HomeMy WebLinkAboutH-103A - 3RD FLOOR HVAC PLAN - AREA AGA GB GC
G8
GE
G7.5
GH GJ
12
F K M
10
11
14
N
16
15
L.5L.1J.1
18
D.8D.3CD.1BA0.8A
G7
A.3
13
13.8
GF
G6.7
G.9A
G7.6
GA.9
GI
G7.9
13.9
LV-7
6/6 H50
EWH-1
10/6 F100
10/6 F100 6ø 6ø8ø 10/10G18/10
6ø10/6 F100
SEE 1/ H-301 FOR
ENLARGED PLAN SEE 2/ H-301 FOR
ENLARGED PLAN
SEE 2/ H-302 FOR
ENLARGED PLAN
SEE 4/ H-303 FOR
ENLARGED PLAN
SEE 3/ H-302 FOR
ENLARGED PLAN
SEE 1/ H-302 FOR
ENLARGED PLAN
SEE 3/ H-302 FOR
ENLARGED PLAN
SEE 4/ H-303 FOR
ENLARGED PLAN
SEE 2/ H-301 FOR
ENLARGED PLAN SEE 1/ H-301 FOR
ENLARGED PLAN
SEE 2/ H-302 FOR
ENLARGED PLAN
SEE 4/ H-302 FOR
ENLARGED PLAN
SEE 4/ H-301 FOR
ENLARGED PLAN
SEE 4/ H-301 FOR
ENLARGED PLAN
SEE 3/ H-301 FOR
ENLARGED PLAN
EWH-2
EWH-1
EWH-1
EWH-2
10/6 F100
FD
FD
FD
FD
1 2
22
2
21071
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateTHE CONCOURSECarmel, IN 46032Carmel Review
JBAJAddressNOT FOR CONSTRUCTIONH-103A
3RD FLOOR HVAC
PLAN - AREA A
02/03/202302/03/2023
1/8" = 1'-0"
3RD FLOOR HVAC PLAN - AREA A1 N
0 16'8'4'
SHEET PLAN NOTES
1 SEE LOUVER SCHEDULE FOR VOLUME DAMPER BALANCING.
2 PROVIDE CEILING RADIATION DAMPER AT ALL LOCATIONS WHERE GRILLES
PENETRATE A FIRE RATED CEILING.