Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
H-302 - HVAC ENLARGED PLANS
T T T T T FD EF-1 EF-1 FCU-1.5 F 12/6 165 F 12/6 160 12/6 F165 F 12/6 165 F 10/4 50 12/6 F110 F 12/6 110 1 1 1 1 1 1 1 1 F 10/4 50 8ø 8ø 8ø 5ø 8ø 8ø 8ø G30/12 G30/12 2 3 4 5 6 7 4ø 5ø 5ø 4 2 2 14/10F 12/6 195 F 12/6 150 F 12/6 195 F 12/6 150 EF-1 EF-1 4ø FD FCU-1.5 F 10/4 50 F 10/4 50 5ø 6ø 8ø 6ø 9ø 14/107ø 8ø5ø 24/12 G0 24/12 G0 5ø 1 1 1 1 1 1 2 3 4 5 6 7 4 4ø 2 2 12/6 F150 EF-1 EF-1 FDFCU-1.5 F 10/4 50 12/6 F165 12/6 F165 12/6 F150 10/4 F50 F 12/6 16014/1010/105ø 7ø 5ø 4ø 5ø 7ø 6ø 5ø 7ø 7ø 7ø 1 1 1 1 1 1 1 1 3 4 5 6 7 4 22 2 20/12 G0 20/12 G0 FCU-1.5 F 12/6 155 F 12/6 100 12/6 F170 F 12/6 155 EF-1 EF-1 FD F 10/4 50 12/6 F1558ø 8ø 8ø 5ø 6ø 6ø 4ø 6ø 5ø 7ø 14/128ø 1 1 1 1 1 1 1 1 3 4 56 7 4 2 2 2 G 30/12 0G30/12 0 F 12/6 140 F 10/4 50 12/6 F180 12/6 F180 12/6 F155 12/6 F180 EF-1 FCU-1.5 FD 10/4 F50 12/6 F180 7ø 7ø 5ø 7ø 7ø 8ø G 30/12 0G30/12 0 1 1 1 1 1 1 1 3 4 5 6 7 4 2 2 2 EF-1 6ø 6ø 5ø 10/4 F5014/1021071 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateTHE CONCOURSECarmel, IN 46032Carmel Review JBAJAddressNOT FOR CONSTRUCTIONH-302 HVAC ENLARGED PLANS 02/03/202302/03/2023 0 8'4'2' 0 8'4'2' 0 8'4'2'0 8'4'2' N N N N 1/4" = 1'-0" UNIT B1 HVAC ENLARGED PLAN1 1/4" = 1'-0" UNIT B2 HVAC ENLARGED PLAN2 1/4" = 1'-0" UNIT B3 HVAC ENLARGED PLAN3 1/4" = 1'-0" UNIT B4 HVAC ENLARGED PLAN4 0 8'4'2' N 1/4" = 1'-0" UNIT B5 HVAC ENLARGED PLAN5 SHEET PLAN NOTES 1 PROVIDE CEILING RADIATION DAMPER AT ALL LOCATIONS WHERE GRILLES PENETRATE A FIRE RATED CEILING. 2 TERMINATE EXHAUST DUCT WITH WALL VENT. CUSTOM COLOR TO BE SELECTED BY ARCHITECT. BASIS OF DESIGN FOR VENT CAP IS DEFLECTO MODEL HSB4W. 3 FURNISH AND INSTALL DRYER BOX PER MANUFACTURER'S INSTRUCTIONS. MOUNT BOTTOM OF DRYER BOX AT NOMINAL 4 PROVIDE BATHROOM EXHAUST FAN EF- IN WALL. USE ONLY SMOOTH RADIUS ELBOWS (R/D = 1.5). 5 FURNISH AND INSTALL 7 DAY PROGRAMMABLE THERMOSTAT 48” AFF. 6 FURNISH AND INSTALL TRANSFER GRILLES 6” ABOVE TOP OF DOOR. SHEETMETAL TO BE INSTALLED THROUGH THE WALL. PAINT ANY STUDS THAT INTERSECT AT DIRECTION OF ARCHITECT. 7 PROVIDE FLEXIBLE CONNECTION TO FCU DISCHARGE BEFORE CONNECTION TO SUPPLY DUCTWORK. FURNISH AND INSTALL FIRE DAMPER WHERE DUCT PENETRATES RATED CEILING PARTITION.