Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
S521 - CLADDING BACKUP ELEVATIONS
SECOND LEVEL 17'-6" SLAB ON GRADE 0'-0" B.2 C.3 D E F H K LJ MD.2 D.7C.4 D.6C.8 D.9 E.30.7A E.6 ML2 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 1 S526 ● 1 S526 ● 1 S526 ● 1 S526 ● 1 S526 ● 2 S521 ●C8x13.75C8x13.75 SEE 2/S527 6'-6"12'-5"2'-0 1/2" TB INDICATES TOP OF BEAM ELEVATION. INDICATES STEEL LOOSE LINTEL. SEE S500 FOR STEEL LINTEL SCHEDULE. INDICATES MASONRY LINTEL. SEE S400 FOR MASONRY LINTEL SCHEDULE. CLADDING BACKUP ELEVATION NOTES: 1. PROJECT ELEVATION 0'-0" = USGS 833.50". 2. SEE S000 SERIES DRAWINGS FOR GENERAL NOTES, CONCRETE SCHEDULES, DESIGN INFORMATION, AND LOADING CRITERIA. 3. SEE S100 SERIES WOOD FRAMING PLANS AND ARCHITECTURAL ELEVATIONS FOR ADDITIONAL STEEL LOOSE LINTELS NOT SHOWN ON THESE CLADDING BACKUP ELEVATIONS. 4. SEE DRAWING S525 FOR CANOPY FRAMING PLANS. LEGEND LX MLX SECOND LEVEL 17'-6" HSS12x6x1/4 HSS5x5x1/4HSS5x5x1/4TB 14'-8 1/4" 1'-8 1/2"9'-2 3/8" E.6/3 1 S527 THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP, LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND PUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP, LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP, LLC. © COPYRIGHT 2022 JAMES R. STUTZMAN, AIA, Carmel, Indiana. Carmel, Indiana 46032 317.705.7980 (fax) 355 City Center Drive 317.705.7979 (phone) Architecture / Project Management: PEDCOR DESIGN GROUP LLC Project: Sheet Number: Project Number Set Issue Date Sheet Title: Sheet Issue Date Drawn By Checked By Last Revision Date: COPYRIGHT & OWNERSHIP OF DOCUMENTS Developer: Architect: By:2/3/2023 2:20:26 PMS521 CLADDING BACKUP ELEVATIONSTHE CONCOURSE22020 550 Monon BlvdCarmel, IN 4603202/03/2023 Author JDWNOT FORCONSTRUCTIONSCALE: 1/8" = 1'-0"1 WEST CLADDING BACKUP ELEVATION SCALE: 1/8" = 1'-0"2 PARTIAL WEST ELEVATION Revision ID Transmittal Set Date Transmittal Set Name