HomeMy WebLinkAboutH-102A - 2ND FLOOR HVAC PLAN - AREA AGA GB GC
G8
GE
G7.5
GH GJ
12
F K M
10
11
14
N
16
15
L.5L.1J.1
18
D.8D.3CD.1BA0.8A
G7
A.3
13
13.8
GF
G6.7
G.9A
G7.6
GA.9
GI
G7.9
13.9
LV-7
6/6 H50
EWH-1
EWH-2
FCU-105
G18/10
10/6 F100
6ø10ø8ø6ø6ø10/6 F100
10/6 F100
6ø10/6 F100
SEE 1/ H-301 FOR
ENLARGED PLAN SEE 2/ H-301 FOR
ENLARGED PLAN
SEE 2/ H-302 FOR
ENLARGED PLAN
SEE 4/ H-303 FOR
ENLARGED PLAN
SEE 3/ H-302 FOR
ENLARGED PLAN
SEE 1/ H-302 FOR
ENLARGED PLAN
SEE 5/ H-303 FOR
ENLARGED PLAN
SEE 3/ H-302 FOR
ENLARGED PLAN
SEE 4/ H-303 FOR
ENLARGED PLAN
SEE 2/ H-301 FOR
ENLARGED PLAN SEE 1/ H-301 FOR
ENLARGED PLAN
SEE 2/ H-302 FOR
ENLARGED PLAN
SEE 4/ H-302 FOR
ENLARGED PLAN
SEE 4/ H-301 FOR
ENLARGED PLAN
SEE 4/ H-301 FOR
ENLARGED PLAN
EWH-1
EWH-1
FD
FD
2
3 4 5
6
6
6
6
1
LV-6
LV-6
LV-6
FD
FD
8øFD
FD
6
21071
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateTHE CONCOURSECarmel, IN 46032Carmel Review
JBAJAddressNOT FOR CONSTRUCTIONH-102A
2ND FLOOR HVAC
PLAN - AREA A
02/03/202302/03/2023
1/8" = 1'-0"
2ND FLOOR HVAC PLAN - AREA A1016'8'4'
N
SHEET PLAN NOTES
1 SEE LOUVER SCHEDULE FOR VOLUME DAMPER BALANCING.
2 SUPPLY AND RETURN DUCTWORK UP TO LEVEL ABOVE. PROVIDE FIRE
DAMPERS WHERE DUCTWORK PENETRATES FIRE-RATED FLOOR ASSEMBLY.
3 PROVIDE FLEXIBLE CONNECTION TO FCU DISCHARGE BEFORE CONNECTION
TO SUPPLY DUCTWORK. FURNISH AND INSTALL FIRE DAMPER WHERE DUCT
PENETRATES RATED CEILING PARTITION.
4 PROVIDE TRAPPED ¾” PLENUM-RATED CPVC CONDENSATE DRAIN LINE FOR
CONDENSATE DRAIN CONNECTION. ROUTE CONNECTION TO NEAREST
HUB-DRAIN. DO NOT BLOCK FILTER ACCESS.
5 ROUTE REFRIGERANT LINES UP TO ABOVE CEILING AND OVER TO FURRED
OUT WALL. ROUTE UP TO ROOF, THEN TO APPROPRIATE CONDENSING UNIT.
REFRIGERANT LINES SIZED PER MANUFACTURER'S RECOMMENDATIONS.
6 <varies>