Loading...
HomeMy WebLinkAboutEP101B - 1ST FLOOR POWER PLAN - AREA BFACPF J GA GB GC G1 G4 G5 G8 GE G3 G7.5 GH GJGGB.2 C.3 D D.5 E F H KJ M 6 7 8 9 10 11 L.1J.1D.8D.3CD.1BA0.8A G7 G2 D.2 D.7 GF G6 G2.3 G6.7 G.9A B.3 C.4 G1.5 G7.6 GA.9 GI G7.9 G1.1 E.6 C6 C5 C4 C3 EUH-2 SECURITY PANEL 1200A METER STACK (RESIDENTIAL) 1200A METER STACK (COMMERCIAL) C2 1200A METER STACK H1A H2AH2A CT H1A CT 1200A METER STACK (RESIDENTIAL)(COMMERCIAL) FIRE ALARM NAC PANEL SECURITY PANEL EWH-1 EWH-1 EWH-1 1 H1A- 39 H1A- 21 H1A- 29 H2A- 8 H2A- 8 H1A- 5 CUH-1 H1A- 64 H1A- 64 H1A- 64 H1A- 64 H1A- 64 H1A- 64 H2A- 8 H2A- 8 H2A- 8 H2A- 8 H2A- 40 H2A- 47 H2A- 47 H2A- 27H2A- 42 T2 E2 +48" +48"+48" H1A- 53 2 H1A- 53 H1A- 44 H1A- 44 AC-1 2H1A- 51 H1A- 51 H1A- 46 H1A- 46 AC-2 EUH-3 EUH-3 EUH-3 EUH-3 EUH-3 EWH-2 C5- 30,32 C5- 23,25 C5- 1,3 C5- 6,8 C5- 10,12 H1A- 69 H2A- 64,66,68 3 H2A- 1 H2A- 21 H2A- 21 FCU-104 C5- 9,11 FCU-104 FCU-104 FCU-104 FCU-104 C5- 5,7 4 C5- 26,28 C5- 2,4 H1A- 16,18 H1A- 12 EUH-1 H1A- 17,19 H2A- 24,26 H2A- 29,31 AUTO DOOR OPENER C5- 27,29 ACCU-1 ACCU-2 OI-1 EWH-2 EWH-2 EWH-2 5 H2A- 13 H2A- 65H2A- 65 H2A- 65 All work shown in this commecrial space is to be temporary to prevent fire system freezing tenant build out of this area not in scope of project unless noted explicitly. H1A- 61 6 H1A- 66 6 H1A- 64 E1 H1A CT DISCONNECT PV DISCONNECT H2A- 65H2A- 65 H2A- 18 H2A- 19 H1A- 12 H1A- 49 C1T1 H1B H2B A. SEE SHEET E-000 FOR SYMBOLS AND ABBREVIATIONS. B. SEE SHEET E-502 FOR MECHANICAL EQUIPMENT POWER SCHEDULE. C. SEE SHEETS E-503 THROUGH E-505 FOR PANEL SCHEDULES. D. SEE SHEETS E-601 FOR ELECTRICAL DETAILS. E. WIRING SYSTEM SHALL BE CONDUIT AND CONDUCTOR UNLESS NOTED OTHERWISE. USE SOLID CONDUCTOR FOR SIZE #10 AWG AND SMALLER. USE STRANDED CONDUCTOR FOR LARGER SIZES. F. ALL COVER PLATES FOR ELECTRICAL DEVICES SHALL BE OF A COLOR TO MATCH THE AREA COLOR SCHEME AS DIRECTED BY THE INTERIOR DESIGNER. G. ALL WORK SHALL COMPLY WITH ALL NATIONAL, STATE AND LOCAL CODES AND ORDINANCES PERTAINING TO THE WORK IN THIS PROJECT. H. EXPOSED CONDUIT SHALL BE RUN PARALLEL TO AND AT RIGHT ANGLES TO BUILDING LINES. I. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGNATION AND LISTING OF FIRE RATED ASSEMBLIES. COORDINATE ALL DESIGN EFFORTS WITH FIRE RESISTANCE OF MATERIALS AND CONSTRUCTION. J. ALL EXTERIOR EQUIPMENT AND DEVICES SHALL BE WEATHER PROOF AND RAIN TIGHT. K. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL INTERCONNECT WIRING FOR MECHANICAL AND PLUMBING EQUIPMENT FURNISHED BY OTHERS. GENERAL SHEET NOTES 21071 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateTHE CONCOURSECarmel, IN 46032Carmel Review GRJK550 Monon BlvdNOT FOR CONSTRUCTIONEP101B 1ST FLOOR POWER PLAN - AREA B 02/03/202302/03/2023 1/8" = 1'-0" 1ST FLOOR POWER PLAN - AREA B1 0 16'8'4' N SHEET PLAN NOTES 1 PROVIDE 120V POWER TO SECURITY PANEL AS REQUIRED BY MANUFACTURER'S DIRECTION. 2 REFER TO TELECOM VENDOR DRAWINGS FOR EXACT MDF ROOM ELECTRICAL OUTLET LAYOUTS AND REQUIREMENTS. 3 COORDINATE EXACT LOCATION OF COMPACTOR DISCONNECT WITH ARCHITECTURAL DRAWINGS. 4 INSTALL PANEL AS TEMPORARY CONSTRUCTION POWER & AS PANEL FOR HEATING ELEMENTS REQUIRED TO PREVENT FIRE SYSTEM FREEZING UNTIL TENANT BUILD OUT 5 BLOCK OUT AT THIS LOCATION FOR ELECTRICAL PODIUM POKE THROUGH. COORDINATE EXACT LOCATION WITH STRUCTURAL AND ARCHITECT. 6 EXTERIOR RECEPTS: PROVIDE WEATHERPROOF WHILE IN USE COVER.