Loading...
HomeMy WebLinkAboutH-103B - 3RD FLOOR HVAC PLAN - AREA BGA GB GC G1 G4 G5 G8 GE G3 G7.5 GH GJGGB.2 C.3 D D.5 E F H KJ M 6 7 8 9 10 11 G7 G2 D.2 D.7 GF G6 G2.3 G6.7 G.9A B.3 C.4 G1.5 G7.6 GA.9 GI G7.9 G1.1 E.6 LV-7 12/40 H1225 LV-7 EWH-2 EWH-2 10/6 F100 EWH-2 6/6 H50 EWH-1 EWH-2 G18/10 6øSEE 4/ H-301 FOR ENLARGED PLAN SEE 4/ H-301 FOR ENLARGED PLAN SEE 4/ H-301 FOR ENLARGED PLAN SEE 4/ H-301 FOR ENLARGED PLAN SEE 4/ H-301 FOR ENLARGED PLAN SEE 4/ H-301 FOR ENLARGED PLAN EWH-1 EWH-1 1 2 1 2 FD FD FD 12/6 F220 21071 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateTHE CONCOURSECarmel, IN 46032Carmel Review JBAJAddressNOT FOR CONSTRUCTIONH-103B 3RD FLOOR HVAC PLAN - AREA B 02/03/202302/03/2023 1/8" = 1'-0" 3RD FLOOR HVAC PLAN - AREA B1016'8'4' N SEE 4/H-301 FOR ENLARGED PLAN SEE 4/H-301 FOR ENLARGED PLAN SEE 4/H-301 FOR ENLARGED PLAN SEE 4/H-301 FOR ENLARGED PLAN SEE 4/H-301 FOR ENLARGED PLAN SHEET PLAN NOTES 1 SEE LOUVER SCHEDULE FOR VOLUME DAMPER BALANCING. 2 PROVIDE CEILING RADIATION DAMPER AT ALL LOCATIONS WHERE GRILLES PENETRATE A FIRE RATED CEILING.