Loading...
HomeMy WebLinkAboutH-101A - 1ST FLOOR HVAC PLAN - AREA AGA GB GC G8 GE G7.5 GH GJ 12 F K M 10 11 14 N 16 15 L.5L.1J.1 18 D.8D.3CD.1BA0.8A G7 A.3 13 13.8 GF G6.7 G.9A G7.6 GA.9 GI G7.9 13.9 EWH-1 EWH-1 10/10G 18/10 8ø D150 8ø D150 EWH-1 LV-4 CUH-1 EWH-2 8ø D150 D 8ø 150 COMMERCIAL/RETAIL 125 COMMERCIAL / RESTAURANT 124 COMMERCIAL 120 COMMERCIAL 119 COMMERCIAL / RESTAURANT 116 EUH-3 EUH-1 EUH-2 EUH-4 EUH-3EUH-3 EWH-2 LV-6 LV-6 LV-6 CUH-1 EUH-3 EUH-3 EUH-1 EUH-3 EUH-3 FCU-104 CUH-1 20/12 18/10 60/40 1 1 1 2 3 4 5 6 EWH-1 21071 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateTHE CONCOURSECarmel, IN 46032Carmel Review JBAJAddressNOT FOR CONSTRUCTIONH-101A 1ST FLOOR HVAC PLAN - AREA A 02/03/202302/03/2023 1/8" = 1'-0" 1ST FLOOR HVAC PLAN - AREA A1 N 0 16'8'4' SHEET PLAN NOTES 1 DUCTWORK AND EQUIPMENT FOR FUTURE TENANT SPACES SHOWN FOR COORDINATION ONLY. NOT IN PROJECT SCOPE. 2 SEE LOUVER SCHEDULE FOR VOLUME DAMPER BALANCING. 3 PROVIDE FLEXIBLE CONNECTION TO FCU DISCHARGE BEFORE CONNECTION TO SUPPLY DUCTWORK. FURNISH AND INSTALL FIRE DAMPER WHERE DUCT PENETRATES RATED CEILING PARTITION. 4 PROVIDE TRAPPED ¾” PLENUM-RATED CPVC CONDENSATE DRAIN LINE FOR CONDENSATE DRAIN CONNECTION. ROUTE CONNECTION TO NEAREST HUB-DRAIN. DO NOT BLOCK FILTER ACCESS. 5 ROUTE REFRIGERANT LINES UP TO ABOVE CEILING AND OVER TO FURRED OUT WALL. ROUTE UP TO ROOF, THEN TO APPROPRIATE CONDENSING UNIT. REFRIGERANT LINES SIZED PER MANUFACTURER'S RECOMMENDATIONS. 6 OA DUCT ROUTED DOWN FROM ROOF IN CHASE. TAP OA DUCT INTO FCU RETURN DUCT.