HomeMy WebLinkAboutH-102C - 2ND FLOOR HVAC PLAN - AREA CGA GB GC
G1
GE GH GJGG
5
4
2
1
3
B.2 C.3 D D.5 E F H K LJ M
6
G2
D.2
4.6
D.7
GFG.9A
1.8
0.1
3.2
B.3 C.4 D.6
3.1
1.5
C.8 D.9 E.3
0.7A
0.7B
G1.5
GA.9
GI
G1.1
E.6
H 6/6
50
EWH-1
EWH-2
G18/10
SEE 3/ H-303 FOR
ENLARGED PLAN
SEE 6/ H-301 FOR
ENLARGED PLAN
SEE 2/ H-303 FOR
ENLARGED PLAN
SEE 2/ H-303 FOR
ENLARGED PLAN
SEE 5/ H-301 FOR
ENLARGED PLAN
SEE 5/ H-302 FOR
ENLARGED PLAN
SEE 4/ H-301 FOR
ENLARGED PLAN
FD
FD
1
2
8ø 8øFD
12/6 F220
3
21071
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateTHE CONCOURSECarmel, IN 46032Carmel Review
JBAJAddressNOT FOR CONSTRUCTIONH-102C
2ND FLOOR HVAC
PLAN - AREA C
02/03/202302/03/2023
1/8" = 1'-0"
2ND FLOOR HVAC PLAN - AREA C1016'8'4'
N
SHEET PLAN NOTES
1 PROVIDE CEILING RADIATION DAMPER AT ALL LOCATIONS WHERE GRILLES
PENETRATE A FIRE RATED CEILING.
2 SUPPLY AND RETURN DUCTWORK UP TO LEVEL ABOVE. PROVIDE FIRE
DAMPERS WHERE DUCTWORK PENETRATES FIRE-RATED FLOOR ASSEMBLY.
3 COORDINATE DUCT ROUTING WITH ELECTRICAL CONDUIT AND CIRCUIT
ROUTING.