HomeMy WebLinkAboutH-105B - 5TH FLOOR HVAC PLAN - AREA BGA GB GC
G1
G4
G5
G8
GE
G3
G7.5
GH GJGGB.2 C.3 D D.5 E F H KJ M
6
7
8
9
10
11
G7
G2
D.2 D.7 GF
G6
G2.3
G6.7
G.9A B.3 C.4
G1.5
G7.6
GA.9
GI
G7.9
G1.1
E.6
EWH-2
EWH-2
EWH-2
G18/10
10/6 F100
6/6 H50
EWH-1
SEE 4/ H-301 FOR
ENLARGED PLAN
SEE 4/ H-301 FOR
ENLARGED PLAN
SEE 4/ H-301 FOR
ENLARGED PLAN
SEE 4/ H-301 FOR
ENLARGED PLAN
SEE 4/ H-301 FOR
ENLARGED PLAN
SEE 4/ H-301 FOR
ENLARGED PLAN
1
1
8øFD
FD
FD
12/6 F220
21071
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateTHE CONCOURSECarmel, IN 46032Carmel Review
JBAJAddressNOT FOR CONSTRUCTIONH-105B
5TH FLOOR HVAC
PLAN - AREA B
02/03/202302/03/2023
1/8" = 1'-0"
5TH FLOOR HVAC PLAN - AREA B1016'8'4'
N
SHEET PLAN NOTES
1 PROVIDE CEILING RADIATION DAMPER AT ALL LOCATIONS WHERE GRILLES
PENETRATE A FIRE RATED CEILING.