Loading...
HomeMy WebLinkAboutH-103A - 3RD FLOOR HVAC PLAN - AREA AGA GB GC G8 GE G7.5 GH GJ 12 F K M 10 11 14 N 16 15 L.5L.1J.1 18 D.8D.3CD.1BA0.8A G7 A.3 13 13.8 GF G6.7 G.9A G7.6 GA.9 GI G7.9 13.9 LV-7 6/6 H50 EWH-1 10/6 F100 10/6 F100 6ø 6ø8ø 10/10G18/10 6ø10/6 F100 SEE 1/ H-301 FOR ENLARGED PLAN SEE 2/ H-301 FOR ENLARGED PLAN SEE 2/ H-302 FOR ENLARGED PLAN SEE 4/ H-303 FOR ENLARGED PLAN SEE 3/ H-302 FOR ENLARGED PLAN SEE 1/ H-302 FOR ENLARGED PLAN SEE 3/ H-302 FOR ENLARGED PLAN SEE 4/ H-303 FOR ENLARGED PLAN SEE 2/ H-301 FOR ENLARGED PLAN SEE 1/ H-301 FOR ENLARGED PLAN SEE 2/ H-302 FOR ENLARGED PLAN SEE 4/ H-302 FOR ENLARGED PLAN SEE 4/ H-301 FOR ENLARGED PLAN SEE 4/ H-301 FOR ENLARGED PLAN SEE 3/ H-301 FOR ENLARGED PLAN EWH-2 EWH-1 EWH-1 EWH-2 10/6 F100 FD FD FD FD 1 2 22 2 21071 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateTHE CONCOURSECarmel, IN 46032Carmel Review JBAJAddressNOT FOR CONSTRUCTIONH-103A 3RD FLOOR HVAC PLAN - AREA A 02/03/202302/03/2023 1/8" = 1'-0" 3RD FLOOR HVAC PLAN - AREA A1 N 0 16'8'4' SHEET PLAN NOTES 1 SEE LOUVER SCHEDULE FOR VOLUME DAMPER BALANCING. 2 PROVIDE CEILING RADIATION DAMPER AT ALL LOCATIONS WHERE GRILLES PENETRATE A FIRE RATED CEILING.