Loading...
HomeMy WebLinkAboutET101A - 1ST FLOOR TECHNOLOGY PLAN - AREA ASSSSSS FFFF F TS FS S F SK K K K K K K K K K K K CAM K CAM S S S S S S S SF FFFFFFFFFFF FFGA GB GC G8 GE GJ 12 F K M 14 N 16 15 L.5L.1J.1 18 D.8D.3CD.1BA0.8A A.3 13 13.8 GFG.9A GA.9 G7.9 13.9 1 360 21071 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateTHE CONCOURSECarmel, IN 46032Carmel Review GRJK550 Monon BlvdNOT FOR CONSTRUCTIONET101A 1ST FLOOR TECHNOLOGY PLAN - AREA A 02/03/202302/03/2023 0 16'8'4' 1/8" = 1'-0" 1ST FLOOR TECHNOLOGY PLAN - AREA A1 N SHEET PLAN NOTES 1 COORDINAE WITH SPRINKLER CONTRACTOR AND PROVIDE FLOW SWITCHES AND TAMPER SWITCHES REQUIRED.