Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
H-101B - 1ST FLOOR HVAC PLAN - AREA B
GA GB GC G1 G4 G5 G8 GE G3 G7.5 GH GJGGB.2 C.3 D D.5 E F H KJ M 6 7 8 9 10 11 G7 G2 D.2 D.7 GF G6 G2.3 G6.7 G.9A B.3 C.4 G1.5 G7.6 GA.9 GI G7.9 G1.1 E.6 LV-5 EUH-2 8ø D220 LV-4 LV-6 LV-6 LV-6 LV-6 LV-6 LV-6 EWH-1 EWH-1 EWH-1 EWH-2 EWH-2 EWH-2 EWH-2 8ø D150 D 8ø 220 G18/10 MDF City 139 MDF House 140 Elev. Lobby 107 AC-1 AC-2 ACCU-2 ACCU-1 EUH-1 EUH-3 EUH-1 8/8 H150 12/40 60/40 EUH-3 EUH-3 EUH-3 EUH-3 14/24 1 1 1 1 1 1 2 3 4 5 21071 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateTHE CONCOURSECarmel, IN 46032Carmel Review JBAJAddressNOT FOR CONSTRUCTIONH-101B 1ST FLOOR HVAC PLAN - AREA B 02/03/202302/03/2023 1/8" = 1'-0" 1ST FLOOR HVAC PLAN - AREA B1016'8'4' N SHEET PLAN NOTES 2 SEE LOUVER SCHEDULE FOR VOLUME DAMPER BALANCING. 3 PROVIDE VERTICAL BLANK OFF FOR LOUVER TO ALLOW TWO DUCT CONNECTIONS. 4 BALANCE 12/40 EA DUCT VOLUME DAMPER TO 1225 CFM. 5 BALANCE 60/40 EA DUCT VOLUME DAMPER TO 8540 CFM.