Loading...
HomeMy WebLinkAboutEL105 - 5TH FLOOR OVERALL LIGHTING PLANM M P M P M P M P M P M P M P M P M P M P M P M P M P M MM P M P M P M PM GA GB GC G1 G4 G5 G8 GE G3 G7.5 GH GJGG 12 5 4 2 1 3 B.2 C.3 D D.5 E F H K LJ M 6 7 8 9 10 11 14 N 16 15 L.5L.1J.1 18 D.8D.3CD.1BA0.8A G7 G2 A.3 D.2 13 4.6 13.8 D.7 GF G6 G2.3 G6.7 G.9A 1.8 3.2 B.3 C.4 D.6 3.1 1.5 C.8 D.9 E.3 0.7A 0.7B G1.5 G7.6 GA.9 GIG7.9 G1.1 13.9 E.6 EL105A 1 Sim EL105B 1 Sim EL105C 1 Sim 21071 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateTHE CONCOURSECarmel, IN 46032Carmel Review550 Monon BlvdNOT FOR CONSTRUCTIONEL105 5TH FLOOR OVERALL LIGHTING PLAN 02/03/202302/03/2023 N 0 32'16'8'1/16" = 1'-0" 5TH FLOOR LIGHTING OVERALL PLAN1