ac.39%54%7%Weighted CN= 89 63,864 SF 24,611 SF 34,728 SF 4,525 SF F:\2022\2211004 - Security Federal Bank Carmel\02 Civil\Engr\Drainage\FES_Storm_Sewer_Design February 3, 2023 Page 28 of 103 PROJECT NAME:SECURITY FEDERAL BANK FES PROJECT #:2211004 DATE:2/3/2023 Enter Appropriate Information for Inlet Grate Capacity Grate #Grate Type Open Area, sf Perimeter, ft.Head, ft Capacity, cfs 50% Clogged Capacity, cfs Weir Transitional Orifice R-3286-8V V 0.7 4.4 0.50 2.55 1.28 1.00 Check 2.55 5.13 R-3010 A,C 1.0 4.6 0.50 3.40 1.70 1.00 Check 3.40 5.37 Full Capacity, cfs AREA INLET CAPACITY CALCULATIONS (Sag / Low Point) Maximum Overland Flow to Inlet/Casting (not including underground roof drains), cfs Sufficient Capacity Provided? F:\2022\2211004 - Security Federal Bank Carmel\02 Civil\Engr\Drainage\FES_Storm_Sewer_Design February 3, 2023 Page 29 of 103 Hydraflow Summary Report 1 Line No.Line ID Flow Rate Line Size (Rise x Span) Line Type Line Length Invert Elev. Down Invert Elev. Up Line Slope HGL Down HGL Up Minor Loss HGL Junct Dn Str Line No. (cfs)(in)(ft)(ft)(ft)(%)(ft)(ft)(ft)(ft) 1 Pipe - (5)4.60 24 Cir 58.380 893.82 894.00 0.31 894.57 894.83 0.22 895.05 Outfall 2 Pipe - (1)0.82 12 Cir 217.517 895.40 896.40 0.46 895.78 896.78 n/a 896.92 j 1 3 Pipe - (4)2.81 15 Cir 112.519 894.70 895.05 0.31 895.49 895.84 0.28 896.11 1 4 Pipe - (3)1.24 12 Cir 205.570 895.15 895.80 0.32 896.11 896.39 0.10 896.49 3 5 Pipe - (2)1.25 12 Cir 25.666 895.00 895.10 0.39 895.51 895.61 0.15 895.76 1 Notes: j-Line contains hyd. jump February 3, 2023 Page 30 of 103 200-6 TABLE 201-2: Rainfall Intensities for Various Return Periods and Storm Durations Rainfall Intensity (Inches/Hour) Return Period (Years) Duration 2 5 10 25 50 100 5 Min. 4.63 5.43 6.12 7.17 8.09 9.12 10 Min. 3.95 4.63 5.22 6.12 6.90 7.78 15 Min. 3.44 4.03 4.55 5.33 6.01 6.77 20 Min. 3.04 3.56 4.02 4.71 5.31 5.99 30 Min. 2.46 2.88 3.25 3.81 4.29 4.84 40 Min. 2.05 2.41 2.71 3.18 3.59 4.05 50 Min. 1.76 2.06 2.33 2.73 3.07 3.47 1 Hr. 1.54 1.80 2.03 2.38 2.68 3.03 1.5 Hrs. 1.07 1.23 1.42 1.63 1.91 2.24 2 Hrs. 0.83 0.95 1.11 1.37 1.60 1.87 3 Hrs. 0.59 0.72 0.84 1.04 1.22 1.42 4 Hrs. 0.47 0.58 0.68 0.84 0.99 1.15 5 Hrs. 0.40 0.49 0.58 0.71 0.83 0.97 6 Hrs. 0.35 0.43 0.50 0.62 0.72 0.85 7 Hrs. 0.31 0.38 0.44 0.55 0.64 0.75 8 Hrs. 0.28 0.34 0.40 0.49 0.57 0.67 9 Hrs. 0.25 0.31 0.36 0.45 0.52 0.61 10 Hrs. 0.23 0.28 0.33 0.41 0.48 0.56 12 Hrs. 0.20 0.24 0.29 0.35 0.41 0.48 14 Hrs. 0.17 0.22 0.25 0.31 0.36 0.42 16 Hrs. 0.16 0.19 0.23 0.28 0.32 0.38 18 Hrs. 0.14 0.17 0.20 0.25 0.29 0.34 20 Hrs. 0.13 0.16 0.19 0.23 0.27 0.31 24 Hrs. 0.11 0.14 0.16 0.20 0.23 0.27 Source: Purdue,A.M., et. al., "Statistical Characteristics of Short Time Incremental Rainfall", Aug., 1992. (Values in this table are based on IDF equation and coefficients provided for Indianapolis, IN.) TABLE 201-3: Rainfall Depths for Various Return Periods February 3, 2023 Page 31 of 103 APPENDIX F – KINDERCARE STORMWATER REPORT February 3, 2023 Page 32 of 103 Crandall Engineering, Inc. Professional Engineering  Architectural  Structural  Civil  Commercial  Residential  236 East Main Street Gas City, IN 46933 Phone: (765) 677-0996 Fax: (765) 677-0997 Email: LCRANDALL@crandalleng.com Website: www.crandalleng.com Stormwater Management Technical Report KinderCare Learning Center – 10910 North Michigan Road, Carmel, IN 46032 Design by Crandall Engineering 2020-09-21 1. Project Introduction: a. Project location: part of the southwest quarter of section 6, township 17 north, range 3 east in clay township, Hamilton County Indiana, detailed land description see survey; Lat 39.946; Long -86.240; b. Project description: The project is a proposed commercial development (1.33 acres) and future development sub-parcel (1.13 acres) on approximately 2.48 acres. The construction will consist of commercial building (child daycare), asphalt parking, utility extensions, and stormwater management. c. The project site is part of the Michigan Road Retail Development by WOOLPERT. The introduction and narrative of the WOOLPERT master stormwater report, dated October 22nd, 2019, is attached in Appendix A. Indicated by the WOOLPERT master stormwater report, the regional detention will handle the runoff from the future retail sites (including this project site) and was sized based on CN equals 92.5. Therefore, the control factor of designing the stormwater system for this project site is to ensure the CN value is less or equals to the pre-assumed CN. d. Since the project site is less than 5.0 acres, the stormwater analysis procedure is Rational Method, evaluation 2-yr, 10-yr, and 100-yr for existing condition; 10-yr and 100-yr for post-development condition. 2. Existing Condition: a. The existing project site is an undeveloped open field with fallow ground cover. Existing stormwater drains west to the pipe end section provided by the Michigan Road Retail Project. No existing utility or building is located within the property boundary. b. Off-site Drainage: the drainage from the north half of the existing parcel was collected by the existing 24” storm stub. c. The existing project site consists of 59.9% Br (soil group B) and 40.1% CrA (soil group C). Due to significant disturbance to the upper soil layers during the construction activities, the actual soil group categories were changed to the next February 3, 2023 Page 33 of 103 level, i.e. using CN associated with soil group C for soil type Br and using CN associated with soil group D for soil type CrA. 3. Post-development Design (see post-development drainage map): a. The proposed site includes the construction of the commercial building, parking, utilities for the business, and stormwater system designed in accordance with “The City of Carmel Stormwater Technical Standards Manual.” b. The proposed stormwater pipe network is designed to handle the stormwater discharge of a 10-year storm event. Stormwater will collect in catch basins and discharge to an existing catch basin by connecting to the stormwater stub provided for the site. The stations used in the stormwater calculations are as follows: c. Station #1 consists of the northwest portion of the parking lot. It flows to the catch basin CB102 at the northwest region of the lot. Then it discharges through the underground pipe network to the existing stub connection. d. Station #2 consists of the northeast portion of the lot. It flows to the catch basin CB101 at the northeast region of the lot. Then it discharges through the underground pipe network to the existing stub connection. e. Station #3 consists of the northern half of the west parking lot and the play area. It flows to the northwest corner of the parking, and to catch basin CB103 near the depressed curb at that corner. Then it discharges through the underground pipe network to the existing stub connection. f. Station #4 consists of the north region of the roof. The west side of this station discharges through roof drains and daylights at the curb face to the west parking lot. Then it flows to catch basin CB103 and into the pipe network. The remainder of the station discharges through roof drains to the north parking lot where it flows to catch basin CB 101 and into the pipe network. Then it discharges through the underground pipe network to the existing stub connection. g. Station # 5 consists of the south region of the roof. The west side of this station discharges through roof drains and daylights at the curb face to the west parking lot. Then it flows to catch basin CB103 and into the pipe network. The remainder of the station discharges through roof drains and daylights at the ditch to the south of the building. It flows through the ditch to the end section with animal guard at the southwest corner of the parcel. Then it discharges through the underground pipe network to the existing stub connection. h. Station # 6 consists of the grassy area to the east, west, and south of the lot. Stormwater from the northwest region of the station flows to catch basin CB104 then to the underground pipe network. The rest of the stormwater of this station flows through the ditch to the south and to the end section with animal guard at the southwest corner of the parcel. Then it discharges through the underground pipe network to the existing stub connection. i. Station #7 consists of the southern portion of the west parking and play area. It flows west to the southwest corner of the parking, and to CB105 near the depressed curb at that corner, then through the underground pipe network to the existing stub connection. j. Off-site Drainage: The drainage from north parcel is collected by the 12” storm stub, connecting to the new CB 103. 4. Water Quality February 3, 2023 Page 34 of 103 a. Water quality for the proposed KinderCare Learning site will be treated off-site at the Aria Development. Water quality will be provided with three mechanical water quality units sized to serve the Aria development and the Michigan Road Retail Site which includes the KinderCare Learning site. Refer to the “Stormwater Technical Report for Michigan Road Site” which was approved for the Aria Development and Michigan Road Retail Development for more details on the water quality units. 5. Site Stormwater Discharge & Downstream Receiver: a. Pre-development discharge: i. Q2: 1.212 cfs; ii. Q10: 1.601 cfs; iii. Q100: 2.384 cfs. b. Post-development discharge: i. Q10: 4.883 cfs; ii. Q100: 7.277 cfs 6. Flood plain and Flood Hazard Information: a. According to the Michigan Road Retail Master Plan, the project site is located in the Zone X, i.e. no flood plain or flood hazard within the project site range. 7. Stormwater Detention: a. Stormwater detention and restricted release will be provided by a large detention basin on the Aria Development site. This detention will store water for the multi- family development and the Michigan Road Retail Site Development which includes the proposed KinderCare Learning Center site. The runoff curve number for the proposed KinderCare Learning Center site is 90.8. The detention sizing calculations assumed a runoff curve number of 92.5 for this commercial development. Please refer to the “Stormwater Technical Report for Michigan Road Site” which was approved for the Aria Development and Michigan Road Retail Development for more details on the detention sizing and release rate. 8. Stormwater Technical Report Index a. Document A: Narrative b. Document B: Pre-development Runoff Map c. Calculation B1: Pre-development Runoff Calculations d. Document C: Post-development Runoff Map e. Calculation C1: Post-development Runoff Calculations f. Calculation D: Storm Sewer Pipe Discharge Calculation g. Appendix A: Aria Development Stormwater Report Narrative h. Appendix B: Survey with plat information i. Document: NRCS Soil Report j. Document: NWI Wetland Map k. Document: National Flood Hazard Map February 3, 2023 Page 35 of 103 336897.71CLO 117902.17BCIC 118902.26BCIC 119902.34BCIC 120901.80BCIC 129901.95BCIC 130902.44BCIC 131902.39BCIC 139902.74BCIC 238902.92BCIC 246902.93BCIC 251902.68BCIC 370902.07BCIC 371902.18BCIC 376901.31BCIC 377901.55BCIC 368901.11BCIC-EC 369901.29BCIC-EC 901.10BCIC-EC 115902.19COMS-BMH 113901.48COMS-ORANGE-NT 123901.65COMS-ORANGE-NT 124901.78COMS-ORANGE-NT 125901.81COMS-ORANGE-NT 126901.78COMS-ORANGE-NT 132902.26COMS-ORANGE-NT133902.20COMS-ORANGE-NT 134901.80COMS-ORANGE-NT 135902.43COMS-ORANGE-NT 237902.59COMS-ORANGE-NT 3 902.94CRBS 109902.34EC110902.47EC 111902.50EC 112902.40EC 114902.31EC 116902.53EC 122902.05EC 127901.90EC 137902.85EC 138902.88EC 140902.97EC 141903.07EC 239903.15EC 240903.19EC 241903.19EC 247903.29EC248903.30EC 252902.92EC253903.07EC 260902.61EC 373902.11EC 374902.31EC 121901.76EC-EC 128901.89EC-EC 318897.87EG 319897.80EG 320897.55EG 321897.97EG 322897.83EG 323897.31EG 324898.08EG 108902.08INLETC 136902.64INLETC 372902.15INLETC 256902.45SGN 375901.85SMH 391902.16SMH 411901.64SMH 412901.64SMH-RIM 244900.53SSFM 245902.47SSFM 254902.74SSFM 255900.92SSFM 261902.59SSFM 262900.74SSFM 362899.70WTR-VAULT 335898.20WTR-WV-NT Sani ta ry Fo rcema inSani tary Fo rcema in WTR WTRWTRWTRWTR WTRWTRWTRWT R WTRWTROVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVH D OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD STMST M STMSTMSTMCOMCOMCOM COMSTMST M STMSTMSTM STMSTMSTM ST M STMSTMSTMSTMSTM STM STMSTMSTMSTM STM STMSTMSTMSTMSTM STM STMSTMSTMSTMSTM STMSTMSTMSTMSTM STM STMSTMSTM STM STM STMSAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SANINDOT EASEMENTINST. #200500073534 ARIA LAND JV, LLC INST. #2019008649 APPROXIMATE 15' ELECTRIC EASEMENT LOCATION - ACUTAL CENTERLINE LOCATION TO FOLLOW ELECTRIC LINES UPON INSTALLATION INST. #2019018084 TEMPO R A R Y A C C E S S E A S E M E N T INST. #2 0 1 9 0 0 8 7 7 164'291,215 Sq. Feet ± 6.685 Acres ±S 11°46'03" E 153.65'S 13°12'49" E 233.15'S 00°23'46" W 683.03'WEEDS WEEDS WEEDSWEST LINE OF SW 14 OF S6-T17N-R3E - HAMILTON COUNTY LINEEAST LINE OF SE 14 OF S1-T17N-R2E - BOONE COUNTY LINEMICHIGAN ROADVARIABLE PUBLIC R/WCOMMON AREA 10,692 Sq. Feet ± 0.245 Acres ±RIGHT-OF-WAY 63,701 Sq. Feet ± 1.462 Acres ± PROPOSED PARCEL "LOT 1" 108,070 Sq. Feet ± 2.481 Acres ±30' M IN IMUM BU ILD ING SETBACK20' WATER L INE EASEMENT30' LANDSCAPE BUFFERYARD20' SANITARY SEWER EASEMENT684902.86EC 683902.85EC 682902.62BCIC 681902.52BCIC680902.71EC679902.82EC 668902.06EC 658902.55EC 493898.00EG 492898.05GRVL 491897.14GRVL 490897.46EG489897.63EG 488897.87EG 487897.66EG 486897.92EG 485898.19EG 484898.06EG 483898.73GRVL 482898.86GRVL 476898.63GRVL 475898.98GRVL EG 473898.36EG 903903902 90290290290 2 901901901 901900 900 900900900900899899 899899 899899 899899 899 899 8998998 9 8 8988 9 8 898 898 898 898898 898898 898898897897897 897N 00°23'46" E 336.73'S 74° 3 0 ' 3 8 " E 1 5 0 . 8 3 ' S 85°28'08" W 387.12 ' N 89°36'03" W 346.67'S 20°32 '51" E35.64 ' S 5 8 ° 2 4 ' 2 1 " E 34 . 3 3 '161.59'175.14'111.73'C2 C3 S 89°36'14" E 1.24'S 11°46'03" E1.48'C1121.42' "LOT 1A" 49,953 Sq. Feet ± 1.147 Acres ± "LOT 1B" 58,112 Sq. Feet ± 1.334 Acres ± 15' SETBACK20' SETBACK30' SETBACK SOUTH SUB-PARCEL (58110 SF OR 1.33 AC) NORTH SUB-PARCEL (49960 SF OR 1.15 AC) 20' SE T B A C K 0' 5' 10' 15' 20' 25' 50'20' SETBACK30' SETBACK ANDGREENBELT20'-0" SAN. EASEMENT 20'-0" WATER E A S E M E N T NO PLAN T I N G SUB-PARCEL LINE 20'-0" SAN. EASEMENT 10'-0" GAS EASEMENT STATION #1 A (ac) = 1.531 c = 0.30 CN = 66.21 Tc (min) = 27.28 10'-0" GAS EASEMENT DISTURBANCE LIMIT DISTURBANCE LIMIT DISTURBANCE LIMIT DISTURBANCE LIMITDISTURBANCE LIMIT DISTURBANCE LIMITSTATION #OFF-SITE A (ac) = 0.950 c = 0.30 CN = 66.21 Tc (min) = 7.36 N SCALE(11x8.5):1" = 60'-0" 1 PRE SITE PRE-DEVELOPMENT DRAINAGE MAP KINDERCARE LEARNING CENTER - PREDEVELOPMENT DRAINAGE MAP 10910 NORTH MICHIGAN ROAD, CARMEL, IN 46032 February 3, 2023 Page 36 of 103 Date:2020-06-03 Computed By:XC Q2 Checked By:LMC IncrementTotalIncrementTotalTo Upper EndIn SectionFlowing FullDesign FlowUpper EndLowee End1 385.7 1.531 0.30 0.459 Existing Unimproved Area 1.20% slope 0.000 0.85 0.000 0.000 0.90 0.000 n=0.15 1.531 0.30 0.459 27.28 2.64 1.212 66.213 Off-Site 345.00 0.950 0.30 0.285 Off-site North Parcel 0.5% slope 0.000 0.85 0.000 0.000 0.90 0.000 n=0.15 0.950 0.30 0.285 7.36 4.31 1.228 66.213 Total Discharge to Ex. Inlet 2.481 0.30 0.744 27.28 2.64 1.963 66.213 PRE-DEVELOPMENT AREAS: SHEET FLOW (100' max) + SHALLOW CONCENTRATED FLOW + CHANNEL FLOW =TC Q2 Q5 Q10 Q25 Q50 Q100 Q2 Q5 Q10 Q25 Q50 Q100 0.08 5 4.63 5.43 6.12 7.17 8.09 9.12 0.08 5 0.17 10 3.95 4.63 5.22 6.12 6.90 7.78 0.17 10 0.25 15 3.44 4.03 4.55 5.33 6.01 6.77 0.25 15 0.50 30 2.46 2.88 3.25 3.81 4.29 4.84 0.50 30 1.00 60 1.54 1.80 2.03 2.38 2.68 3.03 1.00 60 2.00 120 0.83 0.95 1.11 1.37 1.60 1.87 2.00 120 3.00 180 0.59 0.72 0.84 1.04 1.22 1.42 3.00 180 6.00 360 0.35 0.43 0.50 0.62 0.72 0.85 6.00 360 12.00 720 0.20 0.24 0.29 0.35 0.41 0.48 12.00 720 24.00 1440 0.11 0.14 0.16 0.20 0.23 0.27 24.00 1440 2.66 3.27 3.83 4.72 5.52 6.46 Q2 Q2 Q2 City of Carmel SW Spec. Manual) Hours Minutes Return Period - Rainfall Intensity (in) 30.00 Station #REF! IDF Linear Interpolation Time(min) Rain(in/hr) #N/A #REF!#REF! #N/A #N/A IDD Table for Carmel, INIDF Table for Carmel, IN Slope of Drain or Grade (ft/ft)Station Velocity (ft/s) Invert. Elev.Manhole Invert DropTotal Runoff CIA=Q (cfs)SCS Runoff (in)Peak Discharge (cfs)Drainage Area A (ac)(AxC)Flow Time (min)Rainfall Intensity I (in. /hr.)Length (ft)Curve Runoff Coefficient CIDF Linear Interpolation Station 7.36 Return Period - Rainfall Intensity (in/hr) 2.64 2.46 27.28 City of Carmel SW Spec. Manual) Hours Minutes Off-Site IDF Linear Interpolation Time(min) Rain(in/hr) 4.63 Time(min) Rain(in/hr) 3.44 Station 1 Remarks PRE-DEVELOPMENT RUNOFF CALCULATIONS - RATIONAL METHOD 2019-059 EIG14T - KinderCare, 10910 North Michigan Road, IN 46032 Crandall Engineering Calculation #B-1 15.00 5.00 #N/A 4.31 10.00 3.95 Crandall Engineering, Inc.1 February 3, 2023 Page 37 of 103 Date:2020-06-03 Computed By:XC Q10 Checked By:LMC IncrementTotalIncrementTotalTo Upper EndIn SectionFlowing FullDesign FlowUpper EndLowee End1 385.7 1.531 0.30 0.459 Existing Unimproved Area 1.20% slope 0.000 0.85 0.000 0.000 0.90 0.000 n=0.15 1.531 0.30 0.459 27.28 3.49 1.601 66.213 Off-Site 345.00 0.950 0.30 0.285 Off-site North Parcel 0.5% slope 0.000 0.85 0.000 0.000 0.90 0.000 n=0.15 0.950 0.30 0.285 7.36 5.70 1.623 66.213 Total Discharge to Ex. Inlet 2.481 0.30 0.744 27.28 3.49 2.594 66.213 PRE-DEVELOPMENT AREAS: SHEET FLOW (100' max) + SHALLOW CONCENTRATED FLOW + CHANNEL FLOW =TC Q2 Q5 Q10 Q25 Q50 Q100 Q2 Q5 Q10 Q25 Q50 Q100 0.08 5 4.63 5.43 6.12 7.17 8.09 9.12 0.08 5 0.17 10 3.95 4.63 5.22 6.12 6.90 7.78 0.17 10 0.25 15 3.44 4.03 4.55 5.33 6.01 6.77 0.25 15 0.50 30 2.46 2.88 3.25 3.81 4.29 4.84 0.50 30 1.00 60 1.54 1.80 2.03 2.38 2.68 3.03 1.00 60 2.00 120 0.83 0.95 1.11 1.37 1.60 1.87 2.00 120 3.00 180 0.59 0.72 0.84 1.04 1.22 1.42 3.00 180 6.00 360 0.35 0.43 0.50 0.62 0.72 0.85 6.00 360 12.00 720 0.20 0.24 0.29 0.35 0.41 0.48 12.00 720 24.00 1440 0.11 0.14 0.16 0.20 0.23 0.27 24.00 1440 2.66 3.27 3.83 4.72 5.52 6.46 Q10 Q10 Q10 PRE-DEVELOPMENT RUNOFF CALCULATIONS - RATIONAL METHOD 2019-059 EIG14T - KinderCare, 10910 North Michigan Road, IN 46032 Crandall Engineering Calculation #B-1 Station Length (ft)Drainage Area A (ac)Curve Runoff Coefficient C(AxC)Flow Time (min)Manhole Invert DropSlope of Drain or Grade (ft/ft)Remarks IDF Table for Carmel, IN IDD Table for Carmel, IN City of Carmel SW Spec. Manual)City of Carmel SW Spec. Manual)Rainfall Intensity I (in. /hr.)Total Runoff CIA=Q (cfs)SCS Runoff (in)Peak Discharge (cfs)Velocity (ft/s) Invert. Elev. Station 1 Station Off-Site Station #REF! Hours Minutes Return Period - Rainfall Intensity (in/hr)Hours Minutes Return Period - Rainfall Intensity (in) IDF Linear Interpolation IDF Linear Interpolation IDF Linear Interpolation Time(min) Rain(in/hr)Time(min) Rain(in/hr)Time(min) Rain(in/hr) 27.28 3.49 7.36 5.70 #REF!#REF! 15.00 4.55 5.00 6.12 #N/A #N/A 30.00 3.25 10.00 5.22 #N/A #N/A Crandall Engineering, Inc.2 February 3, 2023 Page 38 of 103 Date:2020-06-03 Computed By:XC Q100 Checked By:LMC IncrementTotalIncrementTotalTo Upper EndIn SectionFlowing FullDesign FlowUpper EndLowee End1 385.7 1.531 0.30 0.459 Existing Unimproved Area 1.20% slope 0.000 0.85 0.000 0.000 0.90 0.000 n=0.15 1.531 0.30 0.459 27.28 5.19 2.384 66.213 Off-Site 345.00 0.950 0.30 0.285 Off-site North Parcel 0.5% slope 0.000 0.85 0.000 0.000 0.90 0.000 n=0.15 0.950 0.30 0.285 7.36 8.49 2.418 66.213 Total Discharge to Ex. Inlet 2.481 0.30 0.744 27.28 5.19 3.863 66.213 PRE-DEVELOPMENT AREAS: SHEET FLOW (100' max) + SHALLOW CONCENTRATED FLOW + CHANNEL FLOW =TC Q2 Q5 Q10 Q25 Q50 Q100 Q2 Q5 Q10 Q25 Q50 Q100 0.08 5 4.63 5.43 6.12 7.17 8.09 9.12 0.08 5 0.17 10 3.95 4.63 5.22 6.12 6.90 7.78 0.17 10 0.25 15 3.44 4.03 4.55 5.33 6.01 6.77 0.25 15 0.50 30 2.46 2.88 3.25 3.81 4.29 4.84 0.50 30 1.00 60 1.54 1.80 2.03 2.38 2.68 3.03 1.00 60 2.00 120 0.83 0.95 1.11 1.37 1.60 1.87 2.00 120 3.00 180 0.59 0.72 0.84 1.04 1.22 1.42 3.00 180 6.00 360 0.35 0.43 0.50 0.62 0.72 0.85 6.00 360 12.00 720 0.20 0.24 0.29 0.35 0.41 0.48 12.00 720 24.00 1440 0.11 0.14 0.16 0.20 0.23 0.27 24.00 1440 2.66 3.27 3.83 4.72 5.52 6.46 Q100 Q100 Q100 PRE-DEVELOPMENT RUNOFF CALCULATIONS - RATIONAL METHOD 2019-059 EIG14T - KinderCare, 10910 North Michigan Road, IN 46032 Crandall Engineering Calculation #B-1 Station Length (ft)Drainage Area A (ac)Curve Runoff Coefficient C(AxC)Flow Time (min)Manhole Invert DropSlope of Drain or Grade (ft/ft)Remarks IDF Table for Carmel, IN IDD Table for Carmel, IN City of Carmel SW Spec. Manual)City of Carmel SW Spec. Manual)Rainfall Intensity I (in. /hr.)Total Runoff CIA=Q (cfs)SCS Runoff (in)Peak Discharge (cfs)Velocity (ft/s) Invert. Elev. Station 1 Station Off-Site Station #REF! Hours Minutes Return Period - Rainfall Intensity (in/hr)Hours Minutes Return Period - Rainfall Intensity (in) IDF Linear Interpolation IDF Linear Interpolation IDF Linear Interpolation Time(min) Rain(in/hr)Time(min) Rain(in/hr)Time(min) Rain(in/hr) 27.28 5.19 7.36 8.49 #REF!#REF! 15.00 6.77 5.00 9.12 #N/A #N/A 30.00 4.84 10.00 7.78 #N/A #N/A Crandall Engineering, Inc.3 February 3, 2023 Page 39 of 103 Q10 NRCS Time of Concentration Sheet Flow:Segment A Segment B 1. Surface Description (table 3-1)Short Grass TR-55, Table 3-1 Roughness coefficients (Manning’s n) - sheet flow. 2. Manning's Roughness coeff., n 0.150 #N/A (see RHS) 3. Flow Length, L (should be <= 100 ft)100.00 ft Smooth 0.011 Begin Elevation 899.75 ft Fallow 0.050 End Elevation 899.50 ft Other 4. 2-yr, 24-hr rainfall, P2 2.66 inches 5. Land Slope, s 0.003 #DIV/0! ft/ft Soil, R≤0.2 0.060 6. Tt = 0.007 * (n*L)0.8 / (P2 0.5 * s0.4)0.41 0.00 hr = 24.69 min Soil, R>0.2 0.170 Shallow Concentrated Flow:Segment C Segment D Short Grass 0.150 7. Surface Description (paved/unpaved)Unpaved Unpaved Dense 2 0.240 8. Flow Length, L 285.70 ft Bermuda 0.410 Begin Elevation 899.50 ft Range 0.130 End Elevation 895.79 ft 9. Watercourse slope, s 0.013 #DIV/0! ft/ft Light wood 0.400 10. Average Velocity, V 1.84 #DIV/0! ft/s Dense wood 0.800 11. Tt = L / (3600 * V)0.04 0.00 hr = 2.59 min 1 The n values are a composite of information compiled by Engman Channel Flow:Segment E Segment F (1986). Channel Description 2 Includes species such as weeping lovegrass, bluegrass, buffalo 12. Cross Sectional Flow Area, a sq ft grass, blue grama grass, and native grass mixtures. 13. Wetted Perimeter, Pw ft 3 When selecting n, consider cover to a height of about 0.1 ft. This 14. Hydraulic radius, r = a/Pw #DIV/0! #DIV/0! ft is the only part of the plant cover that will obstruct sheet flow. Begin Elevation ft End Elevation ft 15. Channel Slope, s #DIV/0! #DIV/0! ft/ft 16. Manning's Roughness coeff., n 17. V = 1.49 * r2/3 * s1/2 / n #DIV/0! #DIV/0! ft/s 18. Flow Length, L ft 19. Tt = L / (3600 * V)0.00 0.00 hr = 0.00 min 20. Total Watershed or subarea Tc hr = 27.28 min Notes: Curve Number Calculation Basin Area = 1.531 ac. Total Imperious Area = 0.000 ac.98.0 Pond/Wetland Area = 0.000 ac.100.0 Pervious Area (1) = 0.917 ac.61.0 Soil Type: Br, Group B, 59.9% Pervious Area (2) = 0.614 ac.74.0 Soil TypeL CrA, Group C Weighted Curve Number =66.2 TIME OF CONCENTRATION CALCULATION 2019-059 EIG14T - KinderCare, 10910 North Michigan Road, IN 46032 Crandall Engineering Post-development Station #1 Impervious CN = 0.45 (underbrush) (underbrush) (Residue cover ≤20%) (Residue cover >20%) (and short grass prairie) Surface description n 1 Cultivated soils: Grass: Woods 3 Pond/Wetland CN = Pervious CN (1) = Pervious CN (2) = 2020-06-03 AW / XC Date: Computed by: Checked by: LMC (concrete, asphalt, gravel, or bare soil) (no residue) (User defined, per city stormwater code) Urban Hydrology for Small Watersheds US Department of Agriculture, Technical Release 55, June 1986 (Natural)February 3, 2023 Page 40 of 103 Q10 NRCS Time of Concentration Sheet Flow:Segment A Segment B 1. Surface Description (table 3-1)Short Grass TR-55, Table 3-1 Roughness coefficients (Manning’s n) - sheet flow. 2. Manning's Roughness coeff., n 0.150 #N/A (see RHS) 3. Flow Length, L (should be <= 100 ft)33.00 ft Smooth 0.011 Begin Elevation 900.25 ft Fallow 0.050 End Elevation 898.00 ft Other 4. 2-yr, 24-hr rainfall, P2 2.66 inches 5. Land Slope, s 0.068 #DIV/0! ft/ft Soil, R≤0.2 0.060 6. Tt = 0.007 * (n*L)0.8 / (P2 0.5 * s0.4)0.05 0.00 hr = 2.71 min Soil, R>0.2 0.170 Shallow Concentrated Flow:Segment C Segment D Short Grass 0.150 7. Surface Description (paved/unpaved)Unpaved Unpaved Dense 2 0.240 8. Flow Length, L 312.00 ft Bermuda 0.410 Begin Elevation 898.00 ft Range 0.130 End Elevation 896.50 ft 9. Watercourse slope, s 0.005 #DIV/0! ft/ft Light wood 0.400 10. Average Velocity, V 1.12 #DIV/0! ft/s Dense wood 0.800 11. Tt = L / (3600 * V)0.08 0.00 hr = 4.65 min 1 The n values are a composite of information compiled by Engman Channel Flow:Segment E Segment F (1986). Channel Description 2 Includes species such as weeping lovegrass, bluegrass, buffalo 12. Cross Sectional Flow Area, a sq ft grass, blue grama grass, and native grass mixtures. 13. Wetted Perimeter, Pw ft 3 When selecting n, consider cover to a height of about 0.1 ft. This 14. Hydraulic radius, r = a/Pw #DIV/0! #DIV/0! ft is the only part of the plant cover that will obstruct sheet flow. Begin Elevation ft End Elevation ft 15. Channel Slope, s #DIV/0! #DIV/0! ft/ft 16. Manning's Roughness coeff., n 17. V = 1.49 * r2/3 * s1/2 / n #DIV/0! #DIV/0! ft/s 18. Flow Length, L ft 19. Tt = L / (3600 * V)0.00 0.00 hr = 0.00 min 20. Total Watershed or subarea Tc hr = 7.36 min Notes: Curve Number Calculation Basin Area = 0.950 ac. Total Imperious Area = 0.000 ac.98.0 Pond/Wetland Area = 0.000 ac.100.0 Pervious Area (1) = 0.569 ac.61.0 Soil Type: Br, Group B, 59.9% Pervious Area (2) = 0.381 ac.74.0 Soil TypeL CrA, Group C Weighted Curve Number =66.2 (User defined, per city stormwater code) TIME OF CONCENTRATION CALCULATION 2019-059 EIG14T - KinderCare, 10910 North Michigan Road, IN 46032 Crandall Engineering Post-development Station #OFF-SITE Date: 2020-06-03 Computed by: AW / XC Checked by: LMC Urban Hydrology for Small Watersheds US Department of Agriculture, Technical Release 55, June 1986 Surface description n 1 (concrete, asphalt, gravel, or bare soil) (no residue) 0.12 Cultivated soils: (Residue cover ≤20%) (Residue cover >20%) Grass: (and short grass prairie) Impervious CN = Pond/Wetland CN = Pervious CN (1) = Pervious CN (2) = (Natural) Woods 3 (underbrush) (underbrush)February 3, 2023 Page 41 of 103 336897.71CLO 118902.26BCIC 119902.34BCIC 120901.80BCIC 129901.95BCIC 130902.44BCIC 131902.39BCIC 139902.74BCIC 238902.92BCIC 246902.93BCIC 251902.68BCIC 370902.07BCIC 371902.18BCIC 368901.11BCIC-EC 369901.29BCIC-EC 363897.92BHIVE 364897.52BHIVE-RIM 115902.19COMS-BMH 123901.65COMS-ORANGE-NT 124901.78COMS-ORANGE-NT 125901.81COMS-ORANGE-NT 126901.78COMS-ORANGE-NT 132902.26COMS-ORANGE-NT133902.20COMS-ORANGE-NT 134901.80COMS-ORANGE-NT 135902.43COMS-ORANGE-NT 237902.59COMS-ORANGE-NT 3 902.94CRBS 114902.31EC 116902.53EC 122902.05EC 127901.90EC 137902.85EC 138902.88EC 140902.97EC 141903.07EC 239903.15EC 240903.19EC 241903.19EC 247903.29EC248903.30EC 252902.92EC253903.07EC 260902.61EC 373902.11EC 374902.31EC 121901.76EC-EC 128901.89EC-EC 897.87EG 319897.80EG 320897.55EG 321897.97EG 322897.83EG 323897.31EG 136902.64INLETC 372902.15INLETC 256902.45SGN 375901.85SMH 391902.16SMH 244900.53SSFM 245902.47SSFM 254902.74SSFM 255900.92SSFM 261902.59SSFM 262900.74SSFM 362899.70WTR-VAULT 335898.20WTR-WV-NTWTRWTRWTRWTR INV. W. 15" HDPE= 893.70 INV. NE. 15" HDPE= 893.84 INV. N. 12"? HDPE= 893.51 STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM STM WTRWTR WTRWTRWTRWTR WTRWTROVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVH D OVHD OVHD OVHD OVH D OVHD OVHD OVHD OVH D OVHD OVHD OVHD OVHD OVHD OVHD OVHD OVHD STMSTM STMSTMSTMCOMCOMCOM COMSTM STMSTMSTMSTM STMSTMSTMST M STM STMSTMSTMSTM STM STMSTMSTMSTMSTM STM STMSTMSTM STM STM STMSAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SANSAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN STM STM STM STMSTM STM STMSTMSTMSTM STM STMSTMSTMSTMSTM STM STMAPPROXIMATE 15' ELECTRIC EASEMENT LOCATION - ACUTAL CENTERLINE LOCATION TO FOLLOW ELECTRIC LINES UPON INSTALLATION INST. #2019018084 TEMPO R A R Y A C C E S S E A S E M E N T INST. #2 0 1 9 0 0 8 7 7 1 LOT 2 120' MAX IMUM BU ILD ING SETBACK30' M IN IMUM BU ILD ING SETBACK20' WATER L INE EASEMENT30' LANDSCAPE BUFFERYARD20' SANITARY SEWER EASEMENT684902.86EC 683902.85EC 682902.62BCIC 681902.52BCIC680902.71EC679902.82EC 668902.06EC 492898.05GRVL 491897.14GRVL 490897.46EG489897.63EG 488897.87EG 487897.66EG 486897.92EG 90390390290290290 2 901901901900 900900900900899899 899 899899 899899 899 8998998998 9 8 8988 9 8 898 898 898 898 898898 898898897897897 89715' SETBACK20' SETBACK30' SETBACK KIDERCARE LEARNING CENTER SINGLE STORY BUILDING 12,784± SF F.F. 902.00' SOUTH SUB-PARCEL (58110 SF OR 1.33 AC) NORTH SUB-PARCEL (49960 SF OR 1.15 AC) 20' SE T B A C K 11 12 12 0' 5' 10' 15' 20' 25' 50' OFFSET BRELLA OFFSET BRELLA OFFSET BRELLA20' SETBACK30' SETBACK ANDGREENBELT12 EX.ST EX.ST EX.ST EX.ST EX.ST EX.ST EX.ST EX.ST EX.ST 20'-0" SAN. EASEMENT 20'-0" WATER E A S E M E N T NO PLAN T I N G SUB-PARCEL LINE 20'-0" SAN. EASEMENT 10'-0" GAS EASEMENT STSTSTSTSTSTSTSTSTSTSTSTSTST STSTSTSTSTST STSTSTSTST STATION #2 A (ac) = 0.189 c = 0.72 CN = 93.2 Tc (min) = 5.00 STATION #1 A (ac) = 0.146 c = 0.80 CN = 96.0 Tc (min) = 5.00 STATION #3 A (ac) = 0.295 c = 0.58 CN = 90.5 Tc (min) = 9.72 STATION #4 A (ac) = 0.157 c = 0.90 CN = 98.0 Tc (min) = 5.00 STATION #5 A (ac) = 0.150 c = 0.90 CN = 98.0 Tc (min) = 5.00 STATION #6 A (ac) = 0.379 c = 0.30 CN = 82.9 Tc (min) = 6.29 TOTAL DEV. A (ac) = 1.513 c = 0.61 CN = 90.9 10'-0" GAS EASEMENT DISTURBANCE LIMIT ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST STSTSTSTSTSTSTSTST901.5'901.5'900.0' 898.0' 897.0' 900.0' 901.0'901.5'898.0' STORMWATER DISCHARGE THRU PIPE EX PIPE 1 PIPE 2 PIPE 3 PIPE 5 PIPE EX DISTURBANCE LIMIT DISTURBANCE LIMIT DISTURBANCE LIMITDISTURBANCE LIMIT DISTURBANCE LIMITPIPE 4 STATION #7 A (ac) = 0.197 c = 0.57 CN = 90.1 Tc (min) = 9.59ST CB 101CB 102 CB 103 CB 104 CB 105 END SECT. 901.0'901.0'900.5'900 .5 '900.0'900.0' 900.0' 899.0' 899.0' 899.0' 898.0' 897.0'901.0'897.0'898.0'902.0' 902.0' 901.0' 900.0'; 899.0' 901.0' 900.0' 899.0' 901.0' 900.0' ST ST ST ST ST ST ST ST ST PIPE 6 END SECT. 900.0' 90 0 . 0 ' 900.0' 899.0' 898.0' 899.0' ST ST ST ST ST ST 898.0' CULVERT #1STSTSTSTSTST OFF-STE A (ac) = 0.950 c = 0.85 (BUSINESS) CN = 92.5 (MAX.) PIPE 7 N SCALE(11x8.5):1" = 60'-0" 1 POST SITE POST-DEVELOPMENT DRAINAGE MAP KINDERCARE LEARNING CENTER - POST-DEVELOPMENT DRAINAGE MAP 10910 NORTH MICHIGAN ROAD, CARMEL, IN 46032 February 3, 2023 Page 42 of 103 Date:2020-06-03 Computed By:XC Q10 Checked By:LMC IncrementTotalIncrementTotalTo Upper EndIn SectionFlowing FullDesign FlowUpper EndLowee End1 109 0.012 0.20 0.002 NW parking and drive 0.134 0.85 0.114 0.000 0.90 0.000 0.146 0.80 0.116 5.00 6.12 0.711 96.0 2 92.83 0.038 0.20 0.008 NE parking and east of building lawn 0.151 0.85 0.129 0.000 0.90 0.000 0.189 0.72 0.136 5.00 6.12 0.834 93.2 3 151.00 0.123 0.20 0.025 1/2 of West parking and play area 0.172 0.85 0.146 and Northwest driveway 0.000 0.90 0.000 0.295 0.58 0.171 9.72 5.27 0.900 90.5 4 49.00 0.000 0.20 0.000 North portion of building roof (6:12) 0.000 0.85 0.000 0.157 0.90 0.142 0.157 0.90 0.142 5.00 6.12 0.867 98.0 5 44.25 0.000 0.20 0.000 South portion of building roof (6:12) 0.000 0.85 0.000 0.150 0.90 0.135 0.150 0.90 0.135 5.00 6.12 0.827 98.0 6 467.00 0.319 0.20 0.064 South play area and front, side, & back yard 0.060 0.85 0.051 0.000 0.90 0.000 0.379 0.30 0.115 6.29 5.89 0.676 82.9 7 151.00 0.086 0.20 0.017 1/2 of West Parking and play area 0.111 0.85 0.094 0.000 0.90 0.000 0.197 0.57 0.112 9.59 5.29 0.590 90.1 Off-Site 0.950 0.85 0.807 38.10 2.92 2.358 92.5 Off-site: North Parcel Total Discharge This Site 1.513 0.61 0.926 9.72 5.27 4.883 90.9 Total Discharge to CB 104 2.463 0.70 1.734 38.10 2.92 5.063 91.5 POST-DEVELOPMENT AREAS:SHEET FLOW (100' max) + SHALLOW CONCENTRATED FLOW + CHANNEL FLOW =TC Slope of Drain or Grade (ft/ft)Station Velocity (ft/s) Invert. Elev.Manhole Invert DropTotal Runoff CIA=QSCS Runoff (in)NRCS Curve NumverDrainage Area A (ac)(AxC)Flow Time (min)Rainfall Intensity I (in. /hr.)Length (ft)Curve Runoff Coefficient CRemarks POST-DEVELOPMENT RUNOFF CALCULATIONS - RATIONAL METHOD 2019-059 EIG14T - KinderCare, 10940 North Michigan Road, IN 46032 Crandall Engineering Calculation #C-1 Crandall Engineering, Inc.1 February 3, 2023 Page 43 of 103 Date:2020-06-03 Computed By:XC Q10 Checked By:LMC POST-DEVELOPMENT RUNOFF CALCULATIONS - RATIONAL METHOD 2019-059 EIG14T - KinderCare, 10940 North Michigan Road, IN 46032 Crandall Engineering Calculation #C-1 Q2 Q5 Q10 Q25 Q50 Q100 Q2 Q5 Q10 Q25 Q50 Q100 0.08 5 4.63 5.43 6.12 7.17 8.09 9.12 0.08 5 0.17 10 3.95 4.63 5.22 6.12 6.90 7.78 0.17 10 0.25 15 3.44 4.03 4.55 5.33 6.01 6.77 0.25 15 0.50 30 2.46 2.88 3.25 3.81 4.29 4.84 0.50 30 1.00 60 1.54 1.80 2.03 2.38 2.68 3.03 1.00 60 2.00 120 0.83 0.95 1.11 1.37 1.60 1.87 2.00 120 3.00 180 0.59 0.72 0.84 1.04 1.22 1.42 3.00 180 6.00 360 0.35 0.43 0.50 0.62 0.72 0.85 6.00 360 12.00 720 0.20 0.24 0.29 0.35 0.41 0.48 12.00 720 24.00 1440 0.11 0.14 0.16 0.20 0.23 0.27 24.00 1440 2.66 3.27 3.83 4.72 5.52 6.46 Q10 Q10 Q10 Q10 Q10 Q10 Q10 Q10IDF Linear Interpolation Time(min) Rain(in/hr) 30.00 3.25 38.10 2.92 60.00 2.03 City of Carmel SW Spec. Manual) Hours Minutes Return Period - Rainfall Intensity (in) IDF Linear Interpolation Time(min) 6.12 6.12 5.22 5.00 10.00 Rain(in/hr) 10.00 Station 3 IDF Linear Interpolation Time(min) Rain(in/hr) 6.12 9.72 5.27 10.00 5.22 5.89 IDD Table for Carmel, INIDF Table for Carmel, IN IDF Linear Interpolation Station 5.00 Station Return Period - Rainfall Intensity (in/hr) 6.12 5.22 5.00 City of Carmel SW Spec. Manual) Hours Minutes 2 IDF Linear Interpolation Time(min) Rain(in/hr) 6.12 Time(min) Rain(in/hr) 6.12 Station 1 5.22 Station 7 6 IDF Linear Interpolation Time(min) Rain(in/hr) 6.12 5.00 6.12 10.00 5.22 Station 6.29 5 IDF Linear Interpolation Time(min) Rain(in/hr) 6.12 Station 4 Station Off-Site 10.00 5.22 5.00 5.00 5.00 5.00 5.00 5.00 5.00 IDF Linear Interpolation Time(min) Rain(in/hr) 6.12 9.59 5.29 6.12 10.00 5.22 10.00 Crandall Engineering, Inc.2 February 3, 2023 Page 44 of 103 Date:2020-06-03 Computed By:XC Q100 Checked By:LMC IncrementTotalIncrementTotalTo Upper EndIn SectionFlowing FullDesign FlowUpper EndLowee End1 109 0.012 0.20 0.002 NW parking and drive 0.134 0.85 0.114 0.000 0.90 0.000 0.146 0.80 0.116 5.00 9.12 1.060 96.0 2 92.83 0.038 0.20 0.008 NE parking and east of building lawn 0.151 0.85 0.129 0.000 0.90 0.000 0.189 0.72 0.136 5.00 9.12 1.242 93.2 3 151.00 0.123 0.20 0.025 1/2 of West parking and play area 0.172 0.85 0.146 and Northwest driveway 0.000 0.90 0.000 0.295 0.58 0.171 9.72 7.85 1.342 90.5 4 49.00 0.000 0.20 0.000 North portion of building roof (6:12) 0.000 0.85 0.000 0.157 0.90 0.142 0.157 0.90 0.142 5.00 9.12 1.292 98.0 5 44.25 0.000 0.20 0.000 South portion of building roof (6:12) 0.000 0.85 0.000 0.150 0.90 0.135 0.150 0.90 0.135 5.00 9.12 1.233 98.0 6 467.00 0.319 0.20 0.064 South play area and front, side, & back yard 0.060 0.85 0.051 0.000 0.90 0.000 0.379 0.30 0.115 6.29 8.77 1.008 82.9 7 151.00 0.086 0.20 0.017 1/2 of West Parking and play area 0.111 0.85 0.094 0.000 0.90 0.000 0.197 0.57 0.112 9.59 7.89 0.880 90.1 Off-Site 0.950 0.85 0.807 38.10 4.35 3.512 92.5 Off-site: North Parcel Total Discharge This Site 1.513 0.61 0.926 9.72 7.85 7.277 90.9 Total Discharge to CB 104 2.463 0.70 1.734 38.10 4.35 7.544 91.5 POST-DEVELOPMENT AREAS:SHEET FLOW (100' max) + SHALLOW CONCENTRATED FLOW + CHANNEL FLOW =TC Manhole Invert DropSlope of Drain or Grade (ft/ft)Remarks Rainfall Intensity I (in. /hr.)Total Runoff CIA=QSCS Runoff (in)NRCS Curve NumverVelocity (ft/s) Invert. Elev. POST-DEVELOPMENT RUNOFF CALCULATIONS - RATIONAL METHOD 2019-059 EIG14T - KinderCare, 10940 North Michigan Road, IN 46032 Crandall Engineering Calculation #C-1 Station Length (ft)Drainage Area A (ac)Curve Runoff Coefficient C(AxC)Flow Time (min) Crandall Engineering, Inc.3 February 3, 2023 Page 45 of 103 Date:2020-06-03 Computed By:XC Q100 Checked By:LMC POST-DEVELOPMENT RUNOFF CALCULATIONS - RATIONAL METHOD 2019-059 EIG14T - KinderCare, 10940 North Michigan Road, IN 46032 Crandall Engineering Calculation #C-1 Q2 Q5 Q10 Q25 Q50 Q100 Q2 Q5 Q10 Q25 Q50 Q100 0.08 5 4.63 5.43 6.12 7.17 8.09 9.12 0.08 5 0.17 10 3.95 4.63 5.22 6.12 6.90 7.78 0.17 10 0.25 15 3.44 4.03 4.55 5.33 6.01 6.77 0.25 15 0.50 30 2.46 2.88 3.25 3.81 4.29 4.84 0.50 30 1.00 60 1.54 1.80 2.03 2.38 2.68 3.03 1.00 60 2.00 120 0.83 0.95 1.11 1.37 1.60 1.87 2.00 120 3.00 180 0.59 0.72 0.84 1.04 1.22 1.42 3.00 180 6.00 360 0.35 0.43 0.50 0.62 0.72 0.85 6.00 360 12.00 720 0.20 0.24 0.29 0.35 0.41 0.48 12.00 720 24.00 1440 0.11 0.14 0.16 0.20 0.23 0.27 24.00 1440 2.66 3.27 3.83 4.72 5.52 6.46 Q100 Q100 Q100 Q100 Q100 Q100 Q100 Q100 9.59 7.89 38.10 4.35 10.00 7.78 60.00 3.03 Time(min) Rain(in/hr)Time(min) Rain(in/hr) 5.00 9.12 30.00 4.84 Station 7 Station Off-Site IDF Linear Interpolation IDF Linear Interpolation 10.00 7.78 10.00 7.78 10.00 7.78 5.00 9.12 5.00 9.12 6.29 8.77 5.00 9.12 5.00 9.12 5.00 9.12 IDF Linear Interpolation IDF Linear Interpolation IDF Linear Interpolation Time(min) Rain(in/hr)Time(min) Rain(in/hr)Time(min) Rain(in/hr) Station 4 Station 5 Station 6 10.00 7.78 10.00 7.78 10.00 7.78 5.00 9.12 5.00 9.12 9.72 7.85 5.00 9.12 5.00 9.12 5.00 9.12 IDF Linear Interpolation IDF Linear Interpolation IDF Linear Interpolation Time(min) Rain(in/hr)Time(min) Rain(in/hr)Time(min) Rain(in/hr) Station 1 Station 2 Station 3 Hours Minutes Return Period - Rainfall Intensity (in/hr)Hours Minutes Return Period - Rainfall Intensity (in) IDF Table for Carmel, IN IDD Table for Carmel, IN City of Carmel SW Spec. Manual)City of Carmel SW Spec. Manual) Crandall Engineering, Inc.4 February 3, 2023 Page 46 of 103 Q10 NRCS Time of Concentration Sheet Flow:Segment A Segment B 1. Surface Description (table 3-1)Short Grass Smooth TR-55, Table 3-1 Roughness coefficients (Manning’s n) - sheet flow. 2. Manning's Roughness coeff., n 0.150 0.011 (see RHS) 3. Flow Length, L (should be <= 100 ft)14.0 6.0 ft Smooth 0.011 Begin Elevation 901.96 901.80 ft Fallow 0.050 End Elevation 901.80 901.68 ft Other 4. 2-yr, 24-hr rainfall, P2 2.66 2.66 inches 5. Land Slope, s 0.011 0.020 ft/ft Soil, R≤0.2 0.060 6. Tt = 0.007 * (n*L)0.8 / (P2 0.5 * s0.4)0.05 0.00 hr = 2.79 min Soil, R>0.2 0.170 Shallow Concentrated Flow:Segment C Segment D Short Grass 0.150 7. Surface Description (paved/unpaved)Paved Dense 2 0.240 8. Flow Length, L 89.00 ft Bermuda 0.410 Begin Elevation 901.18 ft Range 0.130 End Elevation 900.50 ft 9. Watercourse slope, s 0.008 #DIV/0! ft/ft Light wood 0.400 10. Average Velocity, V 1.78 #DIV/0! ft/s Dense wood 0.800 11. Tt = L / (3600 * V)0.01 0.00 hr = 0.83 min 1 The n values are a composite of information compiled by Engman Channel Flow:Segment E Segment F (1986). Channel Description 2 Includes species such as weeping lovegrass, bluegrass, buffalo 12. Cross Sectional Flow Area, a sq ft grass, blue grama grass, and native grass mixtures. 13. Wetted Perimeter, Pw ft 3 When selecting n, consider cover to a height of about 0.1 ft. This 14. Hydraulic radius, r = a/Pw #DIV/0! #DIV/0! ft is the only part of the plant cover that will obstruct sheet flow. Begin Elevation ft End Elevation ft 15. Channel Slope, s #DIV/0! #DIV/0! ft/ft 16. Manning's Roughness coeff., n 17. V = 1.49 * r2/3 * s1/2 / n #DIV/0! #DIV/0! ft/s 18. Flow Length, L ft 19. Tt = L / (3600 * V)0.00 0.00 hr = 0.00 min 20. Total Watershed or subarea Tc hr = 3.62 min Notes: Curve Number Calculation Basin Area = 0.146 ac. Total Imperious Area = 0.134 ac.98.0 Pond/Wetland Area = 0.000 ac.100.0 Pervious Area (1) = 0.012 ac.74.0 Soil Type: Br, Group B, use C Pervious Area (2) = 0.000 ac.0.0 Weighted Curve Number =96.0 TIME OF CONCENTRATION CALCULATION 2019-059 EIG14T - KinderCare, 10940 North Michigan Road, IN 46032 Crandall Engineering Post-development Station #1 Impervious CN = 0.06 (underbrush) (underbrush) (Residue cover ≤20%) (Residue cover >20%) (and short grass prairie) Surface description n 1 Cultivated soils: Grass: Woods 3 Pond/Wetland CN = Pervious CN (1) = Pervious CN (2) = 2020-06-03 AW / XC Date: Computed by: Checked by: LMC (concrete, asphalt, gravel, or bare soil) (no residue) (User defined, per city stormwater code) Urban Hydrology for Small Watersheds US Department of Agriculture, Technical Release 55, June 1986 (Natural)February 3, 2023 Page 47 of 103 Q10 NRCS Time of Concentration Sheet Flow:Segment A Segment B 1. Surface Description (table 3-1)Short Grass Smooth Table 3-1 Roughness coefficients (Manning’s n) - sheet flow. 2. Manning's Roughness coeff., n 0.150 0.011 (see RHS) 3. Flow Length, L (should be <= 100 ft)12.83 6 ft Smooth 0.011 Begin El. 901.96 901.80 ft Fallow 0.050 End El. 901.80 901.68 ft Other 4. 2-yr, 24-hr rainfall, P2 2.66 2.66 inches 5. Land Slope, s 0.012 0.020 ft/ft Soil, R≤0.2 0.060 6. Tt = 0.007 * (n*L)0.8 / (P2 0.5 * s0.4)0.04 0.00 hr = 2.51 min Soil, R>0.2 0.170 Shallow Concentrated Flow:Segment C Segment D Short Grass 0.150 7. Surface Description (paved/unpaved)Paved Dense 2 0.240 8. Flow Length, L 74.00 ft Bermuda 0.410 Begin El. 901.18 ft Range 0.130 End El. 900.73 ft 9. Watercourse slope, s 0.006 #DIV/0! ft/ft Light wood 0.400 10. Average Velocity, V 1.59 #DIV/0! ft/s Dense wood 0.800 11. Tt = L / (3600 * V)0.01 0.00 hr = 0.78 min 1 The n values are a composite of information compiled by Engman Channel Flow:Segment E Segment F (1986). Channel Description 2 Includes species such as weeping lovegrass, bluegrass, buffalo 12. Cross Sectional Flow Area, a sq ft grass, blue grama grass, and native grass mixtures. 13. Wetted Perimeter, Pw ft 3 When selecting n, consider cover to a height of about 0.1 ft. This 14. Hydraulic radius, r = a/Pw #DIV/0! #DIV/0! ft is the only part of the plant cover that will obstruct sheet flow. Begin El.ft End El.ft 15. Channel Slope, s #DIV/0! #DIV/0! ft/ft 16. Manning's Roughness coeff., n 17. V = 1.49 * r2/3 * s1/2 / n #DIV/0! #DIV/0! ft/s 18. Flow Length, L ft 19. Tt = L / (3600 * V)0.00 0.00 hr = 0.00 min 20. Total Watershed or subarea Tc hr = 3.29 min Notes: Curve Number Calculation Basin Area = 0.189 ac. Total Imperious Area = 0.151 ac.98.0 Pond/Wetland Area = 0.000 ac.100.0 Pervious Area (1) = 0.038 ac.74.0 Soil Type: Br, Group B, use C Pervious Area (2) = 0.000 ac.0.0 Weighted Curve Number =93.2 (Residue cover ≤20%) (underbrush) (Natural) (Residue cover >20%) (and short grass prairie) Woods 3 (underbrush) Grass: 0.06 Impervious CN = Pond/Wetland CN = Pervious CN (1) = Pervious CN (2) = TIME OF CONCENTRATION CALCULATION 2019-059 EIG14T - KinderCare, 10940 North Michigan Road, IN 46032 Crandall Engineering Post-development Station #2 Date: 2020-06-03 Computed by: AW / XC Checked by: LMC Surface description n 1 Cultivated soils: Urban Hydrology for Small Watersheds US Department of Agriculture, Technical Release 55, June 1986 (concrete, asphalt, gravel, or bare soil) (no residue) (User defined, per city stormwater code)February 3, 2023 Page 48 of 103 Q10 NRCS Time of Concentration Sheet Flow:Segment A Segment B 1. Surface Description (table 3-1)Short Grass Smooth Table 3-1 Roughness coefficients (Manning’s n) - sheet flow. 2. Manning's Roughness coeff., n 0.150 0.011 (see RHS) 3. Flow Length, L (should be <= 100 ft)57.0 5 ft Smooth 0.011 Begin El. 901.84 901.24 ft Fallow 0.050 End El. 901.24 901.14 ft Other 4. 2-yr, 24-hr rainfall, P2 2.66 2.66 inches 5. Land Slope, s 0.011 0.020 ft/ft Soil, R≤0.2 0.060 6. Tt = 0.007 * (n*L)0.8 / (P2 0.5 * s0.4)0.15 0.00 hr = 8.86 min Soil, R>0.2 0.170 Shallow Concentrated Flow:Segment C Segment D Short Grass 0.150 7. Surface Description (paved/unpaved)Paved Dense 2 0.240 8. Flow Length, L 89.0 ft Bermuda 0.410 Begin El. 900.64 ft Range 0.130 End El. 900.00 ft 9. Watercourse slope, s 0.007 #DIV/0! ft/ft Light wood 0.400 10. Average Velocity, V 1.72 #DIV/0! ft/s Dense wood 0.800 11. Tt = L / (3600 * V)0.01 0.00 hr = 0.86 min 1 The n values are a composite of information compiled by Engman Channel Flow:Segment E Segment F (1986). Channel Description 2 Includes species such as weeping lovegrass, bluegrass, buffalo 12. Cross Sectional Flow Area, a sq ft grass, blue grama grass, and native grass mixtures. 13. Wetted Perimeter, Pw ft 3 When selecting n, consider cover to a height of about 0.1 ft. This 14. Hydraulic radius, r = a/Pw #DIV/0! #DIV/0! ft is the only part of the plant cover that will obstruct sheet flow. Begin El.ft End El.ft 15. Channel Slope, s #DIV/0! #DIV/0! ft/ft 16. Manning's Roughness coeff., n 17. V = 1.49 * r2/3 * s1/2 / n #DIV/0! #DIV/0! ft/s 18. Flow Length, L ft 19. Tt = L / (3600 * V)0.00 0.00 hr = 0.00 min 20. Total Watershed or subarea Tc hr = 9.72 min Notes: Curve Number Calculation Basin Area = 0.295 ac. Total Imperious Area = 0.172 ac.98.0 Pond/Wetland Area = 0.000 ac.100.0 Pervious Area (1) = 0.123 ac.80.0 Soil Type: CrA, Group C, use D Pervious Area (2) = 0.000 ac.0.0 Weighted Curve Number =90.5 Pervious CN (1) = Pervious CN (2) = Urban Hydrology for Small Watersheds US Department of Agriculture, Technical Release 55, June 1986 Woods 3 (underbrush) (underbrush) Surface description n 1 (concrete, asphalt, gravel, or bare soil) (no residue) (User defined, per city stormwater code) Cultivated soils: (Residue cover ≤20%) 0.16 Impervious CN = Pond/Wetland CN = (Residue cover >20%) Grass: (and short grass prairie) (Natural) TIME OF CONCENTRATION CALCULATION 2019-059 EIG14T - KinderCare, 10940 North Michigan Road, IN 46032 Crandall Engineering Post-development Station #3 Date: 2020-06-03 Computed by: AW / XC Checked by: LMC February 3, 2023 Page 49 of 103 Q10 NRCS Time of Concentration Sheet Flow:Segment A Segment B 1. Surface Description (table 3-1)Smooth Table 3-1 Roughness coefficients (Manning’s n) - sheet flow. 2. Manning's Roughness coeff., n 0.011 #N/A (see RHS) 3. Flow Length, L (should be <= 100 ft)49.00 ft Smooth 0.011 Begin El.ft Fallow 0.050 End El.ft Other 4. 2-yr, 24-hr rainfall, P2 2.66 inches 5. Land Slope, s 0.250 #DIV/0! ft/ft (3:12 Roof)Soil, R≤0.2 0.060 6. Tt = 0.007 * (n*L)0.8 / (P2 0.5 * s0.4)0.00 0.00 hr = 0.27 min Soil, R>0.2 0.170 Shallow Concentrated Flow:Segment C Segment D Short Grass 0.150 7. Surface Description (paved/unpaved)Dense 2 0.240 8. Flow Length, L ft Bermuda 0.410 Begin El.ft Range 0.130 End El.ft 9. Watercourse slope, s #DIV/0! #DIV/0! ft/ft Light wood 0.400 10. Average Velocity, V #DIV/0! #DIV/0! ft/s Dense wood 0.800 11. Tt = L / (3600 * V)0.00 0.00 hr = 0.00 min 1 The n values are a composite of information compiled by Engman Channel Flow:Segment E Segment F (1986). Channel Description 2 Includes species such as weeping lovegrass, bluegrass, buffalo 12. Cross Sectional Flow Area, a sq ft grass, blue grama grass, and native grass mixtures. 13. Wetted Perimeter, Pw ft 3 When selecting n, consider cover to a height of about 0.1 ft. This 14. Hydraulic radius, r = a/Pw #DIV/0! #DIV/0! ft is the only part of the plant cover that will obstruct sheet flow. Begin El.ft End El.ft 15. Channel Slope, s #DIV/0! #DIV/0! ft/ft 16. Manning's Roughness coeff., n 17. V = 1.49 * r2/3 * s1/2 / n #DIV/0! #DIV/0! ft/s 18. Flow Length, L ft 19. Tt = L / (3600 * V)0.00 0.00 hr = 0.00 min 20. Total Watershed or subarea Tc hr = 0.27 min Notes: Curve Number Calculation Basin Area = 0.157 ac. Total Imperious Area = 0.157 ac.98.0 Pond/Wetland Area = 0.000 ac.100.0 Pervious Area (1) = 0.000 ac.74.0 Soil Type: Br, Group B, use C Pervious Area (2) = 0.000 ac.0.0 Weighted Curve Number =98.0 Impervious CN = Pond/Wetland CN = Pervious CN (1) = Pervious CN (2) = (Natural) Woods 3 (underbrush) (underbrush) 0.00 Cultivated soils: (Residue cover ≤20%) (Residue cover >20%) Grass: (and short grass prairie) (User defined, per city stormwater code) TIME OF CONCENTRATION CALCULATION 2019-059 EIG14T - KinderCare, 10940 North Michigan Road, IN 46032 Crandall Engineering Post-development Station #4 Date: 2020-06-03 Computed by: AW / XC Checked by: LMC Urban Hydrology for Small Watersheds US Department of Agriculture, Technical Release 55, June 1986 Surface description n 1 (concrete, asphalt, gravel, or bare soil) (no residue)February 3, 2023 Page 50 of 103 Q10 NRCS Time of Concentration Sheet Flow:Segment A Segment B 1. Surface Description (table 3-1)Smooth Table 3-1 Roughness coefficients (Manning’s n) - sheet flow. 2. Manning's Roughness coeff., n 0.011 #N/A (see RHS) 3. Flow Length, L (should be <= 100 ft)44.25 ft Smooth 0.011 Begin El.ft Fallow 0.050 End El.ft Other 4. 2-yr, 24-hr rainfall, P2 2.66 inches 5. Land Slope, s 0.333 #DIV/0! ft/ft (4:12 Roof)Soil, R≤0.2 0.060 6. Tt = 0.007 * (n*L)0.8 / (P2 0.5 * s0.4)0.00 0.00 hr = 0.22 min Soil, R>0.2 0.170 Shallow Concentrated Flow:Segment C Segment D Short Grass 0.150 7. Surface Description (paved/unpaved)Dense 2 0.240 8. Flow Length, L ft Bermuda 0.410 Begin El.ft Range 0.130 End El.ft 9. Watercourse slope, s #DIV/0! #DIV/0! ft/ft Light wood 0.400 10. Average Velocity, V #DIV/0! #DIV/0! ft/s Dense wood 0.800 11. Tt = L / (3600 * V)0.00 0.00 hr = 0.00 min 1 The n values are a composite of information compiled by Engman Channel Flow:Segment E Segment F (1986). Channel Description 2 Includes species such as weeping lovegrass, bluegrass, buffalo 12. Cross Sectional Flow Area, a sq ft grass, blue grama grass, and native grass mixtures. 13. Wetted Perimeter, Pw ft 3 When selecting n, consider cover to a height of about 0.1 ft. This 14. Hydraulic radius, r = a/Pw #DIV/0! #DIV/0! ft is the only part of the plant cover that will obstruct sheet flow. Begin El.ft End El.ft 15. Channel Slope, s #DIV/0! #DIV/0! ft/ft 16. Manning's Roughness coeff., n 17. V = 1.49 * r2/3 * s1/2 / n #DIV/0! #DIV/0! ft/s 18. Flow Length, L ft 19. Tt = L / (3600 * V)0.00 0.00 hr = 0.00 min 20. Total Watershed or subarea Tc hr = 0.22 min Notes: Curve Number Calculation Basin Area = 0.150 ac. Total Imperious Area = 0.150 ac.98.0 Pond/Wetland Area = 0.000 ac.100.0 Pervious Area (1) = 0.000 ac.74.0 Soil Type: CrA, Group C, use D Pervious Area (2) = 0.000 ac.0.0 Weighted Curve Number =98.0 Impervious CN = Pond/Wetland CN = Pervious CN (1) = Pervious CN (2) = (Natural) Woods 3 (underbrush) (underbrush) 0.00 Cultivated soils: (Residue cover ≤20%) (Residue cover >20%) Grass: (and short grass prairie) (User defined, per city stormwater code) TIME OF CONCENTRATION CALCULATION 2019-059 EIG14T - KinderCare, 10940 North Michigan Road, IN 46032 Crandall Engineering Post-development Station #5 Date: 2020-06-03 Computed by: AW / XC Checked by: LMC Urban Hydrology for Small Watersheds US Department of Agriculture, Technical Release 55, June 1986 Surface description n 1 (concrete, asphalt, gravel, or bare soil) (no residue)February 3, 2023 Page 51 of 103 Q10 NRCS Time of Concentration Sheet Flow:Segment A Segment B 1. Surface Description (table 3-1)Short Grass Short Grass Table 3-1 Roughness coefficients (Manning’s n) - sheet flow. 2. Manning's Roughness coeff., n 0.150 0.150 (see RHS) 3. Flow Length, L (should be <= 100 ft)21.00 69.00 ft Smooth 0.011 Begin El. 901.68 900.00 ft Fallow 0.050 End El. 900.00 899.00 ft Other 4. 2-yr, 24-hr rainfall, P2 2.66 2.66 inches 5. Land Slope, s 0.080 0.014 ft/ft Soil, R≤0.2 0.060 6. Tt = 0.007 * (n*L)0.8 / (P2 0.5 * s0.4)0.03 0.15 hr = 1.77 min Soil, R>0.2 0.170 Shallow Concentrated Flow:Segment C Segment D Short Grass 0.150 7. Surface Description (paved/unpaved)Unpaved Dense 2 0.240 8. Flow Length, L 377.00 ft Bermuda 0.410 Begin El. 899.00 ft Range 0.130 End El. 896.20 ft 9. Watercourse slope, s 0.007 #DIV/0! ft/ft Light wood 0.400 10. Average Velocity, V 1.39 #DIV/0! ft/s Dense wood 0.800 11. Tt = L / (3600 * V)0.08 0.00 hr = 4.52 min 1 The n values are a composite of information compiled by Engman Channel Flow:Segment E Segment F (1986). Channel Description 2 Includes species such as weeping lovegrass, bluegrass, buffalo 12. Cross Sectional Flow Area, a sq ft grass, blue grama grass, and native grass mixtures. 13. Wetted Perimeter, Pw ft 3 When selecting n, consider cover to a height of about 0.1 ft. This 14. Hydraulic radius, r = a/Pw #DIV/0! #DIV/0! ft is the only part of the plant cover that will obstruct sheet flow. Begin El.ft End El.ft 15. Channel Slope, s #DIV/0! #DIV/0! ft/ft 16. Manning's Roughness coeff., n 17. V = 1.49 * r2/3 * s1/2 / n #DIV/0! #DIV/0! ft/s 18. Flow Length, L ft 19. Tt = L / (3600 * V)0.00 0.00 hr = 0.00 min 20. Total Watershed or subarea Tc hr = 6.29 min Notes: Curve Number Calculation Basin Area = 0.379 ac. Total Imperious Area = 0.060 ac.98.0 Pond/Wetland Area = 0.000 ac.100.0 Pervious Area (1) = 0.319 ac.80.0 Soil Type: CrA, Group C, use D Pervious Area (2) = 0.000 ac.0.0 Weighted Curve Number =82.9 (User defined, per city stormwater code) TIME OF CONCENTRATION CALCULATION 2019-059 EIG14T - KinderCare, 10940 North Michigan Road, IN 46032 Crandall Engineering Post-development Station #6 Date: 2020-06-03 Computed by: AW / XC Checked by: LMC Urban Hydrology for Small Watersheds US Department of Agriculture, Technical Release 55, June 1986 Surface description n 1 (concrete, asphalt, gravel, or bare soil) (no residue) 0.26 Cultivated soils: (Residue cover ≤20%) (Residue cover >20%) Grass: (and short grass prairie) Impervious CN = Pond/Wetland CN = Pervious CN (1) = Pervious CN (2) = (Natural) Woods 3 (underbrush) (underbrush)February 3, 2023 Page 52 of 103 Q10 NRCS Time of Concentration Sheet Flow:Segment A Segment B 1. Surface Description (table 3-1)Short Grass Smooth Table 3-1 Roughness coefficients (Manning’s n) - sheet flow. 2. Manning's Roughness coeff., n 0.150 0.011 (see RHS) 3. Flow Length, L (should be <= 100 ft)57.0 5 ft Smooth 0.011 Begin El. 901.84 901.24 ft Fallow 0.050 End El. 901.24 901.14 ft Other 4. 2-yr, 24-hr rainfall, P2 2.66 2.66 inches 5. Land Slope, s 0.011 0.020 ft/ft Soil, R≤0.2 0.060 6. Tt = 0.007 * (n*L)0.8 / (P2 0.5 * s0.4)0.15 0.00 hr = 8.86 min Soil, R>0.2 0.170 Shallow Concentrated Flow:Segment C Segment D Short Grass 0.150 7. Surface Description (paved/unpaved)Paved Dense 2 0.240 8. Flow Length, L 89.0 ft Bermuda 0.410 Begin El. 900.64 ft Range 0.130 End El. 899.75 ft 9. Watercourse slope, s 0.010 #DIV/0! ft/ft Light wood 0.400 10. Average Velocity, V 2.03 #DIV/0! ft/s Dense wood 0.800 11. Tt = L / (3600 * V)0.01 0.00 hr = 0.73 min 1 The n values are a composite of information compiled by Engman Channel Flow:Segment E Segment F (1986). Channel Description 2 Includes species such as weeping lovegrass, bluegrass, buffalo 12. Cross Sectional Flow Area, a sq ft grass, blue grama grass, and native grass mixtures. 13. Wetted Perimeter, Pw ft 3 When selecting n, consider cover to a height of about 0.1 ft. This 14. Hydraulic radius, r = a/Pw #DIV/0! #DIV/0! ft is the only part of the plant cover that will obstruct sheet flow. Begin El.ft End El.ft 15. Channel Slope, s #DIV/0! #DIV/0! ft/ft 16. Manning's Roughness coeff., n 17. V = 1.49 * r2/3 * s1/2 / n #DIV/0! #DIV/0! ft/s 18. Flow Length, L ft 19. Tt = L / (3600 * V)0.00 0.00 hr = 0.00 min 20. Total Watershed or subarea Tc hr = 9.59 min Notes: Curve Number Calculation Basin Area = 0.197 ac. Total Imperious Area = 0.111 ac.98.0 Pond/Wetland Area = 0.000 ac.100.0 Pervious Area (1) = 0.086 ac.80.0 Soil Type: CrA, Group C, use D Pervious Area (2) = 0.000 ac.0.0 Weighted Curve Number =90.1 (User defined, per city stormwater code) TIME OF CONCENTRATION CALCULATION 2019-059 EIG14T - KinderCare, 10940 North Michigan Road, IN 46032 Crandall Engineering Post-development Station #7 Date: 2020-06-03 Computed by: AW / XC Checked by: LMC Urban Hydrology for Small Watersheds US Department of Agriculture, Technical Release 55, June 1986 Surface description n 1 (concrete, asphalt, gravel, or bare soil) (no residue) 0.16 Cultivated soils: (Residue cover ≤20%) (Residue cover >20%) Grass: (and short grass prairie) Impervious CN = Pond/Wetland CN = Pervious CN (1) = Pervious CN (2) = (Natural) Woods 3 (underbrush) (underbrush)February 3, 2023 Page 53 of 103 Q10 NRCS Time of Concentration Sheet Flow:Segment A Segment B 1. Surface Description (table 3-1)Short Grass Table 3-1 Roughness coefficients (Manning’s n) - sheet flow. 2. Manning's Roughness coeff., n 0.150 (see RHS) 3. Flow Length, L (should be <= 100 ft)100.0 ft Smooth 0.011 Begin El. 898.40 ft Fallow 0.050 End El. 898.25 ft Other Paved 4. 2-yr, 24-hr rainfall, P2 2.66 inches Unpaved 5. Land Slope, s 0.001 #DIV/0! ft/ft Soil, R≤0.2 0.060 6. Tt = 0.007 * (n*L)0.8 / (P2 0.5 * s0.4)0.50 0.00 hr = 30.29 min Soil, R>0.2 0.170 Shallow Concentrated Flow:Segment C Segment D Short Grass 0.150 7. Surface Description (paved/unpaved)Unpaved Dense 2 0.240 8. Flow Length, L 415.0 ft Bermuda 0.410 Begin El. 898.25 ft Range 0.130 End El. 897.00 ft 9. Watercourse slope, s 0.003 #DIV/0! ft/ft Light wood 0.400 10. Average Velocity, V 0.89 #DIV/0! ft/s Dense wood 0.800 11. Tt = L / (3600 * V)0.13 0.00 hr = 7.81 min 1 The n values are a composite of information compiled by Engman Channel Flow:Segment E Segment F (1986). Channel Description 2 Includes species such as weeping lovegrass, bluegrass, buffalo 12. Cross Sectional Flow Area, a sq ft grass, blue grama grass, and native grass mixtures. 13. Wetted Perimeter, Pw ft 3 When selecting n, consider cover to a height of about 0.1 ft. This 14. Hydraulic radius, r = a/Pw #DIV/0! #DIV/0! ft is the only part of the plant cover that will obstruct sheet flow. Begin El.ft End El.ft 15. Channel Slope, s #DIV/0! #DIV/0! ft/ft 16. Manning's Roughness coeff., n 17. V = 1.49 * r2/3 * s1/2 / n #DIV/0! #DIV/0! ft/s 18. Flow Length, L ft 19. Tt = L / (3600 * V)0.00 0.00 hr = 0.00 min 20. Total Watershed or subarea Tc hr = 38.10 min (Natural) Woods 3 (underbrush) (underbrush) 0.63 Cultivated soils: (Residue cover ≤20%) (Residue cover >20%) Grass: (and short grass prairie) Urban Hydrology for Small Watersheds US Department of Agriculture, Technical Release 55, June 1986 Surface description n 1 (concrete, asphalt, gravel, or bare soil) (no residue) (User defined, per city stormwater code) TIME OF CONCENTRATION CALCULATION 2019-059 EIG14T - KinderCare, 10940 North Michigan Road, IN 46032 Crandall Engineering Post-development Station #Off=Site Date: 2020-06-03 Computed by: AW / XC Checked by: LMC February 3, 2023 Page 54 of 103 Date: Computed By: Q10 Checked By: 1. Storm Sewer In-pipe Flow Capacity, Rate, and Velocity Summary Pipe Ident. CB# - CB# Pipe 1 Station 2, 4 0.27 0.77 6.12 1.27 12 CPP 897.12' 099.50' 896.79' 0.0033 2.84 2.23 2.48 CB 101 - CB 102 Pipe 2 Station 1, 4 0.22 0.83 6.12 2.41 12 CPP 896.69' 122.00' 896.20' 0.0040 3.12 2.45 3.25 CB 102 - CB 103 Pipe 3 Station 1, 2, 3, 4 0.30 0.58 5.27 5.67 18 CPP 896.10' 092.00' 895.86' 0.0026 3.30 5.83 3.73 CB 103 - CB 104 Pipe 4 Station 5, 6 0.53 0.47 5.89 1.47 12 CPP 896.20' 013.00' 896.07' 0.0100 4.93 3.87 3.82 End Sect - CB 105 Pipe 5 Station 5, 6, 7 0.20 0.57 5.29 2.07 12 CPP 895.97' 033.00' 895.86' 0.0033 2.84 2.23 2.96 CB 105 - CB 104 Pipe 6 Station 2 0.02 0.20 6.12 0.03 12 CPP 898.60' 110.00' 897.22' 0.0125 5.52 4.33 5.74 End Sect - CB 101 Culvert 1 Station 5, 6 0.53 0.47 5.89 1.47 12 CPP 897.50' 070.30' 897.00' 0.0071 4.16 3.26 4.28 Pipe 7 Station Off-site 0.95 0.85 2.92 2.36 12 CPP 896.50' 070.00' 896.20' 0.0043 3.23 2.53 3.61 End Sect - CB 103 Pipe Ex Site 7.74 24 RCP 895.76' 027.00' 895.73' 0.0011 2.61 8.19 2.89 CB 104 - Ex. Curb Notes:a. Runoff coefficients, contributed areas, and time of concentrations can be found in the Post-development Runoff Calculations . b. Rain intensities are derived using linear interpolation base on the IDF table provided in City of Carmel Manual c. Catch basin structure numbers and basin numbers can be found in the C400 d. Per City of Carmel Stormwater Management Manual , the above calculations are targeting Q10 discharge rate. Part of Station 2 Full contribution from Station 3 and from Pipe 2, Pipe 7 Slope ft/ft Full Flow Velocity Full Flow Cap. cfs Disch. Q=CiA Diam. inQ10 Rain Int. Runoff Coef. STORM SEWER PIPE DISCHARGE CALCULATIONS 2019-059 EIG14T - KinderCare, 10940 North Michigan Road, IN 46032 Crandall Engineering 2020-06-03 AW / XC LMC Calculation #D Station Off-site Begin Invert Length End Invert From Pipe 3 and Pipe 5 Actual Velocity Existing Stormwater Pipes/ Channels/ Swales/ Culverts Full contribution from Station 2 and 50% of Station 4 Full contribution from Station 1 and 50% of Station 4, and from Pipe 1 Full contribution from Station 7 and from Pipe 4 New Stormwater Pipes/ Channels/ Swales/ Culverts Contrib. Basins Contrib. Area February 3, 2023 Page 55 of 103 Date: Computed By: Q10 Checked By: STORM SEWER PIPE DISCHARGE CALCULATIONS 2019-059 EIG14T - KinderCare, 10940 North Michigan Road, IN 46032 Crandall Engineering 2020-06-03 AW / XC LMC Calculation #D 2. Full Flow Velocity & Capacity Formular 3. Conversion Chart used to Obtain Actual Flow Velocity Note:a. n=0.012 for RCP; n=0.012 for PVC, CPP (HDPE) b. Rh is the hydraulic radius c. S is slope 𝑉୑ୟ୬୬୧ ᇲ ୱ ୉୯.=(1.49 𝑛)𝑅௛ ଶ/ଷ 𝑆ଵ/ଶ February 3, 2023 Page 56 of 103 February 3, 2023 Page 57 of 103 February 3, 2023 Page 58 of 103 February 3, 2023 Page 59 of 103 February 3, 2023 Page 60 of 103 February 3, 2023 Page 61 of 103 February 3, 2023 Page 62 of 103 February 3, 2023 Page 63 of 103 February 3, 2023 Page 64 of 103 February 3, 2023 Page 65 of 103 February 3, 2023 Page 66 of 103 February 3, 2023 Page 67 of 103 February 3, 2023 Page 68 of 103 February 3, 2023 Page 69 of 103 February 3, 2023 Page 70 of 103 February 3, 2023 Page 71 of 103 February 3, 2023 Page 72 of 103 United States Department of Agriculture A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Hamilton County, Indiana KinderCare, Carmel, IN Natural Resources Conservation Service October 25, 2019 February 3, 2023 Page 73 of 103 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/ portal/nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/? cid=nrcs142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require 2 February 3, 2023 Page 74 of 103 alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 February 3, 2023 Page 75 of 103 Contents Preface....................................................................................................................2 Soil Map..................................................................................................................5 Soil Map................................................................................................................6 Legend..................................................................................................................7 Map Unit Legend..................................................................................................8 Map Unit Descriptions..........................................................................................8 Hamilton County, Indiana................................................................................10 Br—Brookston silty clay loam, 0 to 2 percent slopes..................................10 CrA—Crosby silt loam, fine-loamy subsoil, 0 to 2 percent slopes...............11 4 February 3, 2023 Page 76 of 103 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 5 February 3, 2023 Page 77 of 103 6 Custom Soil Resource Report Soil Map 442191044219304421950442197044219904422010442203044220504422070442191044219304421950442197044219904422010442203044220504422070564880 564900 564920 564940 564960 564980 565000 564880 564900 564920 564940 564960 564980 565000 39° 56' 46'' N 86° 14' 26'' W39° 56' 46'' N86° 14' 20'' W39° 56' 40'' N 86° 14' 26'' W39° 56' 40'' N 86° 14' 20'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84 0 40 80 160 240 Feet 0 10 20 40 60 Meters Map Scale: 1:887 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. February 3, 2023 Page 78 of 103 MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Hamilton County, Indiana Survey Area Data: Version 20, Sep 16, 2019 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Aug 1, 2018—Sep 30, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 7 February 3, 2023 Page 79 of 103 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI Br Brookston silty clay loam, 0 to 2 percent slopes 1.5 59.9% CrA Crosby silt loam, fine-loamy subsoil, 0 to 2 percent slopes 1.0 40.1% Totals for Area of Interest 2.5 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, Custom Soil Resource Report 8 February 3, 2023 Page 80 of 103 onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. Custom Soil Resource Report 9 February 3, 2023 Page 81 of 103 Hamilton County, Indiana Br—Brookston silty clay loam, 0 to 2 percent slopes Map Unit Setting National map unit symbol: 2t98n Elevation: 600 to 1,260 feet Mean annual precipitation: 37 to 46 inches Mean annual air temperature: 48 to 55 degrees F Frost-free period: 145 to 180 days Farmland classification: Prime farmland if drained Map Unit Composition Brookston and similar soils: 95 percent Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Brookston Setting Landform: Depressions, till plains Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Dip Down-slope shape: Concave, linear Across-slope shape: Concave Parent material: Loess over loamy till Typical profile Ap - 0 to 16 inches: silty clay loam Btg1 - 16 to 32 inches: silty clay loam Btg2 - 32 to 44 inches: loam C - 44 to 60 inches: loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Poorly drained Runoff class: Negligible Capacity of the most limiting layer to transmit water (Ksat): Moderately high (0.20 to 0.60 in/hr) Depth to water table: About 0 to 12 inches Frequency of flooding: None Frequency of ponding: Frequent Calcium carbonate, maximum in profile: 40 percent Salinity, maximum in profile: Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water storage in profile: Moderate (about 8.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2w Hydrologic Soil Group: B/D Hydric soil rating: Yes Custom Soil Resource Report 10 February 3, 2023 Page 82 of 103 Minor Components Crosby Percent of map unit: 5 percent Landform: Till plains Landform position (two-dimensional): Footslope, summit Landform position (three-dimensional): Talf Down-slope shape: Concave Across-slope shape: Linear Hydric soil rating: No CrA—Crosby silt loam, fine-loamy subsoil, 0 to 2 percent slopes Map Unit Setting National map unit symbol: 2thy4 Elevation: 600 to 1,000 feet Mean annual precipitation: 36 to 44 inches Mean annual air temperature: 49 to 54 degrees F Frost-free period: 145 to 180 days Farmland classification: Prime farmland if drained Map Unit Composition Crosby and similar soils: 93 percent Minor components: 7 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Crosby Setting Landform: Recessionial moraines, water-lain moraines, ground moraines Landform position (two-dimensional): Summit, backslope, footslope Landform position (three-dimensional): Interfluve, rise Down-slope shape: Linear, convex Across-slope shape: Convex, linear Parent material: Silty material or loess over loamy till Typical profile Ap - 0 to 10 inches: silt loam Btg - 10 to 17 inches: silty clay loam 2Bt - 17 to 29 inches: clay loam 2BCt - 29 to 36 inches: loam 2Cd - 36 to 79 inches: loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: 24 to 40 inches to densic material Natural drainage class: Somewhat poorly drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Low to moderately high (0.01 to 0.20 in/hr) Custom Soil Resource Report 11 February 3, 2023 Page 83 of 103 Depth to water table: About 6 to 24 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 55 percent Salinity, maximum in profile: Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water storage in profile: Moderate (about 6.5 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2w Hydrologic Soil Group: C/D Hydric soil rating: No Minor Components Williamstown, eroded Percent of map unit: 5 percent Landform: Recessionial moraines, water-lain moraines, ground moraines Landform position (two-dimensional): Backslope, shoulder, summit Landform position (three-dimensional): Head slope, nose slope, side slope, crest, rise Down-slope shape: Convex, linear Across-slope shape: Linear, convex Hydric soil rating: No Treaty, drained Percent of map unit: 2 percent Landform: Depressions, swales, water-lain moraines Landform position (two-dimensional): Toeslope, footslope Landform position (three-dimensional): Base slope, dip Down-slope shape: Linear Across-slope shape: Concave Hydric soil rating: Yes Custom Soil Resource Report 12 February 3, 2023 Page 84 of 103 Indiana Wetlands - NWI (2014) Indiana Wetlands from the National Wetland Inventory, 2014 - Shows the extent, approximate location, and type of wetlands and deepwater habitats in Indiana Opacity: 1 Wetlands - NWI (2014) Wetlands NWI (USFWS) Wetlands Project Metadata NWI (USFS) Wetlands NWI (2014)https://maps.indiana.edu/previewMaps/Hydrology/Wetlands_NWI.html 1 of 1 10/25/2019, 9:00 AMFebruary 3, 2023 Page 85 of 103 USGS The National Map: Orthoimagery. Data refreshed April, 2019. National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250Feet Ü86°14'42.59"W 39°56'56.31"N 86°14'5.14"W 39°56'28.72"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOODHAZARD AREAS Without Base Flood Elevation (BFE)Zone A, V, A99With BFE or Depth Zone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areasof 1% annual chance flood with averagedepth less than one foot or with drainageareas of less than one square mile Zone X Future Conditions 1% AnnualChance Flood Hazard Zone XArea with Reduced Flood Risk due toLevee. See Notes.Zone X Area with Flood Risk due to Levee Zone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood Hazard Zone D Channel, Culvert, or Storm SewerLevee, Dike, or Floodwall Cross Sections with 1% Annual Chance17.5 Water Surface ElevationCoastal Transect Coastal Transect BaselineProfile BaselineHydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of StudyJurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from theauthoritative NFHL web services provided by FEMA. This mapwas exported on 10/25/2019 at 8:47:05 AM and does notreflect changes or amendments subsequent to this date andtime. The NFHL and effective information may change orbecome superseded by new data over time. This map image is void if the one or more of the following mapelements do not appear: basemap imagery, flood zone labels,legend, scale bar, map creation date, community identifiers,FIRM panel number, and FIRM effective date. Map images forunmapped and unmodernized areas cannot be used forregulatory purposes. Legend OTHER AREAS OFFLOOD HAZARD OTHER AREAS GENERALSTRUCTURES OTHERFEATURES MAP PANELS 8 1:6,000 B 20.2 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location.February 3, 2023 Page 86 of 103 APPENDIX G –CHRISTIAN BROS STORMWATER REPORT February 3, 2023 Page 87 of 103 Stormwater Management Plan For: CHRISTIAN BROTHERS AUTOMOTIVE SERVICE CENTER Prepared for: Christian Brothers Automotive Corporation Jonathan Wakefield 17725 Katy Freeway | Suite 200 Houston, TX 77094 Prepared by: Progressive Architecture Engineering, P.C. 1811 4 Mile Road NE Grand Rapids, MI 49525-2442 616/361-2664 August 2, 2019 Project No: 70050012 February 3, 2023 Page 88 of 103 TABLE OF CONTENTS INTRODUCTION ........................................................................................................................................... 1 EXISTING CONDITIONS .............................................................................................................................. 1 PROPOSED DEVELOPMENT...................................................................................................................... 1 Design Standards ..................................................................................................................................... 1 Proposed Storm Pipe Network ................................................................................................................. 1 Water Quality ........................................................................................................................................... 1 Detention ................................................................................................................................................. 1 APPENDICIES Appendix 1 Existing Conditions Drainage Area Map Appendix 2 Post-Development Drainage Area Map – Pipe Network Sizing Appendix 3 Post-Development Drainage Area Map – Detention Sizing Appendix 4 Stormwater Design Calculations February 3, 2023 Page 89 of 103 STORMWATER MANAGEMENT PLAN Christian Brothers Automotive Service Center 70050012 Stormwater Management Plan Page 1 INTRODUCTION Christian Brothers Automotive Service center is the first project as part of the overall development, “Michigan Road Retail Site Development.” The 5,660 square foot automotive service building is proposed on a 1.23-acre parcel with proposed parking, dumpster enclosure and landscaping. In 2018, plans were approved for a multi-family housing development, “Aria.” As part of this development, a large detention basin and water quality units were sized to accommodate both the Aria Development as well as the parcel to the east, Michigan Road Retail Site Development, which the Christian Brothers property is part of. EXISTING CONDITIONS The existing parcel is an open field with fallow ground cover. The east quarter of the property drains to a low point on the east side and the rest of the site drains to the west where it collects and pools in low areas. The existing soil is silty clay and loam with poor infiltration. Appendix 1 shows a drainage area map of existing conditions. PROPOSED DEVELOPMENT Design Standards The proposed stormwater management plan is designed in accordance with “The City of Carmel Stormwater Technical Standards Manual.” Proposed Storm Pipe Network The proposed Christian Brothers stormwater pipe network is designed to handle the stormwater discharge of a 10-year storm event and provide 2-1/2 feet minimum cover at all catch basins. The storm runoff will be collected in catch basins around the site and discharge to a catch basin in Redd Road, proposed as part of the Redd Road extension. The building roof runoff will collect in underdrains and connect to catch basins at the front and rear of the building. The landscaped area behind the building and on the east side of the building will be graded to provided adequate drainage to several yard drains. Appendix 2 shows a drainage area map to each catch basin for pipe network sizing and includes off site drainage. Water Quality Water quality for the proposed Christian Brothers site will be treated off-site on the Aria Development. Water quality will be provided with 3 mechanical water quality units sized to serve both the multi-family development and the Michigan Road Retail Site Development, which includes the Christian Brothers site. Please refer to the “Stormwater Technical Report for Michigan Road Site” which was approved for the Aria Development and Michigan Road Retail Development for more details on the water quality units. Detention Basins Stormwater detention and restricted release will be provided by a large detention basin on the Aria Development site. This detention basin will store water for the multi-family development and the Michigan Road Retail Site Development, which includes the Christian Brothers site. Appendix 3 shows a drainage area map used for detention sizing calculations. The runoff curve number for the proposed Christian Brothers site is 91 and the detention sizing calculations assumed a runoff curve number of 92.8 for this commercial development. Please refer to the “Stormwater Technical Report for Michigan Road Site” which was approved for the Aria Development and Michigan Road Retail Development for more details on the detention sizing and release rates. February 3, 2023 Page 90 of 103 STORMWATER MANAGEMENT PLAN Christian Brothers Automotive Service Center 70050012 Stormwater Management Plan APPENDIX 1 Existing Conditions Drainage Area Map February 3, 2023 Page 91 of 103 XXOHE900900 9009019 0 1 90 1900899 900 899 901898898 1"= DRAINAGE AREA MAP - EXISTING CONDITIONS 40'040' ISSUANCES DRAWN BY PROFESSIONAL PROJECT MANAGER FILE NUMBER CHECKED BY 1811 4 Mile Rd NE Grand Rapids, MI 49525 616.361.2664 www.progressiveae.comTHIS DOCUMENT HAS BEEN PREPARED BY PROGRESSIVE AE AS AN INSTRUMENT OF SERVICE, AND PROGRESSIVE AESHALL RETAIN ALL COMMON LAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING THE COPYRIGHT THERETO.7/31/2019 2:55:36 PMP:\70050012\WIP DRAWINGS\Drainage Area Map.dwg shortjCHRISTIAN BROTHERS AUTOMOTIVEPROPOSED SERVICECENTERCARMEL, INDIANA70050012 JPM JPM JRS DRAINAGE AREA MAP - EXISTING CONDITIONS DRAINAGE AREA PERVIOUS AREA IMPERVIOUS AREA RUNOFF CURVE NUMBER TOTAL PROPERTY AREA 1.23 Ac 1.23 Ac 0.00 Ac 90 PERVIOUS AREA IS FALLOW CROP RESIDUE (CR) IN GOOD CONDITION - HYDROLOGIC SOIL GROUP D - EXISTING FALLOW LAND February 3, 2023 Page 92 of 103 STORMWATER MANAGEMENT PLAN Christian Brothers Automotive Service Center 70050012 Stormwater Management Plan APPENDIX 2 Post-Development Drainage Area Map – Pipe Network Sizing February 3, 2023 Page 93 of 103 WCB-1 CB-2 CB-3 YD-3A YD-3B YD-3C CB-5 CB-4 CO CO CO CO CO 900900 9009019 0 1 90 1900899 900 899 901898898 900 901 900900901900 900901 901 YD-5A 1"= DRAINAGE AREA MAP - PIPE NETWORK SIZING 40'040' ISSUANCES DRAWN BY PROFESSIONAL PROJECT MANAGER FILE NUMBER CHECKED BY 1811 4 Mile Rd NE Grand Rapids, MI 49525 616.361.2664 www.progressiveae.comTHIS DOCUMENT HAS BEEN PREPARED BY PROGRESSIVE AE AS AN INSTRUMENT OF SERVICE, AND PROGRESSIVE AESHALL RETAIN ALL COMMON LAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING THE COPYRIGHT THERETO.7/31/2019 2:55:25 PMP:\70050012\WIP DRAWINGS\Drainage Area Map.dwg shortjCHRISTIAN BROTHERS AUTOMOTIVEPROPOSED SERVICECENTERCARMEL, INDIANA70050012 JPM JPM JRS CATCH BASIN DRAINAGE AREA PERVIOUS AREA IMPERVIOUS AREA CB-1 0.08 Ac 0.03 Ac 0.05 Ac CB-2 0.01 Ac 0.01 Ac 0.00 Ac CB-3 0.05 Ac 0.00 Ac 0.05 Ac CB-4 0.17 Ac 0.03 Ac 0.14 Ac CB-5 0.28 Ac 0.02 Ac 0.26 Ac YD-3A 0.34 Ac (0.25 Ac off-site) 0.33 Ac 0.01 Ac YD-3B 0.23 Ac (0.14 Ac off-site) 0.19 Ac 0.04 Ac YD-3C 0.20 Ac (0.01 Ac off-site) 0.18 Ac 0.02 Ac YD-5A 0.29 Ac (0.24 Ac off-site) 0.28 Ac 0.01 Ac DRAINAGE AREA TO CBA CATCH BASINS 1.65 Ac 1.07 Ac 0.58 Ac Total Off-site drainage area to CBA catch basins = 0.64 Acres DRAINAGE AREA MAP - PIPE NETWORK SIZING - ON-SITE DRAINAGE AREA - OFF-SITE DRAINAGE AREA - PERVIOUS AREA February 3, 2023 Page 94 of 103 STORMWATER MANAGEMENT PLAN Christian Brothers Automotive Service Center 70050012 Stormwater Management Plan APPENDIX 3 Post-Development Drainage Area Map – Detention Sizing February 3, 2023 Page 95 of 103 XXCB-1 CB-2 CB-3 YD-3A YD-3B YD-3C CB-5 CB-4 CO CO CO CO CO 900900 9009019 0 1 90 1900899 900 899 901898898 YD-5A 1"= DRAINAGE AREA MAP - DETENTION SIZING 40'040' - PERVIOUS AREA ISSUANCES DRAWN BY PROFESSIONAL PROJECT MANAGER FILE NUMBER CHECKED BY 1811 4 Mile Rd NE Grand Rapids, MI 49525 616.361.2664 www.progressiveae.comTHIS DOCUMENT HAS BEEN PREPARED BY PROGRESSIVE AE AS AN INSTRUMENT OF SERVICE, AND PROGRESSIVE AESHALL RETAIN ALL COMMON LAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING THE COPYRIGHT THERETO.7/31/2019 2:55:31 PMP:\70050012\WIP DRAWINGS\Drainage Area Map.dwg shortjCHRISTIAN BROTHERS AUTOMOTIVEPROPOSED SERVICECENTERCARMEL, INDIANA70050012 JPM JPM JRS DRAINAGE AREA MAP - DETENTION SIZING DRAINAGE AREA PERVIOUS AREA IMPERVIOUS AREA RUNOFF CURVE NUMBER RATIONAL RUNOFF COEFFICIENT TOTAL PROPERTY AREA 1.23 Ac 0.50 Ac 0.73 Ac 91 0.59 * PERVIOUS AREA IS OPEN SPACE IN GOOD CONDITION - HYDROLOGIC SOIL GROUP D *IMPERVIOUS AREA IS PAVED PARKING LOTS, ROOFS, AND DRIVEWAYS - HYDROLOGIC SOIL GROUP D * DETENTION CALCULATIONS FOR ARIA APARTMENT DETENTION BASIN ASSUMED A RUNOFF CURVE NUMBER OF 92.8 FOR THIS PROPERTY. - IMPERVIOUS AREA February 3, 2023 Page 96 of 103 US 421 (MICHIGAN ROAD)GGGGWOHUOHUOHUOHUOHUOHUOHUOHUOHU OHU OHU OHU OHU ANDRADEDRIVELOT 2 0.25 AC LOT 1 5.86 ACLOT 3 14.56 AC WWWEST O N P O I N T E D R I V E REDD ROADOFF-N 0.39 AC OFF-E 0.41 AC DIR-N 0.17 AC DIR-S 1.22 AC DEV 13.99 AC FUT DEV 5.86 AC FIGURE 3.2POST-DEVELOPED BASIN MAPDate: June 29, 2018WEIHEweihe.netIndianapolis, Indiana 4628010505 N. College Avenue317 | 846 - 6611E N G I N E E R SMICHIGAN ROAD SITEZIONSVILLE, INFebruary 3, 2023 Page 97 of 103 Basin Type of Cover/ Percent Weighted Name A B C D Condition of Cover of Basin A B C D CN DEV 0% 0% 39% 61% Impervious (Pond Area) 8% 98 98 98 98 98.0 0% 0% 39% 61% Commercial 70% 89 92 94 95 94.6 0% 0% 39% 61% Open Space, Good Cond. 22% 39 61 74 80 77.7 DEV 100%91.2 FUT DEV 0% 0% 48% 52% Commercial 90% 89 92 94 95 94.5 0% 0% 48% 52% Open Space, Good Cond. 10% 39 61 74 80 77.1 FUT DEV 92.8 OFF-N 0% 80% 20% 0% Impervious 2% 98 98 98 98 98.0 0% 80% 20% 0% Open Space, Good Cond. 98% 39 61 74 80 63.6 OFF-N 64.3 OFF-E 0% 70% 30% 0% Impervious 12% 98 98 98 98 98.0 0% 70% 30% 0% Open Space, Good Cond. 88% 39 61 74 80 64.9 OFF-E 68.9 Weighted Curve Project:Michigan Road Site Number Calculations Date:6/29/2018 Prepared By:TPG Soil Group %Curve Number (CN) Job No.:W17-0567 Proposed Conditions Checked By:KCS February 3, 2023 Page 98 of 103 WinTR-55 Current Data Description --- Identification Data --- User: ShortJ Date: 7/31/2019 Project: 70050012 - CBA Carmel Units: English SubTitle: Stormwater Runoff Calculations Areal Units: Acres State: Indiana County: Hamilton NOAA_A Filename: P:\70050012\WIP DRAWINGS\Civil\Calcs\TR-55 Stormwater Runoff Data - Drainage Area and Total Property.w55 --- Sub-Area Data --- Name Description Reach Area(ac) RCN Tc ------------------------------------------------------------------------------ CBA SITE PROPERTY AREA Outlet 1.23 91 .145 Total area: 1.23 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) (in) (in) (in) -------------------------------------------------------------------------------- 2.85 3.53 4.06 4.81 5.4 6.02 2.37 Storm Data Source: Hamilton NOAA_A County, IN (NRCS) Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> WinTR-55, Version 1.00.10 Page 1 7/31/2019 1:45:27 PM February 3, 2023 Page 99 of 103 ShortJ 70050012 - CBA Carmel Stormwater Runoff Calculations Hamilton NOAA_A County, Indiana Sub-Area Land Use and Curve Number Details Sub-Area Hydrologic Sub-Area Curve Identifier Land Use Soil Area Number Group (ac) -------------------------------------------------------------------------------- CBA SITE Open space; grass cover > 75% (good) D .5 80 Paved parking lots, roofs, driveways D .73 98 Total Area / Weighted Curve Number 1.23 91 ==== == WinTR-55, Version 1.00.10 Page 1 7/31/2019 1:45:27 PM February 3, 2023 Page 100 of 103 STORMWATER MANAGEMENT PLAN Christian Brothers Automotive Service Center 70050012 Stormwater Management Plan APPENDIX 4 Stormwater Design Calculations February 3, 2023 Page 101 of 103 Storm-Drainage Design Summary - Rational MethodProject Name:Christian Brothers Auto - Carmel, INDesigned By:JRSChecked By:JPMProject #:70050012Date:4/11/2019Date:Project Location:Carmel, IndianaModified:7/15/2019Design Assumptions:Manning's Equation where n =0.013 Concrete PipeDesign Storm =10-YearALL NON-SHADED CELLS ARE INPUT CELLS.Min Tc =5.00min123456789101112131415161718192021222324252627282930Proposed Pipe NetworkDrainage Areas & CDesign FlowFull Flow ConditionsHydraulic Grade Line ElevationActual Flow ConditionsUpper Structure IDLower Structure IDPipe DiameterPipe LengthDesign Slope of Pipe (S)Upper Invert ElevationLower Invert ElevationUpper Rim ElevationLower Rim ElevationInlet Drainage Area (acres)Weighted Runoff Coefficient "C"Time of Concentration (min)Inlet C x ASum of C x ARainfall Intensity (in/hr)Total Runoff Design Flow (cfs)Flowing Full Pipe Capacity Q=C1xS1/2 (cfs)Manning's "C1" Factor(1.49/n) x AxR2/3Velocity (ft/s)Time of Flow (min)Slope of Energy Grade Line (ft/ft)Frictional Losses (ft)Minor Losses 1/2(V2/2g) (ft)Total Hydraulic Head Loss (ft) HGL Upper* HGL LowerDepth of Hydraulic Grade Line below Upper Rim ElevationVelocityDepth of Flow (feet)Percent Full(D/do)YD-3CYD-3B12100 0.38%895.70 895.32899.20899.000.200.325.000.06 0.066.12 0.39 2.20 35.63 2.800.600.000 0.012 0.030 0.042 895.96 895.923.241.960.2525.00%YD-3BYD-3A12100 0.30%895.22 894.92899.00898.900.230.375.600.09 0.156.12 0.91 1.95 35.63 2.480.670.001 0.065 0.043 0.109 895.92 895.813.082.360.4545.00%YD-3ACB-31289 0.30%894.82 894.56898.90899.750.340.276.270.09 0.246.12 1.47 1.95 35.63 2.480.600.002 0.152 0.055 0.207 895.81 895.603.092.670.6060.00%YD-5ACB-512 193.7 0.40%896.34 895.56899.90900.000.290.285.000.08 0.086.12 0.50 2.25 35.63 2.871.130.000 0.039 0.038 0.077 896.38 896.303.522.220.3030.00%CB-5CB-412 102.5 0.50%895.46 894.95900.00898.850.280.906.130.25 0.346.12 2.05 2.52 35.63 3.210.530.003 0.339 0.097 0.436 896.30 895.873.703.530.6565.00%CB-4CB-31584 0.35%894.85 894.56898.85899.750.170.856.660.15 0.486.12 2.95 3.82 64.60 3.110.450.002 0.175 0.091 0.266 895.87 895.602.983.430.8165.00%CB-3CB-21821 0.25%894.46 894.40899.75900.050.050.957.110.05 0.776.12 4.73 5.25 105.05 2.970.120.002 0.043 0.087 0.129 895.60 895.474.153.341.0570.00%CB-2CB-1 1855 0.25%894.30 894.17900.05899.430.010.367.220.00 0.786.12 4.76 5.25 105.05 2.970.310.002 0.113 0.087 0.200 895.47 895.274.583.341.0570.00%CB-1 CB 2.21846 0.25%894.07893.95 899.43n/a0.080.707.530.05 0.836.12 5.09 5.25 105.05 2.970.260.002 0.108 0.089 0.197 895.27 895.084.163.391.1375.00% Total Drainage Area =Total CxA = 0.83Manning's "C1" Factor = (1.49/n) x (A) x (R 2/3) * Starting HGL calculation is set based on actual depth of flow.1.65 Weighted Site "C" = 0.50Q = "C1" x S1/2 * HGL is max value of downstream HGL or actual flow elevation.* Check outlet storm sewer crown or Basin HWL for starting HGLP:\70050012\WIP DRAWINGS\Civil\Calcs\CBA Carmel - Master Storm.xlsm/Storm Sewer 10-YR8/2/2019February 3, 2023 Page 102 of 103 Project: Christian Brothers Auto - Carmel, IN Project # 70050012 Prepared By: JRS Subject: Stormwater Detention Basin Sizing Reviewed By: Date: Revised: Determination of Post-Development Peak Discharge from Site 10-year and 100-year Storm Events Rational Method Design Information: Site Information: Total Area of Proposed Development =1.23 Acres Impervious Area =0.73 Acre Pervious Area = 0.50 Impervious "C" Factor =0.90 Pervious "C" Factor =0.30 Weighted "C" Factor for Post-Development Area of Site =0.59 Storm Information: Time of Concentration = 8.00 Min 10-Year Storm Intensity (5-min) = 6.12 in/hr 100-year Storm Intensity (5-min) = 9.12 in/hr Peak Discharge Rates: 10-Year Peak Discharge = 4.47 cfs 100-Year Peak Discharge = 6.67 cfs * These rates represent the discharge from the Christian Brothers site. Restricted release to allowable rates will be accomplised from the detention basin on the Aria Development. May 30, 2019 P:\70050012\WIP DRAWINGS\Civil\Calcs\CBA Carmel - Master Storm.xlsm/STORM DISCHARGE 8/2/2019 February 3, 2023 Page 103 of 103