Loading...
HomeMy WebLinkAboutH-102A - 2ND FLOOR HVAC PLAN - AREA AGA GB GC G8 GE G7.5 GH GJ 12 F K M 10 11 14 N 16 15 L.5L.1J.1 18 D.8D.3CD.1BA0.8A G7 A.3 13 13.8 GF G6.7 G.9A G7.6 GA.9 GI G7.9 13.9 LV-7 6/6 H50 EWH-1 EWH-2 FCU-105 G18/10 10/6 F100 6ø10ø8ø6ø6ø10/6 F100 10/6 F100 6ø10/6 F100 SEE 1/ H-301 FOR ENLARGED PLAN SEE 2/ H-301 FOR ENLARGED PLAN SEE 2/ H-302 FOR ENLARGED PLAN SEE 4/ H-303 FOR ENLARGED PLAN SEE 3/ H-302 FOR ENLARGED PLAN SEE 1/ H-302 FOR ENLARGED PLAN SEE 5/ H-303 FOR ENLARGED PLAN SEE 3/ H-302 FOR ENLARGED PLAN SEE 4/ H-303 FOR ENLARGED PLAN SEE 2/ H-301 FOR ENLARGED PLAN SEE 1/ H-301 FOR ENLARGED PLAN SEE 2/ H-302 FOR ENLARGED PLAN SEE 4/ H-302 FOR ENLARGED PLAN SEE 4/ H-301 FOR ENLARGED PLAN SEE 4/ H-301 FOR ENLARGED PLAN EWH-1 EWH-1 FD FD 2 3 4 5 6 6 6 6 1 LV-6 LV-6 LV-6 FD FD 8øFD FD 6 21071 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateTHE CONCOURSECarmel, IN 46032Carmel Review JBAJAddressNOT FOR CONSTRUCTIONH-102A 2ND FLOOR HVAC PLAN - AREA A 02/03/202302/03/2023 1/8" = 1'-0" 2ND FLOOR HVAC PLAN - AREA A1016'8'4' N SHEET PLAN NOTES 1 SEE LOUVER SCHEDULE FOR VOLUME DAMPER BALANCING. 2 SUPPLY AND RETURN DUCTWORK UP TO LEVEL ABOVE. PROVIDE FIRE DAMPERS WHERE DUCTWORK PENETRATES FIRE-RATED FLOOR ASSEMBLY. 3 PROVIDE FLEXIBLE CONNECTION TO FCU DISCHARGE BEFORE CONNECTION TO SUPPLY DUCTWORK. FURNISH AND INSTALL FIRE DAMPER WHERE DUCT PENETRATES RATED CEILING PARTITION. 4 PROVIDE TRAPPED ¾” PLENUM-RATED CPVC CONDENSATE DRAIN LINE FOR CONDENSATE DRAIN CONNECTION. ROUTE CONNECTION TO NEAREST HUB-DRAIN. DO NOT BLOCK FILTER ACCESS. 5 ROUTE REFRIGERANT LINES UP TO ABOVE CEILING AND OVER TO FURRED OUT WALL. ROUTE UP TO ROOF, THEN TO APPROPRIATE CONDENSING UNIT. REFRIGERANT LINES SIZED PER MANUFACTURER'S RECOMMENDATIONS. 6 <varies>