HomeMy WebLinkAboutH-101A - 1ST FLOOR HVAC PLAN - AREA AGA GB GC
G8
GE
G7.5
GH GJ
12
F K M
10
11
14
N
16
15
L.5L.1J.1
18
D.8D.3CD.1BA0.8A
G7
A.3
13
13.8
GF
G6.7
G.9A
G7.6
GA.9
GI
G7.9
13.9
EWH-1
EWH-1 10/10G 18/10
8ø D150
8ø D150
EWH-1
LV-4
CUH-1
EWH-2
8ø D150
D 8ø
150
COMMERCIAL/RETAIL
125
COMMERCIAL / RESTAURANT
124
COMMERCIAL
120
COMMERCIAL
119
COMMERCIAL / RESTAURANT
116
EUH-3
EUH-1
EUH-2
EUH-4
EUH-3EUH-3
EWH-2
LV-6
LV-6
LV-6
CUH-1
EUH-3 EUH-3
EUH-1
EUH-3 EUH-3
FCU-104
CUH-1
20/12
18/10
60/40
1
1
1
2
3 4 5
6
EWH-1
21071
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateTHE CONCOURSECarmel, IN 46032Carmel Review
JBAJAddressNOT FOR CONSTRUCTIONH-101A
1ST FLOOR HVAC
PLAN - AREA A
02/03/202302/03/2023
1/8" = 1'-0"
1ST FLOOR HVAC PLAN - AREA A1 N
0 16'8'4'
SHEET PLAN NOTES
1 DUCTWORK AND EQUIPMENT FOR FUTURE TENANT SPACES
SHOWN FOR COORDINATION ONLY. NOT IN PROJECT SCOPE.
2 SEE LOUVER SCHEDULE FOR VOLUME DAMPER BALANCING.
3 PROVIDE FLEXIBLE CONNECTION TO FCU DISCHARGE BEFORE
CONNECTION TO SUPPLY DUCTWORK. FURNISH AND INSTALL FIRE
DAMPER WHERE DUCT PENETRATES RATED CEILING PARTITION.
4 PROVIDE TRAPPED ¾” PLENUM-RATED CPVC CONDENSATE DRAIN
LINE FOR CONDENSATE DRAIN CONNECTION. ROUTE CONNECTION
TO NEAREST HUB-DRAIN. DO NOT BLOCK FILTER ACCESS.
5 ROUTE REFRIGERANT LINES UP TO ABOVE CEILING AND OVER TO
FURRED OUT WALL. ROUTE UP TO ROOF, THEN TO APPROPRIATE
CONDENSING UNIT. REFRIGERANT LINES SIZED PER
MANUFACTURER'S RECOMMENDATIONS.
6 OA DUCT ROUTED DOWN FROM ROOF IN CHASE. TAP OA DUCT
INTO FCU RETURN DUCT.